B19-1527 - 30333 CAMINO CAPISTRANOApollo Inspection Service, Inc.
Serving Southern California Since 1990
Contractor ________________________________
Architect/
Designer________________________________
Sub ______________________________________Engineer_________________________________
_
Deputy/Special Inspector Daily Report
and Certifificate of Compliance
Description of work observed
Inspections are based on a 4 hour minimum. After 4 hrs is 8 hrs. Over 8
and Saturdays are time and one half.
Reg. Hrs.___ O.T.Hrs.___ Test Cyls____Type________
BillTo:________________________________________
_____________________________________________
_____________________________________________
Approved______________________________________
Project Superintendent-Foreman-Other
Permit___________________________________
_
I hereby certify that, unless otherwise noted, I have observed all of the
above reported work. To the best of my knowledge and belief, I have
found this work to comply with the approved plans, specififications, and
applicable section(s) of the governing Building Code.
_____________________________________
Special/Deputy Inspector-Print
Sign_____________________________________
Special/Deputy Inspector-Sign
Date_____________________________________
Lic.No._______________Agency__________________
The Owner or a successor in interest shall hold harmless Apollo Inspection Service, Inc., a
California Corporation, from any and all legal proceedings of any nature whatsoever, that are
related to the inspection services provided in this report.. Should Apollo Inspection Service, Inc.
be required to institute legal action for the collection of a debt incurred as the result of the
acceptance of this report, Apollo Inspection Service, Inc. shall be entitled to Attorney''s fees and
costs iincurred in said action.
2409 Faircross Street
Torrance, CA 90505
310-995-6007 cel
310-326-9787 ofc
310-326-5841 fax
admin@apolloinspection.com
Project___________________________________
Address__________________________________
_________________________________________
Owner___________________________________
________________________________________
Shawn Nelson
5281691 ICC
5-17-21B19-1530
SJC Groves LP The Grove Senior Apartment
30333 Camino Capistrano
San Juan Capistrano
C&C Construction Services Inc.
OC Concrete
IDE Arc
Gouvis Engineering
Observed placement of 3000 psi concrete for foundation footings
section D&E gridlines AA-O / 1-12. Concrete supplied by Cemex ready mix . Mix
design # 1418319 . (2) sets of (4) cylinders cast for strength testing . Work mechanically
vibrated . Total of 240 yards placed.
Conduits adjusted at strongwall and hairpins placed prior to
concrete placement .
C&C Construction Services Inc.
4 8 4x8
FINAL
09/30/2022
Form - Structural Observation Report v1.0.doc Updated: 06-28-17 Page 1 of 2
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box)
FOUNDATIONS WALLS FRAMES DIAPHRAGMS (Floor/Roof) IF PORTION OF BLDG WAS DATE
… Footing, Stem Wall Concrete Steel Moment Frame Concrete
Mat Foundation,
Pre-stressed Conc. Slab Masonry Steel Braced Frame Steel Deck
Caisson, Pile, Grade
Beam Wood Shear Wall
Panel Concrete Moment
Frame Wood
Foundation Pad, Anchor Other: Masonry Wall Frame Other:
Other: Other: Other: Other:
City of San Juan Capistrano Development Services Department Building and Safety Division
Structural Observation Report
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for general conformance to the approved construction documents at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC.
This report includes all construction work through day of , 20 . Report No.: Page No.: of
Project Address: Structural Observer of Record (SOR): Professional Lic./Reg. No.: Phone No. of SOR:
Building Permit No.: Structural Observer (SO), if not by SOR: Professional Lic./Reg. No.: Phone No. of SO:
OBSERVED, INDICATE LOCATION
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
OBSERVED DEFICIENCIES AND COMMENTS:
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge: 1. I am the Registered Design Professional retained by the Owner to be in responsible charge of the structural observation in accordance with the requirements of the City of San Juan Capistrano; 2. I, or another Registered Design Professional whom I have designated above and is under my responsible charge, has performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. I understand that all deficiencies which I have documented must be corrected and a new structural observation report must be issued clearing these deficiencies; and 4. I understand that final acceptance of the structural systems by the Building and Safety Division cannot occur without the correction of all observed deficiencies.
SIGNATURE OF STRUCTURAL OBSERVER OF RECORD DATE STAMP OF STRUCTURAL OBSERVER OF RECORD
32400 Paseo Adelanto San Juan Capistrano, CA 92675
Phone: (949) 443-6347 Website: www.sanjuancapistrano.org
2nd June 21 1 1 1
30333 Camino Capistrano Gouvis group 9497521612
B19-1527 Basil Ammari C052030 9497521612
Area A,B 6-2-21
Observed slab on area A and B. Provide chairs under rebar. No other deficiencies.
