13-0820_AVI-CON DBA CA CONSTRUCTION_ContractCONTRACT
This contract is made and entered into by and between the CITY OF SAN JUAN
CAPISTRANO, hereinafter referred to as "CITY" and AVI-CON, INC. dba CA
CONSTRUCTION hereinafter referred to as "CONTRACTOR."
IT IS HEREBY AGREED BETWEEN THE PARTIES AS FOLLOWS:
FIRST. CONTRACT DOCUMENTS. The contract documents shall be considered to include
the Notice Inviting Bids, the Instructions to Bidders, the Proposal, the Bid Bond, the Non -
Collusion Affidavit, the Designation of Sub -Contractors, the Contract which is prepared for
execution by the CITY and the CONTRACTOR. Plans, Specifications and Special Provisions,
the Uniform Building, Plumbing, Electrical and Mechanical Codes, Standard Specifications for
Public Works Construction, 2012 Edition, including all Supplements, Contract Bonds,
Resolutions adopted by the CITY pertaining to the work, insurance policies and certificates, and
any supplemental written agreements amending or extending the scope of the work originally
contemplated that may be required to complete the work in a substantial and acceptable manner.
SECOND. THE WORK. CONTRACTOR agrees to furnish all tools, labor, material,
equipment, transportation, and supplies necessary to perform and complete in good and
workmanlike manner the construction of Friends of the Library Bookstore Relocation, in strict
conformity with the Plans, Specifications and all other contract documents prepared by James
Goodman Architecture. and dated June, 26, 2012 which documents are on file at the Office of
the City Clerk, City Hall, 32400 Pasco Adelanto, San Juan Capistrano, California.
THIRD. PAYMENT. CITY agrees to pay, and CONTRACTOR agrees to accept, the lump sum
adjusted for variations of quantities, at the prices designated in bid proposal at the time and in the
manner set forth in the Specifications.
FOURTH. COMMENCEMENT AND COMPLETION OF THE WORK. CONTRACTOR
agrees to begin and complete the work within the time specified in the Notice Inviting Bids. It is
agreed that it would be impracticable and extremely difficult to fix the actual amount of
damages, and loss sustained by CITY, should CONTRACTOR fail to complete the work in the
specified time; therefore, CONTRACTOR shall pay CITY, as liquidated damages, not in the
nature of a penalty, Five Hundred (500) Dollars per calendar day for each day delayed; provided
that extensions of time with waiver of liquidated damages, may be granted as provided in the
ATTACHMENT 2
Specifications.
FIFTH. PERFORMANCE BOND AND LABOR AND MATERIAL BOND. CONTRACTOR
agrees to furnish bonds guaranteeing the performance of this contract and guaranteeing payment
of all labor and material used under this contract, as required by the laws of the State of
California, on forms approved by the CITY. The Performance Bond shall be for an amount of
one hundred (100) percent of the amount of this contract and shall be conditioned on fall and
complete performance of the contract, guaranteeing the work against faulty workmanship and
materials for a period of one (1) year after completion and acceptance. The Labor and Material
Bond shall be for an amount of one hundred (100) percent of the amount of this contract and
shall be conditioned upon full payment of all Labor and Material entering into or incidental to
the work covered by this contract. CONTRACTOR agrees to furnish the bonds on the forms
found within the Specifications.
The required Performance, Labor and Materials Bonds, and Bid Bond shall provide that the
surety shall pay attorney's fees incurred by CITY in enforcing this agreement.
SIXTH. GENERAL PREVAILING RATE OF PER DIEM WAGES. Pursuant to the Labor
Code of the State of California, copies of the prevailing rate of per them wages, as determined by
the Director of the State Department of Industrial Relations, are on file in the Office of the City
Clerk, 32400 Pasco Adelanto, San Juan Capistrano, California, and are hereby incorporated and
made a part hereof. CONTRACTOR agrees that he, or any SUB -CONTRACTOR under him,
shall pay not less than the foregoing specified prevailing rates of wages to all workmen
employed in the execution of the contract.
SEVENTH. INSURANCE. CONTRACTOR shall maintain at all times during this contract
liability and property damage insurance naming the CITY and its elected and appointed officials
as a named insured, which such policies shall be of an amount not less than Two Million
(2,000,000) Dollars combined single limit. Insurance certificates shall be for a minimum period
of one (1) year.
ATTACHMENT 2
CONTRACTOR shall m..ntain in full force and effect comprehensive automobile liability
coverage, including owned, hired, and non -owned vehicles in the following minimum amounts:
$1,000,000 property damage;
$ 1,000,000 injury to one person/any one occurrence/ not limited to contractual period;
$2,000,000 injury to more than one person/any one occurrence/not limited to contractual
period.
The insurance policies shall bear an endorsement or shall have an attached rider providing that in
the event of expiration of proposed cancellation of such policies for any reason whatsoever, the
CITY shall be notified by registered mail, return receipt requested, giving a sufficient time
before the date thereof to comply with the applicable law or statute but in no event less than
thirty (30) days before expiration or cancellation is effective. CONTRACTOR shall provide to
CITY the policy certificate establishing that the required level of insurance has been satisfied.
CONTRACTOR shall indemnify, defend and save harmless the CI'T'Y, its officers, agents, and
employees from and against any and all claims, demands, loss or liability of any kind or nature
which CONTRACTOR, its officers, agents and employees may sustain or incur or which may be
imposed upon them or any of them for injury to or death of persons, damage to property as a
result of, or arising out of, or in any manner connected with the performance of the obligations
under this contract.
EIGHTH. COMPLIANCE WITH QJ'HEX PROVISIONS OF LAW RELATIVE TO PUBLIC
CONTRACTS. CITY is subject to the provisions of the Government Code and the Labor Code
of the State of California. It is stipulated and agreed that all provisions of law applicable to
public contracts are a part of this contract to the same extent as though set forth herein and shall
be complied with by CONTRACTOR. These include, but are not limited to, the stipulation that
eight (8) hours labor constitute a legal day's work and CONTRACTOR shall, as a penalty to
CITY, forfeit Twenty-five (25) Dollar for each workman employed in the execution of the
Contract by CONTRACTOR, or by any SUB -CONTRACTOR, for each calendar day during
which such workman is required or permitted to work more than eight (8) hours in violation of
the provisions of Article Three, Chapter One, Part Seven, Division 2, of the California Labor
Code, except as permitted by law.
ATTACHMENT 2
IN WITNESS WHEREOF, this contract is executed by the duly authorized agent(s) of CITY,
pursuant to City Council action, and by CONTRACTOR on the date set before the name of each.
