B23-1291 - 28189 VIA DEL MARCITY OF SAN JUAN CAPISTRANO
BUILDING PERMIT
Permit No. B23-1291
11/20/2023
ISSUED
JOB VALUE
NO UNITS
Permit Number
ISSUED BY
SITE APN
SITE LOT NO
SITE TRACT
SITE SUBDIVISION
PERMIT TYPE.
OCCUPANCY TYPE
BUILDING SF
NO STORIES
DF4
934-542-21
R3
26
13436
SAN JUAN HIILS C-2
$ 15,000
SOLAR PANEL INSTALLA
0
0
1
JOB ADDRESS: 28189 VIA DEL MAR
MEEKER & GRIBBEN, MICHAEL & ELIZABETHOWNER NAME
28189 VIA DEL MARMAILING ADDRESS
CITY,STATE,ZIP
CONTRACTOR NAME
ST. LIC EXPIRE
ADDRESS
CITY, ST, ZIP
TENANT NAME
PHONE #
MAILING ADDR
CITY, ST, ZIP
I have carefully examined the completed permit application and do hereby certify under penalty of
perjury that all information hereon including the declarations are true and correct and I further
certify and agree if a permit is issued: to comply with all City, County, and State laws governing
building construction, whether specified herein or not. I also agree to save, indemnify and keep
harmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses
which may in any way accrue against said City in consequence of the granting of this permit.
Applicant's signature
Owner/Contractor
Print Name
BRIGHT LIFE SOLAR INC
933 NEWHALL ST
07/31/2025
AMOUNT
MECHANICAL PERMIT AMOUNT
Expiration:: Every permit issued shall become invalid unless the work on the site authorized by
such permit is commenced within 12 months after its issuance, or if the work authorized on the
site by such permit is suspended or abandoned for a period of 180 days after the time the work
commenced.
An OSHA permit is required for excavations over 5’0” deep and demolition or construction of
structures over 3 stories in height.
_____Contractor:I hereby affirm that I am licensed under provisions of Chapter 9 of Division 3 of the Business and Professions Code, and my license is in full force and effect.
_____Owner/Builder:I, as owner of the property, or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale. (Sec.7044, Business and Professions
Code: the Contractor’s License Laws does not apply to and owner of property who builds or improves thereon, who does such work himself or through his employees, provided that such improvements are not
intended or offered for sale. If however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale)
______Owner/Builder:I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor’s License Law does not
apply to an owner of property who builds or improves thereon and who contracts for such projects with a contractor’s) license pursuant to the Contractor’s License Law.
_______ Workers Compensation-I hereby affirm under penalty of perjury one of the following declarations:I have and will maintain workers’ compensation insurance, as required by Section 3700 of the
Labor Code, for the performance of the work for which this permit is issued. My workers’ compensation insurance carrier and policy number are: Carrier__STATE COMPENSATION INSURANCE
FUND Policy#9053332 (This section needs to be completed if the permit is for one hundred dollars($100) or less)
AMOUNTELECTRICAL PERMIT
DESCRIPTION
_______Exemption:I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers’ compensation laws of
California and agree that if I should become subject to the workers’ compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
WARNING:FAILURE TO SECURE WORKERS’COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TI CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED
THOUSDAND DOLLARS($100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES.
B23-1291
Total Electrical
Total Plumbing
Total Mechanical
Total Mobile Home
1029267
,
COSTA MESA, CA 92627
SAN JUAN CAPISTRANO, CA 92675
(310) 433-8743
(908) 489-3933
PHONE
PHONE
Date _________________ Applicant _______________________________________
MOBILE HOME PERMIT AMOUNT
19 ROOF MOUNTED SOLAR PANELS. 7.065 AC SYSTEM.
PLUMBING PERMIT
Vin Barba
VB
VB
FINAL
03/04/24
Date:
Permit No.
