Loading...
23-1020_MARBELLA COUNTRY CLUB_Grading Surety AgreementGRADING SURETY AGREEMENT THIS AGREEMENT is made by and between the CITY OF SAN JUAN CAPISTRANO, a municipal corporation, hereinafter referred to as the "City," and MARBELLA COUNTRY CLUB, hereinafter referred to as "Developer." WITNESSETH WHEREAS, City will issue Precise Grading Permit No B23-0325 to Developer to construct certain designated improvements upon a portion of that real property located at 30800 GOLF CLUB DR, San Juan Capistrano, CA, such work being commonly referred to as SINKHOLE REPAIR TEMPORARY SHORING ("Project"). WHEREAS, San Juan Capistrano Municipal Code Section 8-2.08 requires the posting of financial security to secure the faithful performance for the grading and installation of related improvements connected with issuance of grading permits including the construction of drainage and protection devices and any other corrective work to remove and eliminate engineering and geological hazards. WHEREAS, San Juan Capistrano Municipal Code Section 8-2.09 authorizes the Building Official to require additional bonding as security to ensure against adverse aesthetic impacts arising from incomplete grading and/or improvements from development projects which have not been completed. WHEREAS, the Building Official finds that the proposed Project site is highly prominent and visible to the community, has unique topographic features or involves substantial grading of slope areas. NOW, THEREFORE, in consideration of the premises and promises hereinafter contained. City and Developer agree as follows: 1. Developer's Iml2rovernents Obli ations. Developer shall, at its sole cost and expense, provide and furnish all labor, materials and equipment for the Project depicted on the plans entitled "TEMP. SHORING PLAN" as approved by the City Engineer, on 08/17/23. The grading permit and plans, which describe all the work to be constructed pursuant to this Agreement, are on file in the office of the City's Building Official. Grading Surety Agreement, Permit #B23-0325 Page 1 of 11 2. Developer's Security, Developer shall provide a cash deposit, irrevocable letter of credit, certificate of deposit or a bond by a duly authorized corporate surety subject to the approval of the City Attorney, or as approved by the City Engineer, to secure Developer's improvement obligations required under this Agreement ("Security"). The amount of the Security shall be $2,711,840.38 for all onsite grading improvements as approved by the City Engineer. This Security shall also serve as security for restoration of the Project site. A copy of the performance bond form, as approved by the City Attorney, is attached hereto as Exhibit "C" and incorporated herein by this reference. Copies of approved irrevocable letter of credit forms and certificate of deposit form are available upon request. 3. Completion of Improvements. To ensure the protection of the public safety, health and welfare, Developer shall construct the Project in accordance with the schedule as set forth in Exhibit "A", and the conditions as set forth in Exhibit "B". Exhibits "A" and "B" are attached hereto and incorporated herein by this reference. 4. Developer Default. In the event Developer does not complete the required improvements, including erosion and silt control measures within the time required, using Best Management Practices (BMP) in implementing a Water Quality Management Plan in full compliance with Orange County National Pollutant Discharge Elimination System (NPDES) Storm Water Implementation Agreement and San Juan Capistrano Municipal Code Section 8-14, or abandons the Project site, or suspends work for more than twenty (20) working days without written approval of the City, City shall have the right to immediately declare a default and to make demand on Developer's surety for performance of all obligations under this Agreement. 