City of San Juan Capistrano
Dated:�`���� BY:
JO YLO
BY: `-
CHARLES AVILA, PRESIDENT
LICENSE NO. AND CLASSIFICATION
AS TO FORM:
P
IN WITNESS WHEREOF, this contract is executed by the duly authorized agent(s) of CITY,
pursuant to City Council action, and by CONTRACTOR on the date set before the name of each.
City of San Juan Capistrano
Dated: BY:
JOHN T
HN
ET
BY.
CHARLES AVILA, PRESIDENT
LICENSE NO. AND CLASSIFICATION
S Lo (D 2)
ATTEST:
Maria Morris, City Clerk
APil"LOYED AS TO FORM:
-Vl
" I
1 1.13 1 Pi 9 "TO•
For the: Friends of the Library Bookstore Relocation CIP 13301
From: Avi- Con,Inc.dba CA Construction , 588602, A,B ,C61,D49
Contractor, License No. & Classification
To the Members of the City Council
City of San Juan Capistrano
Gentlemen:
The undersigned, as bidder, declares that he has carefully examined the location of the proposed
work as described, examined the Plans, Specifications, Special Provisions, including all supplements
therefore, read the Instructions to Bidders, and is familiar with all proposal requirements, and hereby
proposes and agrees, if the proposal is accepted, to complete the said construction in accordance
with the Contract Documents, as defined in Section 1-2 of the Standard Specifications, in the time
stated herein, for the unit price or lump sum given on the following pages of this proposal,
amounting to a total of.,
-JOL-r-L Yj&QkF-Q $ 'SZ -7 ��M
Words Figures
Said amount to include andmover 1�alxes, the furnishing of all materials, the performing of all the
labor requisite or proper and the providing of all necessary machinery, tools, apparatus, and other
means of construction; also, the performance and completion of all the work in the manner set forth,
described and shown in the Specifications or the drawings for the work.
If the contract is awarded, the undersigned agrees to enter into a contract with the City of San Juan
Capistrano and to commence work within fifteen (15) calendar days from the date of execution
thereof, and to diligently prosecute the work to completion before the expiration of One Hundred
Fifty (150) calendar days.
3
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
STATE OF CALIFORNIA
County of Riverside
On August 5, 2013 before me, Liza Marie Quintana,,r Public
Date ,t Name and Title of the officer
personally appeared Charles Avila
NIMI(4 of Signerw
who proved to me on the basis of satisfactory evidence to
be the personts; whose nameTj,is/ice,subscribed to the
within instrument and acknowledged to me that he/sbe/th5y
executed the same in hislh<Miek authorized capacity(te4
and that by his1hsQ1hsksignatur6* on the instrument the
LIZA MARIE QUINTANA persons or the entity upon behalf of which the personN
comm. #1995198 acted, executed the instrument.
NOTARY PUBLIC - CALIFORNIA
SAN BERNARDINO COUNTY
My CoMm, 6Viles Nov, 19, 2 016 1 certify under PENALTY OF PERJURY,ywcfe-r the laws of
the State of California that the foregoi paragraph is true
and correct. 1-11' /2 I
Witness my han�ddPff Cfiaj I
Place Notary See( Above Signature
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document:
Document Date: Number of Pages:
Signer(s) Other Than Named Above:
L plyri1jr!,
Signer's Name:
11 Individual
D Corporate Officer — Title(s):_
0 Partner — 0 Limited El General
11 Attorney in Fact
EJ Trustee
El Guardian or Conservator
El Other:
Signer Is Representing:
Signer's Name,
F Individual
El Corporate Officer -- Title(s):
F1 Partner — 0 Limited El General
El Attorney in Fact
0 Trustee
0 Guardian or Conservator
0 Other:
Signer Is Representing:
It is also understood by Bidder that the City of San Juan Capistrano has the right to reject this
proposal or to award a contract to the undersigned at the prices stipulated. If the proposal is rejected,
then any check or cashier's check shall be returned to the undersigned within thirty (30) days. No
bid bonds will be returned. If the proposal is accepted and the undersigned fails to enter into a
contract within fifteen (1 S) days after the agreement is delivered to him for signature, or within such
further time as may be granted by the Members of the City Council, then said check shall be cashed
or said bond declared forfeit and an amount equal to the difference between the lowest bid and the
next lowest bid who will execute a contract shall be paid into the treasury of the City of San Juan
Capistrano as liquidated damages for the failure of the undersigned to comply with the terms of this
proposal.
Accompanying this proposal is bid bond - (Insert "S cash," cashier's check,
certified check or bidder's bond on the farms from pages BB -1 and BB -2 of these Contract
Documents, as the case may be), in an amount equal. to at least ten (10) percent of the total bid.
The following is the name and place of business of the surety company which will furnish the
required bonds as surety if the work is awarded to the undersigned:
The Ohio Casualty Insurance CoTRany,333 City Blvd, West. Suite 300 Orange, Ca. 92868
Licensed in accordance with an act providing for the registration of contractors -- License No.
588602 and Classification A,B,C61,D49
Charles Avila, President -CEO
0
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of all
individual co-partners composing the firm: President, Secretary, Treasurer, and Manager thereof.}
Dated: 'r6)
Dated:
981 Iowa Ave. Ste. A , Riverside, Ca. 92507
Business Address
(951)781-8055
Telephone Number
Further, the undersigned bidder certifies that he has thoroughly checked the figures set forth in this
proposal, that they are correct to the best of his knowledge and that they constitute his proposal for
the work called out herein.
Dated:
T— Charles Avila, 15 ident/ cEo
Signature of Bidder
Dated:
-7-7
(951)781-8055
Telenhone Ntimhor
5
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
STATE OF CALIFORNIA
County of Riverside
On August 5, 2013 before me, Liza Marie Quintana. Zol r Public
(late Here Name and Title of the officer
personally appeared Charles Avila 4.
Namet7s of SignerX
who proved to me on the basis of satisfactory evidence to
be the persons whose nameKis/ar-Qsubscribed to the
within instrument and acknowledged to me that he/shelthsy
executed the same in his/S</Vye4 authorized capacity(test,
and that by his/hs0hsignatur#_±* on the instrument the
L1 P; MARIE QUINTANA &�r
COMM. #199519$ sL person�or the entity upon behalf of which the personN
NOTARY PUBLIC . CALIFORNIA acted, executed the instrument.
SAN BERNARDINO COUNTY
My Comm EVIre3 Noy 19,2016 1 certify under PENALTY OF PERJURY under Oa, laws of
the State of California tit the foregoing pa!pgraph is true
and correct.
