B23-0240 - 30986 STEEPLECHASE DRFINAL
06/05/24
2
CSG 12/28/2023
*REPRINT PERMIT & JOB CARD*
Additional Address Info:
PROCEDURE FOR INSTALLATION
1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES.
2. Phone Service Coordinator at 949-361-8066 for the following:
- 3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process.
- After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do
not cover conduit without inspector's written approval to backfill.
- When trench is backfilled and compacted, CALL FOR INSPECTION.
- If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT.
3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection
Metering: Self-Contained Meter Clips: 4
Utilities Maximum Contribution to Fault Current: 22,000Phase: 1# of Wires: 3
Voltage: 120/240
Bend Info: Bend Type:
Riser Quad: Stop Trench: from PoleLadder Arms:
Standards Page: Handhole Lid Shall Read:
Structure #: SH736674Station ID #: 315-250
Temp Service Charge due on First Bill $ 0.00
Assessor's Parcel Number: Additional Information:
To minimize the electrical outage, you are advised to schedule a morning disconnect with an afternoon reconnect. There is no charge
for this service. Before you change out your meter consider (1) SDG&E needs advance notice to schedule a crew and (2) SDG&E will not
reconnect the service without municipal approval on the new panel. Please contact the City San Juan Capistrano regarding permits and
inspections. City/County inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to
allow the SDG&E crew enough time for reconnection of the service on the same day.
Number/Size of Main Switch: 1/200Service Panel Rating: 200
Conduit Size: Conduit Installed By:
Customer Phone #: 385-865-3882Customer POC: Mariah Aldana
Wanted Date: ON CITY INSP.
Job #: 530000315106
ELECTRIC UNDERGROUND METER & SERVICE LOCATION
Customer Copy
Project Title: SOT OC 30986 STEEPLECHASE SJ DR US SOLAR
Notification #: 300000568215
Project Address: 30986 STEEPLECHASE DR
Customer Type: Residential(>2 Units)
Date Prepared: 06/30/2023
Project City: SAN JUAN CAPISTRANO
SDGE Contact: Service Coordinator Contact Info: SERVICE DESK,949-361-8066
Service Type: UG REWIRE (NO TRENCHING)
TB: 0952-E6
SERVICE ATTACHMENT POINT AND/OR METER LOCATION:
Customer to install 200A meter panel at existing location over existing conduit & service conductors. Position new panel to
maintain 3x3 clear & level working space as shown on SDGE Spec 507. Customer to install new panel to meet the location of
existing landing lungs. No splicing allowed. The existing conduit & conductors are adequate for a maximum 200A main or less - if
customer installs greater than a 200A main or installs the panel otherwise, customer will be required to trench from the meter
panel to the source & install the required 3 inch DB conduit. See SDGE Service and Standards Guide pages for specifications. To
schedule, call Service Desk number listed above. Solar System Questions - www.SDGE.com/NEM - SDGE Net Energy Metering Team.
SDG&E Application Required-Call: 1-800-411-7343
Municipal Inspection required By: CITY OF SAN JUAN CAPISTRANO
Bend Installed By:
Handhole Installed By:
Traffic Control Permit Required
Excavation/Encroachment Permits Required By:
Joint Trench With:
Right of Way Required
Meter height -- 4'0'' min. (3'0" min. for multiple installation) -- 6'3" max. From finish grade to centerline of meter base. Meters are required to
be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition.
Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E
office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address
and unit number.
If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will
be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no
liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of
construction unless it is through negligence of SDG&E.
Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements.
Building address and/or houseline must be permanently identified prior to meter set. Barrier posts may be required based on field conditions
at any time prior to meter set as determined by the SDG&E Representative. Per Rule 16.A.1.a. In compliance with Section 783 of the Public
Utilities Code, SDG&E will apply only those construction and design specifications, standards, terms, and conditions that are applicable to a
new extension of service project for the 18 months following the date the application for a new extension of service project is approved. Keep
this notice with your building permit.
All installations performed under this order must meet SDG&E standards unless a written deviation has been approved.
Planned By: Elice Harris Phone#: 6196766059
SEE REV 1