13-0305_CALIF DEPT OF TRANSPORTATION_Utility Agr No. 12-UT-2002STATE OF CALIFORNIA • DEPARTMEN OF TRANSPORTATION UTILITY AGREEMENT RW 13-5 (Rev. 6/2010) Page 1 of 4 DISTRICT COUNTY ROUTE POST MILE EA 12 ORA 5/74 9.3/10.0,0.0/0.2 OE3101 (Project # 12-0000-0102) FEDERAL AID NUMBER: N/A OWNER'S FILE NUMBER: City of San Juan Capistrano CIP: 11805 FEDERAL PARTICIPATION: On the Project ❑ Yes ® No On the Utilities ❑ Yes ® No Owner Payee Data No. VC0000023703 or Form STD 204 is attached. ❑ UTILITY AGREEMENT NO. 12 -UT -2002 DATE The State of California, acting by and through the Department of Transportation, hereinafter called "STATE," proposes to reconstruct the I-5/SR-74 interchange in the City of San Juan Capistrano in Orange County, and City of San Juan Capistrano, Utilities Department, 32400 Paseo Adelanto, San Juan Capistrano, California 92675, hereinafter called "OWNER," owns water facilities, within the limits of STATE's project, which requires relocation to accommodate the STATE's project. It is hereby mutually agreed that: I. WORK TO BE DONE In accordance with Notice to Owner No. 12 -UT -2002, dated April 5, 2012, OWNER shall remove, relocate, or adjust your water and sewer lines and attendant facilities including meters, valves, pipe, manholes, and fire hydrants, in order to clear the State's construction project. All work shall be performed substantially in accordance OWNER's Plan I-5 and Ortega Highway Interchange Pipeline Relocation, Construction Set dated 12/12/2012, consisting of twenty-six (26) sheets, a copy of which is on file in the District office of the Department of Transportation at 3347 Michelson Drive, Suite 100, Irvine, CA 92612-8894. Deviations from the OWNER's plan described above initiated by either the STATE or the OWNER, shall be agreed upon by both parties hereto under a Revised Notice to Owner. Such Revised Notices to Owner, approved by the STATE and agreed to/acknowledged by the OWNER, will constitute an approved revision of the OWNER's plan described above and are hereby made a part hereof. No work under said deviation shall commence prior to written execution by the OWNER of the Revised Notice to Owner. Changes in the scope of the work will require an amendment to this Agreement in addition to the revised Notice to Owner. II. LIABILITY FOR WORK Part A: The existing facilities are located in their present position pursuant to rights superior to those of the STATE and will be relocated at STATE expense. Part B: The existing facilities are lawfully maintained in their present location and qualify for relocation at STATE expense under the provisions of Section 703 of the Streets and Highways Code. Part C: The existing facilities will be relocated at 100% OWNER expense, per Streets & Highway Code Section 673. Part D: The existing facilities will be relocated at 15% STATE and 85% OWNER in accordance with Sections 673 and 703 of the Streets & Highways Code, in accordance with, the following proration: 4741f in State R/W, 82 if in City R/W = 556 if total. III. PERFORMANCE OF WORK OWNER agrees to perform the herein described work with its own forces and to provide and furnish all necessary labor, materials, tools, and equipment required therefore, and to prosecute said work diligently to completion. UTILITY AGREEMENT (Cont.) Page 2 of 4 RW 13-5 (Rev. 6/2010) UTILITY AGREEMENT NO. 12 -UT -2002 OWNER agrees to cause the herein described work to be performed by a contract with the lowest qualified bidder, selected pursuant to a valid competitive bidding procedure, and to furnish or cause to be furnished all necessary labor, materials, tools, and equipment required therefore, and to prosecute said work diligently to completion. Engineering services for locating, making of surveys, preparation of plans, specifications, estimates, are to be furnished by the consulting engineering firm of Dexter Wilson Engineering, Inc., on a fee basis previously approved by STATE. Cost principles for determining the reasonableness and allowability of consultant costs shall be determined in accordance with 48 CFR, Chapter 1, Part 31; 23 CFR Chapter 1, Part 645; and 18 CFR, Chapter 1; Parts 101, 201 and OMB Circular A-87, as applicable. Engineering services for construction management are to be furnished by the consulting engineering firm of RBF