6-2-21
Job number: 65246
Form - Structural Observation Report v1.0.doc Updated: 06-28-17 Page 1 of 2
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box)
FOUNDATIONS WALLS FRAMES DIAPHRAGMS (Floor/Roof) IF PORTION OF BLDG WAS DATE
… Footing, Stem Wall Concrete Steel Moment Frame Concrete
Mat Foundation,
Pre-stressed Conc. Slab Masonry Steel Braced Frame Steel Deck
Caisson, Pile, Grade
Beam Wood Shear Wall
Panel Concrete Moment
Frame Wood
Foundation Pad, Anchor Other: Masonry Wall Frame Other:
Other: Other: Other: Other:
City of San Juan Capistrano Development Services Department Building and Safety Division
Structural Observation Report
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for general conformance to the approved construction documents at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC.
This report includes all construction work through day of , 20 . Report No.: Page No.: of
Project Address: Structural Observer of Record (SOR): Professional Lic./Reg. No.: Phone No. of SOR:
Building Permit No.: Structural Observer (SO), if not by SOR: Professional Lic./Reg. No.: Phone No. of SO:
OBSERVED, INDICATE LOCATION
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
OBSERVED DEFICIENCIES AND COMMENTS:
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge: 1. I am the Registered Design Professional retained by the Owner to be in responsible charge of the structural observation in accordance with the requirements of the City of San Juan Capistrano; 2. I, or another Registered Design Professional whom I have designated above and is under my responsible charge, has performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. I understand that all deficiencies which I have documented must be corrected and a new structural observation report must be issued clearing these deficiencies; and 4. I understand that final acceptance of the structural systems by the Building and Safety Division cannot occur without the correction of all observed deficiencies.
SIGNATURE OF STRUCTURAL OBSERVER OF RECORD DATE STAMP OF STRUCTURAL OBSERVER OF RECORD
32400 Paseo Adelanto San Juan Capistrano, CA 92675
Phone: (949) 443-6347 Website: www.sanjuancapistrano.org
1st June 21 1 1 1
30333 Camino Capistrano Gouvis group 9497521612
B19-1527 Basil Ammari C052030 9497521612
Area C,D,E 6-1-21
Observed slab on area C,D,E. No deficiencies.
6-1-21
Job number: 65246
Apollo Inspection Service, Inc.
Serving Southern California Since 1990
Contractor ________________________________
Architect/
Designer________________________________
Sub ______________________________________Engineer_________________________________
_
Deputy/Special Inspector Daily Report
and Certifificate of Compliance
Description of work observed
Inspections are based on a 4 hour minimum. After 4 hrs is 8 hrs. Over 8
and Saturdays are time and one half.
Reg. Hrs.___ O.T.Hrs.___ Test Cyls____Type________
BillTo:________________________________________
_____________________________________________
_____________________________________________
Approved______________________________________
Project Superintendent-Foreman-Other
Permit___________________________________
_
I hereby certify that, unless otherwise noted, I have observed all of the
above reported work. To the best of my knowledge and belief, I have
found this work to comply with the approved plans, specififications, and
applicable section(s) of the governing Building Code.
_____________________________________
Special/Deputy Inspector-Print
Sign_____________________________________
Special/Deputy Inspector-Sign
Date_____________________________________
Lic.No._______________Agency__________________
The Owner or a successor in interest shall hold harmless Apollo Inspection Service, Inc., a
California Corporation, from any and all legal proceedings of any nature whatsoever, that are
related to the inspection services provided in this report.. Should Apollo Inspection Service, Inc.
be required to institute legal action for the collection of a debt incurred as the result of the
acceptance of this report, Apollo Inspection Service, Inc. shall be entitled to Attorney''s fees and
costs iincurred in said action.
2409 Faircross Street
Torrance, CA 90505
310-995-6007 cel
310-326-9787 ofc
310-326-5841 fax
admin@apolloinspection.com
Project___________________________________
Address__________________________________
_________________________________________
Owner___________________________________
________________________________________
Shawn Nelson
5281691 ICC
6-1-21B19-1530
SJC Groves LP
30333 Camino Capistrano
San Juan Capistrano
The Grove Senior Apartment
IDE Arc
Gouvis Engineering
C&C Construction Services Inc.
OC Concrete
On site for rebar inspection foundation slab sections C , D & E .
# 3 60 Grade rebar placed @ 16 “ OC . Details sheet S-1.1 and SD-1 . 4 “ thick slab
to be placed .
Concrete placement upon city offcials approval .
C&C Construction Services Inc.
4
Apollo Inspection Service, Inc.
Serving Southern California Since 1990
Contractor ________________________________
Architect/
Designer________________________________
Sub ______________________________________Engineer_________________________________
_
Deputy/Special Inspector Daily Report
and Certifificate of Compliance
Description of work observed
Inspections are based on a 4 hour minimum. After 4 hrs is 8 hrs. Over 8
and Saturdays are time and one half.
Reg. Hrs.___ O.T.Hrs.___ Test Cyls____Type________
BillTo:________________________________________
_____________________________________________
_____________________________________________
Approved______________________________________
Project Superintendent-Foreman-Other
Permit___________________________________
_
I hereby certify that, unless otherwise noted, I have observed all of the
above reported work. To the best of my knowledge and belief, I have
found this work to comply with the approved plans, specififications, and
applicable section(s) of the governing Building Code.
