B23-1133 - 26411 SHADYBROOK RDCITY OF SAN JUAN CAPISTRANO
BUILDING PERMIT
Permit No. B23-1133
08/25/2023
ISSUED
JOB VALUE
NO UNITS
Permit Number
ISSUED BY
SITE APN
SITE LOT NO
SITE TRACT
SITE SUBDIVISION
PERMIT TYPE.
OCCUPANCY TYPE
BUILDING SF
NO STORIES
DF4
650-072-10
10
$ 8,500
SOLAR PANEL INSTALLA
0
1
0
JOB ADDRESS: 26411 SHADYBROOK RD
RAY, ALEX & JESSICA,OWNER NAME
26411 SHADYBROOK RDMAILING ADDRESS
CITY,STATE,ZIP
CONTRACTOR NAME
ST. LIC EXPIRE
ADDRESS
CITY, ST, ZIP
TENANT NAME
PHONE #
MAILING ADDR
CITY, ST, ZIP
I have carefully examined the completed permit application and do hereby certify under penalty of
perjury that all information hereon including the declarations are true and correct and I further
certify and agree if a permit is issued: to comply with all City, County, and State laws governing
building construction, whether specified herein or not. I also agree to save, indemnify and keep
harmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses
which may in any way accrue against said City in consequence of the granting of this permit.
Applicant's signature
Owner/Contractor
Print Name
SOLAR OPTIMUM INC
501 W GLENOAKS
04/30/2024
AMOUNT
MECHANICAL PERMIT AMOUNT
Expiration:: Every permit issued shall become invalid unless the work on the site authorized by
such permit is commenced within 12 months after its issuance, or if the work authorized on the
site by such permit is suspended or abandoned for a period of 180 days after the time the work
commenced.
An OSHA permit is required for excavations over 5’0” deep and demolition or construction of
structures over 3 stories in height.
_____Contractor:I hereby affirm that I am licensed under provisions of Chapter 9 of Division 3 of the Business and Professions Code, and my license is in full force and effect.
_____Owner/Builder:I, as owner of the property, or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale. (Sec.7044, Business and Professions
Code: the Contractor’s License Laws does not apply to and owner of property who builds or improves thereon, who does such work himself or through his employees, provided that such improvements are not
intended or offered for sale. If however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale)
______Owner/Builder:I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor’s License Law does not
apply to an owner of property who builds or improves thereon and who contracts for such projects with a contractor’s) license pursuant to the Contractor’s License Law.
_______ Workers Compensation-I hereby affirm under penalty of perjury one of the following declarations:I have and will maintain workers’ compensation insurance, as required by Section 3700 of the
Labor Code, for the performance of the work for which this permit is issued. My workers’ compensation insurance carrier and policy number are: Carrier__CONTINENTAL INDEMNITY COMPANY
Policy#825469720101 (This section needs to be completed if the permit is for one hundred dollars($100) or less)
AMOUNTELECTRICAL PERMIT
DESCRIPTION
_______Exemption:I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers’ compensation laws of
California and agree that if I should become subject to the workers’ compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions.
WARNING:FAILURE TO SECURE WORKERS’COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TI CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED
THOUSDAND DOLLARS($100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES.
B23-1133
SERVICES: < 600V & < 200 AMPS 33.78
ELECTRICAL ISSUANCE FEE 27.24
Total Electrical 61.02
Total Plumbing
Total Mechanical
Total Mobile Home
972228
,
GLENDALE, CA 91202
SAN JUAN CAPISTRANO, CA 92675
(949) 233-2604
(818) 804-3122
PHONE
PHONE
Date _________________ Applicant _______________________________________
MOBILE HOME PERMIT AMOUNT
8 ROOF MOUNTED SOLAR PANELS. 2.97kW AC SYSTEM. 125a MPU
PLUMBING PERMIT
FINAL
01/03/24
Date:
Permit No.
