Loading...
B23-1133 - 26411 SHADYBROOK RDCITY OF SAN JUAN CAPISTRANO BUILDING PERMIT Permit No. B23-1133 08/25/2023 ISSUED JOB VALUE NO UNITS Permit Number ISSUED BY SITE APN SITE LOT NO SITE TRACT SITE SUBDIVISION PERMIT TYPE. OCCUPANCY TYPE BUILDING SF NO STORIES DF4 650-072-10 10 $ 8,500 SOLAR PANEL INSTALLA 0 1 0 JOB ADDRESS: 26411 SHADYBROOK RD RAY, ALEX & JESSICA,OWNER NAME 26411 SHADYBROOK RDMAILING ADDRESS CITY,STATE,ZIP CONTRACTOR NAME ST. LIC EXPIRE ADDRESS CITY, ST, ZIP TENANT NAME PHONE # MAILING ADDR CITY, ST, ZIP I have carefully examined the completed permit application and do hereby certify under penalty of perjury that all information hereon including the declarations are true and correct and I further certify and agree if a permit is issued: to comply with all City, County, and State laws governing building construction, whether specified herein or not. I also agree to save, indemnify and keep harmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses which may in any way accrue against said City in consequence of the granting of this permit. Applicant's signature Owner/Contractor Print Name SOLAR OPTIMUM INC 501 W GLENOAKS 04/30/2024 AMOUNT MECHANICAL PERMIT AMOUNT Expiration:: Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work commenced. An OSHA permit is required for excavations over 5’0” deep and demolition or construction of structures over 3 stories in height. _____Contractor:I hereby affirm that I am licensed under provisions of Chapter 9 of Division 3 of the Business and Professions Code, and my license is in full force and effect. _____Owner/Builder:I, as owner of the property, or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale. (Sec.7044, Business and Professions Code: the Contractor’s License Laws does not apply to and owner of property who builds or improves thereon, who does such work himself or through his employees, provided that such improvements are not intended or offered for sale. If however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale) ______Owner/Builder:I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor’s License Law does not apply to an owner of property who builds or improves thereon and who contracts for such projects with a contractor’s) license pursuant to the Contractor’s License Law. _______ Workers Compensation-I hereby affirm under penalty of perjury one of the following declarations:I have and will maintain workers’ compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers’ compensation insurance carrier and policy number are: Carrier__CONTINENTAL INDEMNITY COMPANY Policy#825469720101 (This section needs to be completed if the permit is for one hundred dollars($100) or less) AMOUNTELECTRICAL PERMIT DESCRIPTION _______Exemption:I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers’ compensation laws of California and agree that if I should become subject to the workers’ compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. WARNING:FAILURE TO SECURE WORKERS’COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TI CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSDAND DOLLARS($100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES. B23-1133 SERVICES: < 600V & < 200 AMPS 33.78 ELECTRICAL ISSUANCE FEE 27.24 Total Electrical 61.02 Total Plumbing Total Mechanical Total Mobile Home 972228 , GLENDALE, CA 91202 SAN JUAN CAPISTRANO, CA 92675 (949) 233-2604 (818) 804-3122 PHONE PHONE Date _________________ Applicant _______________________________________ MOBILE HOME PERMIT AMOUNT 8 ROOF MOUNTED SOLAR PANELS. 2.97kW AC SYSTEM. 