Witness my � hang. ffhe�� Moial I sea.,
Signature
Place Notary Seal Above $56n4l6re 6317X&a+40ic
A
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Title or Type of Document:
Signer(s) Other Than Named Above:
Signer's Name:
El Individual
El Corporate Officer—Title(s):
❑ Partner — 0 Limited El General
F1 Attorney in Fact
El Trustee
F1 Guardian or Conservator
Signer Is Representing:
Number of Pages:
Signer's Name:
L1 Individual
El Corporate Officer — Title(s),
El Partner — El Limited 0 General
El Attorney in Fact
0 Trustee
0 Guardian or Conservator
El Other:
Signer Is Representing:
SCHEDULE OF WORK ITEMS
Friends of the Library Bookstore Relocati
CIP 133 1
01
Item
No.
Description
Quantity
Unit Price
Cost
I
Foundation
Lump
Sum
rOR, C)V. oD
--q Cm
2
Framing
Lump
Sum
3
Exterior Finish
LumpSum
-,v
4
Interior Finish
LumpSum
5
Plumbing (Design and Build l
Lump
Sum
6
Electrical (Design and Build)
LumpSum
cc
7
HVAC (Design and Build)
LumpSum
8
Landscaping and Site Work
LumpSum
T®TALCn
-i
Total Bid Price (Enter here and on Page 3)
T1
Y
Words
m
$ %-21am-m
Figures
NON -COLLUSION AFFIDAVIT TO BE EXECUTED BY
BIDDER AND SUBMITTED WITH BID
STATE OF CALIFORNIA ' )
County of
SS,
Riverside
)
Charles Avila y being first duly sworn deposes
and says that he is President / CEO of
Avi-Con, Inc. dba CA Construction ,the party making the foregoing
bid; that such bid is not made in the interest of or on behalf of any undisclosed person, partnership,
company, association, organization or corporation; that such bid is genuine and not collusive or
sham; that said bidder has not directly or indirectly induced or solicited any other bidder to put in a
false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with
any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that said
bidder has not in any manner, directly or indirectly, sought by agreement, communication or
conference with anyone to fix the bid price of said bidder or of any other bidder, or to fix the bid
price of or cost element of such bid price, or of that of any other bidder, or to secure any advantage
against the public body awarding the contract of anyone interested in the proposed contract; that all
statements contained in such bid are true; and further, that said bidder has not directly or indirectly,
submitted his bid price or any breakdown thereof, or the contents thereof, or divulged information or
data relative thereto, or paid and will not pay any fee in connection therewith, to any corporation,
partnership, company, association, organization, bid depository, or to any member or agent thereof,
or to any other individual except to any person or persons as have a partnership or other financial
interest with said bidder in this general business.
Dated; is 5
rala, President / CEo
SIGNATURE Char
144-1 2013
On this the day of August 203 Ibe ore me, the a dersigmed, a Notary Public
in and for said State, personally appeared '� ' V
proved to me on the basis of satisfactory evidence, to be the person
whose name') subscribed to the within instrument,
and acknowledge that
WITNESS my hand and official
071M MAZ14YOWSwe
executed it.
�:.. LIZA MARIE QUINTANA
COMM. #1995198
NOTARY PUBLIC "CALIFORNIA
SAN BE RNARDINO COUNTY
My Comm, SVites Nov -19, 2016
7
CALIFORNIA JURAT WITH AFFIANT STATEMENT GOVERNMENT CODE §820
0 See Attached Document (Notary to cross out lines 1— 6 below)
❑ See Statement Below (Lines 1— 6 to be completed only by document signer[s], not Notary)
1_��_ _ w
3. _
5 �.
6.
Signature of Document Signer No. 1 Signature of Document Signer No. 2 (if any)
State of California Subscribed and sworn to (or affirmed) before me on
County Of Riverside this 5th day of August 2013
Date Month Year
by
(1) Charles Avila
LIZA MARIE QUINTANA ` Name of signer
COMM. #1995198 proved to me on the basis of satisfactory evidence
NOTARY PUBLIC • CALIFORNIA � .
AN BERNARDINO COUNTY to be the person who appeared before me j
My Comm. E.Vires Nov 1E, 2016
(2)
Na, e of Signer
proved to me on t ` `'basl of tisfi°cto , widen
to be the per t e red More
Place Notary Seal Above Signature-
>v
OPTIONAL
Though the information below is not required by law, it may prove
valuable to persons relying on the document and could prevent
Top of thumb here Top of thumb here
fraudulent removal and reattachment of this form to anther document.
Further Description of Any Attached Document
Title of Type of Document:
Document Date: Number of Pages:
Signer(s) Other Than Named Above:
DESIGNATION OF SUB -CONTRACTORS
Submit with Proposal.
In compliance with the Provisions of Section 4100-4107 of the Government Code of the State of
California as amended, the undersigned certifies that he has used the sub -bids of the following listed
sub -contractors in making up his bid, and that the sub -contractors l isted will be used for the work for
which they bid, subject to the approval of the Engineer, and in accordance with the applicable
provisions of the Specifications. It is understood and agreed that all those portions of the work
called for in the contract documents for which a sub -contractor is not listed will be performed by the
undersigned through his forces. If no sub -contractors are listed, all bonds and insurance will be
written in the name of the general contractor only.
Item of Work Sub -contractor License No.
& Classification
Address Phone
-;5�5 '�AIDDVF—
C"6w_ lf'� 1)
60
0
-2114
k-7-2
-7
3.l+
it
Kul
4.
vqin -
3D
Tq
Kul N
7`5
5.
6.
7.
f5
8.
Address Phone
-;5�5 '�AIDDVF—
C"6w_ lf'� 1)
60
0
-2114
k-7-2
-7
1�Ao
-7
vqin -
3D
Tq
Kul N
7`5
Avi-Con,Inc.dba CA Construction
BIDDER'S NAME
AUTHORIZED SIGNATURE, Charles Avila,
President / CEO
Submit with Proposal.
In compliance with the Provisions of Section 4100-4107 of the Government Code of the State of
California as amended, the undersigned certifies that he has used the sub -bids of the following listed
sub -contractors in making up his bid, and that the sub -contractors listed will be used for the work for
which they bid, subject to the approval of the Engineer, and in accordance with the applicable
provisions of the Specifications. It is understood and agreed that all those portions of the work
called for in the contract documents for which a sub -contractor is not listed will be performed by the
undersigned through his forces. If no sub -contractors are listed, all bonds and insurance will be
written in the name of the general contractor only.
Item of Work
�&w
2. ff'ALN V�_
4.
5.
7.
Y' vA C" —
Sub -contractor License No.
