Loading...
B23-1264 - 27911 PASEO NICOLECITY OF SAN JUAN CAPISTRANO BUILDING PERMIT Permit No. B23-1264 04/23/2024 ISSUED JOB VALUE NO UNITS Permit Number ISSUED BY SITE APN SITE LOT NO SITE TRACT SITE SUBDIVISION PERMIT TYPE. OCCUPANCY TYPE BUILDING SF NO STORIES DF4 666-082-16 26 $ 17,000 SOLAR PANEL INSTALLA 0 1 0 JOB ADDRESS: 27911 PASEO NICOLE KALLEN, CHARLIEOWNER NAME 27911 PASEO NICOLEMAILING ADDRESS CITY,STATE,ZIP CONTRACTOR NAME ST. LIC EXPIRE ADDRESS CITY, ST, ZIP TENANT NAME PHONE # MAILING ADDR CITY, ST, ZIP I have carefully examined the completed permit application and do hereby certify under penalty of perjury that all information hereon including the declarations are true and correct and I further certify and agree if a permit is issued: to comply with all City, County, and State laws governing building construction, whether specified herein or not. I also agree to save, indemnify and keep harmless the City of San Juan Capistrano against all liabilities, judgments, costs and expenses which may in any way accrue against said City in consequence of the granting of this permit. Applicant's signature Owner/Contractor Print Name INDIGO SOLAR 26820 CRILLY RD 02/29/2024 AMOUNT MECHANICAL PERMIT AMOUNT Expiration:: Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 mounths after the time the work commenced. An OSHA permit is required for excavations over 5’0” deep and demolition or construction of structures over 3 stories in height. _____Contractor:I hereby affirm that I am licensed under provisions of Chapter 9 of Division 3 of the Business and Professions Code, and my license is in full force and effect. _____Owner/Builder:I, as owner of the property, or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale. (Sec.7044, Business and Professions Code: the Contractor’s License Laws does not apply to and owner of property who builds or improves thereon, who does such work himself or through his employees, provided that such improvements are not intended or offered for sale. If however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale) ______Owner/Builder:I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor’s License Law does not apply to an owner of property who builds or improves thereon and who contracts for such projects with a contractor’s) license pursuant to the Contractor’s License Law. _______ Workers Compensation-I hereby affirm under penalty of perjury one of the following declarations:I have and will maintain workers’ compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers’ compensation insurance carrier and policy number are: Carrier__EXEMPT Policy# (This section needs to be completed if the permit is for one hundred dollars($100) or less) AMOUNTELECTRICAL PERMIT DESCRIPTION _______Exemption:I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the workers’ compensation laws of California and agree that if I should become subject to the workers’ compensation provisions of Section 3700 of the Labor Code, I shall forthwith comply with those provisions. WARNING:FAILURE TO SECURE WORKERS’COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TI CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSDAND DOLLARS($100,000) IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES. B23-1264 Total Electrical Total Plumbing Total Mechanical Total Mobile Home 1086834 , CORONA, CA 92883 SAN JUAN CAPISTRANO, CA 92675 (949) 212-6182 (951) 427-4527 PHONE PHONE Date _________________ Applicant _______________________________________ MOBILE HOME PERMIT AMOUNT 14 ROOF MOUNTED SOLAR PANELS. 