Applicant:
Phone/E-Mail
Job Location:
CITY OF SAN JUAN CAPISTRANO
BUILDING PERMIT FEES
Account # Type Cost
01-44221 Building Permit
01-44223 Mechanical
01-44224 Plumbing
01-44225 Electrical
01-44221 Mobile Home Permit
01-44222 Grading Permit Fee
01-44231 Grading Plan Check
01-44222 On-Site Residential Permit
01-44231 On-Site Residential Plan Check
Subtotal
01-44230 Bond Processing
01-44230 Building Plan Check
01-44230 Additional Plan Check
01-44230 Digital Record Fee ($1.00 per sheet)
01-44221 C & D Administrative Fee
01-44221 Special Inspection-Reinspection
01-44222 On-Site Commercial/Tract Permit Fee
01-44231 On-Site Commercial/Tract Plan Check Fee
01-44214 Geotechnical Soils Plan Review
10-44320 Ordinance 211
10-42510 Ordinance 364
01-45354 Copies @ .20 Each
90-23331 SMIP Fee
33-44370 H.O.P.E. Fee (Housing in Lieu)
Other Fees
TCA Fees Date Received
HOA Approval Date Received
School Fees Date Received
Engineering Fees Date Received
Water Division Fees Date Received
01-44221
01-44221
01-44240
90-23000
90-23000
TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO
Receipt # _________ Date: ______________ Cashier: _____________________________
Refundable Bond/Deposit Posted by ______Owner_____Contractor ________Type
Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check))
Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check)
Refundable Bond/Deposit Posted by ______Owner_____Contractor ________Type
NPDES Permit Fee (10% Permit Subtotal)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
11/20/2023
$0.00
$0.00
$0.00
11/20/2023
B23-1291
BRIGHT LIFE SOLAR INC
28189 VIA DEL MAR
(908) 489-3933
$0.00
-
Name
Address
City/State/Zip
TENANT NAME
Phone ( )
ACCESSORY DWELLING UNIT
QTY QTY QTY QTY
Light Fixtures/Fans
FAU < 100k BTU's
Fixtures/Hose Bibs
New/Setup
Outlets/Switches FAU > 100k BTU's
Water Heater
Carport
Meters/Main Panels
AC/Comp BTU=
Water Piping
Gas Systems
Awning
Signs
Exhaust Fans
Temp Power
Motors > than 1 HP
Motors < than 1 HP
Duct/Register/Grill
Pool/Spa
Pool/Spa
Extend Plumbing
APPLICANT SIGNATURE DATE
Porch
ISSUANCE
ELECTRICAL PLUMBINGMECHANICAL
ISSUANCEISSUANCE
Fireplace
ISSUANCE
Fire Sprinkler Heads
Miscellaneous
PROPERTY OWNER
Appliance Vent
CONSTRUCTION TYPE NO. OF STORIES
MOBILE HOME
PROJECT ADDRESS UNIT #:
Extend Electrical
Cabana
OCCUPANCY GROUP(S)
SPRINKLERS
PERMIT NUMBER
JOB VALUATION
Pool/Spa
Vent/Exhaust Hood
Miscellaneous
Grease Interceptor
Earthquake Bracing
Electrical Wiring
Gas Piping
Sewage Disposal
Water Piping
City of San Juan Capistrano
DeDevelopment Services Department
32400 Paseo Adelanto
SaSan Juan Capistrano, CA 92675
Phone: (949) 443-6347
Email:building@sanjuancapistrano.org
www.sanjuancapistrano.org/building
Building Sewer
ATTACHED DETACHED
NEW
CONSTRUCTION
CONVERSION OF
EXISTING STRUCTURE
JADU 1.
2.
OCCUPANCY CURRENT OCCUPANCY PROPOSED
INT. ALT.
ADDITION
PATIO
POOL/SPA
DEMOLITION
EXISTING BUILDING ____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT.
NEW BUILDING
____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT.
________________
OCC. GROUP
DESCRIPTION OF WORK
COMBINING OR SUBDIVIDING SUITES?
CHANGE OF OCCUPANCY USE?