Address
& Classification
j?Lq '2
�7 e2 (4N
51\77
(�Dvwl-
fVDt-fl�'i o
�zv>-C'D
2 VL:4u--
CV '7
1z 142'n
Avi-Con,Inc.dba CA Construction
BIDDER'S NAME
AUTHORIZED SIGNATURE Charles Avila, President / CEO
0
DESIGNATION OF SUB -CONTRACTORS
Submit with Proposal.
In compliance with the Provisions of Section 4100-4107 of the Government Code of the State of
California as amended, the undersigned certifies that he has used the sub -bids of the following listed
sub -contractors in making up his bid, and that the sub -contractors listed will be used for the work for
which they bid, subject to the approval of the Engineer, and in accordance with the applicable
provisions of the Specifications. It is understood and agreed that all those portions of the work
called for in the contract documents for which a sub -contractor is not listed will be performed by the
undersigned through his forces. If no sub -contractors are listed, all bonds and insurance will be
written in the name of the general contractor only,
Item of Work
Sub -contractor License No.
Address
Phone
& Classification
f
q IFW-f Ir
zf)"Q —
'w q 10_sr-i�4r
"
2. r194'..
3.
4.
A tip
5.
6.
7.
8.
Avi-Con,lnc.dba CA Construction
AUTaORIZED SIGNATURE Charles A1,11., President / CEO
I
Submit with Proposal.
In compliance with the Provisions of Section 4100-4107 of the Government Code of the State of
California as amended, the undersigned certifies that he has used the sub -bids of the following listed
sub -contractors in making up his bid, and that the sub -contractors listed will be used for the work for
which they bid, subject to the approval of the Engineer, and in accordance with the applicable
provisions of the Specifications. It is understood and agreed that all those portions of the work
called for in the contract documents for which a sub -contractor is not listed will be performed by the
undersigned through his forces. If no sub -contractors are listed, all bonds and insurance will be
written in the name of the general contractor only.
1.
2.
3.
4.
5,
6.
7.
8.
Item of Work Sub -contractor License No, Address Phone
& Classification
Avi-Con,lnc.dba CA Construction
BIDDER'S NAME
AUTHORIZED SIGNATURE Charles Avila, President 1 CRO
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
STATE OF CALIFORNIA
County of Riverside
On August 5, 2013 before me, Liza Marie Quintana. Notary Public ,
Date Here Insert Name and Title of the Officer
personally appeared Charles Avila
Nares f alSigneo}
who proved to me on the basis of satisfactory evidence to
be the person4 whose nameKis/gmsubscribed to the
within instrument and acknowledged to me that helslr beyc
executed the same in hisAwrlth'e4r authorized capacity(te,4
sQUINTANA and that by his/ha lfh�sir signatures on the instrument the
IZA MARIE COMM. #1995198 person`s),, or the entity upon behalf of which the person
NOTARY PUBLIC .CALIFORNIA acted, executed the instrument.
SAN BERNARDINO COUNTY
My Comm.Expifaallow 19, 2016 1 certify under PENALTY OF PERJURY under the laws of
the State of California that the foregoing paragr(jphls true
and correct.
Witness my han rig: officlbl 1.
Signature .;.,
Place Notary Seal Above Si9atu {]+ c
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document:
Document Date:
Signer(s) Other Than Named Above:
Capacity(les) Claimed by Signer(s)
Signer's Name:
❑ Individual
❑ Corporate Officer—Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Attorney in Fact
❑ Trustee
❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
Number of Pages:
Signer's Name:
❑ Individual
❑ Corporate Officer—Title(s):
❑ Partner — ❑ Limited ❑ General
❑ Attorney in Fact
❑ Trustee
❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
INSTRUCTION TO BIDDERS
Securing Documents
Plans, Specifications and other contract documents will be available for examination without charge
and copies may be secured in accordance with the "Notice Inviting Bids."
Examination of Plans, Specifications and Site of Work
The bidder is required to examine the site of work, the Proposal, the Plans and the Specifications,
and Special Provisions, if any, very carefully. He shall satisfy himself as to the character, quality
and quantities of the work to be performed, the materials to be furnished and the requirements of the
Contract Documents. The plans for the work show conditions as they are believed to exist, but it is
not to be inferred that all the conditions as shown thereon are actually existent, nor shall the City of
San Juan Capistrano or any of its officers or agents be liable for any loss sustained by the contractor
as a result of any variance between conditions shown on the plans and actual conditions revealed
during examination or progress of the work. The submission of a proposal shall be prima facie
evidence that the bidder has made such an examination.
Interpretation of Drawings and Documents
If any bidder should find discrepancies in, or omissions from the drawings, specifications or other
proposed contract documents, or ifhe should be in doubt as to the true meaning of any part thereof,
he shall at once make a written request to the Engineer for correction, clarification or interpretation
of the point or points in question. The person submitting such a request shall be responsible for its
prompt delivery.
In the event that the Engineer receives Such a request and it should be found that certain essential
information is not clearly and fully set forth, or if the Engineer discovers errors, omissions, or points
requiring clarification in the drawings or documents, a written addendum will be mailed to each
person to whom a set of contract documents has been delivered, The City of San Juan Capistrano
will not be responsible for any instructions, explanations or interpretations of the documents
presented to bidders in any manner other than written addendum.
Addenda or Bulletins
The effect of all addenda to the contract documents shall be considered in the bid and said addenda
shall be made a part of the contract documents and shall be returned with them. Before submitting
his bid, each bidder shall inform himself as to whether or not any such addenda have been issued,
and failure to cover in his bid any such addenda issued may render his bid invalid and result in its
rejection.
Disoualification of Bidders
No person, firm or corporation shall be allowed to make, file or be interested in more than one bid
for the same work unless alternate bids are called for. A person, firm or corporation who has
submitted a sub -proposal to a bidder, or who has quoted prices on materials to a bidder, is not hereby
disqualified from submitting a bid in his own behalf.
0
Proposals
Bids to receive consideration shall be in accordance with the following instructions:
A. Bids shall be made only upon the forms provided within these specifications; all bid
items shall be properly filled out; bid prices shall be stated both in words and in
figures; and the signatures of all persons signing shall be in longhand. Where there
is a conflict in the words and the figures, the words shall govern.
B. All prices and notations must be in ink or typewritten. No erasures will be Permitted.
Mistakes may be crossed out and corrections Wed or written in, ink adjacent thereto
and must be initialed in ink bthe pqr§2n or 12el§!2ns §igning the bid.
C. Bids shall not contain any recapitulation of the work to be done. Alternate proposals
will not be considered except as required hereinabove. No oral, telegraphic or
telephonic proposals or modifications will be considered.
