13-0305_CALIF DEPT OF TRANSPORTATION_Utility Agr No. 12-UT-2002STATE OF CALIFORNIA • DEPARTMEN OF TRANSPORTATION
UTILITY AGREEMENT
RW 13-5 (Rev. 6/2010)
Page 1 of 4
DISTRICT
COUNTY
ROUTE
POST MILE
EA
12
ORA
5/74
9.3/10.0,0.0/0.2
OE3101
(Project # 12-0000-0102)
FEDERAL AID NUMBER: N/A
OWNER'S FILE NUMBER: City of San Juan Capistrano CIP: 11805
FEDERAL PARTICIPATION:
On the Project ❑ Yes ® No On the Utilities ❑ Yes ® No
Owner Payee Data No. VC0000023703 or Form STD 204 is attached. ❑
UTILITY AGREEMENT NO. 12 -UT -2002 DATE
The State of California, acting by and through the Department of Transportation, hereinafter called "STATE," proposes to
reconstruct the I-5/SR-74 interchange in the City of San Juan Capistrano in Orange County, and
City of San Juan Capistrano, Utilities Department, 32400 Paseo Adelanto, San Juan Capistrano, California 92675,
hereinafter called "OWNER," owns water facilities, within the limits of STATE's project, which requires relocation to
accommodate the STATE's project.
It is hereby mutually agreed that:
I. WORK TO BE DONE
In accordance with Notice to Owner No. 12 -UT -2002, dated April 5, 2012, OWNER shall remove, relocate, or adjust your water and
sewer lines and attendant facilities including meters, valves, pipe, manholes, and fire hydrants, in order to clear the State's
construction project. All work shall be performed substantially in accordance OWNER's Plan I-5 and Ortega Highway Interchange
Pipeline Relocation, Construction Set dated 12/12/2012, consisting of twenty-six (26) sheets, a copy of which is on file in the District
office of the Department of Transportation at 3347 Michelson Drive, Suite 100, Irvine, CA 92612-8894. Deviations from the
OWNER's plan described above initiated by either the STATE or the OWNER, shall be agreed upon by both parties hereto under a
Revised Notice to Owner. Such Revised Notices to Owner, approved by the STATE and agreed to/acknowledged by the OWNER,
will constitute an approved revision of the OWNER's plan described above and are hereby made a part hereof. No work under said
deviation shall commence prior to written execution by the OWNER of the Revised Notice to Owner. Changes in the scope of the
work will require an amendment to this Agreement in addition to the revised Notice to Owner.
II. LIABILITY FOR WORK
Part A: The existing facilities are located in their present position pursuant to rights superior to those of the STATE and will be
relocated at STATE expense. Part B: The existing facilities are lawfully maintained in their present location and qualify for relocation
at STATE expense under the provisions of Section 703 of the Streets and Highways Code. Part C: The existing facilities will be
relocated at 100% OWNER expense, per Streets & Highway Code Section 673. Part D: The existing facilities will be relocated at
15% STATE and 85% OWNER in accordance with Sections 673 and 703 of the Streets & Highways Code, in accordance with, the
following proration: 4741f in State R/W, 82 if in City R/W = 556 if total.
III. PERFORMANCE OF WORK
OWNER agrees to perform the herein described work with its own forces and to provide and furnish all necessary labor, materials,
tools, and equipment required therefore, and to prosecute said work diligently to completion.
UTILITY AGREEMENT (Cont.) Page 2 of 4
RW 13-5 (Rev. 6/2010)
UTILITY AGREEMENT NO. 12 -UT -2002
OWNER agrees to cause the herein described work to be performed by a contract with the lowest qualified bidder, selected pursuant
to a valid competitive bidding procedure, and to furnish or cause to be furnished all necessary labor, materials, tools, and equipment
required therefore, and to prosecute said work diligently to completion.