YES NO
YES NO
YES NO
APPLICANT
CONTACT NAME
CONTACT PHONE ( )
EMAIL ADDRESS
$
PRINT NAME
As the applicant for this project, I am aware of the potential liabilities with undertaking construction within any private easement or use restriction area that may exist on this property. I acknowledge that I have or will review the Title Report for this property to ensure that this project does not impact any private easements or use restriction areas. By signing below, I CERTIFY THE ABOVE INFORMATION TO BE TRUE AND CORRECT.
CONTRACTOR State License #:
Name
Address
City/State/Zip
BUILDING PERMIT APPLICATION
LL 06/28/23
WARNING:
THIS PERMIT APPLICATION WILL EXPIRE 180 DAYS FROM
THE DATE SHOWN BELOW UNLESS THE PERMIT HAS BEEN
ISSUED OR AN EXTENSION IS APPROVED BY THE BUILDING
OFFICAL PRIOR TO APPLICATION EXPIRATION.
____/____/____
:
B23 1291
09 19 23
7.60kW DC
NO MPU/BBU7.065kW AC
GENERAL REQUIREMENTS
Y N
Y N
Y N
Y N
1.System size is 10 kW rating or less
2.Solar array is roof mounted on a one or two family dwelling OR accessory dwelling unit (ADU)
3.Solar panels/module arrays will not exceed the maximum legal building height
4.Solar system is utility interactive and without battery storage
5. New roofing material directly below the solar array may be installed by a separate roofing contractor
or the solar installation contractor. Any roofing outside of the array footprint will require a separate
permit from a licensed roofing contractor.
RESIDENTIAL PHOTOVOLTAIC
ELIGIBILITY CHECKLIST
Solar Photovoltaic (PV) Checklist for
Detached One- or Two- Family Dwellings
Instructions: The licensed contractor of record shall fill in the address of the project, contractor’s licensing
information and answer each statement with Y or N. Complete and sign the certification section.
** If any items are checked NO, plan check shall be required **
Project Address: ___________________________________________________
Contractor Company Name: ____________________________________________________
Contractor State License Number: ____________________________________________________
City of SJC Business License Number: _________________________________
City of San Juan Capistrano
DeDevelopment Services Department
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Phone: (949) 443-6347
Email: building@sanjuancapistrano.org
www.sanjuancapistrano.org/building
07/03/23 LL
1.Permit Application (Completed & Attached)
2.Signed Contract or letter of intent with the homeowner is provided with submittal
3.Structural Roof Criteria and supporting documentation is attached and stamped by a licensed design
professional
4.Electrical load calculation is required for all installations. (MUST BE COMPLETED ON CITY STANDARD
TEMPLATE)
5.SDG&E Work Order is required for all Main Panel Upgrades
6.Clear photographs required of existing main service panel and subpanels showing ALL circuit breakers/
loads and panel board/bus ratings.
7.Manufacturers Specifications required for ALL electrical components that will be installed
Y N
Y N
Y N
Y N
Y N
Y N
Y N
STRUCTURAL REQUIREMENTS
1.A completed Structural Criteria and supporting documentation is attached and stamped by a licensed
design professional for solar array attachment and/or any separate structure or racking supporting array
or equipment.
Y N
Y N
CITY SPECIFIC REQUIREMENTS
FIRE SAFETY REQUIREMENTS
1.Clear access pathways provided per OCFA and CRC guidelines
2.Fire classification solar system is provided (Class A)
3.All required markings and labels are provided
4.Diagram of the roof layout of all panels, modules, clear access pathways and approximate
locations of electrical disconnecting means and roof access points is completed and
attached
**Renewable Meter Adapter (RMA) installations must be approved by SDG&E and have a separate GEC. Any and all grounding work not performed by SDG&E, including but not limited to the RMA disconnect, will be performed by the Solar Contractor.