Applicant:
Phone/E-Mail
Job Location:
CITY OF SAN JUAN CAPISTRANO
BUILDING PERMIT FEES
Account # Type Cost
01-44221 Building Permit
01-44223 Mechanical
01-44224 Plumbing
01-44225 Electrical
01-44221 Mobile Home Permit
01-44222 Grading Permit Fee
01-44231 Grading Plan Check
01-44222 On-Site Residential Permit
01-44231 On-Site Residential Plan Check
Subtotal
01-44230 Bond Processing
01-44230 Building Plan Check
01-44230 Additional Plan Check
01-44230 Digital Record Fee ($1.00 per sheet)
01-44221 C & D Administrative Fee
01-44221 Special Inspection-Reinspection
01-44222 On-Site Commercial/Tract Permit Fee
01-44231 On-Site Commercial/Tract Plan Check Fee
01-44214 Geotechnical Soils Plan Review
10-44320 Ordinance 211
10-42510 Ordinance 364
01-45354 Copies @ .20 Each
90-23331 SMIP Fee
33-44370 H.O.P.E. Fee (Housing in Lieu)
Other Fees
TCA Fees Date Received
HOA Approval Date Received
School Fees Date Received
Engineering Fees Date Received
Water Division Fees Date Received
01-44221
01-44221
01-44240
90-23000
90-23000
TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO
Receipt # _________ Date: ______________ Cashier: _____________________________
Refundable Bond/Deposit Posted by ______Owner_____Contractor ________Type
Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check))
Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check)
Refundable Bond/Deposit Posted by ______Owner_____Contractor ________Type
NPDES Permit Fee (10% Permit Subtotal)
$0.00
$ 61.02
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$6.10
$ 39.90
8/25/2023
$ 107.02
$0.00
$ 61.02
8/25/2023
B23-1133
SOLAR OPTIMUM INC
26411 SHADYBROOK RD
95764
(818) 804-3122
$0.00
1DPH
$GGUHVV
&LW\6WDWH=LS
7(1$171$0(
3KRQH
$&&(6625<':(//,1*81,7
47< 47< 47< 47<
/LJKW)L[WXUHV)DQV
)$8N%78
V
)L[WXUHV+RVH%LEV
1HZ6HWXS
2XWOHWV6ZLWFKHV )$8!N%78
V
:DWHU+HDWHU
&DUSRUW
0HWHUV0DLQ3DQHOV
$&&RPS%78
:DWHU3LSLQJ
*DV6\VWHPV
$ZQLQJ
6LJQV
([KDXVW)DQV
7HPS3RZHU
0RWRUV!WKDQ+3
0RWRUVWKDQ+3
'XFW5HJLVWHU*ULOO
3RRO6SD
3RRO6SD
([WHQG3OXPELQJ
$33/,&$176,*1$785('$7(
3RUFK
,668$1&(
(/(&75,&$/ 3/80%,1*0(&+$1,&$/
,668$1&(,668$1&(
)LUHSODFH
,668$1&(
)LUH6SULQNOHU+HDGV
0LVFHOODQHRXV
3523(57<2:1(5
$SSOLDQFH9HQW
&216758&7,217<3(122)6725,(6
02%,/(+20(
352-(&7$''5(6681,7
([WHQG(OHFWULFDO
&DEDQD
2&&83$1&<*52836
635,1./(56
3(50,7180%(5
-2%9$/8$7,21
3RRO6SD
9HQW([KDXVW+RRG
0LVFHOODQHRXV
*UHDVH,QWHUFHSWRU
(DUWKTXDNH%UDFLQJ
(OHFWULFDO:LULQJ
*DV3LSLQJ
6HZDJH'LVSRVDO
:DWHU3LSLQJ
&LW\RI6DQ-XDQ&DSLVWUDQR
'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW
3DVHR$GHODQWR
6D6DQ-XDQ&DSLVWUDQR&$
3KRQH
(PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ
ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ
%XLOGLQJ6HZHU
$77$&+(''(7$&+('
1(:
&216758&7,21
&219(56,212)
(;,67,1*6758&785(
-$'8
2&&83$1&<&855(17 2&&83$1&<352326('
,17$/7
$'',7,21
3$7,2
322/63$
'(02/,7,21
(;,67,1*%8,/',1*
BBBB64)7
BBBB64)7
BBBB64)7
BBBB64)7
BBBB64)7
1(:%8,/',1*
BBBB64)7
BBBB64)7
BBBB64)7
BBBB64)7
BBBB
BBBB
BBBB
BBBB
2&&*5283
'(6&5,37,212):25.