Engineering services for locating, making of surveys, preparation of plans, specifications, estimates, are to be furnished by the
consulting engineering firm of Dexter Wilson Engineering, Inc., on a fee basis previously approved by STATE. Cost principles for
determining the reasonableness and allowability of consultant costs shall be determined in accordance with 48 CFR, Chapter 1,
Part 31; 23 CFR Chapter 1, Part 645; and 18 CFR, Chapter 1; Parts 101, 201 and OMB Circular A-87, as applicable.
Engineering services for construction management are to be furnished by the consulting engineering firm of RBF Consulting, on a fee
basis previously approved by STATE. Cost principles for determining the reasonableness and allowability of consultant costs shall be
determined in accordance with 48 CFR, Chapter 1, Part 31; 23 CFR Chapter 1, Part 645; and 18 CFR, Chapter 1, Parts 101, 201 and
OMB Circular A-87, as applicable.
Use of out-of-state personnel (or personnel requiring lodging and meal "per diem" expenses) will not be allowed without prior written
authorization by STATE's representative. Requests for such authorization must be contained in OWNER's estimate of actual and
necessary preliminary relocation costs. Accounting Form FA -1301 is to be completed and submitted for all non -State personnel travel
per diem. OWNER shall include an explanation why local employee or contract labor is not considered adequate for the relocation
work proposed. Per Diem expenses shall not exceed the per diem expense amounts allowed under the STATE's Department of
Personnel Administration travel expense guidelines.
Pursuant to Public works Case No. 2001-059 determination by the California Department of Industrial Relations dated October 25,
2002, work performed by OWNER's contractor is a public work under the definition of Labor Code section 1720(a) and is therefore
subject to prevailing wage requirements. OWNER shall verify compliance with this requirement. in the administration of its contracts
referenced above.
IV. PAYMENT FOR WORK
The STATE shall pay its share of the actual and necessary cost of the herein described work within 45 days after receipt of five (5)
copies of OWNER's itemized bill, signed by a responsible official of OWNER's organization and prepared on OWNER's letterhead,
compiled on the basis of the actual and necessary cost and expense. The OWNER shall maintain records of the actual costs incurred
and charged or allocated to the project in accordance with recognized accounting principles.
It is understood and agreed that the STATE will not pay for any betterment or increase in capacity of OWNER's facilities in the new
location and that OWNER shall give credit to the STATE for the accumulated depreciation or "used life" of the replaced facilities and
for the salvage value of any material or parts salvaged and retained or sold by OWNER.
Not more frequently than once a month, but at least quarterly, OWNER will prepare and submit progress bills for costs incurred not to
exceed OWNER's recorded costs as of the billing date less estimated credits applicable to completed work. Payment of progress bills
not to exceed the amount of this Agreement may be made under the terms of this Agreement. Payment of progress bills which exceed
the amount of this Agreement may be made after receipt and approval by STATE of documentation supporting the cost increase and
after an Amendment to this Agreement has been executed by the parties to this Agreement.
The OWNER shall submit a final bill to the STATE within 360 days after the completion of the work described in Section I above. If
the STATE has not received a final bill within 360 days after notification of completion of OWNER's work described in Section I of
this Agreement, and STATE has delivered to OWNER fully executed Director's Deeds, Consents to Common Use or Joint Use
Agreements (if required) for OWNER's facilities, STATE will provide written notification to OWNER of its intent to close its file
within 30 days and OWNER hereby acknowledges, to the extent allowed by law, that all remaining costs will be deemed 1:o have been
abandoned. If the STATE processes a final bill for payment more than 360 days after notification of completion of OWNER's work,
payment of the late bill may be subject to allocation and/or approval by the California Transportation Commission.
UTILITY AGREEMENT (Cont.) Page 3 of 4
RW 13-5 (Rev. 6/2010)
UTILITY AGREEMENT NO. 12 -UT -2002
The final billing shall be in the form of an itemized statement of the total costs charged to the project, less the credits provided for in
this Agreement, and less any amounts covered by progress billings. However, the STATE shall not pay final bills which exceed the
estimated cost of this Agreement without documentation of the reason for the increase of said cost from the OWNER and approval of
documentation by STATE. Except, if the final bill exceeds the OWNER's estimated costs solely as the result of a revised Notice to
Owner as provided for in Section I, a copy of said revised Notice to Owner shall suffice as documentation. In either case, payment of
the amount over the estimated cost of this Agreement may be subject to allocation and/or approval by the California Transportation
Commission.