_____________________________________
Special/Deputy Inspector-Print
Sign_____________________________________
Special/Deputy Inspector-Sign
Date_____________________________________
Lic.No._______________Agency__________________
The Owner or a successor in interest shall hold harmless Apollo Inspection Service, Inc., a
California Corporation, from any and all legal proceedings of any nature whatsoever, that are
related to the inspection services provided in this report.. Should Apollo Inspection Service, Inc.
be required to institute legal action for the collection of a debt incurred as the result of the
acceptance of this report, Apollo Inspection Service, Inc. shall be entitled to Attorney''s fees and
costs iincurred in said action.
2409 Faircross Street
Torrance, CA 90505
310-995-6007 cel
310-326-9787 ofc
310-326-5841 fax
admin@apolloinspection.com
Project___________________________________
Address__________________________________
_________________________________________
Owner___________________________________
________________________________________
B19-1527
30333 Camino Capistrano
The Grove Senior Apartments
San Juan Capistrano, Ca 92675
C&C Construction
.
8/13/21
Gouvis Engineering
Arrived on site to provide periodic special inspection at Sections D and E of 1st Level shear walls requiring nailing at
4” on center or less and 2nd Level floor sheathing. Referenced sheet SN1 Shear Wall Schedule. Referenced sheets
S-1.1C, S-1.1D, S-1.2C and S1.2D for wall types and locations, as well as Holdown Schedule and anchor spacing.
Inspection included sheathing type and thickness. Verified nail spacing, edge distance and penetration. Inspected top and
bottom shear transfers. All walls were complete with the exception of party walls between units. 1 side was sheathed and
both walls were checked for anchor bolts and HDU’s. 2nd Level floor sheathing was nailed per contract documents.
4 Michael Vidovich
8292714 ICC
Idearc
Apollo Inspection Service, Inc.
Serving Southern California Since 1990
Contractor ________________________________
Architect/
Designer________________________________
Sub ______________________________________Engineer_________________________________
_
Deputy/Special Inspector Daily Report
and Certifificate of Compliance
Description of work observed
Inspections are based on a 4 hour minimum. After 4 hrs is 8 hrs. Over 8
and Saturdays are time and one half.
Reg. Hrs.___ O.T.Hrs.___ Test Cyls____Type________
BillTo:________________________________________
_____________________________________________
_____________________________________________
Approved______________________________________
Project Superintendent-Foreman-Other
Permit___________________________________
_
I hereby certify that, unless otherwise noted, I have observed all of the
above reported work. To the best of my knowledge and belief, I have
found this work to comply with the approved plans, specififications, and
applicable section(s) of the governing Building Code.
_____________________________________
Special/Deputy Inspector-Print
Sign_____________________________________
Special/Deputy Inspector-Sign
Date_____________________________________
Lic.No._______________Agency__________________
The Owner or a successor in interest shall hold harmless Apollo Inspection Service, Inc., a
California Corporation, from any and all legal proceedings of any nature whatsoever, that are
related to the inspection services provided in this report.. Should Apollo Inspection Service, Inc.
be required to institute legal action for the collection of a debt incurred as the result of the
acceptance of this report, Apollo Inspection Service, Inc. shall be entitled to Attorney''s fees and
costs iincurred in said action.
2409 Faircross Street
Torrance, CA 90505
310-995-6007 cel
310-326-9787 ofc
310-326-5841 fax
admin@apolloinspection.com
Project___________________________________
Address__________________________________
_________________________________________
Owner___________________________________
________________________________________
8/20/2021BLD19-1527
The Grove Senior Apartment SJC Groves LP
30333 Camino Capistrano
San Juan Capistrano
IDE Arc
Gouvis Engineering
C&C Construction Services Inc.
OC Concrete
Observed placement of 5/8 “ threaded rod for additional
anchor bolts placed at buildings C & B . Detail 19 on sheet SN-3. 7” embed.
All locations brushed and blown prior to placement .
Simpson XP epoxy used. ESR - 2508 Exp. date 6-19-23 .
C&C Construction Services Inc.
Shawn Nelson
5281691 ICC
4
Apollo Inspection Service, Inc.
Serving Southern California Since 1990
Contractor ________________________________
Architect/
Designer________________________________
Sub ______________________________________Engineer_________________________________
_
Deputy/Special Inspector Daily Report
and Certifificate of Compliance
Description of work observed
Inspections are based on a 4 hour minimum. After 4 hrs is 8 hrs. Over 8
and Saturdays are time and one half.
Reg. Hrs.___ O.T.Hrs.___ Test Cyls____Type________
BillTo:________________________________________
_____________________________________________
_____________________________________________
Approved______________________________________
Project Superintendent-Foreman-Other
Permit___________________________________
_
I hereby certify that, unless otherwise noted, I have observed all of the
above reported work. To the best of my knowledge and belief, I have
found this work to comply with the approved plans, specififications, and
applicable section(s) of the governing Building Code.