125a MPU PLUMBING PERMIT FINAL 01/03/24 Date: Permit No. Applicant: Phone/E-Mail Job Location: CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT FEES Account # Type Cost 01-44221 Building Permit 01-44223 Mechanical 01-44224 Plumbing 01-44225 Electrical 01-44221 Mobile Home Permit 01-44222 Grading Permit Fee 01-44231 Grading Plan Check 01-44222 On-Site Residential Permit 01-44231 On-Site Residential Plan Check Subtotal 01-44230 Bond Processing 01-44230 Building Plan Check 01-44230 Additional Plan Check 01-44230 Digital Record Fee ($1.00 per sheet) 01-44221 C & D Administrative Fee 01-44221 Special Inspection-Reinspection 01-44222 On-Site Commercial/Tract Permit Fee 01-44231 On-Site Commercial/Tract Plan Check Fee 01-44214 Geotechnical Soils Plan Review 10-44320 Ordinance 211 10-42510 Ordinance 364 01-45354 Copies @ .20 Each 90-23331 SMIP Fee 33-44370 H.O.P.E. Fee (Housing in Lieu) Other Fees TCA Fees Date Received HOA Approval Date Received School Fees Date Received Engineering Fees Date Received Water Division Fees Date Received 01-44221 01-44221 01-44240 90-23000 90-23000 TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO Receipt # _________ Date: ______________ Cashier: _____________________________ Refundable Bond/Deposit Posted by ______Owner_____Contractor ________Type Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check)) Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check) Refundable Bond/Deposit Posted by ______Owner_____Contractor ________Type NPDES Permit Fee (10% Permit Subtotal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†$77$&+('†'(7$&+(' †1(: &216758&7,21 †&219(56,212) (;,67,1*6758&785( †-$'8   2&&83$1&<&855(17 2&&83$1&<352326(' †,17$/7 †$'',7,21 †3$7,2 †322/63$ †'(02/,7,21 (;,67,1*%8,/',1* BBBB64)7 BBBB64)7 BBBB64)7 BBBB64)7 BBBB64)7 1(:%8,/',1* BBBB64)7 BBBB64)7 BBBB64)7 BBBB64)7 BBBB BBBB BBBB BBBB 2&&*5283 '(6&5,37,212):25. &20%,1,1*2568%',9,',1*68,7(6" &+$1*(2)2&&83$1&<86(" ††<(6 12 ††<(6 12 ††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| 3.20KW 125A PANEL UPGRADE NATALY NORIEGA 818 804-3122 PERMITTING@SOLAROPTIMUM.COM 972228 SOLAR OPTIMUM 614 W COLORADO ST GLENDALE, CA 91204 ALEX RAY 26411 SHADYBROOK RD SAN JUAN CAPISTRANO 949 233-2604 1 Digitally signed by Noriega, Nataly DN: CN="Noriega, Nataly", E=nataly@solaroptimum.com Reason: I am the author of this document Location: Date: 2023-07-10 15:01:44Noriega, Nataly NATALY NORIEGA 07//10/2023 08 08 23 B23 1133 1 DC 2.97kW AC NO BBU GENERAL REQUIREMENTS Y N Y N Y N Y N 1.System size is 10 kW  rating or less 2.Solar array is roof mounted on a one or two family dwelling OR accessory dwelling unit (ADU) 3.Solar panels/module arrays will not exceed the maximum legal building height 4.Solar system is utility interactive and without battery storage 5. New roofing material directly below the solar array may be installed by a separate roofing contractor or the solar installation contractor. Any roofing outside of the array footprint will require a separate permit from a licensed roofing contractor. RESIDENTIAL PHOTOVOLTAIC ELIGIBILITY CHECKLIST Solar Photovoltaic (PV) Checklist for Detached One- or Two- Family Dwellings Instructions: The licensed contractor of record shall fill in the address of the project, contractor’s licensing information and answer each statement with Y or N. Complete and sign the certification section. ** If any items are checked NO, plan check shall be required ** Project Address: ___________________________________________________ Contractor Company Name: ____________________________________________________ Contractor State License Number: ____________________________________________________ City of SJC Business License Number: _________________________________ City of San Juan Capistrano DeDevelopment Services Department 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Phone: (949) 443-6347 Email: building@sanjuancapistrano.org www.sanjuancapistrano.org/building 07/03/23 LL 1.Permit Application (Completed & Attached) 2.Signed Contract or letter of intent with the homeowner is provided with submittal 3.Structural Roof Criteria and supporting documentation is attached and stamped by a licensed design professional 4.Electrical load calculation is required for all installations. (MUST BE COMPLETED ON CITY STANDARD TEMPLATE) 5.SDG&E Work Order is required for all Main Panel Upgrades 6.Clear photographs required of existing main service panel and subpanels showing ALL circuit breakers/ loads and panel board/bus ratings. 7.Manufacturers Specifications required for ALL electrical components that will be installed Y N Y N Y N Y N Y N Y N Y N STRUCTURAL REQUIREMENTS 1.A completed Structural Criteria and supporting documentation is attached and stamped by a licensed design professional for solar array attachment and/or any separate structure or racking supporting array or equipment. Y N Y N CITY SPECIFIC REQUIREMENTS FIRE SAFETY REQUIREMENTS 1.Clear access pathways provided per OCFA and CRC guidelines 2.Fire classification solar system is provided (Class A) 3.All required markings and labels are provided 4.Diagram of the roof layout of all panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points is completed and attached **Renewable Meter Adapter (RMA) installations must be approved by SDG&E and have a separate GEC. Any and all grounding work not performed by SDG&E, including but not limited to the RMA disconnect, will be performed by the Solar Contractor. I certify under penalty of perjury under the laws of the State of California that the above is true and correct. I understand that all approvals are subject to field inspection. Field corrections may require a formal revision submitted for plan review. A re-inspection fee may be assessed when work is not ready, inspection card and/or approved plans are not available, no access has been provided or there is any deviation from the approved plans.: Print Name: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Date: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ  Signature: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Phone Number:ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Email Address: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ ELECTRICAL REQUIREMENTS 1.The PV system is interconnected to a single-phase AC service panel of nominal 120/220 Vac with a bus bar rating of 225A or greater 2.The PV system is connected to the load side of the utility distribution equipment** 3.A Solar PV Standard Plan and supporting documentation is completed and attached Y N Y N Y N Y N Y N Y N Y N Additional Address Info: PROCEDURE FOR INSTALLATION 1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES. 2. Phone Service Coordinator at 949-361-8066 for the following: - 3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process. - After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do not cover conduit without inspector's written approval to backfill. - When trench is backfilled and compacted, CALL FOR INSPECTION. - If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT. 3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection Metering: Self-Contained Meter Clips: 4 Utilities Maximum Contribution to Fault Current: 10000Phase: 1# of