Consulting, on a fee basis previously approved by STATE. Cost principles for determining the reasonableness and allowability of consultant costs shall be determined in accordance with 48 CFR, Chapter 1, Part 31; 23 CFR Chapter 1, Part 645; and 18 CFR, Chapter 1, Parts 101, 201 and OMB Circular A-87, as applicable. Use of out-of-state personnel (or personnel requiring lodging and meal "per diem" expenses) will not be allowed without prior written authorization by STATE's representative. Requests for such authorization must be contained in OWNER's estimate of actual and necessary preliminary relocation costs. Accounting Form FA -1301 is to be completed and submitted for all non -State personnel travel per diem. OWNER shall include an explanation why local employee or contract labor is not considered adequate for the relocation work proposed. Per Diem expenses shall not exceed the per diem expense amounts allowed under the STATE's Department of Personnel Administration travel expense guidelines. Pursuant to Public works Case No. 2001-059 determination by the California Department of Industrial Relations dated October 25, 2002, work performed by OWNER's contractor is a public work under the definition of Labor Code section 1720(a) and is therefore subject to prevailing wage requirements. OWNER shall verify compliance with this requirement. in the administration of its contracts referenced above. IV. PAYMENT FOR WORK The STATE shall pay its share of the actual and necessary cost of the herein described work within 45 days after receipt of five (5) copies of OWNER's itemized bill, signed by a responsible official of OWNER's organization and prepared on OWNER's letterhead, compiled on the basis of the actual and necessary cost and expense. The OWNER shall maintain records of the actual costs incurred and charged or allocated to the project in accordance with recognized accounting principles. It is understood and agreed that the STATE will not pay for any betterment or increase in capacity of OWNER's facilities in the new location and that OWNER shall give credit to the STATE for the accumulated depreciation or "used life" of the replaced facilities and for the salvage value of any material or parts salvaged and retained or sold by OWNER. Not more frequently than once a month, but at least quarterly, OWNER will prepare and submit progress bills for costs incurred not to exceed OWNER's recorded costs as of the billing date less estimated credits applicable to completed work. Payment of progress bills not to exceed the amount of this Agreement may be made under the terms of this Agreement. Payment of progress bills which exceed the amount of this Agreement may be made after receipt and approval by STATE of documentation supporting the cost increase and after an Amendment to this Agreement has been executed by the parties to this Agreement. The OWNER shall submit a final bill to the STATE within 360 days after the completion of the work described in Section I above. If the STATE has not received a final bill within 360 days after notification of completion of OWNER's work described in Section I of this Agreement, and STATE has delivered to OWNER fully executed Director's Deeds, Consents to Common Use or Joint Use Agreements (if required) for OWNER's facilities, STATE will provide written notification to OWNER of its intent to close its file within 30 days and OWNER hereby acknowledges, to the extent allowed by law, that all remaining costs will be deemed 1:o have been abandoned. If the STATE processes a final bill for payment more than 360 days after notification of completion of OWNER's work, payment of the late bill may be subject to allocation and/or approval by the California Transportation Commission. UTILITY AGREEMENT (Cont.) Page 3 of 4 RW 13-5 (Rev. 6/2010) UTILITY AGREEMENT NO. 12 -UT -2002 The final billing shall be in the form of an itemized statement of the total costs charged to the project, less the credits provided for in this Agreement, and less any amounts covered by progress billings. However, the STATE shall not pay final bills which exceed the estimated cost of this Agreement without documentation of the reason for the increase of said cost from the OWNER and approval of documentation by STATE. Except, if the final bill exceeds the