5.044kW AC SYSTEM. PLUMBING PERMIT CARLOS ARVIZU 4/23/2024 CA FINAL 06/10/24 Date: Permit No. Applicant: Phone/E-Mail Job Location: CITY OF SAN JUAN CAPISTRANO BUILDING PERMIT FEES Account # Type Cost 01-44221 Building Permit 01-44223 Mechanical 01-44224 Plumbing 01-44225 Electrical 01-44221 Mobile Home Permit 01-44222 Grading Permit Fee 01-44231 Grading Plan Check 01-44222 On-Site Residential Permit 01-44231 On-Site Residential Plan Check Subtotal 01-44230 Bond Processing 01-44230 Building Plan Check 01-44230 Additional Plan Check 01-44230 Digital Record Fee ($1.00 per sheet) 01-44221 C & D Administrative Fee 01-44221 Special Inspection-Reinspection 01-44222 On-Site Commercial/Tract Permit Fee 01-44231 On-Site Commercial/Tract Plan Check Fee 01-44214 Geotechnical Soils Plan Review 10-44320 Ordinance 211 10-42510 Ordinance 364 01-45354 Copies @ .20 Each 90-23331 SMIP Fee 33-44370 H.O.P.E. Fee (Housing in Lieu) Other Fees TCA Fees Date Received HOA Approval Date Received School Fees Date Received Engineering Fees Date Received Water Division Fees Date Received 01-44221 01-44221 01-44240 90-23000 90-23000 TOTAL FEES PAYABLE TO CITY OF SAN JUAN CAPISTRANO Receipt # ______________ Date: ______________ Cashier: _____________________________ Refundable Bond/Deposit Posted by ______Owner_____Contractor ________Type Title 24 Energy Provision (20% Permit Subtotal & Bldg Plan Check)) Title 24 ADA Fee (10% Permit Subtotal & Bldg Plan Check) Refundable Bond/Deposit Posted by ______Owner_____Contractor ________Type NPDES Permit Fee (10% Permit Subtotal) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 4/23/2024 $0.00 $0.00 $0.00 4/23/2024 B23-1264 INDIGO SOLAR 27911 PASEO NICOLE (951) 427-4527 $0.00 - Name Address City/State/Zip TENANT NAME Phone ( ) ACCESSORY DWELLING UNIT QTY QTY QTY QTY Light Fixtures/Fans FAU < 100k BTU's Fixtures/Hose Bibs New/Setup Outlets/Switches FAU > 100k BTU's Water Heater Carport Meters/Main Panels AC/Comp BTU= Water Piping Gas Systems Awning Signs Exhaust Fans Temp Power Motors > than 1 HP Motors < than 1 HP Duct/Register/Grill Pool/Spa Pool/Spa Extend Plumbing APPLICANT SIGNATURE DATE Porch ISSUANCE ELECTRICAL PLUMBINGMECHANICAL ISSUANCEISSUANCE Fireplace ISSUANCE Fire Sprinkler Heads Miscellaneous PROPERTY OWNER Appliance Vent CONSTRUCTION TYPE NO. OF STORIES MOBILE HOME PROJECT ADDRESS UNIT #: Extend Electrical Cabana OCCUPANCY GROUP(S) SPRINKLERS PERMIT NUMBER JOB VALUATION Pool/Spa Vent/Exhaust Hood Miscellaneous Grease Interceptor Earthquake Bracing Electrical Wiring Gas Piping Sewage Disposal Water Piping City of San Juan Capistrano DeDevelopment Services Department 32400 Paseo Adelanto SaSan Juan Capistrano, CA 92675 Phone: (949) 443-6347 Email:building@sanjuancapistrano.org www.sanjuancapistrano.org/building Building Sewer ATTACHED DETACHED NEW CONSTRUCTION CONVERSION OF EXISTING STRUCTURE JADU 1. 2. OCCUPANCY CURRENT OCCUPANCY PROPOSED INT. ALT. ADDITION PATIO POOL/SPA DEMOLITION EXISTING BUILDING ____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT. NEW BUILDING ____SQ.FT.____SQ.FT.____SQ.FT.____SQ.FT. ________________ OCC. GROUP DESCRIPTION OF WORK COMBINING OR SUBDIVIDING SUITES? CHANGE OF OCCUPANCY USE? YES NO YES NO YES NO APPLICANT CONTACT NAME CONTACT PHONE ( ) EMAIL ADDRESS $ PRINT NAME As the applicant for this project, I am aware of the potential liabilities with undertaking construction within any private easement or use restriction area that may exist on this property. I acknowledge that I have or will review the Title Report for this property to ensure that this project does not impact any private easements or use restriction areas. By signing below, I CERTIFY THE ABOVE INFORMATION TO