5. Restoration of Site. San Juan Capistrano Municipal Code Section 8-2.09 allows the City to require bonding as security to ensure against adverse aesthetic impacts arising from incomplete grading, drainage and/or improvements which includes illicit non - storm drain water discharge. The purpose of this security shall be to restore the property to a safe and acceptable condition in the event the Developer defaults. This restoration shall include but not be limited to the following: A. Dismantle and/or demolish improvements; B Grade property to its original contours as shown on the approved grading plans. C. Remove all debris and construction materials from the site; and Grading Surety Agreement, Permit #B23-0325 Page 2 of 11 D. Install erosion and silt control devices, including hydroseeding, to insure a uniform vegetative cover, or equivalent stabilization measures which include the use of such Best Management Practices as blankets, fiber matrices, catch basin filters, or other erosion resistant soil coverings or treatments to satisfaction of the City Engineer. 6. Attorney's Fees. Developer agrees to pay City such sum as the court may judge as reasonable for the legal services of an attorney representing the City in an action brought to enforce or interpret the obligations of this agreement, and such sum shall be made a part of any judgment in such action against Developer if such action is determined in favor of the City. 7. Developer's Work in Safe Condition. Developer shall perform all work in a safe workmanlike manner and shall take such precautions as may be necessary to warn and protect the public from any dangerous condition caused by the Project. 8. Liability. City, its officials, officers, employees, agents, and volunteers shall not be liable for any injury to persons or property occasioned by reason of the acts or omissions of Developer, its agents or employees in the performance of this Agreement. Developer further agrees to protect, indemnify, and hold harmless City, its officials, officers, employees, agents, and volunteers from any and all claims, demands, causes of action, liability or loss of any sort, because of, or arising out of, the alleged acts or omissions of Developer, its agents or employees in the performance of this Agreement, including all claims, demands, causes of action, liability, or loss because of, or arising out of, in whole or in part, the design or construction of the Project. This indemnification and agreement to hold harmless shall extend to injuries to persons and damages or taking of property resulting from the design or construction of said Project, and in addition, to adjacent property owners as a consequence of the diversion of waters from the design or construction of drainage systems, streets and other improvements. 9. Force Majeure. Any prevention, delay or stoppage due to strike, lockouts, labor disputes, acts of God, inability to obtain labor or materials or reasonable substitutes therefor, failure of power, governmental restrictions, judicial orders, riots, insurrection, enemy or hostile governmental action, terrorism, civil commotion, fire or other casualty, epidemic, and other reason of a similar or dissimilar nature beyond the reasonable control of the party obligated to perform ("Force Majeure"), shall excuse the performance by such party for a period equal to any such prevention, delay or stoppage and the period for the performance of any act shall be extended for the period of the delay. Force Majeure shall Grading Surety Agreement, Permit #B23-0325 Page 3 of 11 excuse the performance by that party for a period equal to the prevention, delay or stoppage; provided the party prevented, delayed or stopped shall have given the other party written notice thereof within thirty (30) days of such event causing the prevention, delay or stoppage. Delays or failure to perform resulting from lack of funds or financial inability shall not be deemed delays beyond the reasonable control of a party and shall not constitute Force Majeure. SIGNATURES ON FOLLOWING PAGE Grading Surety Agreement, Permit #B23-0325 Page 