1992-0616_OC TRASNPORTATION AUTHORITY_Memorandum of Understanding0
MEMORANDUM OF UNDERSTANDING
REGARDING RECEIPT AND USE
MEASURE M FUNDS
The City of San Juan Capistrano, in conjunction with the receipt of funds derived from
the one-half percent sales tax imposed by Orange County Local Transportation Authority
Ordinance No. 2 (Measure M), and as required by the Authority's Local Turnback Program
Guidelines, hereby provides the following assurances and understandings:
A. The City of San Juan Capistrano hereby assures the Authority that:
1. Measure M funds will not be substituted or replaced by funds which are
currently funding existing transportation programs;
2. Measure M funds will be used for only transportation purposes as defined in the
Authority guidelines;
3. The City of San Juan Capistrano will submit to the Authority a quarterly
description of the use of funds;
4. Measure M funds will be expended within three years after receipt unless
specific permission for a time extension has been granted by the Authority;
5. The City of San Juan Capistrano agrees to submit to annual fiscal and
compliance audits conducted by the Authority or its agent;
6. All Measure M funded projects will meet the legal requirements of the
Ordinance and the Authority's Local Turnback Program Guidelines.
B. The City of San Juan Capistrano further understands and agrees that:
1. LTA will require the City of San Juan Capistrano to return any Measure M funds
and may impose interest penalties on any expenditure found to be improper or
illegal under the terms of the Measure M Ordinance or the Authority's Local
Turnback Program Guidelines;
2. The City of San Juan Capistrano will establish a separate Measure M fund
accounting system which will allow financial and compliance audits of Measure
M funds transaction and expenditures;
3. Any Measure M funds not expended within three years of receipt will be
returned to the Authority upon request.
IN WITNESS WHEREOF the City of San Juan Capistrano has executed these assurances
and understandings regarding receipt and use of Measure M Funds this 16th day
of June , 19 92 by its duly authorized officer.
City of San Juan Capistrano
By
JONES, MAYOR
t�
Date 6/16/92
ATTEST:
CHERYL JOHN SON�U'ERK�
ED AS TO
PER CITY ATTORNEY
0
June 22, 1992
JMo„
m�ovoealo
�euisnla 1961
1776
Lisa Mills
Director of Planning and Development
Orange County Transportation Authority
1055 North Main Street, Suite 516
Santa Ana, California 92701-3267
Re: Measure MMeasure M FundingEligibility
Dear Ms. Mills:
MEMBERS OF THE CITY COUNCIL
JERRY HARRIS
KENNETH E FRIESS
GARY HAUSDORFER
GIL JONES
JEFF VASQUEZ
CITY MANAGER
STEPHEN B JULIAN
At their regular meeting held June 16, 1992, the City Council of the City of San
Juan Capistrano approved the Memorandum of Understanding for the Receipt and
Use of Measure M Funds and adopted Resolution No. 92-6-16-7, which certified
that the City is in the process of developing a Pavement Management Plan in
conformance with Orange County Local Transportation Authority requirements.
Two executed copies of the Memorandum of Understanding and two certified
copies of Resolution No. 92-6-16-7 are enclosed for your files. If you need any
further information, please let us know.
Very truly yours,
Cheryl Johnson—,
City Clerk
Enclosure
cc: Director of Engineering and Building
Theodore Simon
32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 0 (714) 493-1171
0 0
Councilman Friess felt that it was important to address the
concerns of the existing residents and suggested that staff
continue to meet with Mr. Klein and residents of McCracken
Hill to consider possible creative ways (e.g. predestined
viewshed envelopes) to protect view corridors without a zone
change.
Mr. Denhalter stated that the CC&Rs for this subdivision
specify single and split-level homes, which specifications
could be enforced.
Direction to Staff:
It was moved by Councilman Friess, seconded by Councilman
Hausdorfer, and unanimously carried that staff be directed
to continue to meet with Mr. Klein and residents of McCracken
Hill to consider possible creative ways (e.g. predestined
viewshed envelopes) to protect view corridors without a zone
change.
Written Communication:
Report dated June 16, 1992, from the Director of Engineering
and Building, recommending that the City's eligibility
package for Measure M funds be approved, including certifica-
tion of the City's intent regarding the Pavement Management
System Program and a Memorandum of Understanding executed by
the Mayor for receipt and use of Measure M funding.
Approval of Memorandum of Understanding:
It was moved by Councilman Hausdorfer, seconded by Councilman
Friess, and unanimously carried that the Memorandum of
Understanding be approved for receipt and use of Measure M
funding. The Mayor was authorized to execute the document
on behalf of the City.
It was moved by Councilman Hausdorfer, seconded by Councilman
Friess, that the following Resolution be adopted certifying
the City's intent regarding the Pavement Management System
Program:
-19-
6/16/92
1.
0
0
SYSTEM PROGRAM - A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA,
CERTIFYING THE INTENT OF THE CITY OF SAN JUAN
CAPISTRANO PAVEMENT MANAGEMENT SYSTEM PROGRAM
The motion carried by the following vote:
AYES: Councilmen Friess, Harris, Hausdorfer,
Vasquez, and Mayor Jones
NOES: None
ABSENT: None
Staff was authorized to submit the Measure M eligibility
package.
Written Communication:
Report dated June 16, 1992, from the City Clerk, advising
that the Ordinance was introduced at the meeting of June 2,
1992, and was scheduled for adoption.
Adoption of Ordinance:
The Deputy City Clerk read the title of the Ordinance next
in order. Further reading of all ordinances had been waived
earlier in the meeting. It was moved by Councilman
Hausdorfer, seconded by Councilman Friess, that the following
Ordinance be adopted:
(WITTENBERG-LIVINGSTON) (PEPPERWOOD ESTATES) - AN
ORDINANCE OF THE CITY OF SAN JUAN CAPISTRANO,
CALIFORNIA, APPROVING REZONE 87-11, REZONING
ASSESSOR'S PARCEL NOS. 649-111-08 AND 121-020-04
FROM THE GM (GROWTH MANAGEMENT) DISTRICT TO THE ES
(SMALL ESTATE) DISTRICT
The motion carried by the following vote:
-20-
6/16/92
0
AGENDA ITEM
TO: Stephen B. Julian, City Manager
9
June 16, 1992
FROM: William M. Huber, Director of Engineering & Building
SUBJECT: Approval of Memorandum of Understanding (Orange County Local
Transportation Authority) for Receipt and Use of Measure M Funding,
Adoption of Resolution Certifying the City's Intent Regarding the
Pavement Management System Program and Authorization of Staff to
Submit the Measure M Eligibility Package
RECOMMENDATION
Approve and authorize the Mayor to execute the Memorandum of Understanding
(OCLTA) for receipt and use of Measure M funding.
Adopt the Resolution certifying the City's intent regarding the Pavement Management
System Program.
Authorize Staff to submit the Measure M eligibility package.
SITUATION
The approval of Measure M by the voters of Orange County in 1990 authorized a 1/2%
sales tax for a 20 -year period, effective April 1, 1991. The purpose of these funds is for
providing transportation improvements throughout the County.
In June, 1991, the City Council approved Resolution No. 91-6-18-5 approving the
definition of and process for determining City compliance with the County Master Plan
of Arterial Highways for securing Measure M funds.
Further, as part of the procedure for local jurisdictions to be eligible for Measure M
funds, specific documentation must be prepared and submitted along with a Memorandum
of Understanding for consideration by the Orange County Local Transportation Authority
by June 30, 1992.
Staff has prepared the eligibility package as noted on the attached Measure M Eligibility
Checklist for submittal. Included in the package is 1) a Resolution to be adopted by the
City Council that certifies the City's intent regarding the Pavement Management System
Program and 2) a Memorandum of Understanding to be executed by the Mayor for receipt
and use of Measure M funding. It is understood that, upon completion of the Pavement
Management System project that is now in progress, a Resolution will be brought before
the City Council for approval that certifies that the City has a Pavement Management
Program in conformance with the required criteria. It is further understood that, upon
completion of the Growth Management Element, a Resolution will also be brought before
the City Council for approval that amends the City's General Plan to incorporate that
element in conformance with the City's Growth Management Policies and the required
criteria.
FOR CITY COUNCIL AGENVXJUptV
AGENDA ITEM • •
June 16, 1992
.Page 2
COMMISSION/BOARD REVIEW, RECOMMENDATIONS
N/A
FINANCIAL CONSIDERATIONS
Based upon Staff review and the funding criteria, the City's share of the estimated $450
million to be generated for Orange County is approximately $235,000 annually in local
return funds and $190,000 in FY 1992-93 for project specific grants including Rancho
Viejo Road/Village Road traffic signal, Del Obispo/Aguacate traffic signal, Camino
Capistrano/Juniperro Serra traffic signal, Del Obispo - Aspero to La Paz street widening
and Del Obispo traffic signal interconnect. Staff will be submitting future applications
for additional Measure M funds.
NOTIFICATION
N/A
ALTERNATE ACTIONS
1. Approve the Memorandum of Understanding, adopt the Resolution and authorize
Staff to submit the eligibility package.
2. Do not approve the MOU, nor adopt the Resolution, nor authorize Staff to submit
the eligibility package.
3. Request additicnal information from Staff.
RECOMMENDATION
Approve and authorize the Mayor to execute the Memorandum of Understanding
(OCLTA) for receipt and use of Measure M funding.
Adopt the Resolution certifying the City's intent regarding the Pavement Management
System Program.
Authorize Staff to submit the Measure M eligibility package.
Respect ully submitted
cf
William M. Huber, P.E.-
g5
WMH/TGS:cI
Attachments: 1. Memorandum of Understanding
2. Resolution
3. Measure M Eligibility Checklist with Attachments
NOTE: Attachments included only in City Council packets. Copies available for
public review in office of City Clerk.
RESOLUTION NO. 92-6-16-7
CITY OF SAN JUAN CAPISTRANO -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JUAN
CAPISTRANO, CALIFORNIA, CERTIFYING THE INTENT OF THE
CITY OF SAN JUAN CAPISTRANO PAVEMENT MANAGEMENT
SYSTEM PROGRAM
WHEREAS, the City of San Juan Capistrano desires to maintain and improve
the streets and roads within its jurisdiction; and,
WHEREAS, the City of San Juan Capistrano supports regional coordination of
transportation improvements; and,
WHEREAS, the Orange County Local Transportation Authority Ordinance No.
2 Policy Resolution No. 3 requires that each City have in place a Local Pavement
Management Plan and be maintained to qualify for allocation of revenues generated from
Measure M.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of San
Juan Capistrano as follows:
SECTION 1.
Certifies that the City of San Juan Capistrano is in the process of developing a
Pavement Management Plan in conformance with the criteria stated in the Orange
County Local Transportation Authority Ordinance No. 2 Policy Resolution No. 3.
SECTION 2.
The Pavement Management System Program is being prepared by Pavement
Management Systems, Inc., and contains, as a minimum, the following elements:
- Inventory of arterial and collector routes reviewed and updated
biennially. The last update of the inventory was completed in April,
1992.
- Assessment of pavement condition for all routes in system, updated
biennially. The last review of pavement condition was completed in
April, 1992.
- Identification of all sections of pavement needing rehabilitation or
replacement.
- Determination of budget needs for rehabilitation or replacement of
deficient sections of pavement for current biennial period, and for
following biennial period.
•
11
A copy of this certification and the Pavement Management Plan are being
provided to the Orange County Local Transportation Authority.
PASSED, APPROVED, AND ADOPTED this 16th day
of T„nP , 1992.
ATTEST:
GIL JONES, MAYOR
27
if
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF SAN JUAN CAPISTRANO )
I, CHERYL JOHNSON, City Clerk of the City of San Juan Capistrano,
California, DO HEREBY CERTIFY that the foregoing is a true and correct copy of
Resolution No. 92-6-16-7 adopted by the City Council of the City of San Juan
Capistrano, California, at a regular meeting thereof held on the 16th day
of June , 1992, by the following vote:
AYES: Councilmen Friess, Hausdorfer, Harris
Vasquez and Mayor Jones
NOES: None
ABSTAIN: None
ABSENT: None
(SEAL)
-2-
Growth Management
Policy
Attachment 3a
Attachment 3b
Attachment 3c
Attachment 3d
Attachment 3e
Attachment 3f
Attachment 3g
Attachment 3h
Attachment 3i
Attachment 3j
Attachment 3k
Attachment 31
Attachment 3m
Attachment 3n
Attachment 3o
0
is
MEASURE M ELIGIBILITY CHECKLIST
CITY OF SAN JUAN CAPISTRANO
A copy of the Growth Management Program which includes:
- Specified traffic level of service standards.
- Planning standards for fire, police, library, flood control, parks
and open space, and other items as determined by each
jurisdiction.
- A development mitigation program to cover costs of new
services and fees to address cumulative impacts on existing
traffic.
- A development phasing and annual monitoring program for
levels of service.
- A means to balance housing options with job opportunities.
- A Traffic Demand Management Ordinance or other action to
promote ridesharing and alternative work hours for non -peak
commuting.
- Participation in inter -jurisdictional planning forums.
A copy of seven-year Capital Improvement Program that includes
all projects to receive Measure M funding.
A resolution adopting a definition of, and a process for,
determining the consistency of the agency's traffic circulation plan
with the Master Plan of Arterial Highways.
Letter from the County of Orange stating that the City's traffic
circulation element is consistent with the Master Plan of Arterial
Highways.
A resolution and certification adopting a local Pavement
Management Program.
A printout or copy of the agency's Pavement Management Plan.
A resolution adopting a Growth Management Program into its
General Plan.
Have satisfied Maintenance of Effort requirements so that Measure
M revenues are supplementing and not supplanting previous local
spending.
A Memorandum of Understanding regarding receipt and use of
Measure M funds.
i
0 0
DRAFT
GROWTH MANAGEMENT POLICY
An Interim Growth Management Policy for
the City of San Juan Capistrano, California
JUNE 1992
Thomas Tomlinson, Director
Planning Department
City of san Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, California 92675
(714)493-1171
0 0
• Growth Management Policy -2- June 1992
OVERVIEW
The City of San Juan Capistrano has few large remaining parcels
that are undeveloped and which have not been approved for
development. These development approvals are part of several
larger Planned Communities. As a result a significant amount of
review has occurred on designating the density, intensity and
phasing of development over the coming years for their areas.
However, as part of the fast growing south Orange County region,
this City is strongly impacted by surrounding communities
particularly as it relates to traffic congestion due to the
location of Interstate 5. This major circulation link serves as
the primary north -south connection between the Los Angeles, Santa
Ana/Anaheim and San Diego employment centers.
In addition to the above, the City receives many of its public
services through independent agencies, including police, fire,
library and health services from Orange County. Furthermore, the
City is subject to several major County, regional and State growth
management plans and laws independent from the City's adopted
Residential Growth Management Program.
PUBLIC FACILITIES AND SERVICES RELATED TO GROWTH MANAGEMENT
The public facilities and services governed by the Growth
Management Policy include traffic, police, fire, library, park, and
flood control services. These services are discussed in more
detail in the following sections.
Traffic and Circulation: Under provisions of the Circulation
Element a system of streets, bikeways and trails have been
designated to move people and goods throughout the City and onto
the regional transportation network. This system addressed the
emphasis on a multiple network of approaches. This is reinforced
by the following statement, "The City shall seek to provide a safe
and efficient transportation and circulation system that minimizes
the impact of the automobile, maximizes the use of public
transportation and strives for a more adequate non -vehicular
circulation system."
Using the above goal, the City's circulation network identifies
primary, secondary and local commuter roadways generally consistent
with the Orange County Master Plan of Arterial Highways. The
implementation of the primary and secondary arterial is
specifically designed to facilitate regional movement of vehicles
through the City. The local commuter street designation is
designed to provide an internal linkage system that connects to the
above mentioned regional street network.
0 0
• Growth Management Policy -3- June 1992
In regards to public transportation, the City continues to be a
strong advocate of rail transit. This emphasis has focused upon
improvements, both existing and planned, for the Amtrak Depot
located on Verdugo Street. That rail station encourages regional
commuter trips as an alternative to single occupant vehicles.
In addition, the City has developed a separate bikeway and
hiking/equestrian trails system to encourage residents and visitors
to avail themselves of alternate transportation methods to conduct
localized trips, thus reducing the dependence upon the automobile.
Law Enforcement: The City of San Juan Capistrano receives law
enforcement services under a contract with the Orange County
Sheriff's Department. The station serving the City is located on
Crown Valley Parkway in Laguna Niguel. Existing service levels in
the City meet standards established by the Department.
The Orange County Growth Management Plan Element requires that the
cost of new facilities be borne by new development. Orange County
has indicated that the station currently serving the City is
temporary and will ultimately be replaced with a permanent
facility. The location and timing of this replacement facility
has not been determined. The need for any additional sheriff's
facilities will depend upon the timing of future development within
the sub -region, which is monitored by the County.
The policies established herein require annual monitoring of police
service levels to the City, including gang suppression units,
neighborhood watch, etc. Because existing levels of police
services are adequate, the City in consultation with the Orange
County Sheriff's Department will constantly evaluate service levels
and adjust where necessary to provide a safe community in which to
work and live.
Fire Service: The City receives fire protection under a contract
with the Orange County Fire Department. Five fire stations
including one within the City are available to respond to calls.
The Fire Station No. 7 provides primary response with back-up from
Dana Point, Laguna Niguel, and Mission Viejo. Existing fire
service level in the City are adequate by the Department's
standards.
The Orange County Public Services and Facilities Element contains
the following criteria for fire station site relocation:
"...for 80 percent of the service area, first fire
engine to reach the emergency scene within 5 minutes
and paramedics to reach scene within 10 minutes".
The policies of this program call for ongoing coordination with the
County of Orange to ensure the continued provision of adequate fire
0 0
0 Growth Management Policy -4- June 1992
protection services to the City. As a part of this cooperation
the City has acquired and prepared preliminary designs for the
future relocation of Station No. 7 with expanded facilities to
serve the City. Station 7 will eventually be relocated along
Rancho Viejo Road adjoining the Marbella Commercial Center.
Library Service: The City receives library services under contract
through the Orange County Public Library System. City residents
are served by the San Juan Capistrano Library located at E1 Camino
Real and Acjachema Street. Based upon existing services standards
of 0.2 square feet of library space per capita, the San Juan
Capistrano Library is more than adequate to serve the City's
• projected resident population under the General Plan.