OWNER's estimated costs solely as the result of a revised Notice to Owner as provided for in Section I, a copy of said revised Notice to Owner shall suffice as documentation. In either case, payment of the amount over the estimated cost of this Agreement may be subject to allocation and/or approval by the California Transportation Commission. In any event if the final bill exceeds 125% of the estimated cost of this Agreement, an Amended Agreement shall be executed by the parties to this Agreement prior to the payment of the OWNER'S final bill. Any and all increases in costs that are the direct result of deviations from the work described in Section I of this Agreement, shall have the prior concurrence of STATE. Detailed records from which the billing is compiled shall be retained by the OWNER for a period of three years from the date of the final payment and will be available for audit by State and/or Federal auditors. Owner agrees to comply with Contract Cost Principles and Procedures as set forth in 48 CFR, Chapter 1, Part 31, et seq., 23 CFR, Chapter 1, Part 645. If a subsequent State and/or Federal audit determines payments to be unallowable, OWNER agrees to reimburse STATE upon receipt of STATE billing. It is understood that a portion of the relocation as herein contemplated includes betterment to OWNER's facilities by reason of increased capacity from an 8" to 12" inch water pipe. Said 67% - 33% split shall be applied to the actual and necessary cost of work done, and OWNER shall credit the STATE for the actual and necessary cost of said betterment, all of the accumulated depreciation and the salvage value of any materials or parts salvaged and retained by OWNER. V. GENERAL CONDITIONS All costs accrued by OWNER as a result of STATE's request of March 30, 2011, to review, study and/or prepare relocation plans and estimates for the project associated with this Agreement may be billed pursuant to the terms and conditions of this Agreement. If STATE's project, which precipitated this Agreement is canceled or modified so as to eliminate the necessity of work by OWNER, STATE will notify OWNER in writing and STATE reserves the right to terminate this Agreement by Amendment. The Amendment shall provide mutually acceptable terms and conditions for terminating the Agreement. All obligations of STATE under the terms of this Agreement are subject to the passage of the annual Budget Act by the State Legislature and the allocation of those funds by the California Transportation Commission. OWNER shall submit a Notice of Completion to the STATE within 30 days of the completion of the work described herein. STATE will acquire new rights of way in the name of either the STATE or OWNER through negotiation or condemnation and when acquired in STATE's name, shall convey same to OWNER by Director's Easement Deed. STATE"s liability for such rights of way will be at the proration shown for relocation work involved under this Agreement. It is understood that said highway is a Federal aid highway and accordingly, 23 CFR, Chapter 1, Part 645 is hereby incorporated into this Agreement. UTILITY AGREEMENT (Cont.) RW 1.3-5 (Rev. 6/2010) Page 4 of 4 UTILITY AGREEMENT NO. 12 -UT -2002 IN WITNESS WHEREOF, the above parties have executed this Agreement the day and year above written. STATE: OWNER: Qity of San Juan Capistrano, tili 'es epart ent By ode c �Z- By Sin Robert Enriquez Da Name (F ' t) Vatle District 12 Utility oor inator, Right of Way Title �e APPROVAL RECOMMENDED: By +ti--- Ul/ 1 /00�4- John kman Date Utility Coordinator DO NOT WRITE BELOW - FOR ACCOUNTNG PURPOSES ONLY PLANNING AND MANAGEMENT TO COMPLETE UNSHADED FIELDS: P65 I/"r l 1( 4:fth i�- t`1fL.