4 of 11 SIGNATURE PAGE TO GRADING SURETY AGREEMENT BETWEEN THE CITY OF SAN JUAN CAPISTRANO AND MARBELLA COUNTRY CLUB IN WITNESS WHEREOF, the parties have executed this Agreement as of October 20 CITY WSAN JUA APISTRANO i t a , Building Official Dated: l ( 17,z l I Approved as to Form By: �� r5 Jeff Ballinger, City Attorney 2023 MARBELLA COUNT CLUB By Printed Name,., IGS•! Zee— Title Printed Name Title Grading Surety Agreement, Permit #B23-0325 Page 5 of 11 EXHIBIT"A" SCHEDULE FOR COMPLETION OF IMPROVEMENTS Please refer to the following slip -sheet schedule provided by MIK Construction Inc. (Revision: 001, Revision Date: 10/25/23) Grading Surety Agreement, Permit #B23-0325 Page 6 of 11 1 >W. i t, V=TpBCTI01 LK !D Task Name Start Fm.df '• Hailt. 2@2 Hall 2 2022 hall• 2023 Haf,L, FD23 HrN 1-li« Heil Z 7029 H01 2Di; -111-1 u1- Jl.DJ rM0.a1,JJA50N.D,i.?3HA71�. J_.A:5;0-+k D.. rN1.AN J -)-A- 5.0 NO. .• Yp r411 A S. 1 _ i MARBELLA GOLF COUNTRY CLUB - SINK HOLE REPAIR Wed Mon 7/8/24 MARBELLA GOLF COUNTRY CLUB - SINK HOLE REPAIR PROJECT PROJECT 3/15/23 2 Mobil2ation Wed Fri 4/28/23 Mobilzation 3/15/23 gII1 3 Engineering Wed Fri 4/28/23 Engineering 3/15/23 i Temporary Stabilization Plan by Hadely Eng Wed Tue 3/21/23 3/15/23 3/15 -,3/21 S Shoring Plan by Bold Eng Mon Fri 4/21/23 4/10/23 .1/l0 ` 4/21 6 Final Grading/Pipe Plan by Point Eng Mon Fri 4/28/23 4/10/23 4/10, A(28--___ 7 Sink Hole area Drainage Plan by Point Eng Wed Tue 4/11/23 3/15/23 3/15 , 4111 a Landscaping Plan by YKD Mon Fri 4/28/23 4/10/23 4/10 ;".-4/28 9 Construction Wed Tue 6/18/24 Const+vction 3/15/23 j� 10 PHASE 1. EMERGENCY CLEANUP AND TEMPORARY Wed Tue 8/29/23 PHASE 1. EMERGENCY CLIEU IPAND TEMPORARY STABiLLZAT40N STABILIZATION 3/15/23 11 Emergency Clean Up Wed Tue 3/21/23 3/15/23 3/1S T Q Cut & Excavation, Temporary Grading for access for Wed Tue 4/11/23 machine (1,174 CY( 3/22/23 3/22 4/41 13 Hole Bottom Cleaning for the shoring Box installation Wed Tue 4/18/23 4/12/23 4/12 X4/18 ld Protection Slope from Road to Bottom of hole per 96 Wed Wed on Hadley Eng's Sketch Sheet 4/19/23 4/19/23 4/19 4119 15 Install Shoring Boxes at the Bottom & Install Wed Tue 512/23 Styrofoam 4/19/23 4/19 f 5/2 16 Crushed rocks & Geo Textile non -woven Fabric per Wed Tue 5/2/23 U6 and 411 4/19/23 4/19 :5/2 17 Dirt Compaction instead of slurry per n12 Wed Tue 5/9/23 1 4/26/23 4/26 18 Install 6ea of 3'dia corrugated pipe Per s10 Wed Tue 5/16/23 1-141 5/10/23 silo5/16 19 Owner Approval Wed Tue 8/29123 5/17/23 5117 x,11/29 20 PHASE 2. SHORING Wed Mon 3/4/240141if5E Z51HOWHG 8/30/23 21 Equipment Temp Bridge Wed Fri 9/15/23 8/30/23 8130 9115 22 Construction Bonds and Permit Wed Fri 11/3/23 8/30 &61, 11/3 8/30/23 23 Install Soldier Beam (56 EA) - Layout. Drilling, Install Mon Fri 2/9/24 1 11 /6 �;Fi2f9 Caisson, Placing Soldier Beam, Concrete 2,500psi 11/6/23 24 19'x17' Corrugated Pipe Support against Heavy Tue Fri 2/9/24 Equipment Overload during shoring work 11/21/23 11lZt. ;Rr9 25 Grading Work for install Shoring Beam at entrance Mon Mon 3/4/24 Slope 1/15/24 1/15 314 26 PHASE 3. PIPE REPLACEMENTAND FINAL GRADING Tue 3/5/24 Tue 6/18/24 PHASE 3. PIPE REF LACiht F.'iT AAD FINAL GRADING WORK WORK -•• 27 Remove Installed Dirt and Crushed Rock. Tue 3/5/24 Mon Transporation to a Stockpile Area before removal of 3/11/24 3/5' temp. Trench shoring Bax 28 Remove Shoring Boxes (24ea( & Temp 3' pipe Tue 3/12/24 Mon 3/18/24 3/12 -3r.18 29 Install and Repair 17'x 19' Corrugated Pipe Tue 3/19/24 Mon 3/25/24 3/18 Kva 30 Grading Work Per Engineer's Grading Plan Tue 3/26/24 Mon 5/6/24 i 3126 "` ; Slii 31 Final Landscaping & Irrigation at Golf Course Tue 5/7/24 Tue 6/18/24 517 �` S/tB 32 Repair of Sidewalk and Curb Tue 5/7/24 Tue 5/28/24 5128 33 Asphalt Road Repair Work Wed 5/29/24 Tue 6/18/24 5/ 9 r 6119 34 Diversion of Dam @ Inlet Tue 3/19/24 Mon 5/6/24 _ 3/19 .5/4 35 Cleaning of Dirt at inside Pipe and Lower Area Tue 5/7/24 Tue 6/18/24 S/7 IS/ i9 36 Closeout Tue 6/18/24 Mon 7/8/24 Ctosrvut 37 Substantial Completion Tue 6/18/24 Tue 