In any event if the final bill exceeds 125% of the estimated cost of this Agreement, an Amended Agreement shall be executed by the
parties to this Agreement prior to the payment of the OWNER'S final bill. Any and all increases in costs that are the direct result of
deviations from the work described in Section I of this Agreement, shall have the prior concurrence of STATE.
Detailed records from which the billing is compiled shall be retained by the OWNER for a period of three years from the date of the
final payment and will be available for audit by State and/or Federal auditors. Owner agrees to comply with Contract Cost Principles
and Procedures as set forth in 48 CFR, Chapter 1, Part 31, et seq., 23 CFR, Chapter 1, Part 645. If a subsequent State and/or Federal
audit determines payments to be unallowable, OWNER agrees to reimburse STATE upon receipt of STATE billing.
It is understood that a portion of the relocation as herein contemplated includes betterment to OWNER's facilities by reason of
increased capacity from an 8" to 12" inch water pipe. Said 67% - 33% split shall be applied to the actual and necessary cost of work
done, and OWNER shall credit the STATE for the actual and necessary cost of said betterment, all of the accumulated depreciation
and the salvage value of any materials or parts salvaged and retained by OWNER.
V. GENERAL CONDITIONS
All costs accrued by OWNER as a result of STATE's request of March 30, 2011, to review, study and/or prepare relocation plans and
estimates for the project associated with this Agreement may be billed pursuant to the terms and conditions of this Agreement.
If STATE's project, which precipitated this Agreement is canceled or modified so as to eliminate the necessity of work by OWNER,
STATE will notify OWNER in writing and STATE reserves the right to terminate this Agreement by Amendment. The Amendment
shall provide mutually acceptable terms and conditions for terminating the Agreement.
All obligations of STATE under the terms of this Agreement are subject to the passage of the annual Budget Act by the State
Legislature and the allocation of those funds by the California Transportation Commission.
OWNER shall submit a Notice of Completion to the STATE within 30 days of the completion of the work described herein.
STATE will acquire new rights of way in the name of either the STATE or OWNER through negotiation or condemnation and when
acquired in STATE's name, shall convey same to OWNER by Director's Easement Deed. STATE"s liability for such rights of way
will be at the proration shown for relocation work involved under this Agreement.
It is understood that said highway is a Federal aid highway and accordingly, 23 CFR, Chapter 1, Part 645 is hereby incorporated into
this Agreement.
UTILITY AGREEMENT (Cont.)
RW 1.3-5 (Rev. 6/2010)
Page 4 of 4
UTILITY AGREEMENT NO. 12 -UT -2002
IN WITNESS WHEREOF, the above parties have executed this Agreement the day and year above written.
STATE: OWNER: Qity of San Juan Capistrano,
tili 'es epart ent
By ode c �Z- By Sin
Robert Enriquez Da Name (F ' t) Vatle
District 12 Utility oor inator, Right of Way Title �e
APPROVAL RECOMMENDED:
By +ti--- Ul/ 1 /00�4-
John kman Date
Utility Coordinator
DO NOT WRITE BELOW - FOR ACCOUNTNG PURPOSES ONLY
PLANNING AND MANAGEMENT TO COMPLETE UNSHADED FIELDS:
P65 I/"r l 1( 4:fth
i�- t`1fL.�C1 t
UTILITY COMPLETES:
T
CODE
DOCUMENT CHG
NUMBER SUFFIX DIST UNIT DIST
SUB SPECIAL
EA JOB DESIGNATION FFY FA
OBJ DOLLAR
CODE AMOUNT
-CHAP
UA,PoU 1rz �0 A
3 15 7
054 $ 890,000.00
$ 0.00
UA
(-1
$ 890,000.00
EA FUNDING FIED: REVIEW/REQUEST FUNDING:
2
Sign: 1 -z-11 0' Si n>
4
Print> Evangaiina Washington Dae Print> John Dykman Date
R/W Ylanning and Man441ement Utility Coordinator
tj
THE ESTIMATED COST TO THE STATE FOR ITS SHARE OF THE ABOVE DESCRIBED WORK IS $ 890,000.00.