D. The City of San Juan Capistrano may require any bidder to furnish a statement of his
experience, financial responsibility, technical ability, equipment and references
properly and fully filled out.
E. Each bidder shall list his proposed sub -contractors on the form accompanying the
proposal in accordance with the provisions of the specifications.
F. Each bidder must accompany his bid with either a cashier's check upon some
responsible bank, or a properly certified check upon such bank, or an approved
corporate surety bond payable to the City of San Juan Capistrano for such a sum of
not less than ten (10) percent of the aggregate sum of the bid, which check or bond
and the monies represented thereby shall be held by the City of San Juan Capistrano
as a guarantee that the bidder, if awarded the contract, will in good faith enter into
such contract and furnish the required bonds.
The bidder agrees that, in case of his refusal or failure to execute said contract and
give bonds within the time required by these documents, such check or bond, and the
money represented thereby, shall remain the property of the City of San Juan.
Capistrano and, if the bidder shall fail to execute said contract, said surety will pay to
the City of San Juan Capistrano the damages which the City of San Juan. Capistrano
may suffer by reason of such failure not exceeding the sum of ten (10) percent of the
amount of the bid. A bid received and not accompanied by such cashier's check,
certified check or approved bond shall be rejected.
G, Bids shall be delivered to the City of San. Juan Capistrano at the location stipulated
on or before the day and hour set for the opening of bids, as hereinbefore specified in
the "Notice Inviting Bids." Bids shall be enclosed in a sealed envelope bearing the
title of the work, the name of the bidder, bid opening date and time of bid opening.
In
Licensing of Contractor
All persons, firms, partnerships or corporations shall be licensed in accordance with the Business
and Professions Code of the State of California and the applicable ordinances of the City and County
before doing any work of any kind.
Withdrawal of Bids
Any bidder may withdraw his bid in person or by written request at any time prior to the scheduled
closing time for receipt of bids.
Opening of Bid Proposals
The City of San Juan Capistrano will, in open session, publicly open, examine and declare the bids
at the time set forth in the "Notice Inviting Bids." Bidders or their authorized representatives are
invited to be present.
Award of Contract or Rejection of Bids
No bidder may withdraw his bid for a period of ninety (90) days after the date set for the opening of
bids. The contract for the work will either be awarded or the bids rejected within the ninety (90)
days from the date set for the opening of bids.
The contract for the work will be awarded to the lowest responsible bidder complying with these
instructions and with the "Notice Inviting Bids." The City of San Juan Capistrano, however,
reserves the right to reject any or all bids and to waive mere informalities, minor technical errors or
irregularities, obvious clerical errors or erasures.
The bidder to whom the award is made shall execute two (2) copies of the written contract with the
City of San Juan Capistrano and furnish the stipulated bonds, insurance and bid breakdown within
fifteen (15) days after the bid opening date. The contract shall be made in the form adopted by the
City of San Juan Capistrano. The release of the successful bidder's surety deposit, as previously
stipulated (page 5), shall be made upon the City of San Juan Capistrano's acceptance of the Labor
and Materials Bond and the Faithful Performance Bond.
If the bidder to whom the award is made fails to enter the contract as herein provided, the award may
be annulled and an award may be made to the next lowest responsible bidder; and such bidder shall
fulfill every stipulation embraced herein, as if he were the party to whom the first award was made.
A corporation to which an award is made shall furnish evidence of its corporate existence and
evidence that the officer signing the contract and bonds for the corporation is duly authorized to do
SO.
ag—nk
The successful bidder, simultaneously with the execution of the Agreement, will be required to
furnish a Labor and Material Bond in a sum not less than one hundred (100) percent of the total
amount payable by the terms of the contract and a Faithful Performance Bond in a sum not less than
one hundred (100) percent of the amount of the contract. Said bonds shall be secured from a surety
company selected from the surety companies set forth in the standard specifications. Bonds must be
submitted on the forms contained in these specifications.
Time Performance
The work shall be commenced within fifteen (15) calendar days from the date of issuance of the
Notice to Proceed and shall be diligently prosecuted until completion. A time limit of one hundred
fifty (150) calendar days from the date specified in the Notice to Proceed has been set for completion
of the work. The bidder's attention is directed to the specifications as to provisions for extension of
time of completion and/or assessment of liquidated damages.
Assiannient of Contract
No assignment by the Contractor of any contract to be entered into hereunder or any part thereof, or
of funds to be received thereunder by the Contractor, will be recognized by the awarding authority
unless such assignment has had prior approval of the awarding authority and the surety has been
given notice of such assignment in writing and has consented thereto in writing.
Workmen and Wanes
Attention is specifically directed to all provisions of the Labor Code of the State of California with
regard to workmen and wages. Wages shalt not be less than prevailing wage rates determined by the
City of San Juan Capistrano pursuant to said Code and as listed in the "Notice Inviting Bids,"
Construction Permits
It shall be the Contractor's responsibility to obtain all necessary permits, bonds and insurance, as
required, for the completion of the project. No extra compensation shall be made therefore.
The Contractor will be required to execute a City Encroachment Permit for construction work under
this contract. This Encroachment Permit does not satisfy the requirement for transportation permits
for overload or overweight vehicles. The Contractor shall contact the Engineering Division for
issuance of these permits.
12
BID BOND
KNOW ALL MEN BY THESE PRESENTAVI-CON, Inc. dba CA C0T1')trL1CtwnS, that we ,
as PRINCIPAL, and The Ohio Casualty Insurance Company
as SURETY, hereinafter called Surety, are held and firmly
bound unto the CITY OF SAN JUAN CAPISTRANO, Obligee, hereinafter called City, in the sum
Ten Percent of the total amount bid
of $ --,, for payment whereof Principal and Surety bind themselves, their
heirs, executors, administrators, successors, and assigns, jointly and severally, fairly by these
presents.
THE CONDITION OF THIS OBLIGATION is such that whereas the Principal has
�T.
submitted the accompanying bid dated for the construction of
Ai/�
"Friends of the Library Bookstore Relocation CIP 13301", for the CITY OF SAN JUAN
CAPISTRANO, Orange County, California.
NOW, THEREFORE, ifthe Principal shall not withdraw said bid within thirty (30) days after
the opening of same, and shall, within fifteen (15) days after the agreement has been presented to
him for execution, enter into a written contract with the City in accordance with the bidas accepted.
and if the Principal shall give the required bond with good and sufficient sureties, or sureties forthe
faithful performance and proper fulfillment of such contract and for the protection of laborers and
materialmen, or in the event of the withdrawal of said bid within the periods specified, or the failure
to enter into said contract and give said bond within the time specified, if the Principal shall within
sixty (60) days after request by the City, pay the City the difference between the amount specified III
said bid and the amount for which the City may procure the required work and/or supplies if the
latter amount. be in excess of the former, then the above obligation shall be void and of no effect.
otherwise to remain in full farce and virtue.