�C1 t UTILITY COMPLETES: T CODE DOCUMENT CHG NUMBER SUFFIX DIST UNIT DIST SUB SPECIAL EA JOB DESIGNATION FFY FA OBJ DOLLAR CODE AMOUNT -CHAP UA,PoU 1rz �0 A 3 15 7 054 $ 890,000.00 $ 0.00 UA (-1 $ 890,000.00 EA FUNDING FIED: REVIEW/REQUEST FUNDING: 2 Sign: 1 -z-11 0' Si n> 4 Print> Evangaiina Washington Dae Print> John Dykman Date R/W Ylanning and Man441ement Utility Coordinator tj THE ESTIMATED COST TO THE STATE FOR ITS SHARE OF THE ABOVE DESCRIBED WORK IS $ 890,000.00. CERTIFICATION OF FUNDS I hereby certify upon my own personal knowledge that budgeted funds are available for the period and purpoe expenditure shown here. ' HQ AcWunting Officer Dat ITEM -CHAP STT FY AMOUNT $ 0.00 R/W Funds OE3109 $ 890,000.00 Distribution: 2 originals to R/W Accounting 1 original to Utility Owner 1 original to Utility File FUND TYPE EA AMOUNT Design Funds OE3101 $ 0.00 Construction Funds OE3104 $ 0.00 R/W Funds OE3109 $ 890,000.00 ,6TATE OF CALIFORNIA - DEPARTMENT OF ISPORTATION NOTICE TO OWNER RW 13-4 Rev. 9/86) NOTICE TO OWNER Number 12-2002 To: City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Dist. County Route PM E.A. 12 ORA 5,74 9.4/10.0, 0.0/0.2 OE3101 Federal Aid No.: N/A Owners Fiie: City of San Juan Capistrano CIP: 11805 Date: April 5, 2012 Freeway: [ X ] Yes [ ] No Because of the State Highway construction project: In the City of San Juan Capistrano, to reconstruct the I-5/SR-74 Interchange including the realignment of Del Obispo Street and Ortega Highway in Orange County, Which affects your facilities: Part A: Existing 12" ACP water and attendant facilities adjacent to the nb Ortega Hwy off -ramp; Part B: Existing 6" water line and attendant facilities in Del Obispo St; fire hydrants and sewers within the project limits; Part C: water meters and valves in Ortega Hwy, State R/W; Part D: 8" ACP water and attendant facilities in Ortega Hwy bridge overcrossing I-5 and westerly in State and City R/W, all within the limits of the State proposed construction project, You are hereby ordered to: relocate your facilities as described in your plan "I-5 and Ortega Highway Interchange Pipeline Relocation", Construction Set dated 12/12/2012, consisting of 26 sheets, City of San Juan Capistrano CIP #11805, all in order to clear the State's proposed construction project, Your work schedule shall be as follows: schedule your forces to perform the above mentioned work prior to and/or concurrent to Construction Contract 12-OE3104, as per the attached Special Provisions, and as directed by the State's Resident Engineer. Notify Mohammad Ravanipour, at telephone number (949) 936-35701 72 hours prior to initial start of work, and 48 hours prior to subsequent restart when your work schedule is interrupted. Liability for the cost of the work is: Part A: Existing facilities are located in their present position pursuant to rights superior to those of the STATE and will be relocated at STATE expense. Part B: The existing facilities are lawfully maintained in their present location and qualify for relocation at STATE expense under the provisions of Section 703 of the Streets and Highways Code, Part C: The existing: facilities described above will be relocated at 100% OWNER expense, per Streets & Highway Code Section 673. Parte Q: The existing facilities described in Section D above will be relocated at 15% STATE and 85°% OWNER in accordance with Sections 673 and 703 of the Streets & Highways Code. _BRENT GREEN ---____-- — - Acting District 12 Director RICKY ROD_RIGUE_Z _ R/W Project Delivery Manager - By CT Design R/W K ROBERT P. Ztl),� tJ iJI=Z"Di strict 12 Uoordinator THIS NOTICE DOES NOT CONSTITUTE A PERMIT. OBTAIN AN ENCROACHMENT PERMIT BEFORE STARTING WORK. 5-1.14 NONHIGHWAY FACILITIES (INCLUDING UTILITIES) The utility owner will relocate a utility shown in the following table before the corresponding date shown: American Telephone and Telegraph Company -Telephone Underground Conduits, Transverse crossing 1-5 Relocate from MH to MH by American Telephone and Telegraph Company and Bate of the Location 192 ft Lt of Sta 12+30 to 38 ft Lt of Sta Dee 1, 201 18+06 "B" Line I Installation of the utilities shown in the following table requires coordination with your activities. Make the necessary arrangements with the utility company through the Engineer and submit a schedule: 1. Verified by a representative of the utility company 2. Allowing at least the time shown for the utility owner to complete its work CONTRACTNO. 12-0E3104 PFK _tA�DDFNDj T REIVISED j M NO1 DATED JULY 2, 2012 Utility Relocation and Contractor-Arranzed Time for the Relocation Utility 'Utility Address, _ _ _ Location Days City of San Juan Capistrano Water City of San Juan 41 A Lt of Sta 6+11. 