&20%,1,1*2568%',9,',1*68,7(6"
&+$1*(2)2&&83$1&<86("
<(6 12
<(6 12
<(6 12
$33/,&$17
&217$&71$0(
&217$&73+21(
(0$,/$''5(66
35,171$0(
$VWKHDSSOLFDQWIRUWKLVSURMHFW,DPDZDUHRIWKHSRWHQWLDOOLDELOLWLHVZLWKXQGHUWDNLQJFRQVWUXFWLRQZLWKLQDQ\SULYDWHHDVHPHQWRUXVHUHVWULFWLRQDUHDWKDW
PD\H[LVWRQWKLVSURSHUW\,DFNQRZOHGJHWKDW,KDYHRUZLOOUHYLHZWKH7LWOH5HSRUWIRUWKLVSURSHUW\WRHQVXUHWKDWWKLVSURMHFWGRHVQRWLPSDFWDQ\SULYDWH
HDVHPHQWVRUXVHUHVWULFWLRQDUHDV%\VLJQLQJEHORZ,&(57,)<7+($%29(,1)250$7,2172%(758($1'&255(&7
&2175$&725
6WDWH/LFHQVH
1DPH
$GGUHVV
&LW\6WDWH=LS
%8,/',1*
3(50,7$33/,&$7,21
//
:$51,1*
7+,63(50,7$33/,&$7,21:,//(;3,5('$<6)520
7+('$7(6+2:1%(/2:81/(667+(3(50,7+$6%((1
,668('25$1(;7(16,21,6$33529('%<7+(%8,/',1*
2)),&$/35,2572$33/,&$7,21(;3,5$7,21
BBBBBBBBBBBB
8,500.00
SOLAR & ELECTRICAL 26411 SHADYBROOK RD SAN JUAN
INSTALL 8 PV PANELS | 3.20KW
125A PANEL UPGRADE
NATALY NORIEGA
818 804-3122
PERMITTING@SOLAROPTIMUM.COM
972228
SOLAR OPTIMUM
614 W COLORADO ST
GLENDALE, CA 91204
ALEX RAY
26411 SHADYBROOK RD
SAN JUAN CAPISTRANO
949 233-2604
1
Digitally signed by Noriega, Nataly
DN: CN="Noriega, Nataly", E=nataly@solaroptimum.com
Reason: I am the author of this document
Location:
Date: 2023-07-10 15:01:44Noriega, Nataly NATALY NORIEGA 07//10/2023
08 08 23
B23 1133
1
DC
2.97kW AC
NO BBU
GENERAL REQUIREMENTS
Y N
Y N
Y N
Y N
1.System size is 10 kW rating or less
2.Solar array is roof mounted on a one or two family dwelling OR accessory dwelling unit (ADU)
3.Solar panels/module arrays will not exceed the maximum legal building height
4.Solar system is utility interactive and without battery storage
5. New roofing material directly below the solar array may be installed by a separate roofing contractor
or the solar installation contractor. Any roofing outside of the array footprint will require a separate
permit from a licensed roofing contractor.
RESIDENTIAL PHOTOVOLTAIC
ELIGIBILITY CHECKLIST
Solar Photovoltaic (PV) Checklist for
Detached One- or Two- Family Dwellings
Instructions: The licensed contractor of record shall fill in the address of the project, contractor’s licensing
information and answer each statement with Y or N. Complete and sign the certification section.
** If any items are checked NO, plan check shall be required **
Project Address: ___________________________________________________
Contractor Company Name: ____________________________________________________
Contractor State License Number: ____________________________________________________
City of SJC Business License Number: _________________________________
City of San Juan Capistrano
DeDevelopment Services Department
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Phone: (949) 443-6347
Email: building@sanjuancapistrano.org
www.sanjuancapistrano.org/building
07/03/23 LL
1.Permit Application (Completed & Attached)
2.Signed Contract or letter of intent with the homeowner is provided with submittal
3.Structural Roof Criteria and supporting documentation is attached and stamped by a licensed design
professional
4.Electrical load calculation is required for all installations. (MUST BE COMPLETED ON CITY STANDARD
TEMPLATE)
5.SDG&E Work Order is required for all Main Panel Upgrades
6.Clear photographs required of existing main service panel and subpanels showing ALL circuit breakers/
loads and panel board/bus ratings.