CERTIFICATION OF FUNDS
I hereby certify upon my own personal knowledge that budgeted
funds are available for the period and purpoe expenditure
shown here. '
HQ AcWunting Officer Dat
ITEM
-CHAP
STT
FY
AMOUNT
$ 0.00
R/W Funds
OE3109
$ 890,000.00
Distribution: 2 originals to R/W Accounting
1 original to Utility Owner
1 original to Utility File
FUND TYPE
EA
AMOUNT
Design Funds
OE3101
$ 0.00
Construction Funds
OE3104
$ 0.00
R/W Funds
OE3109
$ 890,000.00
,6TATE OF CALIFORNIA - DEPARTMENT OF ISPORTATION
NOTICE TO OWNER
RW 13-4 Rev. 9/86)
NOTICE TO OWNER
Number 12-2002
To: City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Dist.
County
Route
PM
E.A.
12
ORA
5,74
9.4/10.0, 0.0/0.2
OE3101
Federal Aid No.: N/A
Owners Fiie: City of San Juan Capistrano CIP: 11805
Date: April 5, 2012
Freeway: [ X ] Yes [ ] No
Because of the State Highway construction project: In the City of San Juan Capistrano, to reconstruct the I-5/SR-74
Interchange including the realignment of Del Obispo Street and Ortega Highway in Orange County,
Which affects your facilities: Part A: Existing 12" ACP water and attendant facilities adjacent to the nb Ortega Hwy
off -ramp; Part B: Existing 6" water line and attendant facilities in Del Obispo St; fire hydrants and sewers within the
project limits; Part C: water meters and valves in Ortega Hwy, State R/W; Part D: 8" ACP water and attendant facilities in
Ortega Hwy bridge overcrossing I-5 and westerly in State and City R/W, all within the limits of the State proposed
construction project,
You are hereby ordered to: relocate your facilities as described in your plan "I-5 and Ortega Highway Interchange
Pipeline Relocation", Construction Set dated 12/12/2012, consisting of 26 sheets, City of San Juan Capistrano CIP
#11805, all in order to clear the State's proposed construction project,
Your work schedule shall be as follows: schedule your forces to perform the above mentioned work prior to and/or
concurrent to Construction Contract 12-OE3104, as per the attached Special Provisions, and as directed by the State's
Resident Engineer.
Notify Mohammad Ravanipour, at telephone number (949) 936-35701 72 hours prior to initial start of work, and 48 hours
prior to subsequent restart when your work schedule is interrupted.
Liability for the cost of the work is: Part A: Existing facilities are located in their present position pursuant to rights
superior to those of the STATE and will be relocated at STATE expense. Part B: The existing facilities are lawfully
maintained in their present location and qualify for relocation at STATE expense under the provisions of Section 703 of
the Streets and Highways Code, Part C: The existing: facilities described above will be relocated at 100% OWNER
expense, per Streets & Highway Code Section 673. Parte Q: The existing facilities described in Section D above will be
relocated at 15% STATE and 85°% OWNER in accordance with Sections 673 and 703 of the Streets & Highways Code.
_BRENT GREEN ---____-- — -
Acting District 12 Director
RICKY ROD_RIGUE_Z _
R/W Project Delivery Manager -
By
CT Design
R/W
K
ROBERT P. Ztl),�
tJ iJI=Z"Di strict 12 Uoordinator
THIS NOTICE DOES NOT CONSTITUTE A PERMIT. OBTAIN AN ENCROACHMENT PERMIT BEFORE STARTING WORK.