I certify under penalty of perjury under the laws of the State of California that the above is true and
correct. I understand that all approvals are subject to field inspection. Field corrections may
require a formal revision submitted for plan review. A re-inspection fee may be assessed when
work is not ready, inspection card and/or approved plans are not available, no access has been
provided or there is any deviation from the approved plans.:
Print Name: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Date: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
Signature: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
Phone Number:ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
Email Address: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
ELECTRICAL REQUIREMENTS
1.The PV system is interconnected to a single-phase AC service panel of nominal 120/220 Vac with
a bus bar rating of 225A or greater
2.The PV system is connected to the load side of the utility distribution equipment**
3.A Solar PV Standard Plan and supporting documentation is completed and attached
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Page 1/3
RESIDENTIAL ELECTRICAL
LOAD CALCULATION
INSTRUCTIONS: Review the electrical loads in the table below and check all that exist in the home
(be sure to include the proposed Level 2 EVCE and/or Photovoltaic System). Fill in the corresponding
wattage for each item checked, and then add up all the checked items to determine total wattage used.
Wattages shown are rough estimates: for a more precise analysis use actual values based on nameplate
ratings or consult with an electrical professional.
PROJECT ADDRESS:
_______________________________________________________________________________
STATEMENT OF COMPLIANCE:
By my signature, I attest that the information provided is true and accurate.
Name of Applicant: _________________________________________________________________
(Print Name)
Signature: __________________________________ __________
(Signature of Applicant) (Date)
Note: This form is a voluntary compliance alternative and you may wish to hire a qualified individual or
company to perform a thorough evaluation of your electrical service capacity in lieu of this
methodology. Use of this electrical load calculation worksheet is at the user’s risk and carries no implied
guarantee of accuracy. Users of this form are advised to seek professional assistance in determining the
electrical capacity of a service panel.
(Only for Service Ratings of 120/240V, 225 Amps Max)
City of San Juan Capistrano
DeDevelopment Services Department
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Phone: (949) 443-6347
Email: building@sanjuancapistrano.org
www.sanjuancapistrano.org/building
LL 05/15/23
DIANNA F.11/20/23
B23-1291
SUBJECT TO FIELD INSPECTION
Page 2/3
Check All
Applicable
Description of Load Volt-Amps on
Nameplate Rating
(Watts) Volt-Amps
Used
General Lighting/Power Load
Required Total Square footage of building times 3 sf x 3 volt-amp