Parks: The City has sought to provide abundant open space areas
and through the Open Space Bond Measure passed by voters in June
1990, has acquired or is in the process of acquiring one -hundred
and twenty (120) acres of public parkland. That parkland
acquisition will supplement existing parks in the City. The City
presently maintains about 42 acres of public park and the Open
Space Bond Measure will increase the acreage to 162 acres. The
City, as part its General Plan, has previously established a
standard of five (5) acres of parkland for every one -thousand
(1000) residents. With a current population of 28,000, the City
will provide 5.78 acres per 1000 residents and exceed the General
Plan standard.
Floodplain Management: The City of San Juan Capistrano, through
its Floodplain Element, has adopted policies and implementation
measures to protect life and property from 100 year floods of the
major drainage basins represented by Oso, Trabuco and San Juan
Creek. Any development that is proposed within designated flood
hazard areas must comply with specific design standards to insure
that the project and adjacent properties are not impacted by
flooding.
LOCAL GROWTH MANAGEMENT ISSUES
As indicated previously, most major vacant parcels have been
previously reviewed and approved as part of various designated
"Planned Communities". These planned communities have been
evaluated for the various on-site and off-site impacts upon public
services. In response, each of these planned communities have
included specific construction phasing and infrastructures
improvement scheduling for all on and off-site improvements
necessary to maintain adopted service levels. These major
developments include the Lomas San Juan Planned Community, Forster
Canyon Planned Community, Marbella Planned Community, and the
Pueblo Serra Planned Community.
Growth Management Policy -5- June 1992
Although the potential for significant new development applications
is somewhat limited, the City's public services and facilities
including its transportation system (rail and streets) will
continue to be impacted by both local and regional movement of
people and goods. As a result, the City will continue to implement
various strategies to comply with adopted service levels of its
General Plan. These various methods have been outlined in
subsequent sections of this program and the City's existing
residential growth management program is discussed below.
Residential Growth Management Program: In 1976, San Juan
Capistrano became the first City in the County to adopt a growth
management program. This program phases residential development
over an extended period of time in order to allow for the planning
and funding of public improvements and utilities commensurate with
the ability of the community to absorb the costs their growth
inducing impacts. This program was implemented in response to
specific provisions of the land Use Element.
This program allows for an annual evaluation of the ability of the
City to absorb residential growth in the community and to modify
the pace of development in response to this review. However, in
no instance can the number of residential building permits
allocated in any calendar year exceed four -hundred (400) permits.
REGIONAL GROWTH MANAGEMENT ISSUES
The State, regional, and Orange County plans and laws affecting the
City are varied and complex. They include the SCAG Growth
Management Plan, State Assembly Bill 471, and Measure M (Orange
County). Of all these, Measure M will have the most direct and
significant impact upon the City's General Plan. Nevertheless, the
other plans and legislation are important and must be addressed.
SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS (SCAG) GROWTH
MANAGEMENT PLAN
The SCAG Growth Management Plan recommends ways to redirect the
region's growth in order to minimize congestion and better protect
the environment. While that agency lacks the authority to mandate
implementation of the Growth Management Plan, other agencies, such
as the Air Quality Management District (AQMD), are authorized to
mandate implementation of the Air Quality Management Plan, a
program related to the Growth Management Plan which follows its
major provisions.
The Air Quality Management Plan mandates a variety of measures to
reduce traffic congestion and improve air quality, including the
9
9
Growth Management Policy -6- June 1992
Regulation XV Commuter Program and the requirement of each
jurisdiction to develop an implementation strategy to comply with
the adopted Air Quality Plan. These and other measures must be
implemented gradually over several years. The City has adopted an
Air Quality Policy Plan to meet the requirements for local
jurisdictions as identified in the regional Air Quality Management
Plan.
CONGESTION MANAGEMENT PLAN (AB 471
Assembly Bill 471, subsequently modified by Assembly Bill 1791,
requires every urbanized city and county with a population of
50,000 or more persons to adopt a Congestion Management Plan (CMP).
A jurisdiction which does not comply with the CMP will loose gas
tax revenues to which it would otherwise be entitled. Since the
City of San Juan Capistrano has a population that even at total
build -out under the General Plan will be substantially under
50,000, adoption of our own Plan is not required. However, the
City is required to participate in the CMP which has been developed
by Orange County. The City has and continues to work with Orange
County staff on implementation of the Orange County CMP consistent
with the requirements of AB 471, as amended.
MEASURE "M" THE ORANGE COUNTY TRAFFIC IMPROVEMENT AND GROWTH
MANAGEMENT INITIATIVE
Measure "M", the Traffic Improvement and Growth Management
Initiative adopted by Orange County voters in November, 1990,
requires each City and County to adopt a Growth Management Element
according to specific guidelines. In order to be certified, each
Growth Management Element must follow an established framework,
which includes specifying traffic level of service standards,
developing a seven-year capital improvements program, adopting a
Transportation Systems Management Ordinance, adopting a local
Pavement Management Program, participation in Growth Management
Area inter -jurisdictional forums and adopting service standards for
various public services.
The purpose of the following Growth Management Program is to define
goals and accompanying policies and implementation strategies to
ensure that local and regional growth issues, as outlined above,
are comprehensively addressed:
Goal 1: Develop a Growth Management Plan which ensures that growth
and development are based upon the City's ability to provide an
adequate circulation system and public facilities and services
which preserves the City's quality of life and natural setting
while also providing for its fiscal stability.
0
0
• Growth Management Policy -7- June 1992
Policy 1.1: Require that all new development projects
participate in the construction of all necessary traffic and
other facility improvements based upon the "Fair Share"
methodology (City Council Policy 111, Adopted 7-16-91) in
order to meet adopted levels of services criteria as a
condition of development approval, except where an increased
level of participation exceeding these requirements is
established thought negotiated legal instruments.
Policy 1.2: Develop a program to monitor new development to
ensure compliance with adopted improvement construction
phasing program and level of service standards.
Policy 1.3: Require new developments to install all necessary
infrastructure improvements necessary to transportation
facilities prior to issuance of use and occupancy permits.
For large scale developments a specific construction phasing
and mitigation program shall be adopted and implemented where
a project contributes measurable traffic imputes, must be
constructed and completed to attain compliance with adopted
Level of Service (IAS) at inter -sections for primary arterial,
secondary arterial and local streets under the sole control
of the City.
Goal 2: Develop an Annual Review process to monitor existing
facilities and identify projects and funding mechanisms necessary
to maintain adopted service levels.
Policy 2.1: On an annual basis develop a Seven -Year Capital
Improvement Program to meet and maintain adopted service
standards for traffic and public services.
Policy 2.2: Prepare a Development Phasing and Annual
Monitoring Program to ensure that service goals are achieved
and to be implemented prior to June 30, 1993.
Goal 3: Evaluate various programs and strategies to reduce the
number of daily trips to and from employment centers.
Policy 3.1: Promote traffic reduction strategies thought
implementation of the adopted Transportation Demand Management
Ordinance.
Goal 4: Promote inter -jurisdictional coordination and cooperation
on growth management issues with adjacent communities.
Policy 4.1: Participate in intra -jurisdictional planning
forms with adjacent communities to coordinate public
improvement plans and new development applications to maintain
regional traffic movements at adopted level of service
0 0
• Growth Management Policy -8- June 1992
standards.
Policy 4.2: Require all new development to pay its share of
the costs of mitigating traffic impacts, including regional
impacts. Coordinate with other jurisdictions to determine
acceptable impact fee levels.
Goal 5: Establish levels of service to be maintained as
development occurs in the City.
Policy 5.1: Continue to implement the following level of
service standards for law enforcement, fire, library, flood
• and parks and open space.
Service Level of Service
a. Fire First fire engine to reach emergency
within five minutes and paramedics
to reach the scene 10 minutes for 80
percent of City.
b. Law Enforcement Deputy at the scene of an emergency
call within five minutes, 50 percent
of the time, and to all emergencies
within eight minutes. Response to
non -emergencies to be 15 minutes or
less, 75 percent of the time.
C. Library Two-tenths (0.2) square foot of
library space per capita.
d. Parks Five (5) acres of park per one -
thousand (1,000) residents.
e. Flood Insure that all new development is
located outside 100 -year flood as
determined by Federal Emergency
Management Agency (FEMA) flood -plain
maps.
f. Traffic ADT link Volumes
LOS C: Primary arterial, secondary
articles and local streets.
LOS D: Major arterials and state
highways.
•
• Growth Management Policy -9- June 1992
f. Traffic (cont.) Peak Hour Intersection Volumes
IAS D: Major arterials, state
highways, primary arterials,
secondary arterials, and local
streets.
LOS E: CMP -designated roadways only.
Goal 6: Ensure that Growth Management Policies are internally
consistent with the adopted General Plan goals and policies and
maintain existing growth management efforts.
Policy 6.1: Limit residential building permits to a maximum
of four -hundred (400) permits in any calendar year (all
residential developments of 12 units or more) as provided by
Title 9, Chapter 7 of the Municipal Code.
Policy 6.2: Continue to monitor the General Plan and its
progress towards providing a jobs/housing balance (adopted Air
Quality Implementation Plan, dated 9-17-91).
IMPLEMENTATION MEASURES
The following section lists the
that are to be used to comply witl
this Growth Management Program.
exhaustive and several additional
of the annual review process.
TRAFFIC LEVEL OF SERVICE GOALS
major implementation strategies
the policy directives listed in
This list is not intended to be
programs may be added as a part
Policy 5.1 of this Element requires that development make necessary
improvements to the circulation system to maintain acceptable LOS
levels at intersections under City control. If existing segments
are operating below acceptable service levels, the development
improvements required shall be at a level that would either
maintain or improve existing LOS levels. The LOS goals will be
enforced through conditions of approval and monitored annually
through the Performance Monitoring Program.
Roadway segments that are currently operating below LOS policies
and would not be subject to future development mitigation should
be identified and included in the Capital Improvement Program.
0
• Growth Management Policy -10- June 1992
PUBLIC FACILITY STANDARDS
Pursuant to Policy 5.1 the City has adopted policies to established
performance criteria for law enforcement, fire service, library,
floodplain management, parks and residential phasing of building
permits. Future facilities will be determined as part of specific
needs assessment. Impact fees will be considered on a pro -rated
basis related to additional facility requirements necessary to off-
set project specific impacts.
• DEVELOPMENT PHASING
The purpose of development phasing is to insure that adequate
infrastructure is added as development proceeds so that such
facilities remain in balance with demand. In this City, the
primary emphasis of development phasing is upon roadway
improvements, traffic control, and extension of utility infra-
structure. The City will continue to require development -
construction phasing program for all large undeveloped areas. Said
phasing programs will define the type, location, and construction
schedule for installing necessary public improvements. In addition
provisions will be included which would preclude development from
continuing to subsequent phases until specific improvements have
been completed.
CAPITAL IMPROVEMENTS PROGRAM
Major emphasis will be directed toward development and annual
updating of a Seven -Year Capital Improvement Program that provides
for identification of eligible projects for capital expenditures.
Transportation improvements, including streets, bicycle
lanes/paths, and equestrian facilities (alternate transportation
modes) should be studied in conjunction with other major proposed
capital outlays necessary to maintain or improve adopted service
levels.
PAVEMENT MANAGEMENT PROGRAM
The City in addition to the long-term capital improvement program
should implement a pavement management program that establishes a
multi-year program for the maintenance of existing transportation
facilities. The purpose of this program is to implement a strategy
of preventive maintenance to prolong the useful life of existing
facilities.
0
•
• Growth Management Policy -11- June 1992
SYSTEMS DEVELOPMENT TA%
The City shall continue to impose a systems development tax upon
new development at the set rate of 1% (one percent) of the building
permit valuation. Said funds shall be allocated as part of the
Capital Improvement Program.
INTER -JURISDICTIONAL COOPERATION
The City shall continue its involvement in the inter -jurisdictional
• coordination for various purposes, including:
o Working with the Growth Management Area Inter -
jurisdictional Forums to identify and fund traffic
improvement projects that improve regional/sub-regional
movement of people and goods.
o Continue to be an active member and participant in the
implementation of the San Joaquin Hills, Foothill and
Eastern Transportation Corridors.
o Continue participation with both regional and local
jurisdictions to develop strategies for providing a
job/housing balance at the sub -regional level.
COORDINATION WITH ADJACENT JURISDICTIONS
Apart from the above mentioned involvement with sub -regional inter -
jurisdictional forums, the City will continue its practice to work
separately with its immediately adjacent cities to develop mutual
agreements for review and possible conditioning of development
projects along with the coordination of capital improvement
projects that benefit both jurisdictions.
(C:\WP50\SP2\GP-IGMP.DR1)
0 0
Objective - To prepare a Growth Management Element to the
City's General Plan that will comply with the planning
criteria adopted by electors as "Measure M". The ultimate
objective of the Growth Management Element is to establish
specific levels of service for traffic, police and fire
services, flood control, and park and open space which must
be met by development proposals and planning programs.
2. Study Tasks - The following task sequence has been prepared
to provide for the orderly methodology to be used to
accomplish the stated objectives.
Task 1. Review the adopted City -County Coordination
guidelines for preparing the Growth Management
Element to insure that all subsequent data
collection and policy development will be in
compliance with "Measure M" provisions.
Task 2. Review current General Plan policies and other
applicable regulations and define Level of Service
Standards that should be considered for inclusion
in the Growth Management Element.
Task 3. Prepare a city-wide traffic model to analyze the
current General Plan Land Use and Circulation
Elements to determine future service levels within
the City. Preparation of the Model to incorporate
the following sub -tasks:
a.) Develop zone and network system model to be
windowed from the Orange County OCTAM II model.
b.) Compile land use by traffic zone, street
geometric, and existing peak traffic count
data.
c.) Using the land use, geometric, and traffic
count data create two windowed traffic models,
an "existing" model and "buildout" model.
d.) Analyze existing and build -out model output and
identify areas within the City that exceed
proposed levels of service. where levels of
service are exceeded, identify possible land
use and circulation amendments that would
result in conformity with proposed level of
service standards.
Task 4
Develop a draft Growth Management Element. The
draft is to discuss various strategies and include
the following components:
a.) Specification of traffic levels of service.
b.) Identification of other planning service levels
including fire and police services, flood
control, parks and open space and any other
special needs of the City.
c.) Development of a policy statement on balancing
•
jobs and housing opportunities.
d.) An implementation program that discusses the
following components:
(1) Adoption of a Development Mitigation
Program;
(2) Adoption of a Development Phasing and
Monitoring Program;
(3) Participation in inter -jurisdictional
planning forums;
(4) Preparation of a Capital Improvement
Program to achieve adopted Level of
Service standards; and
(5) Adoption of TSM ordinance or an
alternative program to reduce single
occupancy automobile travel.
Task 5
Prepare draft implementation measure language to be
considered concurrently with Growth Management
Element (see sub -task 4.d, above).
Task 6
Prepare preliminary report and conduct joint
worksession with City Council, Traffic and
Transportation Commission and Planning Commission.
Task 7
Respond to comments from joint worksession meeting
and make revisions if applicable.
Task 8
Conduct environmental evaluation. This task may
include some or all the sub -tasks lists below
dependent upon the determination on the initial
study findings and consideration by the
Environmental Review Board:
L
0
a) Prepare Initial Study and submit to
Environmental Review Board;
b) Review of Initial Study by ERB. If an EIR is
required subsection rs - g will be followed. If
a Negative Declaration is issued proceed to
subsection h.
C) Prepare EIR Consultant services contract and
Scope of Work for distribution to consultants.
Notice of Preparation sent to all responsible
. agencies and interested public groups for
comments.
d) Execute Consultant services contract upon
review of RFP.
e) EIR Consultant prepares screen check EIR and
submits to the City.
f) Screen Check EIR distributed to ERB members for
review.
g) ERB reviews screen check EIR and accepts as
draft EIR. Copies of draft EIR sent to State
Clearinghouse and Notice of Completion posted.
h) Draft EIR or Negative Declaration review period
to run concurrent with public hearing process
before the Traffic and Transportation and
Planning Commission.
i) Upon certification of EIR or Negative
Declaration by City Council, Notice of
Determination filed with Orange County.
Task 9 Prepare staff analysis on General Plan Growth
Management Element for review and consideration by
the Traffic and Transportation, and Planning
Commission.
Task 10 Prepare public notification and schedule hearing
dates.
Task 11 Conduct public hearing with the Traffic and
Transportation Commission.
Task 12 Conduct public hearing with the Planning Commission.
0
E
Task 13 Prepare staff report for City Council and
incorporate comments and recommendations from the
Traffic and Transportation, and Planning Commission.
Task 14 Prepare public notification and schedule hearing
date.
Task 15 City Council conducts public hearing and takes an
action on the following:
a) Certification or EIR or Negative Declaration;
• b) Action on the Growth Management Element; and,
C) Action on implementation ordinances.
ATTACHMENT 3a - SPECIFIED TRAFFIC LEVEL OF SERVICE STANDARDS
(See also, Pages 2, 3, 8 and 9 of Growth Management Policy)
i
LI
0
CHAPTER 4.
SUBDIVISIONS
Article 1. Design Standards and Requirements
Sec. 94.101. Conformity with the General
Plan.
All improvement plans, building plans, sub-
division plans, tentative maps, parcel maps, final
maps, and construction shall conform to the
General Plan. No plan shall be approved which is
not in conformance with the General Plan.
Occupancy permits shall not be issued for struc-
tures not in conformance with the General Plan,
and public improvements shall not be accepted
for the dedication if they are not in conformance
with the General Plan. (§ 4.1.1, Ord. 293)
Sec. 94.102. Application of provisions.
(a) Subdivisions. The design standards set
forth in this article shall be used in the design of
subdivisions. The specific design criteria set forth
in this article shall be used as the basis for design,
and specific design parameters shall not be
exceeded during design. Where referenced,
design shall be based upon, and in conformance
with, certain publications. Conformance with
the design standards of the City shall not alone
satisfy the requirements for the approval of
plans. In addition, design shall be in conform-
ance with standard engineering practices. All
street improvement plans, including plans for
water, sanitary sewers, and storm drains, shall be
prepared and signed by a civil engineer registered
in the State. All final maps and parcel maps shall
be prepared and signed by a civil engineer regis-
tered in the State or a land surveyor licensed in
the State. All building and on-site improvement
plans shall be prepared and signed by a civil
engineer, structural engineer, or architect regis-
tered in the State. Where provided for by law.
buildings may be designed by building designers
1]
9-4.101
licensed in the State. All landscaping plans shall
be prepared and signed by a landscape architect
registered in the State.