5-1.14 NONHIGHWAY FACILITIES (INCLUDING UTILITIES)
The utility owner will relocate a utility shown in the following table before the corresponding date shown:
American Telephone and Telegraph
Company -Telephone Underground
Conduits, Transverse crossing 1-5
Relocate from MH to MH by American
Telephone and Telegraph Company
and Bate of the
Location
192 ft Lt of Sta 12+30 to 38 ft Lt of Sta Dee 1, 201
18+06 "B" Line I
Installation of the utilities shown in the following table requires coordination with your activities. Make the necessary
arrangements with the utility company through the Engineer and submit a schedule:
1. Verified by a representative of the utility company
2. Allowing at least the time shown for the utility owner to complete its work
CONTRACTNO. 12-0E3104
PFK _tA�DDFNDj T
REIVISED j M NO1 DATED JULY 2, 2012
Utility Relocation and Contractor-Arranzed Time for the Relocation
Utility
'Utility Address,
_ _ _ Location
Days
City of San Juan Capistrano Water
City of San Juan
41 A Lt of Sta 6+11.
4 weeks notification
Meter
Capistrano
"H'T Line
I day to complete
Tobe adjusted to grade
32400 Pasco Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano Water
City of San Juan
56 ft Lt of Sta 7+54.
Meter
Capistrano
'113" Line
To be adjusted to grade
32400 Pasco Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano Water
City of San Juan
33 ft Rt of Sta 6+37
Meter To be relocated
Capistrano
"B" Line
32400 Pasco Adelento,
San Juan Capistrano,
CA 92675
City of San Juan Capistrano Water
City of San Juan
45 fi Rt of Sta 6+61
Mett-r and backflow preventer
Capistrano
"B" Line
To be relocated
32400 Pasco Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano Fire
City of San Juan
25 ft Lt of Sta 8+84.
4 weeks notification
Hydrant
Capistrano
11111f Line
1 day to complete
To be relocated
32400 Paseo Adelento
San Juan Capistrano,
CA 92(75
City of San Juan Capistrano Water
City of San Juan
29 ft Lt of Sta 84-92
4 weeks notification
Valve
Capistrano
"H" Line
I day to complete,
To be relocated
32400 Pasco Adelento
San Juan Capistrano,
CA 92675
Czty of San Juan Capistrano Water
City of San Juan
43 ft Lt of Sta 7+50,
Valve
Capistrano
"B" Line
To be adjusted to grade
32400 Paseo Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano Water
City of San Juan
22 ft Lt of Sta 6+62,
Valve
Capistrano
"B" Line
To be adjusted lograde
32400 Pasco Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano Water
City of San Juan
53 ft Rt of Sta 6+75
Valve.
Capistrano
I "B" Line,
To be removed and install new valve
away from 'Retaining "Wall No 80
32400 Pasco Adelento
San Juan Capistrano,
CA 92,675
City of San Juan Capistrano Sewer
City of San Juan
—
Ilandhole at 27 ft Lt of
4 weekE -notification
Handhole and 8" Sewer Line.
Capistrano
Sta 8+20. "B" Line
2 days to complete
I o be relocated sewer handhole to
32400 Paseo Adelento
And
Sta 7+50 and abandoned portion of
San Juan Capistrano,
8" sewer line between
8" Sewer Line
CA 92675
Sta 7.50 to 27ft Lt of
I
S A 2
Sta 8 0 IT' Line,
CONI-RACTNO, i2 -0E3 04
REVISED FFR, ADE)ENDUM NO. I DATED JT, A 2,'2012
REVISED PER ADDENDUM NO.