Required Kitchen Small Appliance Branch Circuits
(min. 2)
1,500 volt-amps/circuit
Required Laundry Circuit (min. 1) 1,500 Volt-Amps
Appliances and Equipment Except Air Conditioner(s)
Microwave 1,400 watts
Trash Compactor 1,000 watts
Dishwasher 1,500 watts
Disposal 1,000 watts
Electric Oven 2,000 watts
Electric Range 5,000 watts
Induction Range 10,000 watts
Electric Clothes Dryer 4,000 watts
Electric Clothes Washer 500 watts
Electric Tankless Water Heater 15,000 watts
Electric Water Heater 4,000 watts
Electric Heat Pump Water Heater 550 watts
Required on new
homes
Electric Vehicle Supply Equipment (EVSE) 7,000 watts
Evaporative Cooler 500 watts
Pool or Spa 2,000 watts
Other:
Other:
Other:
Sub-Total Volt-Amps Used (add up V-A used for everything checked)
- 10,000 V-A
Subtotal (A)
x .40
Subtotal (B)
+ 10,000 V-A
Subtotal (C)
Heating and Air-Conditioning (Add the largest of the following): +
1. Air conditioning and cooling (100% of nameplate (NP) rating) =
2. Heat pump without supplemental heating (100% NP Rating) =
3. Heat pump with supplemental electric heat (100% NP plus 65%) =
4. Electrical space heating , 4 separate units (65% NP rating) =
5. Electrical space heating > 4 separate units (40% NP rating) =
6. Electrical thermal storage and other 100% NP rating =
Total Current Demand (Volt-Amps) =
Divided by 240 Volts = Amps
Total Amps Required for Service Conductors and Panel =
Rating of Existing Electrical Service or Subpanel (Amps)=
Panel Upgrade Required? (YES OR NO)
Rating of Proposed Electrical Service or Subpanel (IF YES ABOVE)=
watts
watts
watts
LL 05/15/23
Sheet Item
1-2 Wind parameters
3-4 Seismic parameters and determination of Fp
5 design loads, roof member check, wind uplift check, deflection
6 attachment check, rail span check
7 lateral check
Project Number: BLS-1935
Date:
BASIS FOR DESIGN
CODE:2022 California Building Code
ASCE 7-16
LIVE LOADS
ROOF 20.0 psf
SNOW 0.0 psf
CALCULATIONS FOR SOLAR PHOTOVOLTAIC PANELS:
Owner: Michael Meeker
Address: 28189 Via Del Mar,San Juan Capistrano,CA 92675
INDEX TO CALCULATIONS
Engineering Calculations Performed By:
Doug Engineering
5 Via Belmonte, Rancho Santa Margarita, CA 92688
949-285-5104
Engineering Calculations For:
Bright Life Solar
933 Newhall Street, Costa Mesa, CA 92627
(908) 489-3933
8/28/2023
FLUSH MOUNTED SOLAR PANELS
Type of Roof Gable
Roof Slope - = Angle of plane of roof from horizontal, in degrees
=14 deg
Mean Roof Height - Eave height will be used for <= 10deg
h = 22 ft
Building dimensions s1 = 30 ft
s2 = 30 ft
a = 10% of least horizontal dimension or 0.4h, whichever is smaller, but not less than 4% of the least
horizontal direction or 3 ft
a = 3 ft
B = Horizontal dimension of building normal to wind direction, in ft.
B = 20 ft Horizontal dimension of building
Attachment Spacing
Effective Area A = 15 ft2
p = qh(GCp)(E)(a)29.4-7
Velocity pressure Exposure Coefficients
ROOF OVERHANG Wind Exposure C
(GCp)down = 0.49 0.49 Kzt =1
(GCp)upz1 = -2 -2.5 Kd =0.85
(GCp)upz2e = -2 -2.5 Kz =0.85