(b) Other development projects. The provi-
sions set forth in subsection (a) of this section
shall apply to all other development projects
within the City as well as to subdivisions. Where
a project is of such an unusual nature that design
standards and parameters have not been set forth
in this chapter, the City Engineer shall establish
such standards and parameters consistent with
standard engineering practices. (§ 4.1.2, Ord.
293)
457
Sec. 94.103. Streets, highways, and alleys.
(a) Introduction. This section sets forth street.
highway, and alley requirements to serve existing
and new development in the City.
(b) Paving. Pavement materials shall consist
only of aggregate base with asphalt concrete and/
or portland cement concrete, conforming to the
requirements of the State Department of Trans-
portation Standard Specifications (as last
revised). The pavement thickness shall be desig-
nated by the City Engineer.
(c) Engineering Manual. The design speeds.
curve radii, street grades, and related standards
shall be as set forth in the City Engineering
Design Manual. Said Manual shall be adopted by
resolution of the Council.
(d) Public streets and dedications.
(1) General requirements. All streets and
highways intended for through traffic or provid-
ing access to public areas within a property to be
developed shall be public streets and shall be
constructed and dedicated to the City by the
developer.
(2) Offers of dedication. Real property within
a development project to be used for future
streets, highways, or alleys shall require an irre-
vocable offer of dedication.
Where the City requires an irrevocable offer of
dedication, on-site improvements shall be con-
structed in such a manner as to not interfere with
the future use of the right-of-way. Such on-site
i
9-4.103 •
improvements shall also be constructed in such a
manner as to conform to all the provisions of this
Code and the General Plan in order to provide
for future City acceptance of the offered dedica-
tion.
(3) Reimbursement agreements. Streets and
highways which would provide access to areas to
be developed in the future or whose closing
would cause an undue disruption to the orderly
development of the City shall be constructed and
dedicated to the City by the developer. The devel-
oper may be required to construct improvements
not required by the project or which are off-site of
the property to be developed. A reimbursement
agreement for such improvements may be pro-
vided by the City. Conversely, a developer may
be required to pay fees in reimbursement for
improvements previously constructed.
Where the City requires the construction and
dedication of facilities prescribed in the General
Plan through a reimbursement agreement, the
area benefited shall be determined through pub-
lic hearings before the Planning Commission
and Council.
(4) Parkway facilities. Parkway areas shall be
provided adjacent to roadways to allow room for
the provision of utility lines, sidewalks,
bikeways, equestrian trails, street landscaping,
and related facilities. Such parkway facilities
shall be constructed in conjunction with the
roadway proper in accordance with the require-
ments of this chapter (refer to Figures 4-5
through 4-7).
The additional parkway facilities shall insure
reasonable public access to public natural
resources consistent with public safety.
(5) Access rights. The City may require the
waiver of direct access rights to any street, high-
way, or alley which is to be dedicated to the City
from property abutting thereon.
(e) Private streets. Private streets, including
driveways, may be permitted by the City for local
access only. Such streets shall be built to the same
construction standards as public streets of the
same classification as such classifications are set
458
forth in subsection (f) of this section. Private
streets shall not be maintained by the City.
Where private streets are permitted, verification
of the intention and ability to assume the mainte-
nance thereof shall be provided to the City
Engineer in the form of legal documents fixing
such responsibility. r
(f) Required local access steets. The following
streets will be required for local access to abutting
residential and nonresidential land uses (Table
4-1). Standard sections for such streets are shown
in Figure 4-1. Right-of-way widths for local
access streets may be reduced in conjunction
with the development review if the City deter-
mines that such reduction will not result in
greater project density or intensity. Local access
streets, except driveways, may be public or pri-
vate as determined by the City during the devel-
opment review. Driveways shall be private in all
cases.
A. RESIDENTIAL: BY NUMBER OF
DWELLING UNITS SERVED AND
AVERAGE LOT SIZE
See Table 4-1.
B. NONRESIDENTIAL: BY AVERAGE
DAILY TRIP
A way or local street shall be required if 2,500
ADT or less are to be generated by abutting uses
and through traffic. If generation is greater than
2,500 ADT, an arterial highway shall be required
as set forth in subsection (g) of this section.
(g) General plan arterials. All arterial high-
ways within the City shall be public streets and
shall be improved in accordance with applicable
adopted precise alignments. Precise arterial
alignments shall be in accordance with the classi-
fication (primary, secondary, or commuter) and
general alignments shown on the General Plan.
Standard sections for arterial highways are
shown in Figures 4-2 through 4-4.
The following shall be the capacities of arterial
highways in average daily trips (ADT):
0
•
na
d
a
F
a
C
z
0
z
9-4.103
T
ry q
3 O q
U U Y
�+•w .r
T
q y H
4
3 O
ry 0
.+ �
T Ua U L
.•1 ^I ti
1 Y
a
C
a
'f s o
IJ
d
U
Asa
rU O
U y
SssJ
'Is
M
d
N
T y
'•
O
W
3 S
.+ .y .�
O
N
O L m
y
q q q
d
T
q
d'
00
00
N
N
3
I O V
co
M
U
00
q
q
q
N
N�
39
3s
s
9
a
3 O L
Y
Or
Y
U
O
9
q
q
q
O
>• U
>. U
U
U
a I
J Y
s
3
Yv
Y a
Y
O v
O v
0
Y
Y
Ll
0 N
q
Ll
O
I '�
I• J G 1
4
I
.1
••
N
N
U J
U V
U >pI�
O w
m
eO
O O
c
O D
C q
M �
_
L
4
P�m
O'D
O�L
.O O
O
N Ci
I vl_.I
�O OI J
•
•
9-4.103 •
(1) Commuter or Commuter Rural High-
ways, 2,500 through 7,000 ADT;
(2) Secondary or Secondary Rural Highways,
7,000 through 20,000 ADT; and
(3) Primary or Primary Rural Highways, over
20,000 ADT.
Dwellings shall not take direct access onto
arterial highways unless the City finds, by special
circumstance, that such access is warranted and
can be designed consistent with traffic safety. The
City may require special driveway design to
insure forward vehicle entry onto such arterials.
(h) Alleys. Alleys may be permitted in non-
residential districts only when off-street parking,
service, loading, and delivery areas are not other-
wise available. Alleys in nonresidential districts
shall be constructed and dedicated to the City in
compliance with this section and the design stan-
dards prescribed in the City's Road Design Man-
ual.
Alleys may be permitted in residential districts
if approved by the City during the development
review. Such alleys shall be private. Verification
of the ability and intention to maintain private
alleys shall be provided to the City Engineer in
the form of legal documents fixing such responsi-
bility.
(i) Definitions. For the purposes of this sec-
tion, certain words and phrases are defined as
follows:
(1) "Right-of-way" shall mean an area or strip
of land, either public or private, on which a right
of passage has been recorded. Thus, "right-of-
way" shall include a public right-of-way, an ease-
ment, a common lot containing a private street,
or other public or private right of passage consis-
tent with this definition.
(2) "Roadway" shall mean that portion of a
street, highway, or alley right-of-way designed or
used for the movement of vehicles. The roadway
may or may not accommodate vehicle parking.
(3) "Parkway" shall mean that portion of a
street, highway, or alley right-of-way adjacent to
but outside of and separate from the roadway
460
proper. "Parkway area" shall not include median
strips and shall not be designed or used for the
movement of motor vehicles.
0) Standard road sections. Figures 4-1
through 4-7 are the standard road and parkway
sections required as set forth in this section. Such
road sections shall be required for all new devel-
opment, unless the City, after finding special
circumstances, approves modified or alternate
road sections. The sections shown may be
required to be expanded near intersections to
provide width for deceleration lanes, left turn
pockets, and other intersection facilities. (§ 4.1.3,
Ord. 293, as amended by § 26, Ord. 349, and § 2,
Ord. 444, eff. December 31, 198 1)
•
•
0
0 9-4.104
FIGURE 4-1
STANDARD RESIDENTIAL
AND OTHER LOCAL ACCESS STREET SECTIONS
lz• y
nary
1pnwv oniYl
S6' i
20' 16•• 1
�Pr PL�fo�Y -� � T6tlsaY I
W6:
/� �. / IPClie ee a1wL1
,M
11
MuGL= ar pawn)
56'
10' i6' 17'
16u. �AEIT
IRN.l OL 'JYSw01
SidCYlk od p1tltiY bai¢I
lrvalcP�n� x�ww•
L 56'
Y
(P1ti1:C OL p[ywLl
*Public or private status and drainage, sidewalk, curb, landscaping, and other parkway improve-
ments to be determined during the development review. On -street parking may be prohibited.
DETAIL NOTES:
1. Paved shoulder (non -paved shoulder to be used only on approval of the City Engineer).
2. Adjustments may be made in the right-of-way in accordance with Sectiones (e) and (f).
461
•
•
9-4.104 • 0
FIGURE 4-2
STANDARD PRIMARY HIGHWAY SECTIONS
10' 1 7`11• 7'• , 10'
T
PRIMARY
RM 101' A/W
1 •0. 1 SJ' 17'17.1 34' I1
1p5.1 I I ` l y'S 31
PRIMARY RURAL
DETAIL NOTES:
1. Paved shoulder (non -paved shoulder to be used only on approval of the City Engineer).
2. Drainage swale.
GENERAL NOTES:
1. The City Engineer shall provide standard drawings specifying materials and methods of
construction.
2. Sidewalk, landscaping, and other parkway improvements shall be determined during the
development review.
3. Parkway (and right-of-way) widths may increase if additional facilities are required outside
of the traveled way (e.g., equestrian trails). Refer to the Standard Parkway Facilities details
following.
TIM
•
Is
9-4.104
FIGURE 4-3
STANDARD SECONDARY
HIGHWAY SECTIONS
R/V
BI• •
10.
i I 1 1 1
� I 1
SECONDARY
�. 9. yd'
SECONDARY RURAL
DETAIL NOTES:
1. Paved shoulder (non -paved shoulder to be used only on approval of the City Engineer).
2. Drainage swale.
GENERAL NOTES:
1. The City Engineer shall provide standard drawings specifying materials and methods of
construction.
2. Sidewalk, landscaping, and other parkway improvements shall be determined during the
development review.
3. Parkway (and right-of-way) widths may increase if additional facilities are required outside
of the traveled way (e.g., equestrian trails). Refer to the Standard Parkway facilities details
following.
i
I
463
•
J
9-4.104 •
DETAIL NOTES:
•
FIGURE 44
STANDARD COMMUTER SECTIONS
R/W R/W
6 O'
10' 20' 1 20' 10' I
1
COMMUTER
Rfw 60 RM
io' e' iz' i iz' 6 �o'
i iris r�i S� S •)
V2 (OD
COMMUTER RURAL
1. Paved shoulder (non -paved shoulder to be used only on approval of the City Engineer).
2. Drainage swale.
GENERAL NOTES:
1. The City Engineer shall provide standard drawings specifying materials and methods of
construction.
2. Sidewalk, landscaping, and other parkway improvements shall be determined during the
development review.
3. Parkway (and right-of-way) widths may increase if additional facilities are required outside
or the traveled way (e.g., equestrian trails). Refer to the Standard Parkway facilities details
following.
464
0 0
ATTACHMENT 3b - PLANNING STANDARDS FOR FIRE, POLICE, LIBRARY,
FLOOD CONTROL, PARKS AND OPEN SPACE
(See Pages 3, 4, 5, 8 and 10 of Growth Management Policy)
7
0
0
ATTACHMENT 3c - MITIGATION PROGRAM
TO ADDRESS CUMULATIVE IMPACTS
ON EXISTING TRAFFIC
(See Pages 4, 5, 6, 7, 8, 10 and 11 of
Growth Management Policy)
0
ORANGE COUNTY
TRANSPORTATION
AUTHORITY
0
0
BOARD OF DIRECTORS
March 31, 1992
Roger R. Stenon
Chairmen
Iry plawr
VicaCluam 11
William M. Huber
Gary L. Hausoarler
Director
Director of Engineering & Building
William D. Mahoney
City of San Juan Capistrano
oeador
32400 Paseo Adelanto
Dene Reed
San Juan Capistrano, CA 92675
Director
Thornes F Riley
Dear Mr. Huber:
Director
Don R. ROM
We have reviewed the City of San Juan Capistrano's Traffic Impact Analysis (TIA)
Director
process and found it to be consistent with the recommended Congestion
Chanes V Smith
Director
Management Program TIA.
Bob wahistrom
Director
Based on a conversation with Mr. Vokoun, it is our understanding you haven't
Harnett M. Wieder
established a TIA threshold because TIAs are done for virtually all development
Director
projects in San Juan Capistrano, and any project generating 1600 ADT would
Dan Young
certainly be subject to a TIA. Mr. Vokoun also confirmed that the TIA study area
Director
will include all CMP roadway links Including those outside your city boundaries)
Russell, L ghheGO
s
and that the study's boundaries will extend to the point where project -related
Governors x-Offoo
GO
Member
traffic falls below one percent (1%) of capacity on individual roadway links.
Saran L. Caa
Alternate
If you have any questions, please call me at 571-5849 or Cindy Krebs at 571-
Eleen Krause
5833.
Alternate
Gaoo'H Vasquez
Sincerely,
Alternate
lel J ,/
[-� S -U, `-
AFFILIA TED AGENCIES
1✓`�jcc_�
Orange County
Lisa Burke
Transit Drstnct
Manager of Planning
Local Tnansportabon
Authority
LB:mg
5emoe Authority for
Freeway Emergenues
-�
Consolidated Transportation,
Service Agerwy
Congasaon Management
r r - -
Agency
,4&,ce Authority for
-_
AbandonedVbhtoles
-.n... ..:v 1pirsrJAhn
1055 North Main Street l Suite 516/ Sena Anel Caldomia 92701-36271(714) 571-5800 / Fax (714) 571.5643
ADMINISTRATIVE POLICY
DATE ADOPTED6/ POLICY NO. 310
CITY MANAGER PAGE 1 OF 3
SUBJECT: PREPARATION OF AND USE OF TRAFFIC STUDIES
PURPOSE: To provide a useful guideline in preparing traffic studies.
In order to facilitate the ability of the City to evaluate traffic impacts associated with
development proposals, the following guidelines were prepared. It is the intent of this
policy and the traffic studies that they be used as guidelines, not rules, in evaluating
proposed development projects and their anticipated traffic impacts.
f. INTRODUCTION
A. Site and study area boundaries, including complete project description, vicinity
map and site plan
B. Existing and proposed site uses
C. Existing and proposed uses in vicinity of site
D. Existing and proposed roadways and intersections -- illustrations to show
existing striping and driveways (on both sides of street) along project frontage
and minimum of 500 feet beyond.
H. TRIP GENERATION
A. Standard ITE trip rates shall be used except site specific rates may be utilized
with approval of City Traffic Engineer; OCEMA and/or San Diego (SANDAG)
trip rates may be utilized where appropriate when ITE rates are not applicable
or available.
Ill. TRIP DISTRIBUTION
A. Regional trip distribution may be based on the OCTAM traffic model and/or
LARTS data. Local trip distribution shall be estimated from turning movement
counts taken at nearby intersections and driveways. The actual directional
distribution utilized for trip assignment shall be approved by the City Traffic
Engineer. A map illustrating the regional and local distribution shall be
included in the report.
IV. TRIP ASSIGNMENT
A. All project trips shall be assigned to the circulation system and carried outside
the identified study area (minimum one mile radius) except for internal trips
which shall be specifically identified as to origin/destination. A map
illustrating the project trip assignments on the circulation system shall be
included in the report.
E
ADMINISTRATIVE POLICY POLICY NO. 310
PAGE 2 OF 3
SUBJECT: PREPARATION OF AND USE OF TRAFFIC STUDIES
V. EXISTING CONDITIONS AND PROJECTED TRAFFIC VOLUMES
A. Peak hour(s) traffic volumes and 24-hour ADT's in vicinity of site.
B. Peak hour(s) site traffic volumes and 24-hour ADT's in vicinity of site
C. Peak hour(s) site and through traffic volumes and 24-hour ADT's in vicinity of
site.
D. Peak hour(s) site and through traffic volumes for approved cumulative projects
• and 24-hour ADT's in vicinity of site.
Maps illustrating each of the above noted criteria shall be included in the report
tographically illustrate the traffic volume assignments on the circulation system.
VI. INTERSECTION CAPACITY ANALYSIS
A. ICU analysis at critical intersections for peak hour(s) for existing conditions
B. ICU analysis at critical intersections for peak hour(s), including project traffic
and cumulative projects
C. 1985 Highway Capacity Manual methodology for A and B above.
(Note: ICU analysis shall be considered insignificant if ICU change is less than or
equal to one percent. HCM analysis shall be considered insignificant if increase is
less than one-half second of average vehicle delay.)
VII. TRAFFIC SIGNAL IMPACTS
A. Need for new traffic signals shall be analyzed utilizing all applicable standard
warrants.
B. Impact on existing progression
VIII. TRAFFIC ACCIDENT HISTORY
IX. ON SITE TRAFFIC REVIEW
A. Parking
B. Site access (including emergency vehicle)
C. Internal circulation (including intersection site distance, traffic volumes,
street widths, and other relevant issues).
X. FINDINGS AND CONCLUSIONS
•
• ADMINISTRATIVE POLICY POLICY NO. 310
PAGE 3 OF 3
SUBJECT: PREPARATION OF AND USE OF TRAFFIC STUDIES
XI. PROPOSED MITIGATION
A. Proposed recommended improvements
B. Revised ICU analysis at critical points, including proposed improvements
C. Revised levels of service at critical points, including proposed improvements
XII. EXECUTIVE SUMMARY
A. Summary of findings and conclusions and proposed mitigation (maximum of one
page)
XIII. PROJECT ORIENTATION MEETING
A. An initial meeting shall be scheduled with the City Traffic Engineer to discuss
the project, scope of study, data requirements, specific issues, and other
matters deemed appropriate. This meeting shall be regarded as the first work
task.