BE TRUE AND CORRECT. CONTRACTOR State License #: Name Address City/State/Zip BUILDING PERMIT APPLICATION LL 06/28/23 WARNING: THIS PERMIT APPLICATION WILL EXPIRE 180 DAYS FROM THE DATE SHOWN BELOW UNLESS THE PERMIT HAS BEEN ISSUED OR AN EXTENSION IS APPROVED BY THE BUILDING OFFICAL PRIOR TO APPLICATION EXPIRATION. ____/____/____ : 27911 PASEO NICOLE, SAN JUAN CAPISTRANO, CA 92675 17,000 SYSTEM SIZE: 5.46kW DC, 5.044kW CEC-AC MODULES: (14) JA SOLAR JAM54S31-390/MR INVERTER: (1) SOLAREDGE SE3800H-US [240V] OPTIMIZERS: (14) SOLAREDGE P400 RACKING: IRONRIDGE ROOF TYPE: COMP SHINGLE 09 11 23 B23 1264 NO MPU/BBU GENERAL REQUIREMENTS Y N Y N Y N Y N 1.System size is 10 kW  rating or less 2.Solar array is roof mounted on a one or two family dwelling OR accessory dwelling unit (ADU) 3.Solar panels/module arrays will not exceed the maximum legal building height 4.Solar system is utility interactive and without battery storage 5. New roofing material directly below the solar array may be installed by a separate roofing contractor or the solar installation contractor. Any roofing outside of the array footprint will require a separate permit from a licensed roofing contractor. RESIDENTIAL PHOTOVOLTAIC ELIGIBILITY CHECKLIST Solar Photovoltaic (PV) Checklist for Detached One- or Two- Family Dwellings Instructions: The licensed contractor of record shall fill in the address of the project, contractor’s licensing information and answer each statement with Y or N. Complete and sign the certification section. ** If any items are checked NO, plan check shall be required ** Project Address: ___________________________________________________ Contractor Company Name: ____________________________________________________ Contractor State License Number: ____________________________________________________ City of SJC Business License Number: _________________________________ City of San Juan Capistrano DeDevelopment Services Department 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Phone: (949) 443-6347 Email: building@sanjuancapistrano.org www.sanjuancapistrano.org/building 07/03/23 LL 1.Permit Application (Completed & Attached) 2.Signed Contract or letter of intent with the homeowner is provided with submittal 3.Structural Roof Criteria and supporting documentation is attached and stamped by a licensed design professional 4.Electrical load calculation is required for all installations. (MUST BE COMPLETED ON CITY STANDARD TEMPLATE) 5.SDG&E Work Order is required for all Main Panel Upgrades 6.Clear photographs required of existing main service panel and subpanels showing ALL circuit breakers/ loads and panel board/bus ratings. 7.Manufacturers Specifications required for ALL electrical components that will be installed Y N Y N Y N Y N Y N Y N Y N STRUCTURAL REQUIREMENTS 1.A completed Structural Criteria and supporting documentation is attached and stamped by a licensed design professional for solar array attachment and/or any separate structure or racking supporting array or equipment. Y N Y N CITY SPECIFIC REQUIREMENTS FIRE SAFETY REQUIREMENTS 1.Clear access pathways provided per OCFA and CRC guidelines 2.Fire classification solar system is provided (Class A) 3.All required markings and labels are provided 4.Diagram of the roof layout of all panels, modules, clear access pathways and approximate locations of electrical disconnecting means and roof access points is completed and attached **Renewable Meter Adapter (RMA) installations must be approved by SDG&E and have a separate GEC. Any and all grounding work not performed by SDG&E, including but not limited to the RMA disconnect, will be