Loading...
B24-0171 - 26966 CALLE ESPERANZAFINAL 07/26/24 Additional Address Info: PROCEDURE FOR INSTALLATION 1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES. 2. Phone Operations Assistant at 949-361-8061 for the following: - 3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process. - After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do not cover conduit without inspector's written approval to backfill. - When trench is backfilled and compacted, CALL FOR INSPECTION. - If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT. 3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection Metering: Self-Contained Meter Clips: 4 Utilities Maximum Contribution to Fault Current: 10000Phase: 1# of Wires: 3 Voltage: 120/240 Bend Info: 3" 90 DEG 36"R DB60Bend Type: TRANSFORMER Riser Quad: Stop Trench: from PoleLadder Arms: Standards Page: Handhole Lid Shall Read: Structure #: D4795956979Station ID #: 795-278 Temp Service Charge due on First Bill $ 0.00 Assessor's Parcel Number: Additional Information: To minimize the electrical outage, you are advised to schedule a morning disconnect with an afternoon reconnect. There is no charge for this service. Before you change out your meter consider (1) SDG&E needs advance notice to schedule a crew and (2) SDG&E will not reconnect the service without municipal approval on the new panel. Please contact the City of San Juan Capistrano regarding permits and inspections. City/County inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to allow the SDG&E crew enough time for reconnection of the service on the same day. Number/Size of Main Switch: 1/200Service Panel Rating: 200 Conduit Size: 3"Conduit Installed By: CUSTOMER Customer Phone #: 713-446-8984Customer POC: anthony quinton Wanted Date: ON INSPECTION Job #: 530000352645 ELECTRIC UNDERGROUND METER & SERVICE LOCATION Customer Copy Project Title: SOT OC 26966 CALLE ESPERANZA DR US Notification #: 300000704099 Project Address: 26966 CALLE ESPERANZA Customer Type: Residential(1-2 Units) Date Prepared: 04/01/2024 Project City: SAN JUAN CAPISTRANO SDGE Contact: Operations Assistant Contact Info: SERVICE DESK,949-361-8061 Service Type: UG SERVICE REWIRE/RELOCATION TB: 0972-D4 SERVICE ATTACHMENT POINT AND/OR METER LOCATION: Locate the new 200 amp meter panel on the West wall, in existing location as indicated on sketch. Customer is to provide all excavation, trench, 3" conduit, backfill, compaction, 3/4" pulling and measuring tape in conduit and surface repair from transformer D4795956979 to new meter panel. Take conduit to within distance as instructed by SDG&E inspector. Prior to digging, please contact the Trench Desk at 949-361-8061 schedule a pre-meet with your trench inspector. Customer is to provide and maintain a 3 foot by 3 foot clear and level workspace in front of the new electric meter panel. See SDG&E Service and Standards Guide pages for specifications. SDG&E Application Required-Call: 1-800-411-7343 Municipal Inspection required By: CITY OF SAN JUAN CAPISTRANO Bend Installed By: SDG&E Handhole Installed By: Traffic Control Permit Required Excavation/Encroachment Permits Required By: Joint Trench With: Right of Way Required Meter height -- 4'0'' min. (3'0" min. for multiple installation) -- 6'3" max. From finish grade to centerline of meter base. Meters are required to be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition. Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address and unit number. If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of construction unless it is through negligence of SDG&E. Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements. Building address and/or houseline must be permanently identified prior to meter set. Barrier posts may be required based on field conditions at any time prior to meter set as determined by the SDG&E Representative. Per Rule 16.A.1.a. In compliance with Section 783 of the Public Utilities Code, SDG&E will apply only those construction and design specifications, standards, terms, and conditions that are applicable to a new extension of service project for the 18 months following the date the application for a new extension of service project is approved. Keep this notice with your building permit. All installations performed under this order must meet SDG&E standards unless a written deviation has been approved. Planned By: Melissa Riggs Phone#: 6196765787