(GCp)upz2n = -2.75 -3.31 Ke =1
(GCp)upz2r = -2.75 -3.31 E =1
(GCp)upz3e = -2.75 -3.77 a = 0.73
(GCp)upz3r = -3.28 -4.28
V = 110 mph
qh = 0.00256KzKztKdKeV2
qh = 22.4 psf
p = 16.352 *(GCp)
FIGURE 30.3-2B Components & Cladding h<= 60 ft: External Pressure Coefficients, (GCp), for
Enclosed and Partially Enclosed Buildings - Gable roofs 7<=20deg
ASCE 7-16
1
Wind Pressures
Wind Down - All Zones 8 psf 10 psf, MIN
ROOF OVERHANG
Zone 1 -32.7 psf -40.88 psf
Zone 2e -32.7 psf -40.88 psf
Zone 2n -44.97 psf -54.13 psf
Zone 2r -44.97 psf -54.13 psf
Zone 3e -44.97 psf -61.65 psf
Zone 3r -53.63 psf -69.99 psf
All panels are in Zones 1 and 2e
ROOF OVERHANG
Use -32.7 psf -40.88 psf
0.6*W -19.6 psf -24.5 psf
ASCE 7-16
2
Soil Site Class = D
Risk Category = II
SS = 1.329 Mapped Spectral Response acceleration in short periods
S1 = 0.496 Mapped Spectral Response acceleration at one second periods
SS< 0.25 SS= 1.0 SS>1.25 SS>1.5
0.8 0.8 0.8 0.8
0.9 0.9 1.0 1.0
1.3 1.2 1.2 1.2
1.6 1.1 1.0 1.0
2.4 - - -
----
Fa =1.200 (interpolated) SMS = Fa*SS = 1.595
Min. 1.2 per 11.4.3
S1< 0.1 S1= 0.4 S1>0.5 S1>0.6
0.8 0.8 0.8 0.8
0.8 0.8 0.8 0.8
1.5 1.5 1.5 1.4
2.4 1.6 1.5 1.7
4.2 - - -
----
Fv =1.504 (interpolated) SM1 = Fv*S1 = 0.746
SDS = 2/3 *SMS =1.063 SD1 = 2/3 *SM1 =0.497
SDS RISK CATEGORY SD1 RISK CATEGORY
> I, II III IV >I, II III IV
0A A A 0A A A
0.167 B B C 0.067 B B C
0.33 C C D 0.133 C C D
0.5 D D D 0.2 D D D
Seismic Design Category = D
1.5 1.5
B
E--
F--
2.2 2.0D
C
0.8 0.8
1.3
Table 1613.2.3(2)
0.8
Values of Site Coefficient Fv
S1= 0.2 S1= 0.3SITE CLASS
1.7
A
0.8
1.3
C
E
-F-
1.2
SITE CLASS SS= 0.5 SS= 0.75
A 0.8 0.8
B
1.2
0.9
D 1.4
0.9
ASCE 7-16
Table 1613.2.3(1)
Values of Site Coefficient Fa
Seismic Use Group =I
Seismic Design Category =D
I=1
SS = 1.329
S1 = 0.496
SMS = 1.595
SM1 = 0.746
R =6.5
Height = 11.375
T = 0.035*hn^.75 = 0.21679
r (Reliability/Redundancy Factor)=1
SDS = 1.063
SD1 = 0.497
(ASCE 7-16 12.8-2)Cs = SDS/(R/I) = 0.1635 W
(ASCE 7-16 12.8-3)Cs <= SD1/[(R/I)T] = 0.353 W
(ASCE 7-16 12.8-5)Cs >= .01 = 0.01 W
If S1>0.6g
(ASCE 7-16 12.8-5)Cs >= 0.5*S1/[R/I]= 0.000 W
V(controls)=0.1635 W
Determine Fp for seismic loading on attachments
Seismic Load on Nonstructural Components
Spacing of attachments 6 ft
Tributary width of attachments = 1/2 Panel length = 35.9 in
Ap =18.0 ft2
PV unit weight including racking = 3 psf
W p =53.85 lb
Other mechanical/electrical components
ap =1 Fp = 0.4apSDS*W p/(Rp/Ip)(1+2z/h)45.79 lb 13.3-1
Rp =1.5
Ip =1 Fp <= 1.6SDS*IpW p 91.59 lb 13.3-2
SDS = 1.063
Wp = 53.85 lb
Fp >= 0.3SDS*IpW p 17.17 lb 13.3-3
z= 22 ft
h= 22 ft
ASCE 7-16
SHEET: 7 OF 7
DATE:
DE JOB NO.:
DESIGN LOADS
Dead Loads Uplift
Roof 0.6WL
CONC. FLAT TILE 9.0 psf 0.6WL Zone 1 and 2e -19.6 psf, MIN 10 PSF
5/8" Ply shtg 1.9 Overhang -24.5 psf
Rf Frm'g 2.8 pWLdown =8.0 psf 10 psf, MIN 10 PSF
Misc. 1.5 Uplift 0.6DL+0.6WL
(N) PV System 3.0 Zone 1 0.6*3 -19.6 -17.8 psf
Zone 2 0.6*3 -24.5 -22.7 psf
Total DL 18.2 psf Downward DL+0.6WL
LL 20.0 psf PDL+WL =13.0 psf
SNOW 0.0 psf
Rafter Check