XIV. REPORT FORMAT
A. The project report shall be written in clear, concise terminology which may be
readily understood by lay persons. The report shall be prepared in a standard
engineering report format with the following general outline:
1. Executive Summary
2. Introduction/Project Description
3. Existing Conditions
4. Project Trip Generation, Distribution and Assignment
5. Existing plus Cumulative plus Project Traffic Conditions
a. A summary of all cumulative projects with traffic patterns (peak
hour and ADT) shall be provided
b. Analysis and discussion shall be provided for existing and existing
plus cumulative plus project traffic conditions
6. Analysis
7. On-site Traffic Review
8. Findings and Conclusions
9. Appendix (including technical data and support materials)
CITY OF SAN JUAN CAPISTRANO
. EXHIBIT A
MINIMUM TRAFFIC STUDY CONTENTS
1. INTRODUCTION
A. Site and Study Area Boundaries, including complete project description,
vicinity map and site plan.
B. Existing and Proposed Site Uses
C. Existing and Proposed Uses in Vicinity of Site
D. Existing and Proposed Roadways and Intersections - Illustrations to show
existing striping and driveways (on both sides of street) along project frontage
and minimum of 500 feet beyond.
2. TRIP GENERATION
A. Standard ITE trip rates shall be used except site specific rates may be utilized
with approval of City Traffic Engineer. OCEMA and/or San Diego (SANDAG)
• trip rates may be utilized where appropriate when ITE rates are not applicable
or available.
3. TRIP DISTRIBUTION
A. Regional trip distribution may be based on the OCTAM traffic model and/or
LARTS data. Local trip distribution shall be estimated from turning
movement counts taken at nearby intersections and driveways. The actual
directional distribution utilized for trip assignment shall be approved by the
City Traffic Engineer. A map illustrating the regional and local distribution
shall be included in the report.
4. TRIP ASSIGNMENT
A. All project trips shall be assigned to the circulation system and carried outside
the identified study area (minimum one mile radius) except for internal trips
which shallbe specifically identified as to origin/destination. A map
illustrating the project trip assignment onto the circulation system shall be
included in the report.
S. EXISTING CONDITIONS AND PROJECTED TRAFFIC VOLUMES
A. Peak hour(s) traffic volumes and 24-hour ADT's in vicinity of site.
B. Peak hour(s) site traffic volumes and 24-hour project ADT's in vicinity of site.
C. Peak hour(s) site and through traffic volumes and 24-hour ADT's in vicinity of
si te.
D. Peak hour(s) site and through traffic volumes for cumulative projects and 24-
hour ADT's in vicinity of site.
Maps illustrating each of the above noted criteria shall be included in the report to
graphically illustrate the traffic volume assignment onto the circulation system.
6. INTERSECTION CAPACITY ANALYSIS
A. ICU analysis at critical intersections for peak hour(s) for existing conditions.
B. ICU analysis at critical intersections for peak hour(s), including project traffic
and cumulative projects.
C. 1985 Highway Capacity Manual methodology for A and B above.
(Note: ICU analysis shall be considered insignificant if ICU change is less than or
equal to one percent. HCM analysis shall be considered insignificant if increase is
less than one half second of average vehicle delay).
-1- March 17, 1989
•
Exhibit A (Cowed) •
Minimum Traffic Study Contents
7. TRAFFIC SIGNAL IMPACTS
A. Need for new traffic signals shall be analyzed utilizing all applicable standard
warrants.
B. Impact on existing progression.
L TRAFFIC ACCIDENT HISTORY
9. ON SITE TRAFFIC REVIEW
A. Parking
B. Site Access (including emergency vehicle)
C. Internal Circulation (including intersection site distance, traffic volumes,
street widths, and other relevant issues)
• 10. FINDINGS AND CONCLUSIONS
11. PROPOSED MITIGATION
A. Proposed recommended improvements.
B. Revised ICU analysis at critical points, including proposed improvements.
C. Revised levels of service at critical points, including proposed improvements.
12. EXECUTIVE SUMMARY
A. Summary of findings and conclusions and proposed mitigation (maximum of one
page).
13. PROJECT ORIENTATION MEETING
A. An initial meeting shall be scheduled with the City Traffic Engineer to discuss
the project, scope of study, data requirements, specific issues, and other
matters deemed appropriate. This meeting shall be regarded as the first work
task.
14. REPORT FORMAT
A. The project report shall be written in clear concise terminology which may be
readily understood by lay persons. The report shall be prepared in a standard
engineering report format with the following general outline:
1. Executive Summary
2. Introduction/Project Description
3. Existing Conditions
4. Project Trip Generation, Distribution and Assignment
3. Existing plus Cumulative plus Project Traffic Conditions
a. A summary of all cumulative projects with traffic patterns (peak hour
and ADT) shall be provided.
b. Analysis and discussion shall be provided for existing and existing plus
cumulative plus project traffic conditions.
6. Analysis
7. On -Site Traffic Review
8. Findings and Conclusions
9. Appendix (including technical data and support materials)
-2- March 17, 1989
0 0
• CITY OF SAN JUAN CAPISTRANO
COUNCIL POLICY
Subject: Effective Policy
Page Date Number
"FAIR SHARE" METHODOLOGY
& DEVELOPER REIMBURSEMENTS 1 of 2 7/16/91 111
It is the policy of the City Council that the method for determining developers'
"Fair Share" improvement costs and reimbursements shall be as follows:
The purpose of a "Fair Share" arrangement is to equitably distribute costs for
infrastructure development among future development creating the need for
improvements to the infrastructure. Systems Development Tax should not be
• utilized to supplement new development as its intent is to offset the City's cost for
the existing infrastructure (M.C. Section 3-3.501). To this end, the following
guidelines are established to provide a more equitable distribution of costs.
1. All improvements immediately adjacent to a development or
improvements which directly support a particular development (i.e.,
driveway entrance signalization) shall be borne 100% by the development.
2. All off-site improvements will be "Fair Shared" based on the following
criteria:
a. "Fair Share" will be developer's percentage of costs based on the
percent of traffic generated by the project relative to the future
projected traffic generation within the traffic impact study area
from potential development within the City.
b. Existing traffic will not be considered in the calculations.
C. Traffic will be based on 2010 projected traffic volumes from future
development. Where volumes are not available or inconsistencies
exist, the traffic volumes will be approved by the City Traffic
Engineer as determined by a traffic report prepared by the City at
developer's expense.
d. Through traffic will not be included in the calculations. Through
traffic will be discounted as a percentage of the future volume and
may range from 10% on up, dependent upon a particular street as
approved by the City Traffic Engineer. City shall include, in its
traffic study, the amount of through traffic for the City Traffic
Engineer's review and approval.
3. Impacts less than 5% will not be considered for participation as a "Fair
Share".
0 0
• CITY OF SAN JUAN CAPISTRANO
COUNCIL POLICY
Subject: Effective Policy
Page Date Number
"FAIR SHARE" METHODOLOGY
do DEVELOPER REIMBURSEMENTS 2 of 2 7/16/91 111
4. Developer may enter into a reimbursement agreement whenever it is
required that improvements are to be "Fair Shared". Reimbursement
agreements may include pay -back from future development that is also
"Fair Shared" into the same improvements. Reimbursement agreements
shall not include any requirements for the City to pay for future
reimbursements should future development not occur.
• Reimbursement agreements shall run for a period not to exceed fifteen
(15) years. Renewals shall only be considered if a development providing
reimbursement is imminent. In no case shall a renewal exceed five (5)
years and it shall be limited to one (1) renewal.
5. Existing reimbursement agreements. Where developers have entered into
reimbursement agreements with the City to provide necessary
improvements benefiting future development, the future development shall
contribute its "Fair Share" exclusive of the City's System Development
Tax.
0
•
0
CHAPTER 3.
TAXES
Article 1. Construction Taxes
Sec. 3-3.101. Policies.
(a) Need for additional funds for municipal
services. The Council finds that the continuing
increase in the construction of new buildings in
the City, together with the accompanying
increase in the population of the City, has created
an urgent need for additional funds to be used for
the purpose of providing public safety, public
works, and other municipal services.
(b) Need for additional funds for the preserva-
tion of agriculture and related valuable commu-
nity resources. The Council finds and determines
that the preservation of agriculture is integral to
carrying out the goals and objectives of the Gen-
eral Plan in that the Land Use Element of the
General Plan states that "the only way through
which the community could maintain its agri-
cultural and rural heritage would be to maintain
a substantial portion of the valley in agriculture".
The Land Use Element of the General Plan fur-
ther indicates that the designation of prime farm-
land for agricultural land use is necessary "to
preserve the rural character of the community by
maintaining active agricultural operations and
to provide a continuing opportunity for promot-
ing the agricultural heritage through active par-
ticipation and association with agriculture".
The Council does also reaffirm the designa-
tion of Agriculture Preservation within Priority
Group I in the Open Space and Conservation
Element of the General Plan inasmuch as the
surge and demand for development, the resulting
increase in construction, and the accompanying
growth in population has, and will continue to
have, the following impacts upon the City:
(1) That the City's capability for providing
municipal services, and the costs thereof, will
materially increase;
55
• 3-3.101
(2) That the available open space will dimin-
ish;
(3) That the existence of agriculture, which is
a valuable community resource, will be
endangered; and
(4) That the City, as a "small self-contained
villagelike community with abundant open
space", which is a goal established in the General
Plan, will bethreatened.
Therefore, there is an urgent need for funds for
the preservation of agriculture and related valu-
able community resources. Thus, in order to
implement the goals of open space and agri-
culture established in the General Plan, the
Council hereby establishes and assesses taxes to
be imposed as set forth in this article. (§ 1, Ord.
204, and § 1, Ord. 316)
Sec. 3-3.102. Revenue measure.
The Council hereby declares that the taxes
required to be paid pursuant to the provisions of
this article are assessed pursuant to the taxing
powers of the City and are solely for the purpose
of producing revenue. (§ 1, Ord. 204, and § 1,
Ord. 316)
See. 3-3.103. Definitions.
For the purposes of this article, unless other-
wise apparent from the context, certain words
and phrases used in this article are defined as
follows:
(a) "Commercial unit" shall mean any space
in a building or structure designed or intended to
be occupied or used for business or commercial
purposes, including sleeping rooms in hotels and
motels.
(b) "Industrial unit" shall mean any space in
a building or structure designed or intended for
manufacturing, processing, research, warehous-
ing, or similar purposes.
(c) "Mobile home park" shall mean any area
where one or more lots or spaces are rented or
held out for rent to be occupied by a house trailer.
mobile home, camper, or similar vehicle.
E
•
3-3.103 •
(d) "Person" shall mean every person con-
structing dwelling units or commercial or indus•
trial sites by himself or through the services of an
employee, agent, or independent contractor.
(e) "Residential unit' shall mean a group of
two (2) or more rooms, one of which is a kitchen,
designed for occupancy by one family for living
and sleeping purposes.
(f) "Sales price" shall mean the total consider-
ation paid for the unit. (§ 2, Ord. 204, and § 2,
Ord. 316)
Sec. 3-3.104. Taxes: Imposed: Rates.
It being the intent of the Council to provide
the City and its citizens with an atmosphere in
keeping with the Mexican -Western heritage of
the area, the following Schedule A shall be used
for those persons submitting plans to the Archi-
tectural Board of Review and whose plans are
approved by said Board as meeting the standards
of the Design Standards Environmental Man-
agement District (D). Plans not requiring such
approval shall be subject to the following Sched-
ule B:
Schedule A
(a) Residential.
(1) For single-family dwellings ........
$50.00 per unit
(2) For duplexes ......... $50.00 per unit
(3) For multi -family dwellings (three (3) or
more units) .............. $50.00 per unit
(4) For each hotel or motel room without a
kitchen, excluding bathrooms ...........
........................ $25.00 per unit
(5) For mobile home park pads - ......
....................... $25.00 per pad
'Permanent buildings and landscape only
need conform to qualify.
(b) Commercial. For each commercial build-
ing unit in a building, including any area within a
building designed for the parking of vehicles,
three (34) cents per square foot of gross floor
area.
56
0
(c) Industrial. For each industrial building or
industrial unit in a building, including any area
within a building designed for the parking of
vehicles, three (3(r) cents per square foot of gross
floor area.
Schedule B
(a) Residential.
(1) For single-family dwellings ........
... . .......... . ...... $75.00 per unit,
plus $10.00 per bedroom over one
(2) For duplexes ........ $75.00 per unit,
plus $10.00 per bedroom over one
(3) For multi -family dwellings (three (3) or
more units) .............. $75.00 per unit,
plus $10.00 per bedroom over one
(C) For each hotel or motel room without a
kitchen, excluding bathrooms ...........
... $35.00 per unit
(5) For mobile home park pads .......
$35.00 per pad
(b) Commercial. For each commercial build-
ing unit in a building, including any area within a
building designed for the parking of vehicles. five
(5(Z) cents per square foot of gross floor area.
(c) Industrial. For each industrial building or
industrial unit in a building, including any area
within a building designed for the parking of
vehicles, five (5¢) cents per square foot of gross
floor area.
The taxes collected pursuant to the provisions
of this subsection shall be used for the purposes
set forth in subsection (a) of Section 3-3.109 of
this article.
Schedule C
A tax is hereby imposed upon the construction of
each residential unit, commercial unit, and
industrial unit in the City at the following rates:
(a) For residential units .............
................ $500.00 per unit: and
(b) For commercial or industrial units
...................... $1,000.00 per acre.
•
0
The taxes collected pursuant to the provisions
of this subsection shall be used for the purposes
set forth in subsection (b) of Section 3-3.109 of
this article.
(§ 3, Ord. 204, as amended by § 1, Ord. 211,
and § 3, Ord. 316)
Sec. 3-3.105. Taxes: Payment.
The tax imposed by the provisions of Section
3-3.104 of this article shall be due and payable
upon the issuance of a building permit for the
construction of any such residential, commer-
cial, or industrial unit or upon a request for the
final approval and granting of a certificate of
occupancy for a mobile home park. For all such
units, the tax shall be in addition to other taxes as
well as to the fees required to be paid for the
building permits. For all mobile home spaces, the
tax shall be in addition to all inspection fees
required to be paid in the construction of a
mobile home park, and no final approval or
occupancy permit shall be granted until the tax is
paid on all mobile home spaces.
No permit shall be issued authorizing the con-
struction of any residential, commercial, or
industrial unit or building or any mobile home
park in the City without the payment of the tax
imposed by the provisions of this article. (§§ 4
and 8, Ord. 204, and §§ 4 and 8, Ord. 316)
Sec. 3-3.106. Taxes: Refunds.
Any tax paid to the City pursuant to the provi-
sions of this article for any building or unit of a
building or mobile home park which is not con-
structed shall be refunded upon an application of
the taxpayer and a showing to the satisfaction of
the Director of Administrative Services that the
building or unit has not been constructed or
construction commenced and that the building
permit issued for the building or unit has been
cancelled or surrendered or otherwise does not
authorize the construction of the building or
unit. (§ 9, Ord. 204, and § 9. Ord. 316)
57
Is 3-3.104
See. 3-3.107. Exceptions.
The Council may grant an exception to the
provisions of this article upon the appeal of a
property owner in the case of the replacement of
a residential, commercial, or industrial unit
destroyed by fire, earthquake, flood, explosion,
or other disaster. (§ 6, Ord. 204, and § 6, Ord. 316)
See. 3-3.108. Exemptions.
The following construction and occupancies
shall be excluded from the tax imposed by this
article so long as such uses and occupancies shall
continue:
(a) The construction and occupancy of any
residential unit which has a sales price of Fifty
Thousand and no/100ths ($50,000.00) Dollars
or less or the construction and occupancy of any
residential unit which is determined by the
Council to provide housing for low income resi-
dents. In the case of residential units selling for
Fifty Thousand and no/100ths ($50,000.00)
Dollars or less, the exemption shall be granted in
the form of a refund to be paid by the City to the
purchaser of the unit upon the submission of an
escrow statement showing the sales price of the
unit to be Fifty Thousand and no/100ths
($50,000.00) Dollars or less;
(b) The construction and occupancy of any
building or unit by any bank, including national
banking associations;
(c) The construction and occupancy of any
building by an insurer as that term is defined in
Section 28 of Article XIII of the Constitution of
the State;
(d) The construction and occupancy of any
building by the United States, or any department
or agency thereof, or by the State, or any depart-
ment, agency, or political subdivision thereof;
and
(e) The construction and occupancy of any
building by a nonprofit corporation exclusively
for religious, educational, hospital. or charitable
purposes.
In addition to the specific exemptions set forth
in this section, where commercial, industrial, or
•
3-3.108 •
recreational uses are involved, the Council, upon
the application of any affected person, may con-
sider the exemption of all or any part of the taxes
imposed by this article where there is a long
standing family ownership which will continue
after development.
If any change occurs in any use or occupancy
set forth in this section, the taxes imposed by this
article shall become fully applicable and enfor-
ceable on and after the date any change in such
use or occupancy shall occur. (§ 7, Ord. 204, and
§ 7, Ord. 316)
• Sec. 3-3.109. Disposition of proceeds.
(a) For municipal services. All proceeds from
the taxes, penalties, and interest collected pur-
suant to Schedules A and B set forth in Section
3-3.104 of this article shall be deposited in the
General Fund of the City and shall be used for
such municipal purposes as are authorized by
law.
(b) For the preservation of agriculture and
related valuable community resources. All pro-
ceeds from the taxes collected pursuant to Sched-
ule C set forth in Section 3-3.104 of this article
shall be deposited in the Agriculture Preservation
Fund and shall be used exclusively for the pur-
pose of preserving agriculture on lands desig-
nated for such use in the General Plan and such
other related purposes as are authorized by law.
Expenditures from the Agriculture Preservation
Fund shall be made after the General Plan has
been amended designating specific farmlands to
be preserved in agriculture as a longterm or per-
manent land use. Such expenditures from the
Agriculture Preservation Fund may include, but
shall not be limited to:
(1) The construction of buffers and fences;
(2) Employee housing assistance:
(3) Refunds of prior capital improvement
bond assessments:
(4) Refunds of those portions of prior prop-
erty tax payments determined to be in excess of
taxes which would have been paid based only on
agricultural land values;
58
is
(5) The promotion of local agriculture prod-
uct sales;
(6) City acquisitions of farmlands; and
(7) Such other applicable expenditures as
deemed appropriate by the Council. (§ 10, Ord.