4 weeks notification Meter Capistrano "H'T Line I day to complete Tobe adjusted to grade 32400 Pasco Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano Water City of San Juan 56 ft Lt of Sta 7+54. Meter Capistrano '113" Line To be adjusted to grade 32400 Pasco Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano Water City of San Juan 33 ft Rt of Sta 6+37 Meter To be relocated Capistrano "B" Line 32400 Pasco Adelento, San Juan Capistrano, CA 92675 City of San Juan Capistrano Water City of San Juan 45 fi Rt of Sta 6+61 Mett-r and backflow preventer Capistrano "B" Line To be relocated 32400 Pasco Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano Fire City of San Juan 25 ft Lt of Sta 8+84. 4 weeks notification Hydrant Capistrano 11111f Line 1 day to complete To be relocated 32400 Paseo Adelento San Juan Capistrano, CA 92(75 City of San Juan Capistrano Water City of San Juan 29 ft Lt of Sta 84-92 4 weeks notification Valve Capistrano "H" Line I day to complete, To be relocated 32400 Pasco Adelento San Juan Capistrano, CA 92675 Czty of San Juan Capistrano Water City of San Juan 43 ft Lt of Sta 7+50, Valve Capistrano "B" Line To be adjusted to grade 32400 Paseo Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano Water City of San Juan 22 ft Lt of Sta 6+62, Valve Capistrano "B" Line To be adjusted lograde 32400 Pasco Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano Water City of San Juan 53 ft Rt of Sta 6+75 Valve. Capistrano I "B" Line, To be removed and install new valve away from 'Retaining "Wall No 80 32400 Pasco Adelento San Juan Capistrano, CA 92,675 City of San Juan Capistrano Sewer City of San Juan — Ilandhole at 27 ft Lt of 4 weekE -notification Handhole and 8" Sewer Line. Capistrano Sta 8+20. "B" Line 2 days to complete I o be relocated sewer handhole to 32400 Paseo Adelento And Sta 7+50 and abandoned portion of San Juan Capistrano, 8" sewer line between 8" Sewer Line CA 92675 Sta 7.50 to 27ft Lt of I S A 2 Sta 8 0 IT' Line, CONI-RACTNO, i2 -0E3 04 REVISED FFR, ADE)ENDUM NO. I DATED JT, A 2,'2012 REVISED PER ADDENDUM NO. City of San Juan 6 ft Lt of Sta 6+60 1111" 4 weeks notification I DATED JULY 2, 2012City of Sana Capistrano Lire to 6 ft Lt of Sta If) working days Juan Capistrano 32400 Pasco Adelento 10+30 "B" Line 2-12" Water Lines San Juan Capistrano, CA 92675 City of San Juan Capistrano City of San Juan 34 ft Lt of Sta 6+92 to Re connection of Existing 2- 8" Capistrano 34 ft Lt of Sta 8+90 Water Lines 32.404 Paseo Adelento "ll" Line San Juan Capistrano, CA 92675 City of San Juan Capistrano City of San Juan 6 ft to 14ft Lt of Sta 4 weeks notification 2-12" Water Lines (Geo Foam Area) Capistrano 10+30 to 12+51.60 4 days to complete 32400 Paseo Adelento 11H., Line San Juan Capistrano, CA 92675 City of San Juan Capistrano -8" City of San Juan 80 ft Lt of Sta 10+30 4 weeks notification Water Line. (Geo Foam Area) Capistrano to 10ft Lt of Sta12+52 I day to complete To be removed 32400 Pasco Adelento "J3" Line San Juan Capistrano, CA 92675 City of San Juan Capistrano. Install City of San Juan 6.5 ft Lt of "B: Line 4 weeks notification 20" Casing Capistrano between Sta 12+95 to 11 days to complete New installation in new bridge. 32400 Pasco Adelento Sta 16+04 "B" Line San Juan Capistrano, CA 92675 City of San Juan Capistrano. Install City of San lutan 6.5 ft Lt of "B: Line New 12" Water I ine in Capistrano between Sta 12+95 to 20" Casing 32400 Pasco Adelento Sta 16+04 "B" Line New installation in new bridge. San Juan Capistrano, CA 92675 City of San Juan Capistrano. Install City of San Juan 13.5 ft Lt of "B- Line New 20" Casing Capistrano between Sta 12+9,r, to New instellalion in new bridge- 32400 Pasco Adelento Sta 16+04 "B" Line San Juan Capistrano, City of San Juan Capistrano. Install CA 92675 City of San Juan 13.5 ft Lt of `B: Line New 12" Water Line in Capistrano between Sta 12+95 to 20" Casing 32400 Pasco Adelento Sta 16+04 "B" Line New installation in new bridge. San Juan Capistrano, CA 92675 City of San Juan Cap­isirn . City of San Juan 10-5 ft Lt of Sta 12-? 95 Existing 8" Steel Water Line in Capistrano to 10.5 ft Lt of Sta 12" Steel Casing. 