Wires: 3 Voltage: 120/240 Bend Info: Bend Type: Riser Quad: Stop Trench: from PoleLadder Arms: Standards Page: Handhole Lid Shall Read: Structure #: SH778038Station ID #: 799-141 Temp Service Charge due on First Bill $ 0.00 Assessor's Parcel Number:Additional Information: To minimize the electrical outage, you are advised to schedule a morning disconnect with an afternoon reconnect. There is no charge for this service. Before you change out your meter consider (1) SDG&E needs advance notice to schedule a crew and (2) SDG&E will not reconnect the service without municipal approval on the new panel. Please contact the City of San Juan Capistrano regarding permits and inspections. City/County inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to allow the SDG&E crew enough time for reconnection of the service on the same day. Number/Size of Main Switch: 1/125Service Panel Rating: 125 Conduit Size: Conduit Installed By: Customer Phone #: 818-804-3122Customer POC: Nataly Noriega Wanted Date: ON INSPECTION Job #: 530000323303 ELECTRIC UNDERGROUND METER & SERVICE LOCATION Customer Copy Project Title: SOT OC 26411 SHADYBROOK DR US SOLAR Notification #: 300000585559 Project Address: 26411 SHADYBROOK RD Customer Type: Residential(1-2 Units) Date Prepared: 06/26/2023 Project City: SAN JUAN CAPISTRANO SDGE Contact: Service Coordinator Contact Info: SERVICE DESK,949-361-8066 Service Type: UG REWIRE (NO TRENCHING) TB: 0952-B4 SERVICE ATTACHMENT POINT AND/OR METER LOCATION: Customer to install 125A meter panel at existing location over existing conduit & service conductors. Position new panel to maintain 3x3 clear & level working space as shown on SDGE Spec 507. Customer to install new panel to meet the location of existing landing lungs. No splicing allowed. The existing conduit & conductors are adequate for a maximum 125A main or less - if customer installs greater than a 125A main or installs the panel otherwise, customer will be required to trench from the meter panel to the source & install the required 3 inch DB conduit. See SDGE Service and Standards Guide pages for specifications. To schedule, call Service Desk number listed above. Solar System Questions - www.SDGE.com/NEM - SDGE Net Energy Metering Team SDG&E Application Required-Call: 1-800-411-7343 Municipal Inspection required By: CITY OF SAN JUAN CAPISTRANO Bend Installed By: Handhole Installed By: Traffic Control Permit Required Excavation/Encroachment Permits Required By: Joint Trench With: Right of Way Required Meter height -- 4'0'' min. (3'0" min. for multiple installation) -- 6'3" max. From finish grade to centerline of meter base. Meters are required to be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition. Provide 3-ft. x 3-ft. clear and level working space in front of meter. Where meter room is proposed, contact the planner at the nearest SDG&E office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address and unit number. If SDG&E encounters hazardous or toxic material while performing construction of your project, SDG&E will halt work immediately and it will be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of construction unless it is through negligence of SDG&E. Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements. Building address and/or houseline must be permanently identified prior to meter set. Barrier posts may be required based on field conditions at any time prior to meter set as determined by the SDG&E Representative. Per Rule 16.A.1.a. In compliance with Section 783 of the Public Utilities Code, SDG&E will apply only those construction and design specifications, standards, terms, and conditions that are applicable to a new extension of service project for the 18 months following the date the application for a new extension of service project is approved. Keep this notice with your building permit. All installations performed under this order must meet SDG&E standards unless a written deviation has been approved. Planned By: Karissa Jackson-Tarrani Phone#: WĂŐĞϭͬϯ RESIDENTIAL ELECTRICAL LOAD &A/&8/$7,21 /E^dZhd/KE^͗Review the electrical loads in the table below and check all that exist in the home (be sure to include the proposed Level 2 EVCE and/or Photovoltaic System). Fill in the corresponding wattage for each item checked, and then add up all the checked items to determine total wattage used. Wattages shown are rough estimates: for a more precise analysis use actual values based on nameplate ratings or consult with an electrical professional. WZK:d Z^^͗ _______________________________________________________________________________ STATEMENT OF COMPLIANCE: By my signature, I attest that the information provided is true and accurate. EĂŵĞ ŽĨƉƉůŝĐĂŶƚ͗_________________________________________________________________ (Print Name) ^ŝŐŶĂƚƵƌĞ͗__________________________________ __________ (Signature of Applicant)(Date) Note: This form is ŽŶĞ ŽĨ ƐĞǀĞƌĂů ǁĂLJƐ ŝŶ ǁŚŝĐŚ LJŽƵ ĐĂŶ ĚĞŵŽŶƐƚƌĂƚĞ ƐĞƌǀŝĐĞ ůŽĂĚƐ͕ ƉĞƌ  ƌƚŝĐůĞ ϮϮϬ and you may wish to hire a qualified individual or company to perform a thorough evaluation of your electrical service capacity in lieu of this methodology. Use of this electrical load calculation worksheet is at the user’s risk and carries no implied guarantee of accuracy. Users of this form are advised to seek professional assistance in determining the electrical capacity of a service panel. 2QO\IRU6HUYLFH5DWLQJV RI9$PSV 0D[ &LW\ RI6DQ -XDQ &DSLVWUDQR 'H'HYHORSPHQW6HUYLFHV'HSDUWPHQW 3DVHR $GHODQWR 6DQ-XDQ&DSLVWUDQR&$ 3KRQH   (PDLOEXLOGLQJ#VDQMXDQFDSLVWUDQRRUJ ZZZVDQMXDQFDSLVWUDQRRUJEXLOGLQJ &ϬϳͬϭϵͬϮϯ ) _______________________ f Afpplicant) 26411 Shadybrook Rd, San Juan Capistrano, 92675 08/16/2023 NATALY NORIEGA DIANNA F.08/22/23 B23-113 SUBJECT TO FIELD INSPECTION WĂŐĞϮͬϯ Check All Applicable Description of Load Volt-Amps on Nameplate Rating (Watts) Volt-Amps Used General Lighting/Power Load ZĞƋƵŝƌĞĚ Total Square footage of building times 3 sf džϯǀŽůƚͲĂŵƉ ZĞƋƵŝƌĞĚ Kitchen Small Appliance Branch Circuits (min. 2) 1,500 volt-amps/circuit ZĞƋƵŝƌĞĚ Laundry Circuit (min. 1) 1,500 Volt-Amps Appliances and Equipment Except Air Conditioner(s) Microwave 1,400 watts Trash Compactor 1,000 watts Dishwasher 1,500 watts Disposal 1,000 watts Electric Oven 2,000 watts Electric Range 5,000 watts Induction Range 10,000 watts Electric Clothes Dryer 4,000 watts Electric Clothes Washer 500 watts Electric Tankless Water Heater 15,000 watts Electric Water Heater 4,000 watts Electric Heat Pump Water Heater 550 watts Required on new homes Electric Vehicle Supply Equipment (EVSE) 7,000 watts Evaporative Cooler 500 watts Pool or Spa 2,000 watts Other: Other: Other: Sub-Total Volt-Amps Used (add up V-A used for everything checked) Ͳ ϭϬ͕ϬϬϬsͲ Subtotal (A) x .40 Subtotal (B) н ϭϬ͕ϬϬϬsͲ Subtotal (C) Heating and Air-Conditioning (ĚĚ the largest of the following): н 1. Air conditioning and cooling (100% of nameplate (NP) rating) = 2. Heat pump without supplemental heating (100% NP Rating) = 3. Heat pump with supplemental electric heat (100% NP plus 65%) = 4. Electrical space heating , 4 separate units (65% NP rating) = 5. Electrical space heating > 4 separate units (40% NP rating) = 6. Electrical thermal storage and other 