Further, as a part of the obligation secured hereby, and in addition to the face amount
specified therefore, there shall be included costs and reasonable expenses and fees, including
reasonable attorney's fees, incurred by City in successfully enforcing Such obligation, all to be taxed
as costs and included in any judgment rendered.
IN WITNESS WHEREOF, the above -bounden parties have executed this instrument under twin,
BB- I
several seals this 2.2nd day of "y .2013 , the name and corporate seal of each
corporate patty being affixed hereto and these presents duly signed by its undersigned representative
pursuant to authority of its governing body.
Two Witnesses (If Individual)
ATTEST (If Corporation)
Corporate Seal
ATTEST
APPROVED AS TO FORM:
Hans Van Lighten, City Attorney
AVI-CON, Inc. dba CA ConstrucLion
PRINCIPAL
BY:
Title:
The Ohio Casualty Tnjurance Ccinparry
Sid ETY
BY:
Titl , JAse. Hamilton, Attorney -in -Fact
THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND,
This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated.
Certificate No. 6099104
American Fire and Casualty Company Liberty Mutual insurance Company
The Ohio Casualty Insurance Company West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: That American Fire & Casualty Company and The Ohio Casualty Insurance Company are corporations duly organized under the laws of
the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company
is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies" , pursuant to and by authority herein set forth, does hereby name, constitute
and appoint, Gerri E. Brouwer; James P. Schabarum ll; Jase Hamilton; Jeffrey W. Cavignac
all of the city of San Dieao state of CA each individually if there be more than one named, its true and imvful attorney-in-fact to make, execute, seal, acknowledge
and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, reoognizances and other surety obligations, in pursuance of these presents and shall
be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 26th- day of April 12013 g,
American Fire and Casualty Company 'e
The Ohio Casualty Insurance Company o►
ocs sn d .nf Liberty Mutual Insurance Company
' West American Insurance Company
_ � ''f�,�'�a�a'`"ys� }*��>tu•� `��� m,'�1rSSy,,;,,'��'4_:yf,:. r�` ,, � to
By:
.o >r STATE OF WASHINGTON ss Gregory qV. Davenport, Assistant Secretary
. % COUNTY OF KING
mOn this 26th day of April 2013 , before me personally appeared Gregory W. Davenport, who acknowledged himself to be the Assistant Secretary of American M Ia
u y Fire and Casualty Company, Liberty Mutual Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, >Ui
execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. C NJ
..y4) > IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Seattle, Washington, on the day and year first above written. Q CL
V CD
NOTAft! By:..
O i I3U.re .% KD Riley, Not PublicAl
C
r
0 j' J' ` OE
0 di ; , a. i0
i This Power ofAttomey is made and executed pursuant to and by authority of the following By-laws and Authorizations of American Fire and Casualty Company, The Ohio Casualty Insurance N
Company, Liberty Mutual Insurance Company, and WestAmerican Insurance Company which resolutions are now In full force and effect reading as follows: o
ARTICLE IV — OFFICERS — Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject p
0 #; to such limitation as the Chairman or the President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal,
o C acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective :a
E ay powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so — y
L +� executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney-in-fact>
under
Lo the provisions of this article may be revoked at anytime by the Board, the Chairman, the President or by the officer or officers granting such power or authority. r
ARTICLE Xill — Execution of Contracts — SECTION 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, allo
> eb and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of theCompany to make, execute, E
q seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations, Such attorneys -in -fact subject to the limitations set forth in their OP
Z +J respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so v o
executed such instruments shall be as binding as if signed by the president and attested by the secretary. o to
Certificate of Designation — The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Gregory W. Davenport, Assistant Secretary to appoint such ~
attomeys-in-fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and
other surety obligations.
Authorization — By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
1, David M. Carey, the undersigned, Assistant Secretary, of American Fire and Casualty Company, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West
American Insurance Company do hereby certify that the original power of attomey of which the foregoing is a full, true and correc cop of the Power of Attorney executed by said Companies,
is in full force and effect and has not been revoked. UL ' 1 2013
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seats of said Companies this day of , 20
ACAS W$4,
tttSts �:ttSkt
7306 0 i117
a. C : 'v
�at�'i.'AP,+.'tF��3"`'a
By: 44 �,
David M. Ca4"Asslsianf Secretary
LMS 128738082412 88 of 250
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
STATE OF CALIFORNIA
County of San Dieqo
On 07/22/13 before me, Julia P. Plemmons. Notary Public
Date Hoe Insert Name and Title of the Officer
personally appeared Jase Hamilton Name(s) of Signer(s)
Commission # 1972967 L
lifornia
Notary Public - Ca Z
San Diego County
who proved iomaonthe basis Vfsatisfactory evidence 8»
be theonfe) whose
within instrument and acknowledged to me that he/.s�/ft—y
executed the same in his/Ihrer/tKeir authorized capacity4,e,,,i�,
and that by his/hef/#-te�signaturefe) on the instrument the
person*, or the entity upon behalf of which the person*
acted, executed the instrument.
| certify under PENALTY 0FPERJURY under the laws of
the State ofCalifornia that the foregoing paragraph is true
and correct.
Witness myhand andofficial seal,
8ignakuna
Place Notary Seal Above s
ijagurre @f Notary Public
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Title or Type of Document:.Bid Bond - AVI-CON, Inc. db CA Construction
Document Date: Number ofPages: 2
Signer(s) Other Than Named Above: N/A
Capacity(ies) Claimed by Signer(s)
Signer's Name.- Jase Hamilton
El Individual
OCorporateOfficer—TNe(m):_
D Portner—OUmitedUGonend
E�Attorney inFact
L1 Trustee
[] Guardian orConservator
El Other:
Signer |oRepresenting:
The Ohio Casualty Insurance
Company
Signer's Name:
O|ndividmd
OCorporate Officer --- Title(s),_
U Partner—OUmitedOGenem|
O Attorney inFact
El Trustee
LJ Guardian orConservator
El Other:
Signer bRepresenting:
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
STATE OF CALIFORNIA
County of Riverside
On August 5, 2013 before me, Liza Marie Quintana, Notary Public
Date Here Insert Name and Title of the Officer
personally appeared Charles Avila "I
NarneK�) o, &grlorx
who proved to me on the basis of satisfactory evidence to
be the person�,-4 whose nameZ5,is/ayesubscribed to the
within instrument and acknowledged to me that he/shs/tray
executed the same in his/ts<1t*k authorized capacity(te,- ,
LIZA MARIE QUINTANA and that by his/heQThiqj!r_signatur0js4 on the instrument the
person�sL or the entity upon behalf of which the personN
comm. #1995198 acted, executed the instrument,
NOTARY PUBLIC - CALIFORNIA
SAN BERNARDINO COUNTY
My Comm Explim Nov 19,2016 1 certify under PENALTY OF PERJURY under the
the State of California 14t the foregoing paragraph-i,8)rue
and correct.