32400 Pasco Adelento 16+04 "B" Line To be abandoned during demolition San Juan Capistrano, of bridge. CA 92675 City of San Juan Capistrano City of San Juan 12ft Lt of Sta 15-s 30 Manhole. Capistrano "B" Line To be abandoned duriag, demolition 32400 Pasco Adelento of bridge San Juan Capistrano, CA 92675 City of San Juan Capistrano City of San Juan 12ft Lt of Sta 0--41 Manhole. Capistrano "B" Line Tv be abandoned dilTing demolition of bridge 32400 Pasco Adelento San Rian Capistrano, CA 92675 CONTRACT NO, 12-OE3104 REVISED PER ADDENDUM NO, I DATED JULY 2; 2012, City of San Juan Capistrano Fire City of San Juan 66 ft Lt of Sta 18+45 4 weeks notification Hydrant Capistrano "B"Une 3 days to complete To be relocated 32400 Paseo Adelimto San Juan Capistrano, CA 92675 City of San Juan Capistrano Fire City of San Juan 78 ft Rt of Sta 18+73 Hydrant Capistrano "B" Line To be abandoned 32400 Paseo Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano- City of San Juan 44 ft Lt of Sta 17+14 4 weeks notification Abandoned Water Meter Servicing Capistrano "B" Line 4 days to complete State Landscaping 32400 Paseo Adelento To be abandoned San Juan Capistrano, CA 92675 City of San Juan Capistrano Water City of San Juan 57 ft Rt of Sta 18+73 Meter Capistrano "B" Line To be abandoned 32400 Paseo Adelento, San Juan Capistrano, CA 92675 City of San Juan Capistrano Water City of San Juan 57 ft Rt of Sta 18+75 1 Meter Capistrano "B"Line To be abandoned 32400 Pasco Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano Water City of San Juan 45 ft Rt of Sta 19+45 Meter Capistrano "B" Line To be abandoned 32400 Pasco Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano City of San Juan 47 It Rt of Sta 20+14 Water Meter Capistrano "B11 Line To be relocated to new sidewalk 32400 Paseo Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano-Water City of San Juan 53 ft Rt of Sta 21-x.13 Meter Capistrano "B" Line Adjust to grade 32400 Paseo Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano-Sewer City of San Juan Manhole at 16 ft Rt of 4 weeks notification Manhole and 8" Sewer Line Capistrano Sta 18+32 "B" Line 2 days to complete To be relocate manhole to Sta 32403 Paseo Adelento 8" Sewer Line between 19+1 land to abandon portion of 8" San Juan Capistrano, Sta 18+32 to 19+11 Sewer Line CA 92675 "B" Line City of San Juan Capistrano-2 Water City of San Juan Between Sta 18+32 to 4 weeks notification Valves Capistrano Sta 18+61 "B" Line 3 days to complete To be adjusted to grade 32400 Paseo Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano-4 Water City of San Juan Between Sta, 18+32 to Valves Capistrano Sta 18-61 "B" Line To be adjusted to grade 324-00 Paseo Adelento L San Juan Capistrano, I CA, 92675 CONTRACT NO. 12-OE3104 REVISED PER ADDENDUM NO. 1 DATED JULY 2, 2012 City of San Juan Capistrano -Water City of San Juan 15 ft Lt of Sta 17+14 Valve, Capistrano "B" Line To be abandoned 32400 Pasco Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano -2 City of San Juan Between Sta 18+68 to Water Valve- Capistrano Sta 18+84"l3" Line To be adjusted to grade 32400 Pasco Adelento San Juan Capistrano, CA 92675 City of San Juan Capistrano City of San Juan Between to 16+05 to 4 weeks -notification Install new 12" PVC water pipelines Capistrano 19+00 "B" Line 4 days to complete system 32400 Pasco Adelento San Juan Capistrano, CA 92675 City of San Juan CapLetrano-Install. City of San Juan Sta 514+16 to Sta 4 weeks notification 12" AC Water Line. Capistrano 520+03 "G" Line 11 days to complete New installation by City of San Juan 32400 Pasco Adelento Capistrano along new R/W Line San Juan Capistrano, CA 92675 City of San Juan Capistrano -12" AC City of San Juan Sta 514+16 to Sta 14 days notification Water Line along existing R/W Capistrano 520+03 "G" Line 6 days to complete fence. 32400 Pasco Adelento To be abandoned San Juan Capistrano, CA 92675 City of San Juan Capistrano City of San Juan 38 ft Rt of Sta 17+08 Portion of exist 14" AC Water Line Capistrano to38 ft Rt of Sta 18+90 along Rte 74 to be abandoned. 32400 Pasco Adelento, "B" Line San Juan Capistrano, CA 92675 American Telephone and Telegraph American Telephone 9 ft Lt of Sta 8+13 "B" 10 week notification Company and Telegraph Line to 25 ft Rt of Sta I week to complete Existing underground conduits to be Company 9+05 "H" Line abandoned Attn: Anthony Kwan 1265 Van Buren Street, RM 180 Anaheim, CA 92807 American Telephone and Telegraph American Telephone 9 ft Lt of Sta 8+13 "B*' Company and Telegraph Line Existing pull -box to be removed Company Attn: Anthony Kwan 1265 Van Buren Street, RM 180 Anaheim, CA 92821___L_ CONTRACT NO. 12-0E3104 REVISED PER ADDENDUML NO. 1 DATED JULY 2, 2012