_____________________________________
Special/Deputy Inspector-Print
Sign_____________________________________
Special/Deputy Inspector-Sign
Date_____________________________________
Lic.No._______________Agency__________________
The Owner or a successor in interest shall hold harmless Apollo Inspection Service, Inc., a
California Corporation, from any and all legal proceedings of any nature whatsoever, that are
related to the inspection services provided in this report.. Should Apollo Inspection Service, Inc.
be required to institute legal action for the collection of a debt incurred as the result of the
acceptance of this report, Apollo Inspection Service, Inc. shall be entitled to Attorney''s fees and
costs iincurred in said action.
2409 Faircross Street
Torrance, CA 90505
310-995-6007 cel
310-326-9787 ofc
310-326-5841 fax
admin@apolloinspection.com
Project___________________________________
Address__________________________________
_________________________________________
Owner___________________________________
________________________________________
Shawn Nelson
5281691 ICC
5-25-21B19-1530
SJC Groves LP
IDE Arc
Gouvis Engineering OC Concrete
The Grove Senior Apartment
30333 Camino Capistrano
San Juan Capistrano
C&C Construction Services Inc.
On site for foundation footing inspection prior to concrete
placement . Sections A and B . 60 grade rebar placed per approved plans . Details
on sheet SD-1. Hold downs and anchor bolts in place and secured . Concrete
placement upon city official and engineers approval .
C&C Construction Services Inc.
4
Apollo Inspection Service, Inc.
Serving Southern California Since 1990
Contractor ________________________________
Architect/
Designer________________________________
Sub ______________________________________Engineer_________________________________
_
Deputy/Special Inspector Daily Report
and Certifificate of Compliance
Description of work observed
Inspections are based on a 4 hour minimum. After 4 hrs is 8 hrs. Over 8
and Saturdays are time and one half.
Reg. Hrs.___ O.T.Hrs.___ Test Cyls____Type________
BillTo:________________________________________
_____________________________________________
_____________________________________________
Approved______________________________________
Project Superintendent-Foreman-Other
Permit___________________________________
_
I hereby certify that, unless otherwise noted, I have observed all of the
above reported work. To the best of my knowledge and belief, I have
found this work to comply with the approved plans, specififications, and
applicable section(s) of the governing Building Code.
_____________________________________
Special/Deputy Inspector-Print
Sign_____________________________________
Special/Deputy Inspector-Sign
Date_____________________________________
Lic.No._______________Agency__________________
The Owner or a successor in interest shall hold harmless Apollo Inspection Service, Inc., a
California Corporation, from any and all legal proceedings of any nature whatsoever, that are
related to the inspection services provided in this report.. Should Apollo Inspection Service, Inc.
be required to institute legal action for the collection of a debt incurred as the result of the
acceptance of this report, Apollo Inspection Service, Inc. shall be entitled to Attorney''s fees and
costs iincurred in said action.
2409 Faircross Street
Torrance, CA 90505
310-995-6007 cel
310-326-9787 ofc
310-326-5841 fax
admin@apolloinspection.com
Project___________________________________
Address__________________________________
_________________________________________
Owner___________________________________
________________________________________
B19-1527
The grove senior apartments
30333 Camino CapistranoSan Juan Capistrano
C&C Construction
Framing
08-22-2021
Idearc
Gouvis Eng.
Work was observed to been completed per the project documents and drawings as provided.
Work was observed to be Complete at the areas as described above.
Observed the floor deck at the second level for the spacing and locations and penitrations and to be free of excessive edge nailing damages.
Observed the shear wall nailing of the first floor area "C" at the areas of installation requiring nailingvalues of 4" and less, as well the areas of the floor sheathing of the second level was observed to be nailed at 6 / 12. Observed the placement and attachment of the shear wall HDs and plate anchor spacing and locations per SN1 and the applicable details.
Observed the nailing for the spacing, thicknesses and locations and to be completed at the areas shown per the structural drawings.
8250109 ICC
Robert Lisk
Apollo Inspection Service, Inc.
Serving Southern California Since 1990
Contractor ________________________________
Architect/
Designer________________________________
Sub ______________________________________Engineer_________________________________
_
Deputy/Special Inspector Daily Report
and Certifificate of Compliance
Description of work observed
Inspections are based on a 4 hour minimum. After 4 hrs is 8 hrs. Over 8
and Saturdays are time and one half.
Reg. Hrs.___ O.T.Hrs.___ Test Cyls____Type________
BillTo:________________________________________
_____________________________________________
_____________________________________________
Approved______________________________________
Project Superintendent-Foreman-Other
Permit___________________________________
_
I hereby certify that, unless otherwise noted, I have observed all of the
above reported work. To the best of my knowledge and belief, I have
found this work to comply with the approved plans, specififications, and
applicable section(s) of the governing Building Code.