Witness my h n J fficia-r" I.
Signature
Place Notary Seal Above SI Surfr at ofw 150RC—_
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document:
Document Date: Number of Pages:
S igner(s) Other Than Named Above:
Signer's Name:
El Individual
El Corporate Officer — Title(s):
D Partner — 7 Limited 0 General
0 Attorney in Fact
L1 Trustee
El Guardian or Conservator
0 Other:
Signer Is Representing:
Signer's Name.
0 Individual
El Corporate Officer Titlo(s):_
171 Partner — [I Limited 11 General
El Attorney in Fact
El Trustee
El Guardian or Conservator
fffl•
Signer Is Representing:
ADDENDUM NO. I
TO THE SPECIFICATIONS AND BID FORMS
FOR THE CONSTRUCTION
OF THE
FRIENDS OF THE LIBRARY BOOKSTORE RELOCATION
CII' 13301
August, 2013
To: All Plan Holders
From: The City of San Juan Capistrano
James Goodman Architecture
Friends of the Library
Addendum I was added as a part of the Plan and Specification package made available
through the City's Plan Room at Coastal Blue. Notice is hereby given to prospective bidders
that the changes, additions, and/or deletions therein are made a part of the Plans and
specifications to furnish, deliver, and install the Friends of the Library Bookstore Relocation
(CIP 1330 1) - project as fully and completely as if the same were fully set forth therein.
This Addendum No. I shall form a part of the Contract Documents and take precedence of
the original Contract Documents.
Bidders shall acknowledge receipt of this Addendum No. I by signing page Page Al -2 and
include it in the Contractor's bidding document package.
DATED: August 6, 2013 By: Joe Mankawich
Associate Engineer
City of San Juan Capistrano
PAGE AM
Addendum No. I
City of San Juan Capistrano
Friends of the Library Bookstore Relocation
THIS PAGE TO BE ATTACHED TO BIDDING DOCUMENTS.
I have received Pages A I - I through AI -4.
Date Received by Bidder: By: Avi-Cance
Naomi Avila,
Typed or Printed Name
Addendum 1 Library Bookstore PAGE Al -2
ADDENDUM NO. 2
TO THE SPECIFICATIONS AND BID FORMS
FOR THE CONSTRUCTION
OF THE
FRIENDS OF THE LIBRARY BOOKSTORE RELOCATION
CIP 13301
August 1, 2013
To: All Plan Holders
From: The City of San Juan Capistrano
James Goodman Architecture
Friends of the Library
Notice is hereby given to prospective bidders that the following changes, additions, and/or
deletions are hereby made a part of the Plans and specifications to furnish, deliver, and install
the Friends of the Library Bookstore Relocation (CIP 13301) project as fully and completely
as if the same were fully set forth therein.
This Addendum No. 2 shall form a part of the Contract Documents and take precedence of
the original Contract Documents.
Bidders shall acknowledge receipt of this Addendum No. 2 by signing page AI -2 and
emailing a copy of page Al -2 to the City of San Juan Capistrano, Mr. Joe Mankawich,
iiiiaiikawicli(ld,sanitiaiicaVi,.-,trano.or� by 2:00 PM Monday August 5, 2013. In addition,
Page Al -2 shall be included in the Contractor's bidding document package.
DATED: August 1, 2013 By: Joe Mankawich
Associate Engineer
City of San Juan Capistrano
PAGE A2-1
Addendum No. 2 (August 1, 2013)
City of San Juan Capistrano
Friends of the Library Bookstore Relocation
THIS PAGE TO BE ATTACHED TO BIDDING DOCUMENTS.
I have received Pages A2-1 through A2-4.
Date Received by Bidder:
8/5/2013
Addendum 2 Library Bookstore - August 1 2013.doe PAGE A2-2
By: Avi-Con,Inc.dba CA Construction
Bidders �Comrpny
Com- ny_,
—Widder's Signatu,�=�
Charles Avila, President / CEO
Typed or Printed Name
Addendum No. 2 (August 1, 2013)
City of San Juan Capistrano
Friends of the Library Bookstore Relocation
BIDDER'S GENERAL INFORMATION
The Bidder shall furnish the following information. Failure to complete all
Items will cause the Bid to be non-responsive and may cause its rejection.
1. BIDDER/CONTRACTOR'S Name and Street Address:
Avi-Con,inc.dba CA Construction -981 Iowa Ave. Ste. A, Riverside, Ca. 92507
2. CONTRACTOR'S Telephone Number: (95 1) 781-8055
Facsimile Number: (951),181-8o33
E-mail address: aa@caconstruction.net
3. CONTRACTOR'S License: Primary Classification
State License Number(s): 588602
Supplemental License Classifications: A,B,chi, D49
4. Surety Company and Agent who will provide the required Bonds on this
Contract: Friends of The Library Bookstore Relocation
Name of Surety The Ohio Casualty Insurance Company
Address333 City Blvd. West, Suite 300,Orange Ca.92866
Surety Company Agent Sara Poplaswki
Telephone Numbers: Agent (714)642-0454 Surety (714)937-140,') ex632
1� !!1111 RON 11!11111111111!!1 111111 111111 11 111 111 111111 111 111PI
I11fti 1111111 1��i 1111'11�1 •#. a
6. Corporation organized under the laws of the State of: California
7. List the names and addresses of the principal members of the firm or names
and titles of the principal officers of the corporation or firm:
Charles Avila, PresidenL/CEO,Naomi Avila,Vice President,jacob Avila,secretary
8. Number of years experience as a contractor in this specific type of
construction work: 23
1. List at least three related projects of comparable size and complexity
completed within the last 10 years:
Owner Whittier Union High School District
Contact Danny True
Phone (_LL_) 698-8121 1-22
Project (_s62 ) 698-8121
Address 94,ol So=h minter Ly_iQrCa,90605
Class of work General Construction
Contract amount $1,179499.53
Date completed , 9/2012
Addendum 2 Library Bookstore - August 1 2013.doe PAGE A2-10
Addendum No. 2 (August 1, 2013)
City of San Juan Capistrano
Friends of the Library Bookstore Relocation
owner County of Los Angeles
Contact Maureen Ng
Phone
Project (151 > 571-0281 Woo 2l Crest Library
Address 2.340 West 1 -06th Street, Los Angeles, CA 90044
Class of work - Renovation of Existing Public Library
Contract amount $873,378
Date completed 8/2009
Owner City of Riverside
Contact Christina Guerrero
Phone ( 951)334 9304
Project( 9-51 1 826.5201 ever e Public Library
Address 3581 Mission Inn Ave, Riverside, CA 92501
Class of work —T,t-p-rinr modi fi at i ons ro ^xi skiing Library
Contract amount $jj6,nc)n
Date completed 6Z2007
10. List the name and title of the person who will supervise full-time the
proposed work for your firm: Josh mIller
Which similar project (s) listed above did he/she perform supervisor duties?
