Loading...
13-0829_COSTCO WHOLESALE_Grading Bond ReleaseMEMORANDUM December 17, 2013 TO: Accounts Payable, Financial Services FROM: Keith Van Der Maaten, Public Works & Utilities Direc r SUBJECT: Grading Bond Release Costco Carwash 33949 Doheny Park Road — B13-0347 This memorandum is to authorize the release of the grading bond posted in the amount of $7,245.00 for the grading at 33949 Doheny Park Road. The grading and on-site improvements that were secured by the bond have been completed to the satisfaction of the City. A company check was posted as the security. I have included a copy of the Surety Agreement & receipt #33949 for your information. Thanks for your assistance. Attachments CC' Maria Morris, City Clerk City of San Juan Capistrano CHECK REQUEST Administrative Services Department Address Check to: Name: W L BUTLER CONSTRUCTION Address: 204 FRANKLIN STREET REDWOOD CITY, CA 94062 Check Amount Requested $ 7,245.00 Account No.: 90-00000-23302-00000-238 CHECK TOTAL: $ 7,245.00 Invoice Number: B13-0347 Invoice Date: 9/4/2013 Check stub to contain the following: Grading Surety Bond Release Check Requested By: Employee: Deena Berens Department: Public Works & Utilities Date: 12/17/2013 Department Approval: Keith Van Der Maater�— � . Transmittal Instructions: Return Check To: MX Mail: Other (specify) For Administrative Services Use Only Vendor Number: Warrant Number: Approved: Date: CITY OF SAN JUAN CAPISTRANO 32400 Paseo Adelanto SAN JUAN CAPISTRANO, CA 92675 ola7Sl (949) 493-1171 Paid By W L BUTLER CONSTRUCTI Contractor W L BUTLER CONSTRUCT[ 204 FRANKLIN STREET REDWOOD CITY CA 94062 Permit Number B13-0347 Receipt Number 33949 Paid Date 9/4/2013 Check No 8172 Payment Method CHECK ADMINISTRATIVE FEE GRADING PERMIT FEE GRADING REFUNDABLE DEPOSI OTHER INSPECTIONS & FEES PERMIT ISSUANCE FEES PRIVATE INSPECTIONS FEE TOTAL Site Address 33949 DOHENY PARK ROAD Description Grading/On Site Imp for Costco Carwash Fees $299.73 01-00000-44222-00000-000 $362.30 90-00000-23302-00000-238 $7,245.00 01-00000-44120-00000-000 $707.03 $27.24 $4,538.45 $13,179.75 o GRADING SURETY AGREEME14fe THIS AGREEMENT is made by and between the CITY OF SAN JUAN CAPISTRANO, a municipal corporation, hereinafter referred to as the "City" and Costco Wholesale, a Limited Liability Corporation referred to as "Developer". WITNESSETH WHEREAS, City will issue Grading Permit No B13-0347 to Developer to construct certain designated improvements which constitute a portion of that real property at the location of 33949 Doheny Park Road, commonly referred to as Costco Car Wash. WHEREAS, San Juan Capistrano Municipal Codes Section 8-2.08 requires the posting of financial security to secure the faithful performance and labor and materials for the grading and installation of improvements connected with issuance of grading permits including the construction of drainage and protection devices and any other corrective work to remove and eliminate engineering and geological hazards. WHEREAS, San Juan Capistrano Municipal Code Section 8-2.09 authorizes the Building Official to require additional bonding as security to ensure against adverse aesthetic impacts arising from incomplete grading and/or improvements from development projects which have not been completed. WHEREAS, the Building Official finds that the proposed project site is highly prominent and visible to the community, has unique topographic features or involves substantial grading of slope areas. NOW, THEREFORE, in consideration of the premises and promises hereinafter contained, City and Developer agree as follows: 1. Developer's Improvements Obligations. Developer shall, at its sole cost and expense, provide and furnish all labor, materials and equipment for the construction of grading improvements as approved by the City Engineer. The grading permit and plans, which describe all the work to be constructed per this agreement, are on file in the office of the City's Building Official. as blankets, fiber matrices, catch basin filters, or other erosion resistant soil coverings or treatments to satisfaction of the Director of Engineering and Building. 6. Attorney's Fees. Developer agrees to pay City such sum as the court may judge as reasonable for the legal services of an attorney representing the City in an action brought to enforce or interpret the obligations of this agreement, and such sum shall be made a part of any judgment in such action against Developer if such action is determined in favor of said City. 7. Developer's Work in Safe Condition. Developer shall perform all work in a safe workmanlike manner and shall take such precautions as may be necessary to warn and protect the public from any dangerous condition caused by the construction of said improvements. 8. Liability. Developer shall hold City, its officers, and employees harmless from any and all claims, demands, causes of action, liability or loss of any sort because of, or arising out of, the acts or omissions of Developer, his contractor, subcontractors, agents or employees in the performance of this agreement. In witness whereof, the parties have executed this agreement as of Developer August 29 2013 1 By: (Signee) 'y (Title) Authorized Approved as to Form: nt For Costco Wholesale 0 By: Keith Van Der MaateiT; -Pk. .' f- blic Works & Utilities tJ ArCA � � �If z �x�` !' • `asioy' �s yv 1�UT,�q�, ten'• p ` -P •!r ,��r�ArWAS l'�,�ti EXHIBIT "B" CONDITIONS FOR COMPLETION OF IMPROVEMENTS 1. The grading for this project shall be in strict conformance with the grading plans as well as the San Juan Capistrano Municipal Code. 2. Grading operations shall commence within fourteen (14) calendar days after issuance of Grading Permit. Winter grading will be conducted in strict accordance with the dynamic erosion and silt control plan submitted by the Developer, and approved by the City. This erosion and silt control plan reflects erosion and silt mitigation measures for expected grading conditions as the work progresses through the winter season and shall not be amended except with the permission of the City. In the event Developer does not wish to implement winter grading, or permission for winter grading is rescinded, static erosion and silt control plans reflecting current conditions of grading shall be submitted within ten (10) days of cessation of work. These plans shall: 1. Identify all pollutant sources including sources of sediment that may affect the quality of storm water discharges associated with the construction activity. 2. Include the erosion and sediment control planting and hydroseeding to insure a uniform vegetative cover or equivalent stabilization measures which include the use of such Best Management Practices as blankets, fiber matrices, catch basin filters or other erosion resistant soil covering or treatments to the satisfaction of the City Engineer. 3. Suspension in excess of twenty (20) working days of work authorized by approved grading plans and grading permit for subject property, including erosion and sediment control measures and landscaping and irrigation, shall constitute default of this agreement. 4. The supervising civil engineer and soils engineer shall file biweekly progress reports of all grading operations with the Building Official. An interim compaction report, for that work completed at the time work is suspended for the rainy season, shall be