City of San Juan
6 ft Lt of Sta 6+60 1111"
4 weeks notification
I DATED JULY 2, 2012City of Sana
Capistrano
Lire to 6 ft Lt of Sta
If) working days
Juan Capistrano
32400 Pasco Adelento
10+30 "B" Line
2-12" Water Lines
San Juan Capistrano,
CA 92675
City of San Juan Capistrano
City of San Juan
34 ft Lt of Sta 6+92 to
Re connection of Existing 2- 8"
Capistrano
34 ft Lt of Sta 8+90
Water Lines
32.404 Paseo Adelento
"ll" Line
San Juan Capistrano,
CA 92675
City of San Juan Capistrano
City of San Juan
6 ft to 14ft Lt of Sta
4 weeks notification
2-12" Water Lines (Geo Foam Area)
Capistrano
10+30 to 12+51.60
4 days to complete
32400 Paseo Adelento
11H., Line
San Juan Capistrano,
CA 92675
City of San Juan Capistrano -8"
City of San Juan
80 ft Lt of Sta 10+30
4 weeks notification
Water Line. (Geo Foam Area)
Capistrano
to 10ft Lt of Sta12+52
I day to complete
To be removed
32400 Pasco Adelento
"J3" Line
San Juan Capistrano,
CA 92675
City of San Juan Capistrano. Install
City of San Juan
6.5 ft Lt of "B: Line
4 weeks notification
20" Casing
Capistrano
between Sta 12+95 to
11 days to complete
New installation in new bridge.
32400 Pasco Adelento
Sta 16+04 "B" Line
San Juan Capistrano,
CA 92675
City of San Juan Capistrano. Install
City of San lutan
6.5 ft Lt of "B: Line
New 12" Water I ine in
Capistrano
between Sta 12+95 to
20" Casing
32400 Pasco Adelento
Sta 16+04 "B" Line
New installation in new bridge.
San Juan Capistrano,
CA 92675
City of San Juan Capistrano. Install
City of San Juan
13.5 ft Lt of "B- Line
New 20" Casing
Capistrano
between Sta 12+9,r, to
New instellalion in new bridge-
32400 Pasco Adelento
Sta 16+04 "B" Line
San Juan Capistrano,
City of San Juan Capistrano. Install
CA 92675
City of San Juan
13.5 ft Lt of `B: Line
New 12" Water Line in
Capistrano
between Sta 12+95 to
20" Casing
32400 Pasco Adelento
Sta 16+04 "B" Line
New installation in new bridge.
San Juan Capistrano,
CA 92675
City of San Juan Capisirn .
City of San Juan
10-5 ft Lt of Sta 12-? 95
Existing 8" Steel Water Line in
Capistrano
to 10.5 ft Lt of Sta
12" Steel Casing.
32400 Pasco Adelento
16+04 "B" Line
To be abandoned during demolition
San Juan Capistrano,
of bridge.
CA 92675
City of San Juan Capistrano
City of San Juan
12ft Lt of Sta 15-s 30
Manhole.
Capistrano
"B" Line
To be abandoned duriag, demolition
32400 Pasco Adelento
of bridge
San Juan Capistrano,
CA 92675
City of San Juan Capistrano
City of San Juan
12ft Lt of Sta 0--41
Manhole.
Capistrano
"B" Line
Tv be abandoned dilTing demolition
of bridge
32400 Pasco Adelento
San Rian Capistrano,
CA 92675
CONTRACT NO, 12-OE3104
REVISED PER ADDENDUM NO, I DATED JULY 2; 2012,
City of San Juan Capistrano Fire
City of San Juan
66 ft Lt of Sta 18+45
4 weeks notification
Hydrant
Capistrano
"B"Une
3 days to complete
To be relocated
32400 Paseo Adelimto
San Juan Capistrano,
CA 92675
City of San Juan Capistrano Fire
City of San Juan
78 ft Rt of Sta 18+73
Hydrant
Capistrano
"B" Line
To be abandoned
32400 Paseo Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano-
City of San Juan
44 ft Lt of Sta 17+14
4 weeks notification
Abandoned Water Meter Servicing
Capistrano
"B" Line
4 days to complete
State Landscaping
32400 Paseo Adelento
To be abandoned
San Juan Capistrano,
CA 92675
City of San Juan Capistrano Water
City of San Juan
57 ft Rt of Sta 18+73
Meter
Capistrano
"B" Line
To be abandoned
32400 Paseo Adelento,