_____________________________________
Special/Deputy Inspector-Print
Sign_____________________________________
Special/Deputy Inspector-Sign
Date_____________________________________
Lic.No._______________Agency__________________
The Owner or a successor in interest shall hold harmless Apollo Inspection Service, Inc., a
California Corporation, from any and all legal proceedings of any nature whatsoever, that are
related to the inspection services provided in this report.. Should Apollo Inspection Service, Inc.
be required to institute legal action for the collection of a debt incurred as the result of the
acceptance of this report, Apollo Inspection Service, Inc. shall be entitled to Attorney''s fees and
costs iincurred in said action.
2409 Faircross Street
Torrance, CA 90505
310-995-6007 cel
310-326-9787 ofc
310-326-5841 fax
admin@apolloinspection.com
Project___________________________________
Address__________________________________
_________________________________________
Owner___________________________________
________________________________________
8-27-21BLD19-1527
SJC Groves LP The Grove Senior Apartments
30333 Camino Capistrano
San Juan Capistrano
IDE Arc
Gouvis Engineering
C&C Construction Services Inc.
OC Concrete
Observed placement of 5/8 “ threaded rod for additional
anchor bolts placed at building A . Detail 19 on sheet SN-3 . 7 “ embed .
All locations brushed and blown prior to placement .
Simpson XP epoxy used. ESR - 2508 Exp. 6-19-23
C&C Construction Services Inc.
4Shawn Nelson
5281691 ICC
Apollo Inspection Service, Inc.
Serving Southern California Since 1990
Contractor ________________________________
Architect/
Designer________________________________
Sub ______________________________________Engineer_________________________________
_
Deputy/Special Inspector Daily Report
and Certifificate of Compliance
Description of work observed
Inspections are based on a 4 hour minimum. After 4 hrs is 8 hrs. Over 8
and Saturdays are time and one half.
Reg. Hrs.___ O.T.Hrs.___ Test Cyls____Type________
BillTo:________________________________________
_____________________________________________
_____________________________________________
Approved______________________________________
Project Superintendent-Foreman-Other
Permit___________________________________
_
I hereby certify that, unless otherwise noted, I have observed all of the
above reported work. To the best of my knowledge and belief, I have
found this work to comply with the approved plans, specififications, and
applicable section(s) of the governing Building Code.
_____________________________________
Special/Deputy Inspector-Print
Sign_____________________________________
Special/Deputy Inspector-Sign
Date_____________________________________
Lic.No._______________Agency__________________
The Owner or a successor in interest shall hold harmless Apollo Inspection Service, Inc., a
California Corporation, from any and all legal proceedings of any nature whatsoever, that are
related to the inspection services provided in this report.. Should Apollo Inspection Service, Inc.
be required to institute legal action for the collection of a debt incurred as the result of the
acceptance of this report, Apollo Inspection Service, Inc. shall be entitled to Attorney''s fees and
costs iincurred in said action.
2409 Faircross Street
Torrance, CA 90505
310-995-6007 cel
310-326-9787 ofc
310-326-5841 fax
admin@apolloinspection.com
Project___________________________________
Address__________________________________
_________________________________________
Owner___________________________________
________________________________________
9-3-21BLD19-1527
SJC Groves LP
30333 Camino Capistrano
San Juan Capistrano
The Grove Senior Apartment
IDE Arc
Gouvis Engineering
C&C Construction Services Inc.
OC Concrete
Observed placement of Cementall Multi-Purpose material
& Non - shrink grout for column base building B . ASTM C1107 . 9000 psi
at 28 days . Details 21 on SD-1 and Foundation Plan B . Total of 10 columns .
(12) addional anchor bolts placed at building B . 7 “
embedment . Simpson XP epoxy used. ESR 2508. Locations cleaned prior to
placement .
C&C Construction Services Inc.
4
5281691 ICC
Shawn Nelson
Apollo Inspection Service, Inc.
Serving Southern California Since 1990
Contractor ________________________________
Architect/
Designer________________________________
Sub ______________________________________Engineer_________________________________
_
Deputy/Special Inspector Daily Report
and Certifificate of Compliance
Description of work observed
Inspections are based on a 4 hour minimum. After 4 hrs is 8 hrs. Over 8
and Saturdays are time and one half.
Reg. Hrs.___ O.T.Hrs.___ Test Cyls____Type________
BillTo:________________________________________
_____________________________________________
_____________________________________________
Approved______________________________________
Project Superintendent-Foreman-Other
Permit___________________________________
_
I hereby certify that, unless otherwise noted, I have observed all of the
above reported work. To the best of my knowledge and belief, I have
found this work to comply with the approved plans, specififications, and
applicable section(s) of the governing Building Code.
_____________________________________
Special/Deputy Inspector-Print
Sign_____________________________________
Special/Deputy Inspector-Sign
Date_____________________________________
Lic.No._______________Agency__________________
The Owner or a successor in interest shall hold harmless Apollo Inspection Service, Inc., a
California Corporation, from any and all legal proceedings of any nature whatsoever, that are
related to the inspection services provided in this report.. Should Apollo Inspection Service, Inc.
be required to institute legal action for the collection of a debt incurred as the result of the
acceptance of this report, Apollo Inspection Service, Inc. shall be entitled to Attorney''s fees and
costs iincurred in said action.