7.Manufacturers Specifications required for ALL electrical components that will be installed
Y N
Y N
Y N
Y N
Y N
Y N
Y N
STRUCTURAL REQUIREMENTS
1.A completed Structural Criteria and supporting documentation is attached and stamped by a licensed
design professional for solar array attachment and/or any separate structure or racking supporting array
or equipment.
Y N
Y N
CITY SPECIFIC REQUIREMENTS
FIRE SAFETY REQUIREMENTS
1.Clear access pathways provided per OCFA and CRC guidelines
2.Fire classification solar system is provided (Class A)
3.All required markings and labels are provided
4.Diagram of the roof layout of all panels, modules, clear access pathways and approximate
locations of electrical disconnecting means and roof access points is completed and
attached
**Renewable Meter Adapter (RMA) installations must be approved by SDG&E and have a separate GEC. Any and all grounding work not performed by SDG&E, including but not limited to the RMA disconnect, will be performed by the Solar Contractor.
I certify under penalty of perjury under the laws of the State of California that the above is true and
correct. I understand that all approvals are subject to field inspection. Field corrections may
require a formal revision submitted for plan review. A re-inspection fee may be assessed when
work is not ready, inspection card and/or approved plans are not available, no access has been
provided or there is any deviation from the approved plans.:
Print Name: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Date: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
Signature: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
Phone Number:ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
Email Address: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ
ELECTRICAL REQUIREMENTS
1.The PV system is interconnected to a single-phase AC service panel of nominal 120/220 Vac with
a bus bar rating of 225A or greater
2.The PV system is connected to the load side of the utility distribution equipment**
3.A Solar PV Standard Plan and supporting documentation is completed and attached
Y N
Y N
Y N
Y N
Y N
Y N
Y N
Additional Address Info:
PROCEDURE FOR INSTALLATION
1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES.
2. Phone Service Coordinator at 949-361-8066 for the following:
- 3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process.
- After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do
not cover conduit without inspector's written approval to backfill.
- When trench is backfilled and compacted, CALL FOR INSPECTION.
- If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT.
3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection
Metering: Self-Contained Meter Clips: 4
Utilities Maximum Contribution to Fault Current: 10000Phase: 1# of Wires: 3
Voltage: 120/240
Bend Info: Bend Type:
Riser Quad: Stop Trench: from PoleLadder Arms:
Standards Page: Handhole Lid Shall Read:
Structure #: SH778038Station ID #: 799-141
Temp Service Charge due on First Bill $ 0.00
Assessor's Parcel Number:Additional Information:
To minimize the electrical outage, you are advised to schedule a morning disconnect with an afternoon reconnect. There is no charge
for this service. Before you change out your meter consider (1) SDG&E needs advance notice to schedule a crew and (2) SDG&E will not
reconnect the service without municipal approval on the new panel. Please contact the City of San Juan Capistrano regarding permits
and inspections. City/County inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to
allow the SDG&E crew enough time for reconnection of the service on the same day.
Number/Size of Main Switch: 1/125Service Panel Rating: 125
Conduit Size: Conduit Installed By:
Customer Phone #: 818-804-3122Customer POC: Nataly Noriega
Wanted Date: ON INSPECTION
Job #: 530000323303
ELECTRIC UNDERGROUND METER & SERVICE LOCATION
Customer Copy
Project Title: SOT OC 26411 SHADYBROOK DR US SOLAR
Notification #: 300000585559
Project Address: 26411 SHADYBROOK RD
Customer Type: Residential(1-2 Units)
Date Prepared: 06/26/2023
Project City: SAN JUAN CAPISTRANO
SDGE Contact: Service Coordinator Contact Info: SERVICE DESK,949-361-8066
Service Type: UG REWIRE (NO TRENCHING)
TB: 0952-B4
SERVICE ATTACHMENT POINT AND/OR METER LOCATION:
Customer to install 125A meter panel at existing location over existing conduit & service conductors. Position new panel to
maintain 3x3 clear & level working space as shown on SDGE Spec 507. Customer to install new panel to meet the location of
existing landing lungs. No splicing allowed. The existing conduit & conductors are adequate for a maximum 125A main or less - if
customer installs greater than a 125A main or installs the panel otherwise, customer will be required to trench from the meter
panel to the source & install the required 3 inch DB conduit. See SDGE Service and Standards Guide pages for specifications. To
schedule, call Service Desk number listed above. Solar System Questions - www.SDGE.com/NEM - SDGE Net Energy Metering Team
SDG&E Application Required-Call: 1-800-411-7343
Municipal Inspection required By: CITY OF SAN JUAN CAPISTRANO
Bend Installed By:
Handhole Installed By:
Traffic Control Permit Required
Excavation/Encroachment Permits Required By:
Joint Trench With:
Right of Way Required
Meter height -- 4'0'' min. (3'0" min. for multiple installation) -- 6'3" max. From finish grade to centerline of meter base. Meters are required to
be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition.
Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E
office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address
and unit number.
If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will
be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no
liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of
construction unless it is through negligence of SDG&E.
Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements.
Building address and/or houseline must be permanently identified prior to meter set. Barrier posts may be required based on field conditions
at any time prior to meter set as determined by the SDG&E Representative. Per Rule 16.A.1.a. In compliance with Section 783 of the Public
Utilities Code, SDG&E will apply only those construction and design specifications, standards, terms, and conditions that are applicable to a
new extension of service project for the 18 months following the date the application for a new extension of service project is approved. Keep
this notice with your building permit.
All installations performed under this order must meet SDG&E standards unless a written deviation has been approved.
Planned By: Karissa Jackson-Tarrani Phone#:
WĂŐĞϭͬϯ
RESIDENTIAL ELECTRICAL
LOAD &A/&8/$7,21
/E^dZhd/KE^͗Review the electrical loads in the table below and check all that exist in the home
(be sure to include the proposed Level 2 EVCE and/or Photovoltaic System). Fill in the corresponding
wattage for each item checked, and then add up all the checked items to determine total wattage used.
Wattages shown are rough estimates: for a more precise analysis use actual values based on nameplate
ratings or consult with an electrical professional.
WZK:d Z^^͗
_______________________________________________________________________________
STATEMENT OF COMPLIANCE:
By my signature, I attest that the information provided is true and accurate.
EĂŵĞ ŽĨƉƉůŝĐĂŶƚ͗_________________________________________________________________
(Print Name)
^ŝŐŶĂƚƵƌĞ͗__________________________________ __________
(Signature of Applicant)(Date)
Note: This form is ŽŶĞ ŽĨ ƐĞǀĞƌĂů ǁĂLJƐ ŝŶ ǁŚŝĐŚ LJŽƵ ĐĂŶ ĚĞŵŽŶƐƚƌĂƚĞ ƐĞƌǀŝĐĞ ůŽĂĚƐ͕ ƉĞƌ ƌƚŝĐůĞ ϮϮϬ
and you may wish to hire a qualified individual or company to perform a thorough evaluation of your
electrical service capacity in lieu of this methodology. Use of this electrical load calculation worksheet is
at the user’s risk and carries no implied guarantee of accuracy. Users of this form are advised to seek
professional assistance in determining the electrical capacity of a service panel.
2QO\IRU6HUYLFH5DWLQJV RI9$PSV 0D[
&LW\ RI6DQ -XDQ &DSLVWUDQR
'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW
3DVHR $GHODQWR
6DQ-XDQ&DSLVWUDQR&$
3KRQH
(PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ
ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ
&ϬϳͬϭϵͬϮϯ
)
_______________________
f Afpplicant)
26411 Shadybrook Rd, San Juan Capistrano, 92675
08/16/2023
NATALY NORIEGA
DIANNA F.08/22/23
B23-113
SUBJECT TO FIELD INSPECTION
WĂŐĞϮͬϯ
Check All
Applicable
Description of Load Volt-Amps on
Nameplate Rating
(Watts) Volt-Amps
Used
General Lighting/Power Load
ZĞƋƵŝƌĞĚ Total Square footage of building times 3 sf džϯǀŽůƚͲĂŵƉ
ZĞƋƵŝƌĞĚ Kitchen Small Appliance Branch Circuits
(min. 2)
1,500 volt-amps/circuit
ZĞƋƵŝƌĞĚ Laundry Circuit (min. 1) 1,500 Volt-Amps