204, and § 10, Ord. 316)
0
0
0 0
3-3.413
Article 5. System Development Taxes
Sec. 3-3.501. Purpose.
There is hereby imposed a systems develop-
ment tax to provide a predictable and equitable
finding source for capital improvements by
requiring those in the business of development to
buy into the preexisting City infrastructure so
that the impact of new growth on existing
improvements will be borne equitably by new
development. (§ 1, Ord. 364)
Sec. 3-3.502. Definitions.
For the purposes of this article, unless other-
wise apparent from the context, certain words
and phrases used in this article are defined as
follows:
(a) "Building" shall mean a structure built for
the support, shelter, or enclosure of persons, ani-
mals, chattels, or property of any kind.
(b) "Development" shall mean one or more
buildings covered by a single building permit.
"Development" shall include new development.
(§ 2, Ord. 364)
Sec. 3-3.503. Rates.
The systems development tax schedule and
63 (San Juan Capistrano 9-87)
•
3-3.503
corresponding method of tax payment shall be in
conformance with, and equal to, an amount set
by resolution by the Council. (§ 3, Ord. 364)
Sec. 3-3.504. Payment.
Any applicant for a building permit for a new
development shall pay the systems development
tax in conjunction with the payment of the build-
ing permit fee. Any and all questions with regard
to the applicability of the systems development
tax to a particular new development shall be
decided by the City Manager. (§ 4, Ord. 364)
Sec. 3-3.505. Exemptions.
Any parcel of land which meets the following
criteria on the date of an application for a build-
ing permit shall be exempt from paying the sys-
tems development tax:
(a) Alterations which do not increase the floor
area of a structure:
(b) Additions to single-family residential
dwellings which do not constitute the addition of
a living unit as defined by the Building Code: and
(c) Low and moderate income level housing,
as defined in the guidelines of the United States
Department of Housing and Urban Develop-
ment. (§ 5. Ord. 364)
Sec. 3-3.506. Disposition of proceeds.
(a) Segregation and use. All funds derived
from the systems development tax shall be segre-
gated by accounting practices from all other
accounts of the City and shall be used for the
design, construction, and acquisition of City cap-
ital improvements as appropriate to accommo-
date new development and growth.
(b) Designation. The designation of the
expenditure of the funds available from the sys-
tems development tax shall be made by the
Council at such time as the Council may direct.
At the discretion of the Council, funds may be
accumulated in unlimited amounts for expected
future expansion costs. (§ 6, Ord. 364)
(San Juan Captsirano 9-87)
0
See. 3-3.507. Appeals.
Any person aggrieved by a decision of the City
Manager made pursuant to the provisions of this
article may appeal such decision to the Council
by filing a written request with the City Clerk.
within ten (10) days after such decision, setting
forth the grounds of the appeal. In considering
the appeal, the Council shall determine whether
the decision of the City Manager is correct and
may affirm, modify, extend. or overrule any such
decision. (§ 7, Ord. 364)
0
0
0
ATTACHMENT 3d - DEVELOPMENT PHASING AND MONITORING PROGRAM
(See Pages 4, 7 and 10 of Growth Management Policy)
0 0
ORDINANCE NO. 691
AN ORDINANCE OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA ADDING
CHAPTER 9-9 TO TUB MUNICIPAL CODE ESTABLISHING TRANSPORTATION
DEMAND MANAGEMENT (TDM) REGULATIONS.
THE CITY COUNCIL OF THE CITY OP SAN JUAN CAPISTRANO, CALIFORNIA
DOES HEREBY ORDAIN AS FOLLOWS:
SECTION -1 FINDING8
• a. Whereas, the Congestion Management Plan (CMP) provisions
established by AB471 and the Measure "M" legislative initiative
require the preparation and adoption of Transportation Demand
Management/Transportation Systems Management Ordinance; and,
b. Whereas, the Environmental Review Board has adopted a negative
declaration pursuant to the provisions of the California
Environmental, Quality Act (1970) and otherwise carried out all
applicable provisions of that Act; and,
C. Whereas, the Traffic and Transportation Commission conducted
a public hearing on the Ordinance at their May 22, 1991 meeting and
recommended adoption.
d. Whereas, the Planning Commission conducted a duly noticed
public hearing on the Transportation Demand Management Ordinance
at their June 11, 1991 meeting and recommended adoption subject to
modifications and said modifications have been incorporated into
the draft Ordinance under City Council consideration; and,
e. Whereas, the Transportation Demand Management Ordinance is
consistent with the goals, policies and objectives of the San Juan
Capistrano General Plan; and,
f. Whereas, the Transportation Demand Management Ordinance is
consistent with and implement the requirements of the County -wide
Congestion Management Plan and Measure "M" which require the
adoption of a TDM Ordinance and TSM Ordinance, respectively; and,
g. Whereas, the Transportation Demand Management Ordinance
complies with the provisions of the California Environmental
Quality Act (1970); and,
h. Whereas, the Transportation Demand Management Ordinance
complies with the provisions of the South Coast Air Quality
Management Plan's control measures.
0 0
• TDM Ordinance -2-
SECTION 2 AIIENDN3NT TEXT
Based upon the findings set forth in Section 1 preceding, the
following amendments to the Municipal Code are hereby enacted:
Chanter 9-9. Tranagortation Demand Nanaaament Ordinance
Sention 9-9.101. Purpose and Intent.
The City of San Juan Capistrano finds and determines that the
purpose and intent of this Ordinance is to:
• (a) Comply with State law requiring the development of
Congestion Management Programs (AB471 and 1791) which
mand to the adoptic of a "Trip Reduction and T-avel
Dema i Ordinance" id County leialative initi._z�ive
(Mea:lre "M") requiring the adoption of a "Transportation
Systems Management Ordinance"; and,
(b). Complement other TransportationDemandManagement (TDM)
programs requirements which have been adopted for the
Southern California region by SCAG including Regulation
XV and Air Quality Management Plan (AQMP) Appendix IV -
G, Control Measures; and,
(c) Reduce traffic congestion which contributes to
significant deterioration of air quality and increase
the efficient use -of energy resources; and,
(d) Increase mobility, improve the overall efficiency of :-a
City Ia transportation system by enhancing vehicular f:_a
and shifting transportation, deed-. to facilities with
available, capacity; and,
(a) Improve air quality and reduce noise levels associated
with traffic.
Section 9-9.102. Definitions.
(a) "Average vehicle ridership (AVR)" is. calculated by
dividinq the number of employees who report to the
worksite or another job-related activity between 6:00
a.m. and 10:00 a.m. inclusive Monday through Friday by
the number of vehicles used by these employees. The AVR
calculation requires that a five (S) consecutive weekday
average be used and cannot include a holiday
(b) "Car/van pool" shall be defined as a shared ride by two
or more employees in motor vehicles, to and from their
worksite(s).
TDM Ordinance
0 0
-3-
(c) "Development project" means any proposed non-residential
proposal subject to a discretionary review process
including rezoning, subdivision, conditional use permit,
site plan review, or architectural control.
(d) "Employee" shall be defined as any person employed by a
firm, business, educational institution, non-profit
agency, corporation, government agency, or other entity.
(e) "Employment generation factors" mean factors used to
calculate the total potential employment of a particular
. project for determining the applicability of the
provisions of this Ordinance.
(f) "Facility standards" are site or building improvements
required by this Ordinance which provide opportunities
for trip reduction.
(g) "Level of service (IAS)" is a measure of the operational
performance of a road link or intersection based on a
ratio of volume to capacity (V/C) of the facility as
determined by the Intersection Capacity Utilization (ICU)
method.
(h) "Mixed-use development" (MXD) means a project which
integrates a variety of land uses including residential,
office, commercial, service, and employment and can
result in measurable reductions in traffic impacts.
(i) "Peak period" shall be defined as 6:00 a.m. through 10:00
am period of time, inclusive Monday through Friday.
(j) "Transportation Demand Management (TDM)" refers to the
implementation of any technique or method which seeks to
or has been demonstrated as being successful in reducing
the demand for travel or vehicle miles traveled (VMT).
Recognized TDM methods include carpooling, transit (rail
or bus), telecommuting, alternative work weeks, and
similar techniques.
(k) Transportation Management Association (TMA) consists of
a group of two or more employers established under
Conditions, Covenants, and Restrictions provisions to
provide a comprehensive and coordinated trip reduction
program.
(1) "Worksite" means a building, grouping of buildings, or
property which are in actual physical contact or
separated solely by a private or public roadway/right-
• •
TDM Ordinance -4-
of-way, and which are owned or operated by the same
employer or by employers under common control.
Section 9-9.103, Anpliaability,
(a) The provisions of this Chapter shall apply to all
proposed non-residential development.
(b) The Facility Standards provisions of this Chapter shall
apply to proposed non-residential development projects
based on projected number of employees according to
subsection (c) and based the, following table. For those
• facility standards which are discretionary. .he Planning
Director .shall•=.•have the authority to squire the
provision of such improvements based on their trip
reduction capability. „
Number of Employees
15-Z5-- 25-49 50-99 •100-249. 250+
Ridsshare Information Area R
R
R
R R
Secure Bike Storaga,� ;..a D
R
R
R R
Preferential Parking -
R
R
R R
Rideshare:Passenger Loading.-
D
R
R R
Bicycle Lockers -
D
D
R R
Shower Facilities -
-
D
R R
Bus Turnout -
-
-
D R
Central Lunchroom -
.
D
D R
(R: Required; D: Discretionary;.-: Not required)
(c) For the- purpose of determining whether a proposed
development -project is subject to the provisions of this
chapter, projected total number of employees shall be
determined based on the following:
(1) Employment projections shall be based on the
proposed area (square fest) of non-residential
development, the type of land use, and the following
"employee generation factors":
Commercial
Office
Industrial
Hotel/motel
others
Soo SF/employes
250 SF/employee
525 SF/employes
1.2 rooms/smployss
determined by the City Engineer
0
TDM Ordinance -5-
0
•
0
(2) In cases where the applicant believes that the
"employee generation factors" of subsection (1) are
not appropriate, they may request approval to use
alternative "employee generation factors" subject
to review and approval by the Planning Director.
The Planning Director may approve such alternative
"employee generation factors" based on findings that
they are based on comparable or more accurate survey
data conducted by a professionally recognized
organization and that they will result in a more
accurate estimate of potential employees for a given
project.
seation 9-9.104, laaility standards.
All non-residential development projects which are required to
provide rideshare facilities pursuant to Section 9-10.103 shall
comply with the following facility standards:
(a) Rideshare Information Area
(1) Rideshare information areas shall be an area that
provides employees with information on available
transportation alternatives to the single -occupancy
vehicle.
(2) The area shall be centrally located and accessible
to all employees or tenants.
(3) Information should include current routes and
schedules for public transit, ridesharinq match
lists, available employee incentives, and
ridesharinq promotional material supplied by
commuter -oriented organizations.
(b) Secure Bicycle Storage
(1) Bicycle storage facilities for use by employees or
tenants shall be conveniently located in
relationship to employee building entrances.
(2) Bike storage facilities shall be provided for five
(5) bicycles for every 100 employees or fraction
thereof.
(c) Preferential Parking
(1) A minimum number of parking spaces restricted for
use by "car/van pool" vehicles shall be based on the
following percentage of total requirtd parking:
0 0
TDM Ordinance -6-
0
Commercial Uses .045
Office/Professional Uses .1275
Industrial/R&D Uses .135
Hotel Uses .045
(2) "Car/Van Pool" parking spaces shall be clearly
designated by surface painting and/or signs
indicating "Car-pool vehicle use only" and will be
located in close proximity to the employee entrance
to the building to the satisfaction of the City
Engineer.
(d) Rideshare Vehicle Loading Area
(1) Loadinq areas shall be •ivided for rideshare
vehicles in close proxim_=y to the building's
employee entrance(s).
(2) Rideshare vehicle loading areas will be sized to
accommodate the anticipated type of rideshare
vehicle and should be designed in a manner that does
not impede vehicular circulation in the parking
area.
(e) Bicycle Lockers
(1) Bicycle lockers shall be provided at the rate of
five (5) bicycles per 100 employees or fraction
thereof.
(2) Bicycle lockers shall consist of enclosed, lockable
cabinets or similar facilities for the temporary
storage of single bicycles by employees.
(f) Employee Shower Facilities
(1) Employee shower facilities for use by bicycle and
pedestrian commuters will be conveniently located
and available to all employees.
(2) Employee shower facilities shall be provided at a
minimum of two (2) for every two -hundred fifty (250)
employees or fraction thereof.
(g) Bus Turnouts
(1) Bus stop improvements including bus pullouts, bus
pads, and right-of-way for bus shelters may be
required by the city Engineer for major developments
TDm Ordinance -7-
0
located along high traffic volume streets and
established bus routes based on the recommendation
of the "Transit Authority" which provides public bus
service to the project site.
(2) Bus stop improvements will be designed to conform
with standard traffic engineering standards.
(h) Central Lunchroom
(1) Central lunchroom facilities will provide employees
with on-site food preparation and eating areas.
Central lunchrooms shall provide a minimum of 10
• square feet per employee.
(2) Central lunchrooms shall include, at a minimum, a
rangstop, refrigerator, microwave, and sink.
section 9-9.105. Transoortatien Ilanacdeat Association (TMA)
Standards.
All proposed non-residential development projects which consist of
multi -tenant or multiple parcel development shall be required to
establish a Transportation management Association within the
Conditions, Covenants and Restrictions (CCiR) for the property.
The purpose of this section is to facilitate compliance with the
provisions of the Air Quality management District's Regulation XV.
The Transportation management Association (TMA) provisions of the
Conditions, Covenants, and Restrictions shall include the following
elements:
(a) Establish Transportaftion management Association (TMA)
membership and operational procedures.
(b) Establish tenant responsibility to participate in the
operation and administration of Transportation Management
Association and the implementation of TMA programs.
(c) Grant the Transportation management Association the
authority to levy an assessment to finance the programs
and activities of the Association.
(d) Grant the Transportation management Association the
authority to administer and implement rideshare and trip
reduction progress including but not limited to the
following:
(1) implement carpool, buspool, and/or vanpool programs.
(2) Fund a vanpool purchase program.
• TDM Ordinance -8-
(3) Provide cash allowances, passes or other public
transit subsidies.
(4) Impose parking fees or restrictions on single
occupancy vehicles.
(5) Provide full or partial parking subsidies for
ridesharinq vehicles.
(6) Administer commuter rideshare matching service.
• (7) Provide employees with guaranteed ride -home program
for ridesharinq.
(8) Limit service vehicle deliveries to non -peak hours.
(9) Provide on-site day care services.
(10) Pay cash bonuses for ridesharinq.
(11) Provide housing including preferential financing,
assistance, moving expenses.
(12) Assign staff responsibility for coordinating
ridesharinq activities.
$eetion s-f.ios. Transportation Demand ltanaeement (TDll) Pian.
At such time that the City issues an occupancy permit, business
license or similar approval for a single .- n -residential use or
project which will employ the minimus numbe.. Of persons requiring
compliance with the South Coast Air Quality Management District's
Regulation XV, the City will forward a notice of such action to the
District to assure preparation of the required Transportation
Demand Management Plan and compliance with the provisions of that
regulation.
:eetid szentions.
(a) All applicable non-residential development projects shall
demonstrate compliance with the provisions of this
Chapter as part of the land development application
review process as follows:
(1) Facility standards shall be reviewed for compliance
as part of the "site plan review" or "architectural
control" application process.
0
• TDM Ordinance -9-
0
(2) The establishment of a Transportation Management
Association (TMA) shall be subject to the review and
approval of the Planning Director as part of the
"subdivision" or "site plan review" process. The
approved TMA document shall be recorded prior to the
issuance any grading/building permits.
(b) The Planning Director shall have the authority to grant
exceptions to the provisions of this Chapter based on
findings that the exception is not contrary to the
purpose and intent of this Chapter and is consistent with
the provisions of the General Plan.
• 8e0tion 9- MA Enferoememt
To assure compliance with this Chapter, the City may withhold the
issuance of "building permits", "certificates of use or occupancy",
and/or "business licenses" for a development project or its tenants
until all required facility improvements have been completed and/or
any necessary CCiR documents have been recorded.
This Ordinance shall take effect and be in force thirty (30) days
after its passage.
The City Clerk shall certify to the adoption of this ordinance and
cause the same to be published once as required by law and posted
at the duly designated posting places within the City of San Juan
Capistrano within fifteen (15) days after its passage.
PASSED, APPROVED AND ADOPTED this 16th
of July , 1991.
KENNETH E. FRIESS, MAYOR
ATTEST:
SEEMS/
�,u✓iii
day
•
0 0
MEETJNG SUbOdARY
MONDAY, MARCH 2, 1992
• The meetiog began at 4:11 PM at the Missh m Viejo City EML City Council Chambers.
Those in attendance weret
Robert A. Curtis, City of Nbsfan Viajo
Marries Rudolph, Catty of Latae Forest
Penia Werner, City of Irvine
GB Jones, City of San Joan Capistrano
Mark Gooduan, Piwesenting Supervisor Tam
RBey, Coauty of Orange
Dennis Wilbe g, City of M don Viejo
William Haber, City of San Juan Copistroo
Aryn Rnhani, City of ir.ine
William Hodge, League of Cities, O.C. Div.
Joan S. Golding, County of Orange, 8MA
Pder Hersh, City of Lniae
Lha Burke, Grange County Trans. Authority
Kari Rigonfi, County of Orange, MA
1. The meeting was called to order by Cowman Robert Curtis, City of 5 inion V'wjo.
2. 11 Plameimg Forma mW Ooerat ng Procedures
The staff presentttion to consolidate later jure dichanal Pbmmag Forma meetings for GMA 9 and
GMA 5 was received and approved.
Cwmcitmend" Paula Werner, City of Irvine, stated that she and the City of irvim were highly
supportive of the consolidation of the fdat-jurkWictional Planning Forms meetings for GMA 5
and GMA 9 and would Support additional efforts for consolidation of meetings.
Comwjk ember Marcia Rudolph, City of Lake Forest, Stated that she was interested in a joint
meeting between GMA 10 aad GMA 9 to discuss land use and developmentwithin both GMA's.
Comeflowneber Marcia Rudolph, City of Lake Forest, was elected Chair and Councilmember
Paula Werner, City of Irvine; was elected Vice Chair.