Existing 2x4 TRUSSES @ 24" o.c
Spacing 2.00 ft Trib panel width = 6 ft
E 1500000 psi Fb =900*1.5*1.15 1552.5 psi
I5.4in^4MallowWind =1110 ft-lb
Span1 4.50 ft MallowLL =867 ft-lb
Span2 3.50 ft See below for Wind Uplift loads
Span3 4.50 ft due to concentated loads at attachments
Span4 0.00 ft
d
(Distance
to Att. abR1 (lb)R2 (lb
Load
(psf)
Trib W
(ft)
P =
Wind
Uplift
Mmax
wind(ft-
lb)
P =
Wind
Down
P =
PVDL
(lb)
-1.50
1 -0.49 -0.49 4.99 487.0 -47.8 24.5 6.0 439.2 -215 179.25 53.8 233.0
2 3.37 3.37 1.13 88.2 263.1 19.6 6.0 351.3 297 179.25 53.8 233.0
3 5.31 0.81 2.69 210.0 63.2 19.6 6.0 351.3 170 179.25 53.8 233.0
4 9.17 1.17 3.33 260.0 91.3 19.6 6.0 351.3 304 179.25 53.8 233.0
10.14
Span 1 Uniform DL 4.50 41.0 41.0 9.1 psf 2.0 18.2 plf 46
Span 2 Uniform DL 3.50 31.9 31.9 9.1 psf 2.0 18.2 28
Reactions at Span1 616.2 256.3 Negative values are uplift reactions
Reactions at Span2 291.9 123.3
Mmaxwindup =189 ft-lb < 1110 ft-lb OK
Mmaxwinddown =221 ft-lb < 1110 ft-lb OK
For DL+LL including the PV system weight point loads w = 70.4 plf P = 53.8 lb
Mmax =198 ft-lb < 867 ft-lb OK
Deflection Check
DDL = 5wL4/(384EI)(5*18.2*4.5^4)*1728 = 0.042 in = L/ 1292.8 OK
384*1.5E6*5.4
PROJECT:
CLIENT:
BY:
PV Panels for Michael Meeker
Bright Life Solar
Doug Engineering
8/28/2023
BLS-1935
P = DL+WL
(lb)
SHEET: 6 OF 7
DATE:
DE JOB NO.:
CHECK SCREW ATTACHMENTS FOR WIND UPLIFT
Pwuplift =439.2 lb 5/16" Lag with min 2.5" penetration for each attachment
Table 12.2A - NDS - Lag Screw Withdrawal Values
For 5/16" Lag into .5G wood 266 lb
Allowable wind load = 1.6*2.5*266 1064 lb > 439.2 lb OK
CHECK SCREW ATTACHMENTS FOR SHEAR DUE TO SEISMIC Fp
Fp = 45.79 lb
Roof slope/module tilt 14 deg
Shear = Fp*cos(14 ) = 44.4 lb Fp sin(ang)
Tension = Fp*sin(14 ) = 11.1 lb
Fp cos(ang)
Table 11K - NDS Z = 190 lb
CD = 1.6 `
Z' = Z*CD =304 lb > 44.43 lb OK Withdrawal capacity W' = 1064 lb
Interaction Equation ft/Ft+fv/Fv 0.423 + 0.146 = 0.569 < 1 OK
RAIL SPAN CHECK
Ironridge Railing Check
Load for half a panel = 2.7'
WXR10 =62.1 plf
Per the Ironridge Structural Analysis of the Ironridge XR10 Rail
for 110 mph and 0 psf snow, the max span for XR10 Ironridge Rails is 79" for Exposure C
Use XR10 Rails with a spacing of 72" o.c. max for attachment points.
PROJECT:
CLIENT:
BY:
PV Panels for Michael Meeker
Bright Life Solar
Doug Engineering
8/28/2023
BLS-1935
SHEET: 7 OF 7
DATE:
DE JOB NO.:
LATERAL ANALYSIS
DETERMINE ADDITIONAL LOAD COMPARED TO EXISTING FOR LATERAL LOADING
Aroofexisting== 2252.3 sf W panel =45.0 lb
W roofexisting =15.2*2252.34 =34236 lb 19 *W panel = 855 lb
W wallexisting =15*80*4 =4800 lb W restofarray =279.3 lb
W existing =39036 lb W array = 1134.3 lb
V = 0.164 W
Vroofexisting =6402 lb Existing Total Lateral Force
Vroofwpanels =6588 lb New Total Later Force
% increase = 6588 increase which results in less than a 10% increase in the
6402 stress of existing lateral resisting elements OK
BY: Doug Engineering BLS-1935
PROJECT: PV Panels for Michael Meeker
CLIENT: Bright Life Solar 8/28/2023
*100%-100% = 3%