6/18/24 6/18 q Substantial Completion 3B Punrhlist / Repair Wed Thu 6/27/24 6/19/24 6/19 6127 39 Final Inspection Fri 6/28/24 Fri 6/28/24 6/28 6176 40 Demobilization Mon 7/1/24 Mon 7/8/24 7/1 718 MARBELLA COUNTRY CLUB SINK HOLE REPAIR PROJECT 11AGEL1NE SCHEDULE EXHIBIT"B" CONDITIONS FOR COMPLETION OF IMPROVEMENTS 1. The grading for this project shall be in strict conformance with the grading plans as well as the San Juan Capistrano Municipal Code. 2. Grading operations shall commence within fourteen (14) calendar days after issuance of Grading Permit. Winter grading will be conducted in strict accordance with the dynamic erosion and silt control plan submitted by the Developer, and approved by the City. This erosion and silt control plan reflects erosion and silt mitigation measures for expected grading conditions as the work progresses through the winter season and shall not be amended except with the permission of the City. In the event Developer does not wish to implement winter grading, or permission for winter grading is rescinded, static erosion and silt control plans reflecting current conditions of grading shall be submitted within ten (10) days of cessation of work. These plans shall: 1. Identify all pollutant sources including sources of sediment that may affect the quality of storm water discharges associated with the construction activity. 2. Include the erosion and sediment control planting and hydroseeding to insure a uniform vegetative cover or equivalent stabilization measures which include the use of such Best Management Practices as blankets, fiber matrices, catch basin filters or other erosion resistant soil covering or treatments to the satisfaction of the City Engineer. 3. Suspension in excess of twenty (20) working days of work authorized by approved grading plans and grading permit for subject property, including erosion and sediment control measures and landscaping and irrigation, shall constitute default of this agreement. 4. The supervising civil engineer and soils engineer shall file biweekly progress reports of all grading operations with the Building Official. An interim compaction report, for that work completed at the time work is suspended for the rainy season, shall be Grading Surety Agreement, Permit #B23-0325 Page 7 of 11 filed with the Building Official. This interim report shall conform to the grading code requirements for final compaction reports. 5. Contractor shall control dust to the satisfaction of the Building Official or his deputy. During grading, Contractor shall keep water truck on site and dampen work area, grounds, and loaded trucks. 6. Grading operations suspended during the rainy season shall be resumed no later than 15 days from date of suspension termination. 7. Installation of interim erosion and sediment control devices and systems shall commence within seven (7) days after rough grade certification has been approved by the Building Official and must be completed within fifteen (15) days of rough grad certification. Final erosion and sediment controls devices, planting, landscaping and irrigation systems shall be installed prior to final inspection of the grading permit. 8. All work shall be performed in strict observation of the Hours of Operation in accordance with San Juan Capistrano Municipal Code Section 8-1.03. 9. Contractor shall adhere to conditions of haul route permit and encroachment permit issued by the City Engineer. 10. Parking for construction crew is to be on-site. 11 Exoneration of Security: Developer's security shall be reduced to 90% upon signoff of precise grading permit. The remaining 10% of the security given by Developer shall not be released until the expiration of the warranty period and until any claims filed during the warranty period have been settled. Nothing herein shall limit the City's rights or the Developer or surety's obligations under this Agreement. 12. Warranty Period: 1 year from permit signoff by City. Grading Surety Agreement, Permit #B23-0325 Page 8 of 11