2409 Faircross Street
Torrance, CA 90505
310-995-6007 cel
310-326-9787 ofc
310-326-5841 fax
admin@apolloinspection.com
Project___________________________________
Address__________________________________
_________________________________________
Owner___________________________________
________________________________________
B19-1527
The grove senior apartments
30333 Camino CapistranoSan Juan Capistrano
C&C Construction
Framing
Idearc
Gouvis Eng.
8250109 ICC
Robert Lisk
09-10-2021
Observed the nailing for the spacing, thicknesses and locations and to be completed at the areas shown per the structural drawings.
Work was observed to been per the project documents and drawings as provided.
Work was observed to be Complete at the areas as described above .
Observed the shear wall nailing of the 2nd floor areas "D & E" at the areas of installation requiring nailingvalues of 4" and less, as well the areas of the floor sheathing of the third (3rd) level was observed to be nailed at 6 / 12.
Observed the placement and installation of the strap / post nailing and the SDS attachments at the shear wall locations for the areas as noted above.
Observed the floor deck at the third level for the nailing spacing, locations and penitrations and to be free of excessive edge nailing damages.
Steve Salcedo
Building & Grading Inspector
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Subject: SUMMARY OF DEPUTY/SPECIAL INSPECTOR DAILY FIELD REPORTS AND
CERTIFICATE OF COMPLIANCE FOR THE GROVES APARTMENTS PER BUILDING PERMIT B19-
1527.
The following attached Deputy/Special Inspector Reports are listed in chronological order.
FRAMING
12/30/21 1st – 3rd Floor double shear walls inspection at sections A – E.
10/19/21 3rd Floor shear walls inspection at section A – E.
10/8/21 3rd Floor shear walls inspection at section A – E.
9/20/21 2nd-3rd Floor shear walls inspection at section B.
9/16/21 2nd-3rd Floor shears walls inspection at section A.
9/14/21 2nd-3rd Floor shears walls inspection at section C.
9/10/21 2nd-3rd Floor shears walls inspection at sections D & E.
8/30/21 1st-2nd Floor shear walls inspection at section A.
8/22/21 1st-2nd Floor shear walls inspection at section C.
2
8/13/21 1st Floor shear walls inspection at section D & E.
FOUNDATION
9/3/21 Observed cement pour for steel column bases at section B.
Continuous inspection for anchor bolt placement post concrete section B.
8/27/21 Continuous inspection for anchor bolt placement post concrete section A.
8/20/21 Continuous inspection for anchor bolt placement post concrete section C &
B.
8/11/21 Continuous inspection for anchor bolt placement post concrete section D &
E.
7/23/21 Continuous inspection for anchor bolt placement post concrete pour.
6/4/21 Observed concrete pour for slab section A & B.
6/3/21 Observed concrete pour for slab section D & E.
6/3/21 Foundation slab inspection for sections A & B.
6/1/21 Foundation slab inspection for sections C, D, E.
5/25/21 Foundation footing inspection for sections A & B.
5/28/21 Observed concrete pour for footings section A & B.
5/20/21 Observed concrete pour for footings section D & C.
5/17/21 Foundation footing inspection for section D & C.
5/17/21 Observed concrete pour for footing section D & E.
5/13/21 Foundation footing inspection for section D & E.
3
WELDING
8/14/21 Observed field welding for structural steel.
8/3/21 Observed field welding for structural steel.
SITE CONCRETE
11/6/21 Observed concrete pour for driveway approach.
Apollo Inspection Service, Inc.
Serving Southern California Since 1990
Contractor ________________________________
Architect/
Designer________________________________
Sub ______________________________________Engineer_________________________________
_
Deputy/Special Inspector Daily Report
and Certifificate of Compliance
Description of work observed
Inspections are based on a 4 hour minimum. After 4 hrs is 8 hrs. Over 8
and Saturdays are time and one half.
Reg. Hrs.___ O.T.Hrs.___ Test Cyls____Type________
BillTo:________________________________________
_____________________________________________
_____________________________________________
Approved______________________________________
Project Superintendent-Foreman-Other
Permit___________________________________
_
I hereby certify that, unless otherwise noted, I have observed all of the
above reported work. To the best of my knowledge and belief, I have
found this work to comply with the approved plans, specififications, and
applicable section(s) of the governing Building Code.
_____________________________________
Special/Deputy Inspector-Print
Sign_____________________________________
Special/Deputy Inspector-Sign
Date_____________________________________
Lic.No._______________Agency__________________
The Owner or a successor in interest shall hold harmless Apollo Inspection Service, Inc., a
California Corporation, from any and all legal proceedings of any nature whatsoever, that are
related to the inspection services provided in this report.. Should Apollo Inspection Service, Inc.
be required to institute legal action for the collection of a debt incurred as the result of the
acceptance of this report, Apollo Inspection Service, Inc. shall be entitled to Attorney''s fees and
costs iincurred in said action.