Appliances and Equipment Except Air Conditioner(s)
Microwave 1,400 watts
Trash Compactor 1,000 watts
Dishwasher 1,500 watts
Disposal 1,000 watts
Electric Oven 2,000 watts
Electric Range 5,000 watts
Induction Range 10,000 watts
Electric Clothes Dryer 4,000 watts
Electric Clothes Washer 500 watts
Electric Tankless Water Heater 15,000 watts
Electric Water Heater 4,000 watts
Electric Heat Pump Water Heater 550 watts
Required on new
homes
Electric Vehicle Supply Equipment (EVSE) 7,000 watts
Evaporative Cooler 500 watts
Pool or Spa 2,000 watts
Other:
Other:
Other:
Sub-Total Volt-Amps Used (add up V-A used for everything checked)
Ͳ ϭϬ͕ϬϬϬsͲ
Subtotal (A)
x .40
Subtotal (B)
н ϭϬ͕ϬϬϬsͲ
Subtotal (C)
Heating and Air-Conditioning (ĚĚ the largest of the following): н
1. Air conditioning and cooling (100% of nameplate (NP) rating) =
2. Heat pump without supplemental heating (100% NP Rating) =
3. Heat pump with supplemental electric heat (100% NP plus 65%) =
4. Electrical space heating , 4 separate units (65% NP rating) =
5. Electrical space heating > 4 separate units (40% NP rating) =
6. Electrical thermal storage and other 100% NP rating =
Total Current Demand (Volt-Amps) =
Divided by 240 Volts = Amps
Total Amps Required for Service Conductors and Panel =
Rating of Existing Electrical Service or Subpanel (Amps)=
Panel Upgrade Required?;z^KZEKͿ
Rating of WƌŽƉŽƐĞĚ Electrical Service or Subpanel (/&z^Ks)=
watts
watts
watts
&ϬϳͬϭϵͬϮϯ
4,869
1,500
1,500
1,400
1,500
1,000
4,000
15,769
5,769
2,308
12,308
4,275
16,583
100
YES
69
1,623
69
125
Panel SchedulePanel IDPanel LocationFed FromAmpsSingle PhaseThree PhaseMain BreakerMain Lugs OnlyFed-thru LugsBreaker DetailsPhase TypeGeneral InformationNotesBrkr Pole Wire (AWG)Pipe SizeVAVoltageDescriptionCktCktDescriptionVoltageVAPipe SizeWire Size (AWG)Pole Brkr 120 / 240120 / 208277/ 480Voltage Type120 / 2401120 / 2403120 / 2405120 / 2407120 / 2409120 / 24011120 / 24013120 / 24015120 / 24017120 / 24019120 / 24021120 / 24023120 / 24025120 / 24027120 / 24029120 / 24031120 / 24033120 / 24035120 / 24037120 / 24039120 / 240412120 / 2404120 / 2406120 / 2408120 / 24010120 / 24012120 / 24014120 / 24016120 / 24018120 / 24020120 / 24022120 / 24024120 / 24026120 / 24028120 / 24030120 / 24032120 / 24034120 / 24036120 / 24038120 / 24040120 / 24042120 / 240✔SOUTH-EASTSDG&E✔✔151-POLE10 3/41,800Kitchen lights151-POLE10 3/41,800Garage lights151-POLE10 3/41,800Dishwasher151-POLE10 3/41,800Disposal201-POLE10 3/42,400Garage plug201-POLE10 3/42,400Kitchen microwave202-POLE10 3/44800LIiving room light302-POLE10 3/47200AIR conditioner302-POLE10 3/47200Dryer
Solar Optimum, Inc., 614 W. Colorado St., Glendale, CA 91204
Tel: (818)745-1475
STRUCTURAL
CALCULATIONS
for
SOLAR ELECTRIC SYSTEM FOR
ALEX RAY
AT
26411 SHADYBROOK RD,
SAN JUAN CAPISTRANO,CA 92675,USA
PROJECT : PAGE :
CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
INPUT DATA
Exposure category (B, C or D)
Importance factor, pg 77, (0.87, 1.0 or 1.15)I =Category II
Basic wind speed (IBC Tab 1609.3.1V3S)V =mph
Topographic factor (Sec.6.5.7.2, pg 26 & 45)Kzt =Flat
Building height to eave he =ft
Building height to ridge hr =ft
Building length L =ft
Building width B =ft
Effective area of components A =11 ft2
DESIGN SUMMARY
Max horizontal force normal to building length, L, face =21.49 kips