California School of the Deaf
Is full-time supervisor an employee OR contract services?
Full-time Employee
11. A financial statement or other information and references sufficiently
comprehensive to permit an appraisal of your current financial condition may
be required by the Engineer.
Addendum 2 Library Bookstore - August 1 2013.doc PAGE A2-11
0�1 = "T=
#
Contact:
Christine Templeton
Title:
Manager of Engineering Development
Address:
PO Box 19575, Irvine, CA 92623
Phone:
949-724-7408
Fax:
949-724-7407
Project CM:
DMC Engineering
Contact:
Howard Colburn
Title:
Construction Manager
Address:
18 Technology, Suite 100, Irvine, CA 92618
Phone:
949-753-9393
Fax:
949-753-9322
Project Architect:
Westgroup Designs
Contact-
Rober Ader
Address:
19772 MacArthur Blvd,, Suite 100, Irvine, CA 92615
Phone:
949-250-0880
Fax:
949-250-0882
Contract Initial:
$1,017,000.00
Contract Final:
$1,425,927.36
Project Start:
03128/2011
Project Completion: 07/10/2011
Description of Work: Building abatement and rehabilitation, seismic upgrades,
installation of new mechanical, plumbing, electrical and fire
protection systems.
Status:
100%
Project Manager:
Paul LaBella
Superintendant:
Kevin Frazer
981 Iowa Avenue, Suite A I Riverside, CA 92507 1 P 951-781-8055 1 F 951-781-1077
Email cac@caconstruction.net I Website www.caconstructiQn,ne
License # 588502
in
ComRleted EMLects
CA Project Number: 09245
Project Name: Navy Medical Drug Screening Lab
Project Address: 9885 Carrol Canyon Rd., San Diego, CA 92134
Project Owner: Stronghold Engineering, Inc.
Contact: Pat Walls
Title: Project Manager
Address: 2000 Market Street, Riverside, CA 92507
Phone: 951-712-8431
Fax: 951-684-3813
Project Architect: Ravatt, Albrecht & Associates, Inc.
Contact: Paul Reinhardt
Title: Architect
Address: 3203 Lightning Street, Suite 201, Santa Maria, CA 93456
Phone: 805-928-5002
Fax: 805-928-0195
Contract Dollar Amount: $2,236,444.94
Change Orders: $316,444.94
Project Start Date: 12/21/09
Project Completion Date: 6/21110
Description of Work: renovation, upgrades, and expansion
Status: 100%
Superintendant: Joshua Miller
Work Completed By CA: $1,190,000.00
981 Iowa Avenue, Suite A I Riverside, CA 92507 1 P 951-781-8055 1 F 951-781-1077
Email cac@caconstruction.net I Website www.cacon5try_Ctiga,0gt
License * 588602
CEAOUL
Completed Protects
Project Name: Arrowhead Regional Medical Center — Pharmacy W
Project Address: 400 N. Pepper Ave., Colton, CA 92324
Project Owner: County of San Bernardino
Address:
385 N. Arrowhead Ave., San Bernardino, CA 92415
Contact:
Arcie Cummings
Title:
Project Manager
Phone:
909-387-5227
Fax-
909-387-5050
Project Architect:
gkkworks
Contact:
Joseph MacDonald
Address:
2355 Main St., Suite 220, Irvine, CA 92614
Phone:
949-250-1500
Contract Initial:
$337,000.00
Contract Final:
$347,385.00
Project Start:
June 18, 2012
Project Compl.:
February 22, 2013
Description of Work: Improvements to existing pharmacy for compliance with USP797
including separate anteroom of at least ISO Class 7 air quality,
create separate clean room environments meeting ISO Class 5 for
ingredients for CSPs for storage of devices that provide
opportunity to exposure to contamination, create two new air
conditioning zones to meet the air change requirements for an ISO
Class 7 environment, implement the additional mechanical and
electrical requirements.
Status:
100%
Project Manager:
David Patnode
Superintendant:
Cody Bierma
981 Iowa Avenue, Suite A I Riverside, CA 925071 P 951-781-8055 1 F 951-781-1077
Email cac@caconstruction, net I Website wfflM&ag!2pst0&VVD.nSt
License * 588602
Completed Projects
Project Name: General Old Golf Course Clubhouse Remodel
Project Address: 16700 Village West Drive, Riverside, CA 92518
Project Owner: March Joint Powers Authority
Address:
16700 Village Drive Riverside, CA 92518
Contact:
Mike De Vries (Vanir Construction Manager)
Title:
Project Manager
Phone:
909-384-1785
Fax:
909-381-7534
Project Architect:
Melzer Deckert & Ruder Architects Inc.
Contact:
Mark Melzer
Address:
9511 Irvine Center Drive, Irvine, CA 92618
Phone:
949-474-8188
Fax:
949-474-8189
Contract Initial:
$1,237,000.00
Contract Final♦
$1,472,597.40
Project Start:
It/l/11
Project Completion:
5/20/12
Description or Work: Renovation of golf clubhouse building, new exterior and interior
finishes, roofing replacement, new roof structure, demolition of
existing and construction of men's and women's restrooms,
commercial kitchen, retrofit of HVAC and plumbing systems,
electrical work, parking lot improvements, storm water mitigation
system, new site and building utilities, tie-in connections to
existing utilities, fire line, trenching and backfill, grease
interceptor, landscape, cart paths, and hardscape
Status:
100%
Project Manager:
Paul LaBella
Superintendant:
Doug Bell
981 Iowa Avenue, Suite A I Riverside, CA 92507 1 P 951-781-8055 1 F 951-781-1077
Email cac@caconstructlon.net I Website www_.caconstruction.nqt
License * 588602