0
0
Metrog Swann" - March 2, 1992
facer-Jorialietdasal ]lasing Forum Meeting
Growth Mauagesnent Areas 5 and 9
Page 2
Executive Director William Hodge, Leagae of Callornk Cities, provided an overview of the
purpose of Memure M Growth Maoagemeat Arras (GMA's), their interface with Inter,
Jurisdictioniai Planning Former psovie3as, and the slam of countywide efforts. Be stated the
purpose of the Growth Management Area bder�jarisWcdon d planning Forams was a chance for
• net&bw°ing cities to discuss iwninal concerns, particularly with respect to the brainspertation
iefrssstrwctme and what projects they could coaperatirely implement.
Joan Golding, Comst,Y of Orange, FAmkvnmmnbd Managenoent Agency, gave a presentation on
mandated requirements and responeviliaties of bder-Jurisdictional Planning Formas.
Dennis Wilim , ftb& Works Director, City of Missiion Viejo, presented the staff report which
ontfiined approved development within GMA 5 and 9. Information was also prated on
deaelepmad carry under review by earls of the respective jurisdictions in both GMV's.
Chanson Marcia Rodalph requested the Saddleback Community Church project and the
Foothill Abse planned Community be added to the list of projects currem* wider review.
civ__:_ ►' a�. _,,. 7
Dennis Wilbur Clave a staff report which identified intersections of GMA 5 and 9 to be included
on the Deficient hte sectio Last. It was noted tbat all of the Intersections listed have
haprweasent projects identified and are eitker fully funded or recommended for funding through
The Growth Manaacment Area.
_� L' 1e;. i��r ° •.t n ��s��[.�_� �.ai. tau-.� 1e.��
Atter reviewing the 1992-93 Transportation improvement project Priority list, the Inter,
JrrOdiet&mal ]Manning Forum approved a resoiuflon entitled A Resoivbon of the Inter-
Jurisdietional Planning FnrnmMs of Growth Management Areas 5 and 9 Adopting a Fiiscal Year
1.992-93 Transportation Improvement Ffojax Priority 149 and Requestate the Orame Canty
Local Transportation Authority to Include Said List Within the Growth Manamatent Area
Program of the Orange County Combined Transportation Funding Programs.
Resobsttnrts establishing the Major "thoroughfare and Bridge Fee Program for the San Joaquin
Bilis Transpatatiow Corridor and the FootM11Fastem Transportation Corridor as the Measure
M base traffic impact mitigation fee for GMA 5 and 9 were adopted.
0
E
Wolin Savary - March 4 1992
iatee*Iueisdimal Planning Foram Meeting
Growth Manopment Arcs 5 and 9
9
LIN Bmhe, Orange County TraNportalln Authority, gave a background of the lin status
of Measure hL legal brief's and commer bis have been filed and a ded" is equeted vri1�
the mod 60 days. A positive response is wed. $66,000,000 will be rdemd if there is a
• fav mble decision from the ApPeak Com-. Ms. Burlm also gave a brief pmwutxdon an the
requiremea ft for obtaining Growth Management Area funding.
7. Additimoal7Enns
Dennis Wiberg stated project applications should be prepared by repvm9abves of each
jm'iodictioo and saknitted to the Oraape Coaanty 7iauspmtabm Authority by March 27.
The wkc& ling Of fatom Uftw uriadictional planning Forma meetings was left open. Mayou GH Jana
requested a memo notice for [.tare mEdkgs.
The meedeg: adjammed at 4:54 ME
0
•
0
0
INTERJURISDICTIONAL PLANNING FORUM PARTICIPATION
GROWTH MANAGEMENT AREA 11
DATE: MARCH 4, 1992
JURISDICTION: City of Dana Point
REPRESENTATIVE: Karen Lloreda
ALTERNATE: None
JURISDICTION: City of San Clemente
REPRESENTATIVE: Scott Diehl
ALTERNATE: None
JURISDICTION: City of San Juan Capistrano
REPRESENTATIVE: Gil Jones
ALTERNATE: None
JURISDICTION: County of Orange
REPRESENTATIVE: Mark Goodman
ALTERNATE: None
PRESENT: X ABSENT:
PRESENT: ABSENT: X
PRESENT: X ABSENT:
PRESENT: ABSENT: X
PRESENT: X ABSENT:
PRESENT: ABSENT: X
PRESENT: X ABSENT:
PRESENT: ABSENT: X
ACTIONS TAKEN: 1. Karen Lloreda elected Chairman. (4-0)
2. Gil Jones elected Vice Chairman. (4-0)
3. Received report on IJPF requirements and adopted the
GMA 11 work program. (4-0)
4. Received report on Land Use Coordination and approved
development projects within GMA 11. (4-0)
5. Received report on deficient intersections and adopted the
GMA 11 Deficient Intersection List. (4-0)
6. Received report on and adopted the GMA 11
Transportation Improvement Projects List. (4-0)
7. Received report on and adopted the GMA 11 Traffic
Impact Mitigation Fee. (4-0)
8. Received report on Measure M funding programs.
9. Adopted a position supporting semi-annual meeting of the
UPF elected officials instead of quarterly meetings. (4-0)
ACTION ITEMS: None.
H: ?Akha.A\ SUREM. STP PARTCPM. UP
FFX 0680.50/Mecum M UPF Pan cipaum
ou
7,
N
o
V
b8�
8m
I O
8�
O
8O
O
p�
O
ypN�
O
c
Ny
m
0
m
w
QP
d
88
O
w
n
V N
O
n
m
O N8C
(4Jl
c
O
a
H
y !yn
IJ
s
T
N fi
V
m
n
m
A
6
O
i
T
m
6
O
L
q
m
m
3
3
£
n
a
m
C
m
v
m
.
o
m
�
i
e
a
u
O
m
m
3
3
$
3
3
3
O
O
O
m
T
2
N
o
V
b8�
8m
I O
8�
O
8O
O
p�
O
ypN�
O
O
N
o
V
N
Of
M
YQ
O
N
V
M
V
Ny
m
0
d
a
w
QP
d
88
O
w
M
V N
O
n
O N8C
(4Jl
c
O
P
H
N
o
N
N
Of
M
YQ
O
N
V
M
V
Ny
m
YY
d
a
QP
d
F,
o
N
d
8V
O
Ny
m
d
a
d
N
w
«
n
o
N
O
c
S
N
H
y !yn
IJ
s
T
N fi
V
m
F,
8a �8 80
O O O
O
m
2
O
K
K
A C)
T T
O s
O
.tea
7:
w
CD
0
O
0
Q
CDW
O
CD
o
d
0
O
d
a
d
O
m
O
n
O
c
S
H
s
T
P
m
n
O
A
6
j
i
T
6
L
q
m
$
3
3
£
n
a
m
8a �8 80
O O O
O
m
2
O
K
K
A C)
T T
O s
O
.tea
7:
w
CD
0
O
0
Q
CDW
O
CD
•
s
m
M y
M !NJ (NJ yN M M N
O N O ON qi IT IUJ 00
O I 0 0 0 0 0 0 0 0
o� o
O N O
O 41 O
O W O
O 8N YY
S O O
O88N
Q
P
Np
M
a8
O O
oM
O8
O
8O
O
8O
O
8O
O
O
M y
M !NJ (NJ yN M M N
O N O ON qi IT IUJ 00
O I 0 0 0 0 0 0 0 0
o� o
O N O
O 41 O
O W O
O 8N YY
S O O
M
O88N
{N81i
O
N
O O
O
c
Y
n
m
T
v
n
r�
i
K
6
N
$ m
7
O
0
<
H
•
m
t
to
$
N
V
V
+
II
a
N
$
m
a
s
O
a
x
i
;
;
N
t
o
m
•
p
r
r
<
m
C
m
m
c
9
n
c
v
>
DO
m
m
�
c
N
H
Y
D
Oqc
=
yH
885
O
8V
O
8N
O
8N
O
M
O
M
O88N
{N81i
O
N
O O
O
Y
T
r�
i
m
N
$ m
0
c
m
N
V
V
+
II
a
N
/CD
Y
CD
E4
w
CD
O
n
O
Q
CD
J
LJ
0
0 •
ATTACHMENT 3i - RESOLUTION ADOPTING A DEFINITION OF,
AND A PROCESS FOR, DETERMINING THE CONSISTENCY OF
THE AGENCY'S TRAFFIC CIRCULATION PLAN WITH THE
MASTER PLAN OF ARTERIAL HIGHWAYS
• •
RESOLUTION NO. 91-6-18-5
• MASTER PLAN OF ARTERIAL HIGHWAYS CONSISTENCY - MEASURE M FUNDS
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN
JUAN CAPISTRANO, CALIFORNIA, APPROVING THE DEFINITION
OF AND PROCESS FOR DETERMINING CITY COMPLIANCE WITH
THE COUNTY MASTER PLAN OF ARTERIAL HIGHWAYS FOR
SECURING MEASURE M FUNDS
WHEREAS, the City of San Juan Capistrano desires to maintain and improve
the streets and roads within its jurisdiction; and,
WHEREAS, the City supports regional coordination of transportation
improvements; and,
WHEREAS, the City desires to use funds collected from the Revised Orange
county Traffic Improvement and Growth Management Ordinance for transportation
• maintenance and improvement projects; and,
WHEREAS, the Revised Orange County Traffic Improvement and Growth
Management Ordinance states that within six months after approval of the Retail Tax by
the electors, the Orange County Local Transportation Authority (OCLTA),through a
cooperative process involving the County and all of the cities within the County, shall
adopt a definition of, and a process -for, determining consistency of each jurisdiction's
General Plan Circulation Element with the Master Plan of Arterial Highways (MPAH);
and,
WHEREAS, representatives from the Orange County Local Transportation
Authority, City Engineers Association, City Managers Association and the County of
Orange have developed a definition of, and process for, determining consistency of each
jurisdiction's Traffic Circulation Element with the Master Plan of Arterial Highways
(Attachment A) which was endorsed by a unanimous vote of the Orange County Division
of the League of California Cities.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of
San Juan Capistrano does hereby endorse the Regional Funding Program Consistency and
Eligibility Criteria as included in Attachment A as the definition of, and process for,
determining consistency of the City of San Juan Capistrano's General Plan Circulation
Element with the Master Plan of Arterial Highways.
PASSED, APPROVED, AND ADOPTED this
of June , 1991.
ATTEST:
18th
r�
KENNETH E. FRIESS, MAYOR
day
i
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF SAN JUAN CAPISTRANO )
1, CHERYL JOHNSON, City Clerk of the City of San Juan Capistrano,
California, DO HEREBY CERTIFY that the foregoing is a true and correct copy of
Resolution No. 91-6-18-5 adopted by the City Council of the City of San Juan
Capistrano, California, at a regular meeting thereof held on the 18th day
of June , 1991, by the following vote:
AYES: Councilmen Jones, Hausdorfer, Buchheim,
Vasquez and Mayor Friess
NOES: None
ABSTAIN: None
40 ABSENT: None
(SEAL)
CHERYL IORNS , CITY CLERK
-2-
• • ATTACHMENT A
REGIONAL FUNDING PROGRAM CONSISTENCY AND ELIGIBILITY CRITERIA
CONSISTENCY DEFINITION
Consistency with the Master Plan of Arterial Highways (MPRH) is the primary
criterion for determining city and county commitment to maintaining the intagrity
of the regional transportation system. For a city circulation element to be
consistent with the MPRH, for purposes of regional funding program eligibility,
it shall have an equivalent planned traffic -carrying capacity for all HPAH links
within the city's jurisdiction.
"Planned capacity" shall be measured by the number of through lanes on each
arterial highway as shown on the local circulation element. Cities shall not
be inconsistent as a result of existing capacity limitations on arterials which
are not yet constructed to the circulation element designation. However, any
city which unilaterally reduces the number of through lanes of an MPAH arterial
• highway on its circulation element to less than shown on the MPAH without County
approval shall be inconsistent with the MPRH on the ante city council action is
taken and is ineligible for regional funding until consistency is re-established.
PROGRAM ELIGIBILITY
Local Agency Responsibility
EHgmaity requirements shall be rssiIIed amsaUy as follows:
For Measure M "Streets and Roads Maintenance and Road Improvements" ($450
million "turnback") funds, cities shall adopt a General Plan Circulation
Element which does not preclude implementation of the MPAH and shall take no
action to preclude implementation of the MPRH.
2. For all competitive regional funding programs such as the Arterial Highway
Financing Program (AHFP), Orange County Unified Transportation Trust Fund
(OCUTT), Combined Road Fund (CRY), and Measure M "Regional Street and Road
Projects", "MPAH Improvements" and "Growth Management Area Improvements",
cities shall adopt:
a. a General Plan Circulation Element which is consistent with the MPAH, and
b. a City Council resolution attesting that no unilateral reduction in lanes
has been made on any HPAH arterials.
Annual Review Process
Each year , County shall determine if city circulation elements provide equal
numbers of through lanes for each highway shown on the MPRH. County shall also
ensure that local agencies have not unilaterally reduced the number of lanes on
any existing arterial highway (effective April 1, 1991).
1
0
Approval Process
Upon completion of the review, a joint committee of city and county
representatives will make recommendations for eligibility to the Orange County
Transportation Authority for Measure M, CRP, slid OCUTT programs and to the County
Board of Supervisors for Arterial Highway Financing Program. These
recommendations shall be reviewed and formally approved by OCTA and the Board.
RE-ESTABLISHING PROGRAM ELIGIBILITY
Once a city has been determined to be ineligible for regional funds, it may seek
• to re-establish eligibility by requesting a cooperative study be undertaken with
County. The study will be designed to 1) ascertain the regional transportation
system need, 2) make provisions to most those needs in the city General Plan and
3)re-establish consistency with rho MPRH. Any changes to the city General Plan
or the MPAR shall be mutually acceptable to the city and the county. Until such
a study has been completed, the City shall be ineligible to receive applicable
funds.
MUTUAL CHANGES TO CIRCULATION ELEMENT AND MPRH
A city and the County may mutually revise their respective circulation element_
through the cooperative process outlined above. Cities shall continue to be
eligible to receive funds while the cooperative study process is underway.
2
0
0
0
ATTACHMENT 3j - LETTER FROM THE COUNTY OF ORANGE STATING THAT
THE CITY'S TRAFFIC CIRCULATION ELEMENT IS CONSISTENT
WITH THE MASTER PLAN OF ARTERIAL HIGHWAYS
171
:01T
CA E
NVIRONMENTAL MANAGEMENT AGENCY
TRANSPORTATION
OCT 1 1 1991'
Mr. Theodore Simon
• City Engineer
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, CA 92677
MICHAEL M. RUANE
DIRECTOR, EMA
KEN R. SMITH
DIRECTOR OF TRANSPORTATION
FILE
LOCATION:
901 CIVIC CENTER DRIVE
SANTA ANA, CALIFORNIA
MAILING ADDRESS:
P.O. BOX 4048
SANTA ANA, CA 927024048
SUBJECT: 1992-93 AHFP/Measure M: Consistency Findings between City's
Circulation Plans and County MPRH
Dear Mr. Simon:
TELEPHONE:
(714) 834-3455
FAX # 8345965
This letter is to advise you that we have completed a comprehensive review of
your city's Circulation Plan with the County Master Plan of Arterial Highways
(MPAH), preparatory to the 1992-93 AHFP/Measure M programming process, and find
your city plan consistent with the MPAH.
Consistency review is based on evaluation of the maps using planned -carrying
capacity criteria. A city's Circulation Plan is consistent if its
planned -carrying capacity is equivalent to the MPAH for all MPAH links within
the cities' jurisdiction. Planned capacity is measured by the number of through
lanes on each arterial link. An MPAH link not shown on a City Circulation Plan,
or one which is planned to have fewer travel lanes than that of the MPAH
designation, is considered an inconsistency.
Should you have any questions on the consistency review and findings procedures,
please feel free to contact me at 834-3669.
Very truly yours,
e.s L
Harry Persaud, Chief` i�^yj 7
Transportation Element Studies-
r
j
PMF:pmf - �� N:_
attachment -
Z N V,
cc: Dean Delgado, OCTA A
Roger Hohnbaum, EMA o
•
•
•
•
AGREEMENT FOR CONSULTING SERVICES
e�� 601�y
THIS AGREEMENT is made and entered into this 180 day of February
Py
19_9_� by and between THE CITY OF SAN JUAN CAPISTRANO, hereinafter referred to
as "CITY", and Pavement Management Systems, Inc., hereinafter referred to as
"CONSULTANT".
WITNESSETH
WHEREAS, CITY requires professional consulting services for the project
described as follows: Measure M Local Pavement Management Program; and,
WHEREAS, CONSULTANT represents that it/he is duly qualified to provide said
service,
NOW, THEREFORE, CITY and CONSULTANT, for the consideration hereinafter
named, agree as follows:
SECTION 1. GENERAL.
The considerations of work on the project shall be governed by the conditions
contained herein. In general, the tasks delineated herein are to be performed with
minimum direction and assistance from CITY.
All work performed by CONSULTANT , however, shall be subject to review and
approval of the Director of Engineering & Building, or his designee at all times.
SECTION 2 SCOPE OF TASKS BY CONSULTANT.
Subject to the terms and conditions of this Agreement, CONSULTANT shall
perform the tasks as set forth in Exhibits A, attached and incorporated herein by
reference.
During the performance of the above tasks, CONSULTANT shall have access to
existing data in CITY files and CITY shall provide copies of any such data CONSULTANT
requests at no cost to CONSULTANT.
SECTION 3. TIME OF BEGINNING AND COMPLETION OF SERVICES.
The services provided under this Agreement shall begin upon execution of this
Agreement by all parties. The services provided under this Agreement shall be com-
pleted on or before Sixty days from the Notice to Proceed.
Page 1
0 0
• SECTION 4. PAYMENT FOR CONSULTANT'S SERVICES
Consultant contract billings may be submitted on the consultant's forms and, at a
minimum, should contain the following:
Title of project(s)
Purchase Order number
Total approved purchase Order amount
Amount paid to date
Amount requested
Amount remaining on Purchase Order
Breakdown of amounts by project type or account number
Three (3) copies of itemized bills, clearly indicating the monthly period for which
the billing is made, shall be submitted to: City of San Juan Capistrano, Attn: Director
of Administrative Services, 32400 Paseo Adelanto, San Juan Capistrano, California
• 92675.