2409 Faircross Street
Torrance, CA 90505
310-995-6007 cel
310-326-9787 ofc
310-326-5841 fax
admin@apolloinspection.com
Project___________________________________
Address__________________________________
_________________________________________
Owner___________________________________
________________________________________
Shawn Nelson
5281691 ICC
5-17-21B19-1530
The Grove Senior Apartment
30333 Camino Capistrano
SJC Groves LP
San Juan Capistrano
C&C Construction Services Inc.IDE Arc
Gouvis Engineering OC Concrete
On site for foundation footing inspection prior to concrete
placement . Remainder of section D and C . 60 grade rebar placed per
approved plans . Details on SD-1. Hold downs and anchor bolts in place
and secured . Concrete placement upon city offcials approval .
C&C Construction Services Inc.
4
Form - Structural Observation Report v1.0.doc Updated: 06-28-17 Page 1 of 2
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box)
FOUNDATIONS WALLS FRAMES DIAPHRAGMS (Floor/Roof) IF PORTION OF BLDG WAS DATE
… Footing, Stem Wall Concrete Steel Moment Frame Concrete
Mat Foundation,
Pre-stressed Conc. Slab Masonry Steel Braced Frame Steel Deck
Caisson, Pile, Grade
Beam Wood Shear Wall
Panel Concrete Moment
Frame Wood
Foundation Pad, Anchor Other: Masonry Wall Frame Other:
Other: Other: Other: Other:
City of San Juan Capistrano Development Services Department Building and Safety Division
Structural Observation Report
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for general conformance to the approved construction documents at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC.
This report includes all construction work through day of , 20 . Report No.: Page No.: of
Project Address: Structural Observer of Record (SOR): Professional Lic./Reg. No.: Phone No. of SOR:
Building Permit No.: Structural Observer (SO), if not by SOR: Professional Lic./Reg. No.: Phone No. of SO:
OBSERVED, INDICATE LOCATION
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
OBSERVED DEFICIENCIES AND COMMENTS:
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge: 1. I am the Registered Design Professional retained by the Owner to be in responsible charge of the structural observation in accordance with the requirements of the City of San Juan Capistrano; 2. I, or another Registered Design Professional whom I have designated above and is under my responsible charge, has performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. I understand that all deficiencies which I have documented must be corrected and a new structural observation report must be issued clearing these deficiencies; and 4. I understand that final acceptance of the structural systems by the Building and Safety Division cannot occur without the correction of all observed deficiencies.
SIGNATURE OF STRUCTURAL OBSERVER OF RECORD DATE STAMP OF STRUCTURAL OBSERVER OF RECORD
32400 Paseo Adelanto San Juan Capistrano, CA 92675
Phone: (949) 443-6347 Website: www.sanjuancapistrano.org
25th May 21 1 1 1
30333 Camino Capistrano Gouvis group 9497521612
B19-1527 Basil Ammari C052030 9497521612
Section A and B 5-25-21
Observed foundation at section A and B. No deficiencies.
5-25-21
Job number: 65246
Form - Structural Observation Report v1.0.doc Updated: 06-28-17 Page 1 of 2
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box)
FOUNDATIONS WALLS FRAMES DIAPHRAGMS (Floor/Roof) IF PORTION OF BLDG WAS DATE
… Footing, Stem Wall Concrete Steel Moment Frame Concrete
Mat Foundation,
Pre-stressed Conc. Slab Masonry Steel Braced Frame Steel Deck
Caisson, Pile, Grade
Beam Wood Shear Wall
Panel Concrete Moment
Frame Wood
Foundation Pad, Anchor Other: Masonry Wall Frame Other:
Other: Other: Other: Other:
City of San Juan Capistrano Development Services Department Building and Safety Division
Structural Observation Report
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for general conformance to the approved construction documents at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC.
This report includes all construction work through day of , 20 . Report No.: Page No.: of
Project Address: Structural Observer of Record (SOR): Professional Lic./Reg. No.: Phone No. of SOR:
Building Permit No.: Structural Observer (SO), if not by SOR: Professional Lic./Reg. No.: Phone No. of SO:
OBSERVED, INDICATE LOCATION
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
OBSERVED DEFICIENCIES AND COMMENTS:
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge:
1.I am the Registered Design Professional retained by the Owner to be in responsible charge of thestructural observation in accordance with the requirements of the City of San Juan Capistrano;2.I, or another Registered Design Professional whom I have designated above and is under myresponsible charge, has performed the required site visits at each significant construction stage toverify that the structure is in general conformance with the approved construction documents;3.I understand that all deficiencies which I have documented must be corrected and a new structuralobservation report must be issued clearing these deficiencies; and4.I understand that final acceptance of the structural systems by the Building and Safety Division cannotoccur without the correction of all observed deficiencies.
