B23-1170 - 25652 WINDJAMMER DRFINAL 08/01/24 Additional Address Info: PROCEDURE FOR INSTALLATION 1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES. 2. Phone Service Coordinator at 949-361-8066 for the following: - 3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process. - After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do not cover conduit without inspector's written approval to backfill. - When trench is backfilled and compacted, CALL FOR INSPECTION. - If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT. 3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection Metering: Self-Contained Meter Clips: 4 Utilities Maximum Contribution to Fault Current: 10000Phase: 1# of Wires: 3 Voltage: 120/240 Bend Info: Bend Type: Riser Quad: Stop Trench: from PoleLadder Arms: Standards Page: Handhole Lid Shall Read: Structure #: SH730372Station ID #: 195-358 Temp Service Charge due on First Bill $ 0.00 Assessor's Parcel Number: Additional Information: To minimize the electrical outage, you are advised to schedule a morning disconnect with an afternoon reconnect. There is no charge for this service. Before you change out your meter consider (1) SDG&E needs advance notice to schedule a crew and (2) SDG&E will not reconnect the service without municipal approval on the new panel. Please contact the City of San Juan Capistrano regarding permits and inspections. City of San Juan Capistrano inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to allow the SDG&E crew enough time for reconnection of the service on the same day. Number/Size of Main Switch: 1@125Service Panel Rating: 125 Conduit Size: Conduit Installed By: Customer Phone #: 951-662-2729Customer POC: Kevin Hitti Wanted Date: ON INSP Job #: 530000341887 ELECTRIC UNDERGROUND METER & SERVICE LOCATION Customer Copy Project Title: SOT OC 25652 WINDJAMMER DR US SOLAR Notification #: 300000607091 Project Address: 25652 WINDJAMMER DR Customer Type: Residential(1-2 Units) Date Prepared: 12/07/2023 Project City: SAN JUAN CAPISTRANO SDGE Contact: Service Coordinator Contact Info: SERVICE DESK,949-361-8066 Service Type: UG REWIRE (NO TRENCHING) TB: 0972-A3 SERVICE ATTACHMENT POINT AND/OR METER LOCATION: Install the new 125 amp meter panel at the existing location over existing conduit and service conductors. Customer to install the new panel to meet the location of the existing landing lugs, if the panel is installed otherwise, the customer is responsible for trenching to the source and installing 3 inch DB conduit. The existing conduit and conductors are adequate for a maximum 125 amp main or less, if the customer installs greater than a 125 amp main, the customer will be required to trench from the meter panel to the power source and install the required 3 inch DB conduit. Customer to relocate gas meter and bring meter cabinet up to standards. SDG&E Application Required-Call: 1-800-411-7343 Municipal Inspection required By: Bend Installed By: Handhole Installed By: Traffic Control Permit Required Excavation/Encroachment Permits Required By: Joint Trench With: Right of Way Required Meter height -- 4'0'' min. (3'0" min. for multiple installation) -- 6'3" max. From finish grade to centerline of meter base. Meters are required to be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition. Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address and unit number. If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of construction unless it is through negligence of SDG&E. Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements. Building address and/or houseline must be permanently identified prior to meter set. Barrier posts may be required based on field conditions at any time prior to meter set as determined by the SDG&E Representative. Per Rule 16.A.1.a. In compliance with Section 783 of the Public Utilities Code, SDG&E will apply only those construction and design specifications, standards, terms, and conditions that are applicable to a new extension of service project for the 18 months following the date the application for a new extension of service project is approved. Keep this notice with your building permit. All installations performed under this order must meet SDG&E standards unless a written deviation has been approved. Planned By: Karissa Jackson-Tarrani Phone#: 125