performed by the Solar Contractor. I certify under penalty of perjury under the laws of the State of California that the above is true and correct. I understand that all approvals are subject to field inspection. Field corrections may require a formal revision submitted for plan review. A re-inspection fee may be assessed when work is not ready, inspection card and/or approved plans are not available, no access has been provided or there is any deviation from the approved plans.: Print Name: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Date: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ  Signature: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Phone Number:ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ Email Address: ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ ELECTRICAL REQUIREMENTS 1.The PV system is interconnected to a single-phase AC service panel of nominal 120/220 Vac with a bus bar rating of 225A or greater 2.The PV system is connected to the load side of the utility distribution equipment** 3.A Solar PV Standard Plan and supporting documentation is completed and attached Y N Y N Y N Y N Y N Y N Y N RESIDENTIAL ELECTRICAL LOAD A Review the electrical loads in the table below and check all that exist in the home (be sure to include the proposed Level 2 EVCE and/or Photovoltaic System). Fill in the corresponding wattage for each item checked, and then add up all the checked items to determine total wattage used. Wattages shown are rough estimates: for a more precise analysis use actual values based on nameplate ratings or consult with an electrical professional. _______________________________________________________________________________ STATEMENT OF COMPLIANCE: By my signature, I attest that the information provided is true and accurate. _________________________________________________________________ (Print Name) __________________________________ __________ (Signature of Applicant) (Date) Note: This form is a voluntary compliance alternative and you may wish to hire a qualified individual or company to perform a thorough evaluation of your electrical service capacity in lieu of this methodology. Use of this electrical load calculation worksheet is at the user’s risk and carries no implied guarantee of accuracy. Users of this form are advised to seek professional assistance in determining the electrical capacity of a service panel. CITY OF SAN JUAN CAPISTRANO CBC/CRC 105.4.shall not be construed of any of the provisions of the applicable code or of any other ordinance of the violate or cancel provisions of the applicable code or other ordinances of the jurisdiction based on construction prevent the building in the construction Every EverEver permit authorized by such permit is commenced within 12 months after its issuance, or if the work abandoned for a period of 12 months after the time the APPROVED B TE: ______________ PERMIT #: _______________________ ______________ COMMENTS: __________________________________________COMMENTS: __________________________________________COMMENTS: ____________________________________________ WĂŐĞϮͬϯ Check All Applicable Description of Load Volt-Amps on Nameplate Rating (Watts) Volt-Amps Used General Lighting/Power Load ZĞƋƵŝƌĞĚ Total Square footage of building times 3 sf džϯǀŽůƚͲĂŵƉ ZĞƋƵŝƌĞĚ Kitchen Small Appliance Branch Circuits (min. 2) 1,500 volt-amps/circuit ZĞƋƵŝƌĞĚ Laundry Circuit (min. 1) 1,500 Volt-Amps Appliances and Equipment Except Air Conditioner(s) Microwave 1,400 watts Trash Compactor 1,000 watts Dishwasher 1,500 watts Disposal 1,000 watts Electric Oven 2,000 watts Electric