SIGNATURE OF STRUCTURAL OBSERVER OF RECORD DATE STAMP OF STRUCTURAL OBSERVER OF RECORD
32400 Paseo Adelanto San Juan Capistrano, CA 92675
Phone: (949) 443-6347 Website: www.sanjuancapistrano.org
13th May 21 1 1 1
30333 Camino Capistrano Gouvis group 9497521612
B19-1527 Basil Ammari C052030 9497521612
Area E and partial area D 5-13-21
Observed foundation only at area E and partial area D. Slab to be poured later.
Interior footing not installed near stairs and trash area. Relocate conduits at strong wall and provide hair pins for the strong wall. Provide dowels from 1st pour to 2nd pour.
Deputy inspector to verify the corrections. No other deficiencies.
5-13-21
Job number: 65246
Form - Structural Observation Report v1.0.doc Updated: 06-28-17 Page 1 of 2
PLEASE INDICATE OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS (check applicable box)
FOUNDATIONS WALLS FRAMES DIAPHRAGMS (Floor/Roof) IF PORTION OF BLDG WAS DATE
… Footing, Stem Wall Concrete Steel Moment Frame Concrete
Mat Foundation,
Pre-stressed Conc. Slab Masonry Steel Braced Frame Steel Deck
Caisson, Pile, Grade
Beam Wood Shear Wall
Panel Concrete Moment
Frame Wood
Foundation Pad, Anchor Other: Masonry Wall Frame Other:
Other: Other: Other: Other:
City of San Juan Capistrano Development Services Department Building and Safety Division
Structural Observation Report
STRUCTURAL OBSERVATION is the visual observation of the structural system by a registered design professional for general conformance to the approved construction documents at significant construction stages and at completion of the structural system. Structural observation does not include or waive the responsibility for the inspection required by SCJMC Section 18.07.050, CBC Section 1704 or other sections of the SCJMC or CBC.
This report includes all construction work through day of , 20 . Report No.: Page No.: of
Project Address: Structural Observer of Record (SOR): Professional Lic./Reg. No.: Phone No. of SOR:
Building Permit No.: Structural Observer (SO), if not by SOR: Professional Lic./Reg. No.: Phone No. of SO:
OBSERVED, INDICATE LOCATION
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
FINAL STRUCTURAL OBSERVATION FOR THE PROJECT IS 100% COMPLETE WITHOUT ANY DEFICIENCIES.
OBSERVED DEFICIENCIES AND COMMENTS:
ADDITIONAL DEFICIENCIES CONTINUED ON ATTACHED PAGES.
I declare that the following statements are true to the best of my knowledge: 1. I am the Registered Design Professional retained by the Owner to be in responsible charge of the structural observation in accordance with the requirements of the City of San Juan Capistrano; 2. I, or another Registered Design Professional whom I have designated above and is under my responsible charge, has performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. I understand that all deficiencies which I have documented must be corrected and a new structural observation report must be issued clearing these deficiencies; and 4. I understand that final acceptance of the structural systems by the Building and Safety Division cannot occur without the correction of all observed deficiencies.
SIGNATURE OF STRUCTURAL OBSERVER OF RECORD DATE STAMP OF STRUCTURAL OBSERVER OF RECORD
32400 Paseo Adelanto San Juan Capistrano, CA 92675
Phone: (949) 443-6347 Website: www.sanjuancapistrano.org
18th May 21 1 1 1
30333 Camino Capistrano Gouvis group 9497521612
B19-1527 Basil Ammari C052030 9497521612
Area D gridline 17/18 5-18-21
And Area E gridline 15/16
Observed foundation on area D gridline 17/18 and area E gridline 15/16.
No deficiencies.
5-18-21
Job number: 65246
09/30/22
A-2 / R-2/ B / S-1
88,072
BOARD OF DIRECTORS
CHARLES T. GIBSON
SAUNDRA F. JACOBS
JUSTIN McCUSKER BETTY H. OLSON, PH.D
FRANK URY
DANIEL R. FERONS
GENERAL MANAGER
Santa Margarita Water District 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688
www.SMWD.com (949) 459-6420
August 12, 2022
Building Department
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, California 92675
Attention Release Desk: building@sanjuancapistrano.org
Subject: I.D. No. 9, 30333 Camino Capistrano, San Juan Capistrano,
The Groves Apartments
The following referenced location(s) may be released as far as the District is concerned effective
August 12, 2022.
Developer: SJC Groves LP
This release does not constitute authorization for you to release the water and sewer bonds for the
subject lots. This authorization will be a Resolution of the Board of Directors of the Santa
Margarita Water District. When the water and sewer facilities are formally accepted by the Board,
they authorize release of the water and sewer bonds. A copy of the Resolution will be forwarded
to you.
Should you have any questions please contact me at (949) 459-6504.
Sincerely,
SANTA MARGARITA WATER DISTRICT
Jeffrey P. McDonnell, P.E.
Construction Engineering Manager
cc: Tony Gaetano, Inspector
Elena Wilson, elenaw@smwd.com
Jenna Finch, jennaf@smwd.com
Bill Webster, billw@smwd.com
File S\Eng\Development\CSJC\CSJC Occupancy Release