Max horizontal force normal to building length, B, face =23.33 kips
Max total horizontal torsional load =188.16 ft-kips
Max total upward force =70.99 kips
ANALYSIS
Velocity pressure
qh = 0.00256 Kh Kzt Kd V2 I =24.01 psf
where:qh = velocity pressure at mean roof height, h. (Eq. 6-15, page 27)
Kh = velocity pressure exposure coefficient evaluated at height, h, (Tab. 6-3, Case 1,pg 79)=0.91
Kd = wind directionality factor. (Tab. 6-4, for building, page 80)=0.85
h = mean roof height =21.50 ft
< 60 ft, [Satisfactory]
< Min (L, B), [Satisfactory]
Design pressures for MWFRS
p = qh [(G Cpf )-(G Cpi )]
where:p = pressure in appropriate zone. (Eq. 6-18, page 28).pmin =10 psf (Sec. 6.1.4.1 & 6.1.4.2)
G Cp f = product of gust effect factor and external pressure coefficient, see table below. (Fig. 6-10, page 53 & 54)
G Cp i = product of gust effect factor and internal pressure coefficient.(Fig. 6-5, Enclosed Building, page 47)
=0.18 or -0.18
a = width of edge strips, Fig 6-10, note 9, page 54, MAX[ MIN(0.1B, 0.4h), 0.04B,3] =6.00 ft
Net Pressures (psf), Basic Load Cases Net Pressures (psf), Torsional Load Cases
13.13 0.00 13.13
(+GCp i )(-GCp i )(+GCp i )(-GCp i )(+GCp i )(-GCp i )
1 0.47 6.98 15.62 0.40 5.28 13.93 1T 0.47 1.74 3.91
2 -0.69 -20.89 -12.25 -0.69 -20.89 -12.25 2T -0.69 -5.22 -3.06
3 -0.43 -14.64 -5.99 -0.37 -13.21 -4.56 3T -0.43 -3.66 -1.50
4 -0.37 -13.11 -4.46 -0.29 -11.29 -2.64 4T -0.37 -3.28 -1.12
1E 0.71 12.80 21.44 0.61 10.33 18.97 0.00
2E -1.07 -30.02 -21.37 -1.07 -30.02 -21.37
3E -0.62 -19.13 -10.49 -0.53 -17.05 -8.40 (+GCp i )(-GCp i )
4E -0.54 -17.38 -8.74 -0.43 -14.65 -6.00 1T 0.40 1.32 3.48
5 -0.45 -15.13 -6.48 -0.45 -15.13 -6.48 2T -0.69 -5.22 -3.06
6 -0.45 -15.13 -6.48 -0.45 -15.13 -6.48 3T -0.37 -3.30 -1.14
4T -0.29 -2.82 -0.66
Net Pressure withG Cp f
Roof angle q =
G Cp f
Net Pressure with
Roof angle q =
G Cp f
Net Pressure with
Surface
Roof angle q =
G Cp f
Net Pressure withSurface
Roof angle q =
Surface
Wind Analysis for Low-rise Building, Based on ASCE 7-16 / IBC 2021 / CBC 2022
C
1.00
110
1
18
ALEX RAY
25
75
30
WEIGHT OF MODULE 41.88 LB
MODULE LENGTH 5.44 FT
MODULE WIDTH 3.25 FT
MODULE AREA 17.68 FT^2
UNIT WT OF MODULE 2.37 PSF
AVG RACKING WT 0.3 PSF
TOTAL AVG WT (MODULE+RACKING)2.67 PSF
NO OF MODULE 8
CONNECTION POINT TRIB LENGTH 4 FT
CONNECTION POINT TRIB WIDTH 2.75 FT MAX. SPACING
CONN POINT TRIB. AREA 11 FT^2
LOAD PER CONN PT LOAD 29 LB
ROOF SLOPE 26.00 DEGREE
SLIING FORCE 12.87 LB LOAD*SIN(ROOF SLOPE )
LOAD ON EXISTING ROOF
1) ROOFING 10.00 PSF
2) 5/8" PLYWOOD 1.8 PSF
3) ROOF RAFTER 3.1 PSF
4) INSULATION 1.5 PSF
5) MISC 1.5 PSF
TOTAL DL 17.90 PSF
ROOF AREA 2250 SF
TOTAL ROOF WT 40.28 KIP
WALL WT 2.52 KIP
TOTAL BUILDING DL 42.80 KIP
EACH MODULE AREA 17.68
TOTAL AREA OF MODULE 141.44 SF
TOTAL MODULE WT 0.39 KIP
GADDITIONAL DL ADDED TO EXISTING BUILDIN 0.91 %
LATERAL LOAD ANALYSIS COMMENTS
SINCE TOTAL ADDED DL TO THE BUILDING IS LESS THAN 10%, PER CBC 2022 EXISTING LATERAL
RESISTING ELEMENTS WILL NOT BE AFFECTED
VERTICAL LOAD ANALYSIS COMMENTS
PER CBC SECTION 1607.13.5.1 EXCEPTION 1, THE ROOF LL NEED NOT TO BE APPLIED TO THE AREA
OCCUPIED BY THE SOLAR MODULES WHERE THE CLEAR SPACE BETWEEN PANELS AND ROOF
SURFACE IS 24" OR LESS. THEREFORE, DESIGN LOAD BY ADDING SOLAR MODULE OF 2.75 PSF IS
LESS THAN WITHOUT MODULES AND HENCE EXISTING FRAMING WILL THEREFORE BE OK.