100% NP rating = Total Current Demand (Volt-Amps) = Divided by 240 Volts = Amps Total Amps Required for Service Conductors and Panel = Rating of Existing Electrical Service or Subpanel (Amps)= Panel Upgrade Required?;z^KZEKͿ Rating of WƌŽƉŽƐĞĚ Electrical Service or Subpanel (/&z^Ks)= watts watts watts &ϬϳͬϭϵͬϮϯ 4,869 1,500 1,500 1,400 1,500 1,000 4,000 15,769 5,769 2,308 12,308 4,275 16,583 100 YES 69 1,623 69 125 Panel SchedulePanel IDPanel LocationFed FromAmpsSingle PhaseThree PhaseMain BreakerMain Lugs OnlyFed-thru LugsBreaker DetailsPhase TypeGeneral InformationNotesBrkr Pole Wire (AWG)Pipe SizeVAVoltageDescriptionCktCktDescriptionVoltageVAPipe SizeWire Size (AWG)Pole Brkr 120 / 240120 / 208277/ 480Voltage Type120 / 2401120 / 2403120 / 2405120 / 2407120 / 2409120 / 24011120 / 24013120 / 24015120 / 24017120 / 24019120 / 24021120 / 24023120 / 24025120 / 24027120 / 24029120 / 24031120 / 24033120 / 24035120 / 24037120 / 24039120 / 240412120 / 2404120 / 2406120 / 2408120 / 24010120 / 24012120 / 24014120 / 24016120 / 24018120 / 24020120 / 24022120 / 24024120 / 24026120 / 24028120 / 24030120 / 24032120 / 24034120 / 24036120 / 24038120 / 24040120 / 24042120 / 240✔SOUTH-EASTSDG&E✔✔151-POLE10 3/41,800Kitchen lights151-POLE10 3/41,800Garage lights151-POLE10 3/41,800Dishwasher151-POLE10 3/41,800Disposal201-POLE10 3/42,400Garage plug201-POLE10 3/42,400Kitchen microwave202-POLE10 3/44800LIiving room light302-POLE10 3/47200AIR conditioner302-POLE10 3/47200Dryer Solar Optimum, Inc., 614 W. Colorado St., Glendale, CA 91204 Tel: (818)745-1475 STRUCTURAL CALCULATIONS for SOLAR ELECTRIC SYSTEM FOR ALEX RAY AT 26411 SHADYBROOK RD, SAN JUAN CAPISTRANO,CA 92675,USA PROJECT : PAGE : CLIENT : DESIGN BY : JOB NO. : DATE : REVIEW BY : INPUT DATA Exposure category (B, C or D) Importance factor, pg 77, (0.87, 1.0 or 1.15)I =Category II Basic wind speed (IBC Tab 1609.3.1V3S)V =mph Topographic factor (Sec.6.5.7.2, pg 26 & 45)Kzt =Flat Building height to eave he =ft Building height to ridge hr =ft Building length L =ft Building width B =ft Effective area of components A =11 ft2 DESIGN SUMMARY Max horizontal force normal to building length, L, face =21.49 kips Max horizontal force normal to building length, B, face =23.33 kips Max total horizontal torsional load =188.16 ft-kips Max total upward force =70.99 kips ANALYSIS Velocity pressure qh = 0.00256 Kh Kzt Kd V2 I =24.01 psf where:qh = velocity pressure at mean roof height, h. (Eq. 6-15, page 27) Kh = velocity pressure exposure coefficient evaluated at height, h, (Tab. 6-3, Case 1,pg 79)=0.91 Kd = wind directionality factor. (Tab. 6-4, for building, page 80)=0.85 h = mean roof height =21.50 ft < 60 ft, [Satisfactory] < Min (L, B), [Satisfactory] Design pressures for MWFRS p = qh [(G Cpf )-(G Cpi )] where:p = pressure in appropriate zone. (Eq. 6-18, page 28).pmin =10 psf (Sec. 6.1.4.1 & 6.1.4.2) G Cp f = product of gust effect factor and external pressure coefficient, see table below. (Fig. 6-10, page 53 & 54) G Cp i = product of gust effect factor and internal pressure coefficient.(Fig. 6-5, Enclosed Building, page 47) =0.18 or -0.18 a = width of edge strips, Fig 6-10, note 9, page 54, MAX[ MIN(0.1B, 0.4h), 0.04B,3] =6.00 ft Net Pressures (psf), Basic Load Cases Net Pressures (psf), Torsional Load Cases 13.13 0.00 13.13 (+GCp i )(-GCp i )(+GCp i )(-GCp i )(+GCp i )(-GCp i ) 1 0.47 6.98 15.62 0.40 5.28 13.93 1T 0.47 1.74 3.91 2 -0.69 -20.89 -12.25 -0.69 -20.89 -12.25 2T -0.69 -5.22 -3.06 3 -0.43 -14.64 -5.99 -0.37 -13.21 -4.56 3T -0.43 -3.66 -1.50 4 -0.37 -13.11 -4.46 -0.29 -11.29 -2.64 4T -0.37 -3.28 -1.12 1E 0.71 12.80 21.44 