Range 5,000 watts Induction Range 10,000 watts Electric Clothes Dryer 4,000 watts Electric Clothes Washer 500 watts Electric Tankless Water Heater 15,000 watts Electric Water Heater 4,000 watts Electric Heat Pump Water Heater 550 watts Required on new homes Electric Vehicle Supply Equipment (EVSE) 7,000 watts Evaporative Cooler 500 watts Pool or Spa 2,000 watts Other: Other: Other: Sub-Total Volt-Amps Used (add up V-A used for everything checked) Ͳ ϭϬ͕ϬϬϬsͲ Subtotal (A) x .40 Subtotal (B) н ϭϬ͕ϬϬϬsͲ Subtotal (C) Heating and Air-Conditioning (ĚĚ the largest of the following): н 1. Air conditioning and cooling (100% of nameplate (NP) rating) = 2. Heat pump without supplemental heating (100% NP Rating) = 3. Heat pump with supplemental electric heat (100% NP plus 65%) = 4. Electrical space heating , 4 separate units (65% NP rating) = 5. Electrical space heating > 4 separate units (40% NP rating) = 6. Electrical thermal storage and other 100% NP rating = Total Current Demand (Volt-Amps) = Divided by 240 Volts = Amps Total Amps Required for Service Conductors and Panel = Rating of Existing Electrical Service or Subpanel (Amps)= Panel Upgrade Required?;z^KZEKͿ Rating of WƌŽƉŽƐĞĚ Electrical Service or Subpanel (/&z^Ks)= watts watts watts >>ϬϱͬϭϱͬϮϯ 4,638 3,000 1,500 1,400 1,500 1,000 2,000 4,000 500 19,538 9,538 3,815 13,815 14,400 28,215 125 NO 118 ✔ ✔ ✔ ✔ ✔ ✔ 1,546 118 STRUCTURAL CALCULATIONS 27911 Paseo Nicole Prepared for: San Juan Capistrano, CA 92675 Kallen Residence Rooftop Photovoltaic Array Addition ISE Project#: 7501.04 December 13, 2023 Engineer Seal Indigo Solar 26820 Crilly Rd. Corona, CA 92883 A TSA T O CFE AI L FI O NR No. S5627 Exp. 6/30/2024 L HETSIGERW P ARED R SEFO N .D GOIREENOSI N LA RHT O NESPS TRUCT U R A L 40810 County Center Drive, Suite 110 Temecula, CA 92591 P: 951.600.0032 www.ISEengineers.com DIANNA F.02/07/24B23-1264SUBJECT TO FIELD INSPECTION Gravity Design Loads: Roof Type: Live Load:20.0 psf Dead Load: Asphalt Shingle:4.2 psf Sheathing:1.5 psf Roof framing members:2.5 psf Drywall:2.0 psf Insulation:1.0 psf Miscellaneous:0.5 Total solar array weight 2.46 psf (Solar panel + Racking + Anchor) 11.70 psf 14.16 psf 31.7 psf 34.2 psf 294 ft2 (Area of affected roof trusses/rafter) 1187 ft2 294 ft2 1187 ft2 (Area of affected LFRS) Gravity Load Demand-Capacity Ratio: (CEBC Section 502.4) 0.61 psf 1.92% < 5.0% LFRS Demand-Capacity Ratio: (CEBC Section 502.5) 0.61 psf 5.21% < 10.0% Photovoltaic Array Addition at Buildings 2022 California Building Code Sections 502.4 & 502.5 - Additions Total Area of Affected Roof (for lateral check) = Total Load Increase at Affected Roof = Area of Solar Array Addition (for lateral check) = Roof Dead Load w/o Solar Array = Roof Dead Load w/ Solar Array = Total Roof Load w/o Solar Array = Total Roof Load w/ Solar Array = Area of Solar Array Addition (for gravity check) = Total Area of Affected Roof (for gravity check) = Asphalt Shingle roofing w/ 1/2" plywood sheathing over 2x4 rafters at 24" o.c., 5/8" gypsum board ceiling, insulation, and miscellaneous loading Percentage of Total Load Increase = Per 2022 CBC 502.4 additional solar array weight is structurally acceptable Dead Load Increase at Entire Roof = Percent. Dead Load Increase on Entire Roof = Per 2022 CBC 502.5 additional solar array weight is structurally acceptable 40810 County Center Drive, Suite 110 Temecula, CA 92591 P: 951.600.0032 www.ISEengineers.com psf ft2 Embed, in Z, lb NDS Table 12K 2.5 220 lb/Mt (Cd=1.6) lb/Mt (Cd=1.6) ASCE 7-16, Sec. 11.4.2 Longitude, deg USGS -117.6435 USGS Site Coefficient, Fa = Site Coefficient, Fv =Table 11.4-2 SDS = 2/3 Fa*Ss =ASCE 