San Juan Capistrano,
CA 92675
City of San Juan Capistrano Water
City of San Juan
57 ft Rt of Sta 18+75
1 Meter
Capistrano
"B"Line
To be abandoned
32400 Pasco Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano Water
City of San Juan
45 ft Rt of Sta 19+45
Meter
Capistrano
"B" Line
To be abandoned
32400 Pasco Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano
City of San Juan
47 It Rt of Sta 20+14
Water Meter
Capistrano
"B11 Line
To be relocated to new sidewalk
32400 Paseo Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano-Water
City of San Juan
53 ft Rt of Sta 21-x.13
Meter
Capistrano
"B" Line
Adjust to grade
32400 Paseo Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano-Sewer
City of San Juan
Manhole at 16 ft Rt of
4 weeks notification
Manhole and 8" Sewer Line
Capistrano
Sta 18+32 "B" Line
2 days to complete
To be relocate manhole to Sta
32403 Paseo Adelento
8" Sewer Line between
19+1 land to abandon portion of 8"
San Juan Capistrano,
Sta 18+32 to 19+11
Sewer Line
CA 92675
"B" Line
City of San Juan Capistrano-2 Water
City of San Juan
Between Sta 18+32 to
4 weeks notification
Valves
Capistrano
Sta 18+61 "B" Line
3 days to complete
To be adjusted to grade
32400 Paseo Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano-4 Water
City of San Juan
Between Sta, 18+32 to
Valves
Capistrano
Sta 18-61 "B" Line
To be adjusted to grade
324-00 Paseo Adelento
L
San Juan Capistrano,
I CA, 92675
CONTRACT NO. 12-OE3104
REVISED PER ADDENDUM NO. 1 DATED JULY 2, 2012
City of San Juan Capistrano -Water
City of San Juan
15 ft Lt of Sta 17+14
Valve,
Capistrano
"B" Line
To be abandoned
32400 Pasco Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano -2
City of San Juan
Between Sta 18+68 to
Water Valve-
Capistrano
Sta 18+84"l3" Line
To be adjusted to grade
32400 Pasco Adelento
San Juan Capistrano,
CA 92675
City of San Juan Capistrano
City of San Juan
Between to 16+05 to
4 weeks -notification
Install new 12" PVC water pipelines
Capistrano
19+00 "B" Line
4 days to complete
system
32400 Pasco Adelento
San Juan Capistrano,
CA 92675
City of San Juan CapLetrano-Install.
City of San Juan
Sta 514+16 to Sta
4 weeks notification
12" AC Water Line.
Capistrano
520+03 "G" Line
11 days to complete
New installation by City of San Juan
32400 Pasco Adelento
Capistrano along new R/W Line
San Juan Capistrano,
CA 92675
City of San Juan Capistrano -12" AC
City of San Juan
Sta 514+16 to Sta
14 days notification
Water Line along existing R/W
Capistrano
520+03 "G" Line
6 days to complete
fence.
32400 Pasco Adelento
To be abandoned
San Juan Capistrano,
CA 92675
City of San Juan Capistrano
City of San Juan
38 ft Rt of Sta 17+08
Portion of exist 14" AC Water Line
Capistrano
to38 ft Rt of Sta 18+90
along Rte 74 to be abandoned.
32400 Pasco Adelento,
"B" Line
San Juan Capistrano,
CA 92675
American Telephone and Telegraph
American Telephone
9 ft Lt of Sta 8+13 "B"
10 week notification
Company
and Telegraph
Line to 25 ft Rt of Sta
I week to complete
Existing underground conduits to be
Company
9+05 "H" Line
abandoned
Attn: Anthony Kwan
1265 Van Buren Street,
RM 180
Anaheim, CA 92807
American Telephone and Telegraph
American Telephone
9 ft Lt of Sta 8+13 "B*'
Company
and Telegraph
Line
Existing pull -box to be removed
Company
Attn: Anthony Kwan
1265 Van Buren Street,
RM 180
Anaheim, CA 92821___L_
CONTRACT NO. 12-0E3104
REVISED PER ADDENDUML NO. 1 DATED JULY 2, 2012