Total cost to CITY/AGENCY for CONSULTANT's fees shall not exceed the total
fee of $32,140 including an estimate of $4,600 for coring per PMS letter dated January
14, 1992, all itemized in Exhibit B, attached and incorporated herein by reference.
SECTION 5. COVENANT AGAINST CONTINGENT FEES.
CONSULTANT warrants that Pavement Management Systems, Inc. has not
employed or retained any company or person, other than a bona fide employee working
for CONSULTANT, to solicit or secure this Agreement, that Pavement Management
Systems, Inc, has not paid or agreed to pay any company or person, other than a bona fide
employee, any fee, commission, percentage, brokerage fee, gift or any other
consideration, contingent upon or resulting from the award or making of this
Agreement. For breach of violation of this warranty, CITY shall have the right to annul
this Agreement without liability , or, at its sole discretion, to deduct from the
Agreement price or consideration, or otherwise recover, the full amount of such fee,
commission, percentage, brokerage fee, gift or contingent fee.
SECTION 6. EXPENSES.
CONSULTANT acknowledges CITY is under no obligation to compensate
CONSULTANT for services rendered or expenses accrued under this Agreement in excess
of the maximum compensation specified in Section 4.
SECTION 7. OWNERSHIP OF DOCUMENTS.
All tracings, plans, specifications, maps or other documents prepared or obtained
under the terms of this Agreement shall be delivered to, and become the property of,
CITY, and basic survey notes and sketches, charts, computations and other data prepared
or obtained under this Agreement, shall be made available upon request, to CITY without
restriction or limitation on their use.
Page 2
Y%'ti-
0 0
SECTION 9. NON -DISCLOSURE.
The designs, plans, reports, investigation, materials and documents prepared or
acquired by CONSULTANT pursuant to this Agreement (including any duplicate copies
kept by CONSULTANT) shall not be shown to any other public or private person or
entity, except as authorized by CITY. CONSULTANT shall not disclose to any other
public or private person or entity any information regarding the activities of CITY,
except as authorized by CITY.
SECTION 9. CONFLICT OF INTEREST.
For the duration of this Agreement, CONSULTANT shall not act as consultant or
perform services of any kind for any person or entity in regard to this project without the
prior written consent of CITY.
SECTION 10. CHANGES IN SCOPE OF CONSULTANT'S SERVICES.
No additional fee shall be paid by CITY for additional consulting services not
included in this Agreement without the written approval of the CITY prior to undertaking
such work. In the event of suspension of project by CITY, CONSULTANT shall have the
right to renegotiate fees if delay is greater than six (6) months.
SECTION 11. TERMINATION.
CITY may, without cause, terminate this Agreement at any time prior to
completion by CONSULTANT of any of the services required hereunder. Notice of
Termination of this Agreement shall be given in writing to CONSULTANT, and shall be
sufficient to complete when same is deposited in the U.S. Mail, first class postage
prepaid.
In the event this Agreement is terminated by CITY, CONSULTANT shall be paid
the value of services performed by him pursuant to this Agreement prior to the date of
termination thereof, such value to be the total to which he shall have become entitled, as
determined by the CITY less the amount of any payments previously made, but in no
event exceeding the maximum contract amount stated in SECTION 4.
SECTION 12. DISPUTES.
Unless otherwise specified herein, any dispute over a question of fact arising
under this Agreement which cannot be resolved by agreement between the parties may
be, by mutual consent of the parties, submitted to a "Board of Arbitration" consisting of
three (3) arbitrators having expertise relating to this contract subject matter, one of
whom shall be selected by each of the parties, and the third by the two members selected
by the parties.
Each of the parties shall pay the member selected by it, and the compensation of
the third member shall be paid equally by the parties. The parties shall be bound by the
decision of the Board of Arbitration.
SECTION 13. NO ASSIGNMENTS.
Neither any part nor all of this Agreement may be assigned or subcontracted,
except as otherwise specifically provided herein, or to which City, in its sole discretion,
consents to in advance thereof in writing. Any assignment or subcontracting in violation
of this provision shall be void.
Page 3 KV-
SECTION 14. ENDORSEMENT ON PLANS, ETC.
CONSULTANT shall endorse all plans, data and other documentation submitted
to CITY pursuant to this Agreement.
SECTION 15. MAINTENANCE OF RECORDS.
CONSULTANT shall maintain all books, documents, papers, employee time
sheets, accounting records and other evidence pertaining to costs incurred and shall make
such materials available at their respective offices at all reasonable times during the
contract period and for three (3) years from the date of final payment under this
Agreement, for inspection by CITY and copies thereof shall be furnished, if requested.
SECTION 16. INDEPENDENT CONTRACTOR.
At all times during the term of this Agreement, CONSULTANT shall be an
independent contractor and shall not be an employee of CITY. CITY shall have the right
to control CONSULTANT only insofar as the results of CONSULTANT's services
rendered pursuant to this Agreement; however, CITY shall not have the right to control
the means by which CONSULTANT accomplishes services rendered pursuant to this
Agreement.
SECTION 17. INSURANCE REQUIREMENTS.
1. Comprehensive General Liability. CONSULTANT shall maintain in full
force and effect Comprehensive general liability coverage, including premises
operations, broad form property damage, and blanket contractual liability in the
following minimum amounts:
$500,000 property damage;
$500,000 injury to one person/any one occurrence/
not limited to contractual period;
$1,000,000 injury to more than one person/any one
occurrence/not limited to contractual period.
II. Comprehensive Automobile Liability. CONSULTANT shall maintain in
full force and effect comprehensive automobile liability coverage, including owned,
hired, and non -owned vehicles in the following minimum amounts:
$500,000 property damage;
$500,000 injury to one person/any one occurrence/
not limited to contractual period;
$1,000,000 injury to more than one person/any one
occurrence/not limited to contractual period.
III. Worker's Compensation. If CONSULTANT intends to employ employees
to perform services under this Agreement, CONSULTANT shall obtain and maintain,
during the life of this Agreement, Worker's Compensation Employer's Liability Insurance
in the statutory amount as required by state law.
Page 4 M`_
•
This policy/policies shall not terminate, nor shall they be cancelled, nor the
coverage reduced, until after 30 days written notice is given to the CITY.
CONSULTANT shall provide, prior to beginning work, Certificates of Insurance
to the CITY establishing that the required insurance coverages have been secured by
CONSULTANT.
CONSULTANT shall provide an endorsement to CITY establishing that CITY has
been legally added as an additional insured for the general liability insurance required
under this Agreement.
SECTION 18. TIME FOR SUBMITTING PROOF OF INSURANCE.
CONSULTANT shall submit proof of insurance requirements under this
Agreement to the City Clerk's office prior to beginning any work under this Agreement.
• CONSULTANT shall not receive any compensation until all insurance provisions
have been satisfied.
SECTION 19. LICENSES, PERMITS, ETC.
CONSULTANT represents and warrants to CITY that he has all licenses, permits,
qualifications and approvals of whatever nature that are legally required to practice his
profession. CONSULTANT represents and warrants to CITY that CONSULTANT shall, at
his sole cost and expense, keep in effect at all times during the term of this Agreement,
any license, permit or approval which is legally required for CONSULTANT to practice
his profession.
SECTION 20. CONSULTANT NOT AN AGENT.
Except as CITY may specify in writing, CONSULTANT shall have no authority,
expressed or implied, to act on behalf of CITY in any capacity whatsoever as an agent.
CONSULTANT shall have no authority, expressed or implied, pursuant to this Agreement
to bind CITY to any obligation whatsoever.
SECTION 21. PERSONNEL.
CONSULTANT agrees to assign the following person/persons to perform the
tasks set forth in this Agreement:
J. R. Hallman
J. K. Poli
CONSULTANT shall not unilaterally alter the assignment of the above personnel
without the authorization of the Director of Engineering & Building.
CITY shall have the unrestricted right to order the removal of any
person/persons assigned by CONSULTANT by giving oral or written notice to
CONSULTANT to such effect.
Page 5 ��
0
E
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the
day and year first hereinabove written.
CONSULTANT
Bypn-_�reS,clda{C_—
CITY OF SAN J N CAPiSTRANO
MAYOR
ATTEST:
Approved as to form:
0 By
CHERYL ja+LWN, (;M CI ERK
Thomas P. C1arR, Jr:, Interim City Attorney
Page 6
0 0
EXHIBIT A
SCOPE OF WORK
1. Inventory of Existing Pavements - The inventory shall include all primary and
secondary arterial highways in the City as shown on the enclosed map and list.
The inventory shall be in a form which can be readily updated.
2. Condition Assessment of Pavements - The proposed assessment process shall
consider each travel lane of the primary and secondary arterial system. In
proposing an assessment process, the consultant should be aware that a biennial
update is a requirement of Measure 10.
3. Rehabilitation Recommendations - The assessment shall result in producing an
engineered recommendation for pavement rehabilitation or replacement,
. complete with section design. Recommendations shall be constructible lane -to -
lane and longitudinally, not simply theoretical. Suitable transitions shall be
recommended between different rehabilitation recommendations.
4. Cost Estimates - Estimates of costs of rehabilitation shall oe provided on a
"between intersections" basis. Calculations shall be provided.
Page 7 K(k-
•
�Mfqp R CITY OF SAN JUAN CAPISTRANO
.� MEASURE M
' PAVEMENT MANAGEMENT PROGRAM
: zy PRIMARY AND SECONDARY ARTERIAL HIGHWAYS
JULY 1991
jj
;Rvl gd,
i/ 'inn "" * � •, s% s �.J- .,"'._ \
x
"z \
K
0 0
• CITY OF SAN JUAN CAPISTR
STREET NAME
FROM
TO
ALIPAZ ST.
1200' s/o Camino Del
1936' n/o Del Obispo St.
Avion
CALLE ARROYO
Rancho Viejo Rd.
La Novia Ave.
CAMINO CAPISTRANO
Doheny Park Rd.
Del Obispo St.
• CAMINO CAPISTRANO
Del Obispo St.
North City Limits
CAMINO DEL AVION
Shipside Dr.
Alipaz St.
CAMINO LAS RAMBLAS
South City Limits &
57' e/o Kinkerry Ln.
Freeway
DEL OBISPO ST.
324' s/o Blue Fin Dr.
Ortega Highway
DOHENY PARK RD.
760' s/o Camino
Camino Capistrano
Capistrano
JUNIPERO SERRA RD.
Camino Capistrano
Rancho Viejo Rd.
LA NOVIA AVE.
San Juan Creek Rd.
Ortega Highway
LA NOVIA AVE.
San Juan Creek Rd.
Valle Rd.
ORTEGA HIGHWAY
Camino Capistrano
San Diego Freeway
RANCHO VIEJO RD.
Via Escolar
Ortega Highway
RANCHO VIEJO RD.
Ortega Highway
Calle Arroyo
SAN JUAN CREEK RD.
Camino Capistrano
La Novia Ave.
SAN JUAN CREEK RD.
La Novia. Ave.
20' e/o Camino Chico
VIA CALIFORNIA
Camino El Molino
Camino Las Ramblas
AYS
MILEAGE
PRIMARY SECOND,
1.44
0.28
2.06
2.89
0.73
1.40
2.31
0.07
0.27
1.02
0.40
1.70
0.21
3.03
0.19
1.30
0.14
Ktl-
0
• EXHIBIT B
FEE SCHEDULE
SHEET 1 OF 2
The fees for this project are as follows:
Task 1: Collect Network Level Condition Data
PJ
A. Surface Distress 20 Miles @ $135.00 $ 2,700.00
B. Ride Condition 20 Miles @ $43.00 860.00
• C. Deflection Testing 35 Miles @ 20 Tests/
Mile @ $10.00/Test 7,000.00
Task 2: Generate Present Status
Calculate SDI, RCI, SAI and POI. Report will rank
the street sections on a priority basis. $1,800.00
Task 3: Collect Design Level Deflection Data
Collect data on those
priority sections identified
In Task 3. 700 Tests @ $10.00 Ea. $ 7,000.00
(Based on Estimate of 12 lane miles.)
Task 4: Design Level Analysis to determine required
rehabilitation or overlay strategy. $ 4,370.00
Task 5: Final Report presenting all results and
rehabilitation costs. $3,740.00
TOTAL $27,540.00
Depending upon the data available from City records, on those streets needing
rehabilitation, additional information may be required from pavement cores. The City should
provide some allowance for this possibility.
Kt&-
• EXHIBIT B
FEE SCHEDULE
SHEET 2 OF 2
Mr. Brian Perry
Senior Civil Engineer
City of San Juan Capistrano
32400 Passo Adelanto
San Juan Capistrano, CA 92675
Dear Mr. Perry:
• In response to your request for an estimate on the necessary coring required In conjunction with
the work plan described In our proposal of August 22nd, PMSI Is pleased to submit the following:
1. Pavement cores to determine layer thickness, material descriptions, subgrade moisture
content and visual soB classification - 20 cores Q $125.00 each.
If PCC pavement or treated base or treated subgrade are encountered, an addklonal $35.00
per Instance will apply.
2. R -values - 10 Q $210.00 each.
PMSI feels that these quantities are fair estimates and are based on 12 lane miles of pavement,
primarily 4 lanes wide and assuming generally consistent design thickness.
PMSI uses the dynaflect deflection data to calculate an estimated subgrade modulus for each
deflection test location. This data, when calibrated with the R -value information, can provide a
comprehensive insight Into subgrade support conditions, at 100 foot intervals, without a large
number of expensive R -value tests.
If you have any further questions, Brian, please do not hesitate to call.
Sincerely,
PAVEMENT MANAGEMENT SYSTEMS, INC. '1
Ja Robert
Regional Manager �, V*
JRH/del
SAKAMN/Lk.
22642 LAMBERT ST, SUITE 402
EL TORO, CALIFORNIA 92630 KLA -
17141 951-0643
0
SCHEfEXHIBIT C
JLE OF HOURLY RATES •
HOURLY CHARGE OUT RATES
Senior Principal
$125.00
Principal
$110.00
Senior Project Manager
5 95.00
Project Manager
$ 80.00
Senior Analyst
$ 80.00
Programmer
$ 65.00
Senior Technician
5 55.00
Technician
5 45.00
Support Service
$ 35.00
fq0`
0
7,
• PMS�i
t1,
PAVEMENT
MANAGEMENT
SYSTEMS
August 22, 1991
60-998-01-01
Mr. Brian Perry
Senior Civil Engineer
CITY OF SAN JUAN CAPISTRANO
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Is RE: Proposal - Pavement Management Project
Dear Mr. Perry:
•
Pavement Management Systems, Inc. (PMSI) is pleased to submit this proposal in response to the
City's RFP dated July 30, 1991.
The previous studies the City has had performed, as referenced in the RFP, were project level
studies. The City had determined that the streets involved were priority needs and detailed data
was required for design purposes. The referenced studies provided that data in terms of overlay
thickness and/or reconstruction areas and new section thicknesses.
For the City's current requirement to provide information and data to satisfy the Measure M
criteria, PMSI suggests an approach slightly different than that carried out in 1986. This would
involve the following phases:
Phase
Conduct data collection on all street sections involved at the network level. This
would involve a surface condition survey, a roughness survey and deflection testing.
The deflection testing would be conducted at 300 foot intervals in the curb lanes only
in both directions. These detail data items would then be converted into indices for
each street section. The resulting Surface Distress Index (SDI), Ride Condition Index
(RCI) and Structural Adequacy Index (SAI) will be provided, as well as Pavement
Quality Index (POI). The POI is an index which combines the previous three indices
into one overall measure of service level. These four indices will be presented, as
well as the detailed data. Appendix E provides a sample of this present status data.
PMSI will meet with the City, rank or prioritize the streets on the basis of this
data. Candidate projects will be selected on the basis of priority for the next two
to three years.
Phase II
This phase will involve the project level type data collection analysis and report as
provided in 1986, on those priority candidates chosen in Phase I. The data collection
will involve additional deflection data only. As the streets and mileage for this
phase are undefined at this point, an allowance has been provided in the fee
schedule. The results of this portion of the project can be used to design and cost
out the priority projects.
22642 LAMBERT ST.. SUITE 402
EL TORO, CALIFORNIA 92630
(714) 951-0843
• PMS
Mr. Brian Perry
City of San Clemente
August 21, 1991
Page 2
The fees for this project are as follows:
Task 1: Collect Network Level Condition Data
A. Surface Distress 20 Miles @ $135.00 $ 2,700.00
• B. Ride Condition 20 Miles @ $43.00 860.00
C. Deflection Testing 35 Miles @ 20 Tests/
Mile @ $10.00/Test 7,000.00
Task 2: Generate Present Status
Calculate SDI, RCI, SAI and PQI. Report will rank
the street sections on a priority basis. $ 1,800.00
Task 3,. Collect Design Level Deflection Data
Collect data on those
priority sections identified
in Task 3. 700 Tests @ $10.00 Ea. $ 7,000.00
(Based on Estimate of 12 lane miles.)
Task 4: Design Level Analysis to determine required
rehabilitation or overlay strategy. $ 4,370.00
Task 5: Final Report presenting all results and
rehabilitation costs. $ 3.740.00
TOTAL $27,540.00
Depending upon the data available from City records, on those streets needing
rehabilitation, additional information may be required from pavement cores. The City should
provide some allowance for this possibility.
int •
• PMS
Mr. Brian Perry
City of San Juan Capistrano
August 21, 1991
Page 3
Concerning the commercial aspects of the project, PMSI has insurance coverage which meets or
exceeds the requirements of Section 17 of the Agreement for Consulting Services attached to the
RFP, with the exception of the Errors and Omissions Coverage, It is almost impossible to find an
insurance company willing to write this type of coverage for firms such as PMSI, which are involved
in software development. Civil engineering firms will have E & O, but it will most likely exclude
any software related activities. In this respect, PMSI cannot meet Paragraph III of Section 17.
• However, this question does occasionally arise and after discussion with the agency's risk
managers, the issue has always disappeared.
If notice to proceed is received by September 13, 1991, the project could be completed within sixty
(60) days. This could vary due to the rate of interaction between the agency and the consultant.
Thank you for this opportunity to provide a proposal concerning pavement management services.
Should you have any questions, please do not hesitate to contact this office.
Sincerely,
PAVE NTj MANAGEMENT SYSTEM, INC.