0.61 10.33 18.97 0.00 2E -1.07 -30.02 -21.37 -1.07 -30.02 -21.37 3E -0.62 -19.13 -10.49 -0.53 -17.05 -8.40 (+GCp i )(-GCp i ) 4E -0.54 -17.38 -8.74 -0.43 -14.65 -6.00 1T 0.40 1.32 3.48 5 -0.45 -15.13 -6.48 -0.45 -15.13 -6.48 2T -0.69 -5.22 -3.06 6 -0.45 -15.13 -6.48 -0.45 -15.13 -6.48 3T -0.37 -3.30 -1.14 4T -0.29 -2.82 -0.66 Net Pressure withG Cp f Roof angle q = G Cp f Net Pressure with Roof angle q = G Cp f Net Pressure with Surface Roof angle q = G Cp f Net Pressure withSurface Roof angle q = Surface Wind Analysis for Low-rise Building, Based on ASCE 7-16 / IBC 2021 / CBC 2022 C 1.00 110 1 18 ALEX RAY 25 75 30 WEIGHT OF MODULE 41.88 LB MODULE LENGTH 5.44 FT MODULE WIDTH 3.25 FT MODULE AREA 17.68 FT^2 UNIT WT OF MODULE 2.37 PSF AVG RACKING WT 0.3 PSF TOTAL AVG WT (MODULE+RACKING)2.67 PSF NO OF MODULE 8 CONNECTION POINT TRIB LENGTH 4 FT CONNECTION POINT TRIB WIDTH 2.75 FT MAX. SPACING CONN POINT TRIB. AREA 11 FT^2 LOAD PER CONN PT LOAD 29 LB ROOF SLOPE 26.00 DEGREE SLIING FORCE 12.87 LB LOAD*SIN(ROOF SLOPE ) LOAD ON EXISTING ROOF 1) ROOFING 10.00 PSF 2) 5/8" PLYWOOD 1.8 PSF 3) ROOF RAFTER 3.1 PSF 4) INSULATION 1.5 PSF 5) MISC 1.5 PSF TOTAL DL 17.90 PSF ROOF AREA 2250 SF TOTAL ROOF WT 40.28 KIP WALL WT 2.52 KIP TOTAL BUILDING DL 42.80 KIP EACH MODULE AREA 17.68 TOTAL AREA OF MODULE 141.44 SF TOTAL MODULE WT 0.39 KIP GADDITIONAL DL ADDED TO EXISTING BUILDIN 0.91 % LATERAL LOAD ANALYSIS COMMENTS SINCE TOTAL ADDED DL TO THE BUILDING IS LESS THAN 10%, PER CBC 2022 EXISTING LATERAL RESISTING ELEMENTS WILL NOT BE AFFECTED VERTICAL LOAD ANALYSIS COMMENTS PER CBC SECTION 1607.13.5.1 EXCEPTION 1, THE ROOF LL NEED NOT TO BE APPLIED TO THE AREA OCCUPIED BY THE SOLAR MODULES WHERE THE CLEAR SPACE BETWEEN PANELS AND ROOF SURFACE IS 24" OR LESS. THEREFORE, DESIGN LOAD BY ADDING SOLAR MODULE OF 2.75 PSF IS LESS THAN WITHOUT MODULES AND HENCE EXISTING FRAMING WILL THEREFORE BE OK. ALEX RAY 26411 SHADYBROOK RD, SAN JUAN CAPISTRANO,CA 92675,USA LOAD CRITERIA CONNECTION DESIGN VELOCITY PRESSURE, qh 24.01 PSF (SEE WIND LOAD CALC) A) LATERAL FORCE Fh FOR ROOFTOP STRUCTURES (FOR ONE CONN POINT) (ONE SCREW PER CONN POINT) HORIZONTAL WIND FORCE, Fh = qh * Gcr * Af ASCE 7-16, Eq. 29.4.4 WIDTH OF BUILDING, B 30 FT MEAN HEIGHT OF BLDG, H 24 FT CONNECTION POINT TRIB LENGTH, l 4 FT MAX. SPACING CONNECTION POINT PROJECTED HEIGHT, h1.21 FT [2.75' SIN(ROOF SLOPE)] VERTICAL PROJECTED AREA, Af 4.82 FT^2 Gcr 1.9 IF(B*H*0.1>Af,1.9)ASCE 7-16, Eq. 29.4.4 WIND LATERAL FORCE, Fh 219.9 LB SLIDING FORCE 12.87 DESIGN LATERAL FORCE 232.81 B) VERTICAL FORCE Fv FOR ROOFTOP STRUCTURES ( (FOR ONE CONN POINT) VERTICAL WIND FORCE, Fv = qh * Gcr * Ar ASCE 7-16, Eq. 29.4.4 WIDTH OF BUILDING, B 30 FT LENGTH OF BLDG, L 75 FT CONNECTION POINT TRIB LENGTH, l 4 FT CONNECTION POINT TRIB WIDTH, w 2.47 FT [2.75' COS(ROOF SLOPE)] HORIZONTAL PROJECTED AREA, Ar 9.89 FT^2 Gcr 1.4 IF(B*L*0.1>Ar,1.5)ASCE 7-16, Eq. 29.4.4 WIND VERTICAL FORCE, Fv 332.3 LB DESIGN WITHDRAWL FORCE 332.3 ALEX RAY 26411 SHADYBROOK RD, SAN JUAN CAPISTRANO,CA 92675,USA CONNECTION DESIGN DESIGN LATERAL FORCE 232.807 USE LAG SCREW 5/16"INCH CAPACITY PER ONE SCREW, ZII 210 LB (NDS 2021 REFERENCE DESIGN VALUE, SEE ATTACHED) DESIGN CAPACITY, ZII '279.3 LB DESIGN NG DESIGN WITHDRAWL FORCE 332.347 USE LAG SCREW 5/16"INCH WITHDRAWL CAPACITY 266 LB (NDS 2021 REFERENCE DESIGN VALUE, SEE ATTACHED) DESIGN WITHDRAWL CAPACITY 884.45 LB DESIGN IS GOOD COMBINED WIND SHEAR/UPLIFT 0.14 0.695 0.84 < 1.0 DESIGN IS GOOD (UPLIFT)(SHEAR) USE 5/16" DIA X 3 1/2" (EMBEDMENT) LAG SCREW PER CONNECTION POINT ALEX RAY 26411 SHADYBROOK RD, SAN JUAN CAPISTRANO,CA 92675,USA