ALEX RAY
26411 SHADYBROOK RD,
SAN JUAN CAPISTRANO,CA 92675,USA
LOAD CRITERIA
CONNECTION DESIGN
VELOCITY PRESSURE, qh 24.01 PSF (SEE WIND LOAD CALC)
A) LATERAL FORCE Fh FOR ROOFTOP STRUCTURES (FOR ONE CONN POINT)
(ONE SCREW PER CONN POINT)
HORIZONTAL WIND FORCE, Fh = qh * Gcr * Af ASCE 7-16, Eq. 29.4.4
WIDTH OF BUILDING, B 30 FT
MEAN HEIGHT OF BLDG, H 24 FT
CONNECTION POINT TRIB LENGTH, l 4 FT MAX. SPACING
CONNECTION POINT PROJECTED HEIGHT, h1.21 FT [2.75' SIN(ROOF SLOPE)]
VERTICAL PROJECTED AREA, Af 4.82 FT^2
Gcr 1.9 IF(B*H*0.1>Af,1.9)ASCE 7-16, Eq. 29.4.4
WIND LATERAL FORCE, Fh 219.9 LB
SLIDING FORCE 12.87
DESIGN LATERAL FORCE 232.81
B) VERTICAL FORCE Fv FOR ROOFTOP STRUCTURES ( (FOR ONE CONN POINT)
VERTICAL WIND FORCE, Fv = qh * Gcr * Ar ASCE 7-16, Eq. 29.4.4
WIDTH OF BUILDING, B 30 FT
LENGTH OF BLDG, L 75 FT
CONNECTION POINT TRIB LENGTH, l 4 FT
CONNECTION POINT TRIB WIDTH, w 2.47 FT [2.75' COS(ROOF SLOPE)]
HORIZONTAL PROJECTED AREA, Ar 9.89 FT^2
Gcr 1.4 IF(B*L*0.1>Ar,1.5)ASCE 7-16, Eq. 29.4.4
WIND VERTICAL FORCE, Fv 332.3 LB
DESIGN WITHDRAWL FORCE 332.3
ALEX RAY
26411 SHADYBROOK RD,
SAN JUAN CAPISTRANO,CA 92675,USA
CONNECTION DESIGN
DESIGN LATERAL FORCE 232.807
USE LAG SCREW 5/16"INCH
CAPACITY PER ONE SCREW, ZII 210 LB (NDS 2021 REFERENCE DESIGN VALUE, SEE ATTACHED)
DESIGN CAPACITY, ZII
'279.3 LB
DESIGN NG
DESIGN WITHDRAWL FORCE 332.347
USE LAG SCREW 5/16"INCH
WITHDRAWL CAPACITY 266 LB (NDS 2021 REFERENCE DESIGN VALUE, SEE ATTACHED)
DESIGN WITHDRAWL CAPACITY 884.45 LB
DESIGN IS GOOD
COMBINED WIND SHEAR/UPLIFT 0.14 0.695 0.84 < 1.0 DESIGN IS GOOD
(UPLIFT)(SHEAR)
USE 5/16" DIA X 3 1/2" (EMBEDMENT) LAG SCREW PER CONNECTION POINT
ALEX RAY
26411 SHADYBROOK RD,
SAN JUAN CAPISTRANO,CA 92675,USA