Loading...
11-0419_WILLDAN ENGINEERING_Exhibit AMs. Nishe Patel March 1, 2011 Page 7 wide to accommodate a striped center median, four travel lanes, and shoulder and si- dewalk on both aides. The Garvey Avenue Bridge was funded by the Highway -Bridge Rehabilitation and Replacement (HBRR) Program and the Seismic Retrofit Funds. The project was awarded Project of the Year by the America Public Works Association. Location City of Rosemead Project Team Wilidan has assembled a highly qualified team of technical experts to augment the CHy of San J uan Capistranos' staff to support the construction of the Vanowen Street Bridge over the Los Angeles River. The following are brief blos of our key team members. Detailed resumes are in the Appendix of this proposal. Ken Taylor, PE, of Wlfldan Engineering, will provide civil and drainage design support services related to the road- way and channel improvements JefrMcClure of McClure Consulting Corporation will assist Mr. Broz and Mr. Taylor to civil and drainage design support services related to the roadway, utility and channel Improvements. Detailed Scope of Services and Schedule — Exhibit A Our following scope of services Identifies the tasks to provide design support services during construction of the re- building and widening of the Van Owen Street Bridge over the Los Angeles River. Task 1-- Civil Design Support Services during Construction The required design support services for the civil Improvements during construction will be provided by Jeff McClure and Ken Taylor who were members of the original desigri team for this project during the design phase of the project. The Wiildan team will perform the following tasks: 1.1 Request for Information (RFQ: The Wfildan team will respond to all the contractor's RFI's related to the design plans and specifications In a timely manner. The WfiEden team will evaluate each RFI and provide a written response to the to City's construction manager for forwarding to the Contractor. J.2 ------- Drawing,Revtew: The WRWan team.will review_ and approve or comment on the contractor's submitted shop�drawings. 1.3 Submittal Review: The Willdan team wl review and approve or comment on the contractor's submitted technical sumittals. WI LLDAN grneering EXHIBIT A Ms. Nisha Patel March I, 2011 Page 8 Schedule Project construction duration has been established by the Gly as being 300 calendar days. The City has not identi- fied, but g is assumed, that the work in the riverbed will be limited to the dry seasons only. Because there Is also- clated roadway work on both roadway approaches to the bridge it Is further assumed that construction work will be continuous for the full 300 calendar days wi0lout any stoppage for the wet seasons. Fee Estimate Out estimated fees for the above scope of work Is $10,200 for a duration of 300 working days of design support ser- vices, which includes our subconsultant's fees. The following table provides a summary of our fee. Task Description ODC Total i Civil Des nSu ort Services Wdldan, McClure $1800 $8400 570,200 Total $1800 $8400 570200 Appendix B co niarns a detailed fee es Deaths The above lump sum fee does nor include the following items • Re- design, new designs or changes to the ezisdng design that are pad of the contractor's operations, ertom or requests for cost reduction Incentive proposals • Materials sampling and testing • Construction engineering or inspection • Job site safety, contractor safely compliance and public safety of construction worksite. • Environmental permit amendments or Section 7 Consultation. • HASSMAER Documentation • Condition 19 of the Section 401 Cer0ication will be the contractors respotmibility. This includes developing and approval of a Surface Water Diversion Plan, Condition 19 also includes water testing that Is also the responsibility of the contractor The Wildan team has the depth of resources to provide the necessary support to the City's project managerfor the succeesNl delli of the proJec6We apprephnetheoppoMnity to present our proposal, P -lease contact me at (714) 978.8251 or tbroz0_41daraw if you have any questions or require additional Information. Respectfultysubmi , Willi Engine g tri(1• Thomas BroBE z, PE, BE, F.ASCE Dlmcher, Program and ConsWction Management Services 'WILLDAN F gl w ng