7-16, EQ 11.4-3 SD1 = 2/3 Fv*S1 =ASCE 7-16, EQ 11.4-4 Importance Factor, Ie =ASCE 7-16, Table 1.5-2 Height of Equipment, z =ft, Sec. 13.3.1.1 Height of Roof, h =ft, Sec. 13.3.1.1 ap =Table 13.6-1 Rp =Table 13.6-1 Fp=(0.4apSDSIp)(1+2z/h)/(Rp/Ip) =EQ 13.3-1 Fp max = 1.6SDSIp =[Not Greater Than]EQ 13.3-2 Fp min = 0.3SDSIp =[Not Less Than]EQ 13.3-3 Sf = Fp/1.4 =Horizontal Seismic Force ASCE 7-16, EQ 12.4-3 Sfv = 0.2SDS/1.4 =Vertical Seismic Force ASCE 7-16, EQ 12.4-4 Vseismic = Sf*Warray*AREAarray =lb, Total Lateral Load on Seismic Anchors Tseismic = Sfv*Warray*AREAarray =lb, Total Vertical Load on Seismic Anchors No. of Anchors = Vseismic/Vallow =No. of Required Lateral Load Seismic Anchors No. of Anchors = Tseismic/Tallow =No. of Required Vertical Load Seismic Anchors Total No. of Required Anchors =Worst Case Tension or Shear No. of Anchors Supplied = 1.276 0.239 Solar Array Properties (Per Solar Array Designer) Warray:2.46 Aarray:294.0 Number of Required Seismic Anchors (Tension & Shear) 361 82 CBC/IBC Alternate Load Combinations (ASD) - Section 1605.3.2, EQ. 16-20 & 16-21 0.499 0.114 1.0 0.1 2 22 Standoff Mounts per solar designer plans Vallow (NDS Table 12K) :352 1 5/16"266 Tallow (NDS Table 12.2A) : 0.439 1.00 33.5083 1064 1.04 0.798 1.59 16.00 14.00 Determine Fp, Seismic Design Force (STRENGTH LEVEL) - ASCE 7-16 Section 13.3.1 0.699 1.50 1.00 S1 =0.415 Latitude, deg Design Parameters Site Class =D Ss =1.151 Roof Mounted Solar Array - Earthquake Analysis Earthquake Design per ASCE 7-16 - Section 13.6 (Mechanical/Electrical Components) Solar Attachment Standoff Anchor:# screws/ standoff Diameter, in W, lb/in NDS Table 12.2A Seismic Anchor Properties 40810 County Center Drive, Suite 110 Temecula, CA 92591 P: 951.600.0032 www.ISEengineers.com PSF FT2 lb/Mt (Cd=1.6) lb/Mt (Cd=1.6) Basic Wind Speed, V :mph (Per ASCE Hazard Tool) Section 26.7 Total Effective Area of Typical Array :ft2 Panel Area to Each Support :ft2 Angle of Panels :degrees "a" :ft (3ft. Min.) ft, above sea level ft Section 26.12 Table 1.5-1 qh = 0.00256 Kh Kzt Kd Ke V2 I = psf Load case 0.6*W Kh =Table 26.10-1 Kzt =Figure 26.8-1 Kd =Table 26.6-1 Ke =Table 26.9-1 I = Table 1.5-1 Internal Pressure Coeff. = (+/-) GCpi =Table 26.13-1 δe = Array edge factor, Figure 29.4-7 δa = Pressure equalization, Figure 29.4-8 Worst Case Zone 1 & 2, Min 100 sf GCp (Zone 1) = GCp (Zone 2) = (+) P = qh (GCp - GCpi) = Lateral Load at Each Mount =lbs OK < Vallow Compression / Uplift at Each Mount =lbs OK < Tallow 16.0 -12.2 psf, Positive Wind (16 psf min), Solar panels located in Zone 1 & 287-66 195 -149 -1.80 Per Figures 30.3-2A thru 30.3- 0.80 -2.20 Per Figures 30.3-2A thru 30.3- 1.00 0.18 1.50 0.40 0.80 Determine Wind Force at Each Roof Mount 10.1 0.86 1.0 0.85 1.00 Structure Risk Category :II Enclosure Classification :Enclosed Height above ground level, z :16.0 Ground Elevation, Zg :121 24 3 294 13.36 95 Wind Exposure :C Design Parameters Vallow (NDS Table 12K) :352 Wind Anchor Properties (Per Seismic Anchor Check) Tallow (NDS Table 12.2A) :1064 Aarray :294.0 Roof Mounted Solar Array - MWFRS Wind Analysis per ASCE 7-16, Sec. 29.4.4 (Solar Panels Parallel to Roof < 2 °) Solar Array Properties (Per Solar Array Designer) W array :2.46 40810 County Center Drive, Suite 110 Temecula, CA 92591 P: 951.600.0032 www.ISEengineers.com Roof Mounted Solar Array - ASCE 7 Hazard Tool - WIND Report 40810 County Center Drive, Suite 110 Temecula, CA 92591 P: 951.600.0032 www.ISEengineers.com Roof Mounted Solar Array - ASCE 7 Hazard Tool - SEISMIC Report 40810 County Center Drive, Suite 110 Temecula, CA 92591 P: 951.600.0032 www.ISEengineers.com