�j
/ ' a
aures R. a man
Regional Manager
JRH/
Enclosures
SIUANCAP/Pmpo s
0-
•
O
z
¢
o:
N
H
a
a
U
In z
£ 6
W �
N
N 6 N
h In U
Z LL -+
W ❑
£ J
W Y ti
0 r¢
Q H (L
za UQ
£
Z
W ++
£ C
LU d a
Q IG
CL Uq
U'
z
F-
m
J
U)
D
4
r
N
h
Z
W
In
W
!r
IL
— 11 m m m N N t + N O 0. m It 0 cr M t 0
a u �` mai ai 1` ui ui ui ui ui cT a ri ai N ri
�+ 11 M o N ,G -0 Cl N N a o•
¢n
m n ui .o m a ri .: .: ni .: ri .• oo o a
If
.. n m o, m o 0 0 0 0 0 o v M .o o• m � N
qu
U) If a ai o; 0 0 0 0 0 0 0 Cl` ai ll� 04 o n o�
If ..
H 11 m v N 0• M N •0 D. O -+ 0 M m m 0 01
U II
¢ If II0 N N In m m N N m N N N •0 N R0 ,O
r n v N 10 v D. N m o, m m o 0 N o 0 0
+� n N -+ M M N N N .+ 0 u) N O O 0 M �O
C II M N in Ln N .N. In M .0 M M O d V M M 4
r- II N .� ... .. .. .. N qr
J n
9
n o
II w w z w w w w z
II z z w z q q ❑
n ¢ Q D ¢ H H H
Ito J J a J } > Y > > z
II In W 0 3 H 3
O II Z > Q C m C LL ❑ w ❑ ❑ W
r l4 Q ❑ Q W O } H m
II J a q q ¢ q O ❑ O 0 m ❑ 3 m
II O m q Q Z z Z 0 Z U' Z m Z 2 O
11 Ix Z H W W ¢ W W w W W W Q a'
II m W > 0 H H m Q 7 W
n W O O 2 2 H 2 Q 2 ❑ 2 O S O z a
If J 0 Z h 1- Z h h F- h W Q H
fl -j J ¢ :) ac W D Z m Z D J 7 r N Z
R Q w w a 0 0 > o a 0 Q O w 0 m a 0
It U ❑ q J N Z ¢ m m Z m m 0 m 0 1 7
II z
11 O
11 H p
11 a ❑ Z Z W Z q a 0
II J ¢ q ¢ Q O ¢ H H H
II W O ¢ J J a J Y > > >
IS 11 a 0 O O 3 •+ �+ �+
0 11 z 7 Y 7 v m Q W CI O A
F 11 £ ¢ O w p w O O Y r
<L I{ U O N > a Z Z ¢ z 0 Z Z z N m S m
11 W W a W W W W W a
If N p O Y In H p p ¢ 7
II W 0 2 Z 2 S H 2 q 2 2 2 O O U' Z
11 O J U W h r z h h h r W a
11 O J J Z 2 7 ¢ W 7 Z m ¢ ❑ J J F- N
Ilrd ¢ w Q O O 0 > O Q ❑ O O w W p a
ll. U ❑ m ❑ m Z Q m m Z Z m ❑ ❑ O J
It
II
II O O O O 0 O O O O O O O O
It 6 ¢ ¢ ¢ 6. ¢ Q 4 Q ZQ Q 6 Q
II K ¢ ¢ 0: p m m p D: p ¢ it x
4+ It r h h F- r F- F- F- h h h r F-
m II O N m m m N m m m N m m U) U1
QI 11 } H H H H H N H H H H H H N
F u o a a a a d a a a- a a a a r.
Ir a ¢ ¢ Q a ¢ ¢ a a a a ¢ a
m II m m m 2 U U U U U U U U U U U U U
II Q
UN N N 0 O 0 0 0 0 O 0 0 0 O O ❑
II a Q ¢ W Z Z Z Z z Z Z z Z Z Z Z Z
II a a aJ H H H H H 1.1 H H H H H . .
II H H H J £ £ £ £ £ £ £ £ £ £ £ £ £
II J J J Q a Q ¢ Q a ¢ Q a Q a ¢ a a
114 Q Q U U U U U U U U U U U U U U
n 0 0 0 o a a .o o a o a �o N 0 rd a
y n M 7 N O In u) n .0 .O N N N N N m m m
a 11
LO 11
• 0
o 11n
m
'+
m
N
a
m
n
•+
a
a
0`
N
-�
•
N
a. if
P
r
,0
f\
N
0�
-t
N
l'I
l7
N
N
.0
N
P
aZ
•o
II
Q
N
O
m
D.
N
m
0
a
.+
O
n
N
II
m 11
o-
w
11
o ii
a
N
O
N
a•
N
m
Q�
N
a
O
If.
U) If
13'
r
o
a
o
of
a
of
o
h
of
o
Q11
o
"[I
0
N
m
0,
M
N
O
0
N
n
0
m
O
n
O
N
0
U 11
n
n
m
n
n
n
a
In
n
h
Iri
m
n
d'
t II
O
0•
O
a
,0
r)
.0
0-
O
O
a
N
0
-+
10
0•
0
11
�
N
N
m
Om`
M
m
rn
n
N
W
O
-a
0`
m
n
a -
C II
N
m II
J u
n
•
ii
¢
¢
z
❑
if
It
Ir
a
m
s
ii
J
II
H
m
z
IX
r
m
N
O
w
O
0 11
..
m
Ir
Q
..
..
a
-�
H
m
~ 11
❑
o
z
Ir
a
>
a.
W
a
V
.Ei
00.
O
O
Ir
If
U
J
m
W
"
❑
W
N
Q
2
V
Z
>
n
z
a
Ila.
•
❑
J
z
>
F-
w
O
¢
a
R
>
w
N
O
a
O
O
w
D
II
¢111
O
R
U
W
O
Q
z
V'
z
x
x
m
-)
W
J
11
H
U
W
Q
M
N
.mow
E
Iw-
E
D
z
a
z
S
.Q+
N
V
II
II
m
Z
❑
m
>
A
Z
IL
Q
U
O
V
w
m
>
II
J II
II
Q
cc
2
Q
Q
z
Q II
If
Q
Q
(A
Ir
K
Q
5
N 11 E
11
J
¢
w
m
z
K
14
f~fi
N
W
F- 11
0 11
W
a
N
a
Q
W-
W II
111
f 11
in
O
IL
O
F-
Z
a:
IL
F-
IL
U
Z
m a
IL u
U
a
Q
YL
.,
O
W
F-
a
a
❑
n
Q
¢ 11
11
O
U
N
m
U
W
m
U
E
U
z
m
D
z
rr
x n
n
Ir
a
I -N
W
F
IL II
11
W
N
m
O
Q
J
m
O
J
O
W
7
m
J u
n
a
F
Q
O
Z
v
w
o
¢
z
z
x
w
m
M
Q n
11
M
it
It.
M
IL
11
II
Z
Q
H
J
E
Q
F-
m
w
£
F-
E
O
J
Q
z
Q
❑ 11
11
D
F-
J
W
Q
.r
w
a
J
a
..
Q
O
Q
•+
Q
U
i
u
m¢❑
v>
v
z
m¢
v
U
v
m>>
m
r
¢
o 11
11
7
m 11
11
rW-
O
O
¢
¢
❑
❑
m
CD II
II
z
Z
Z
z
J
J
¢
a:
}
Z
z II
11
Q
Q
O
O
A
Q
U)
Q N
— If
II
¢
..
N 0•
1- II
-P 11
F-
F-
>
>
Q
Q
K
r
01
m n
m 11
m
m
Q
¢
n
¢
¢
w
w
w
Z
w
m II
111
W
O
J 44
i- 11
a
a
J
J
m
m
O
O
O
O
O
¢
N
6
¢
¢
EJ
11
-P 11
Q
¢
W
W
Q
Q
m
a.
IL
a.
IL
Q
W
> .+
In II
In 11
U
U
q
q
J
J
a7
In
mm
m
IL
O
O
Q
Q
¢
0
F- K
7 11
11
r
.n
.n
w
w
m
cc
Q
.. a.
I- II
II
O
O
O
O
O
O
m
q
O
m
0
>
W
w
>
>
>
z
vQ
Q 11
11
z
z
z
z
z
z
O
O
o
O
o
z
IL
m
o
O
O
Z
Z
Z
E
m 11
u
£
£
£
J
J
J
J
J
m
Z
Z
11
U
U
U
V
U
J
2
Z II
U
A
Q
G
O
O
O
7
"_')
J
J
W
++ ..
W 11
11
,a
m
O
a
O
O
O
O
O
N
0
O
O
O
O
O
O
£
C
In 11
4� II
m
m
N
N
..
N
P
O
-+
.+
.+
T
m
7
�0
N
m
W
a a
W 11
u II
'+
..
..
.a
..
f`1
C1
-+
-+
••
>
¢ II
a II
Q
.y A
d 11
to 11
d
U Q
11
•
0
J
V
❑
I
0
O
111
z
In
►� II
m
It
V
N
01
0
0,
n
m
W
Q
v
wI
W
�i
a If
If
a 'd
o;
m
N
N o
ml
m
m
t:
m
a
of
6
o;
n;
a
�+ II
N
0
�0
-.
0
0•
N
n
0•
v
O
0
0•
�0
m
N
.0
0
II
W 11
O
IN
0
O
m
-0
-0
m
�0
In
m
•+
m
n
0•
0•
O
U'
CL c 11
O
N
3
O
0•
m
0
n
m
0
O
0
m
0-
O
m
m
o II
!L
O
❑
O
U
0
d
O
I•
0
0•
U
0`
P
U 11
Y
O
>
F-
N
O
N
M
.+
-+
O
a
Q
N
m
N
m If
n
n
n
m11
n
=11
-+ If
qT
m
O
'0
N
n
m
n
m
n
O
n
O
In
m
N
O
N
d
�0
N
0
n
O
�0
N
0•
<
O
O
O
O
m II
11 "
N
N
v
0
"
N
^�
et
'+
7
�+
O
N
N
N
N
N0
n
a
,0
N
m
N
O
N
O
N
w
J If
¢
to
.w.
¢
W
•
i
J
V
❑
I
❑
O
111
z
In
�
21
CL
w
W❑
a
W
m
W
Q
v
wI
W
�i
U) z
o: i
w ¢
❑i
W 7
ml
E
0 1
H
(}A 6 N
I
m 0•
F 1
W
O
J I
0 h C
D I
U ¢
¢
F- I
z
m 1
I
Z
ZI
W 4+ ..
W I
W w m
W I
> +Y
C I
¢ •+ N
0_ I
a U ❑
>
i
❑
❑
❑
❑
m
❑
11
w
W❑
W
m
W
W
W
W
II
>
m
>
>
J
>
II
m
3
m
o II
!L
O
❑
O
❑
W
❑
x
x
�
❑
N
q
F- 11
Y
O
>
F-
F
m
0
Q
Q
11
S
N
0
2 m
Z
m
Z
O
Z
❑
O
❑
Q
Z
z
Z
W
m
W
m
W
Z
V
C
W
W
W
If
¢
to
.w.
¢
W
0
0
O
q
0
U
S
V
S
d
2
J
W
W
O
x
x
x
II
W
W
F
F
.a
I-
2
J
Z
F-
f-
F
11
F-
J
Z
F-
m
0:
m
D
Z
D
0
Q
J
D
7
D
II
m
W
Q
w
O
O
O
O
7
O
¢
¢
O
O
O
II
11
O
q
m
O
J
Z
J
In
7
m
S
>
>
J
m
N
m
II
11
Z
0
0
0
❑
O
q
m
❑
w
III
III!r
!Z'
Q
❑
❑
Q
In
Z
11
m
m
Q
Q
C
.•
Q
II
F
z
¢
~
>
J
E II
O
m
O
m
�>+
.>.
H
Oil
>m
O
q
❑
❑
W
W
C
.m.
>
❑
N
II
Z
a¢
0
Z
3
m
m
q
0
¢
li
11
m
U
m
C
2
C
z
z
z
O
O
❑
V
❑
¢
z
Z
If¢
¢
W
W
W
m
C
Z
¢
..
W
W
O
d
¢
W
11
W
z
o
W
0
U
x
x
x
a
a
J
Z
W
o
x
x
J
W
F-
x
-
J
Z
I-
F-
II
¢
m
O
Z
Z
U'
r
J
O
7
II
Q
¢
W
¢
C
O
O
O
O
D
D
O
O
II
if
V
U
q
V
❑
J
Z
Z
m
7
7
x
U
>
J
m
m
11
❑
❑
❑
q
q
C
C
C
x
m
II
❑
❑
❑
q
O
❑
q
q
0
2
C
m
C
C
It
C
Ir
C
II
W
W
W
W
W
m 11
W
O
O
❑
O
O
O
O
O
O
W
W
W
W
W
aw 11
>
V'
0
0
0
V'
V'
0
0
0
C
C
C
C
C
F-11
¢
}
}
W
W
W
W
W
W
W
W
W
V
U
U
U
U
4+ 11
3
3
.
..
..
r
w
..
..
«.
..
m II
Q
x
2
>
>
>>
>
>
>
>
>
Z
Z
Z
Z
Z
11
>
¢
Q
O
O
O
O
O
O
O
O
O
>
>
j
7
D
II
O
CD
x
S
2
x
x
x
2
x
x
7
7
7
?
7
II
Z
W
III
W
U
U
U
U
U
U
U
U
U
II
F-
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
11
¢
m
Q
¢
¢
¢
Q
¢
Q
¢
Q
¢
6
¢
6
¢
Il
J
0
0
O
¢
C
C
C
C
C
m
Et
C
m
N
m
m
m
11
O
O
?
O
O
O
-
O
O
O
O
O
N
O
O
-+
+' it
0`
N
If1
10
n
m
m
0•
O
O
N
N
M
M
u 11
-.
N
N
N
N
N
N
N
m
m
[`')
m
N
N
N
N
N
W II
m 11
It
i
ri
L J
0
0
11
m
01
u
II
►� II
Q 11
n
0�
.0
N II
W II
U
U
�0
O
Q " 11
a qIt
O
P
O
In it
n
o
..
tr
o
►+ II
U II
Q�
IT
�G
� II
II
IS
f`
N
4� II
1
0 11
n
N
N
N
J II
F 11
ri
L J
11
m
II
W
II
Z
II
Q
II
J
0 11
N
F 11
it
q
n
q
z
O
11
w
taJ
w
n
x
11
a D
a
11
o
wa
T n
11
11
to
J 11
Z
11
z
Q 11
It
Q
..
v If
J
11
E 11
O
h 11
0 11
N
E
z
o11
Lill
q
J
W
2 II
11
W
z
II
11
W
N
J
2
Z
II
F
q
�••�
11
11
o
w
0
U
II
lA
q
U
r II
N
z
Ix II
II
oi
11
W
7
cril 11
Ir-
11
11
I:Z1
a
0 11
11
c
¢
�11
r}n
QN
11
s
�c
Q
N D`
F 11
4+ II
W
W
F
01
N 11
a II
W
w
Z
Z
tl
`+ If
d It
m
C
Ir
W
O
J I;
F If
U
U
Q
E
11
11
LL
W
T N
to If
N 11
Z
Z
�+
0
F a
D II
II
Q
Q
J
Q
. 0.
h- 11
If
>
>
Q
Z
U Q
<
U
Q
II
11
fA 11
11
z
Q
it
it
Q
H
11
m
m
>
Z
Z 11
til
W II
II
C
N
O
E
C
(A II
11
Cl
m
L'I
W
m m
W 11
u If
N
N
>
•. p
m 11
m II
11
N
IL
U G
11
0 9
►� n
-.
m
m
a
n
a
a
n
a
o
0
It
a
n
n
o
m
a
II
Z
11
11
.o
ri
rd
ui
rd
.o
ui
m
o
ri
N
P
m
ro
o;
o
-o
¢11
N
a
n
a
N
.o
a
O
0•
o
o
m
11
0
N
3
m ii
(ari
o
.o
o'd
ui
o;
di
o
r;
�
m
of
o4
vi
w
O
O
W
W
F
m
N
G
O 11
>
H
<L
O II
O
M
m
'
0`
O
P
O
N
10
,0
0-
0•
m
O
to
m
a
>
>
¢
O
O
E
F-
r
>
O
Q
II
U) f1
0
0.
.0
m
N
0`
n
O
0`
U
n
n
0Z
a`
O
0�
U
11
Q
V
W
Z
>
H
J
a
❑
2
w
0
�+ 11
0
n
m
H
N
II
O
Q
Q
W
O
>
q
q
>
7
W
nv
Q
v
v
ui
vi
ui
in
ui
,o
,o
,o
,o
.o
.0
.6
-d
.o
F-
t n
N
o
o
Is
at
o•
It
J
•+
W
W
❑
U
Z
++ 11
o•
n
10
n
Is
n
m
m
m
o
o
m
N
a
n
m
N
Z
cm 11
o•
N
m
a
m
o`
o,
❑
n
a
N
m
N
;r
o
o•
..
Ir
F 11
Q
.+
.+
W
..a
Q
O
.w
w
W
cr
N
•r
..
N
M
O
a II
O
❑
cc
J
❑
❑
Z
J
J
>
O
❑
v
J II
Z
11
O
II
Z
II
Q
q
if
M
0
N
3
0
O
W
W
F
m
N
G
O 11
>
H
<L
w
O
F- II
O
a
>
>
¢
O
O
E
F-
r
>
O
Q
II
IX
Q
3
O
3
m
11
Q
V
W
Z
>
H
J
a
❑
2
w
0
H
N
II
O
Q
Q
W
O
>
q
q
>
7
W
Q
q
11111
Z
U'
❑
0
S
O
O
O
F-
Z
v
W
O
O
W
It
J
•+
W
W
❑
U
Z
..
Q
J
W
J
II
J
£
F-
Z
F-
Q
Z
J
J
U
N
m
J
F-
J
J
II
Q
Q
a:
Q
Ir
W
Q
Q
W
W
Q
O
Q
w
W
Q
II
U
U
O
in
O
❑
cc
J
❑
❑
Z
J
J
>
O
❑
v
Z
11
O
II
11
Q
Z
Z
III
Q
II
q
❑
Q
Q
11
Y
—
Q
m
m
11
W
F-
F-
J
J
F-
>
F
W
ii1
m
E
o
M
m
o
❑o
v
0
O
h II
U
O
O
a
w
a
>
>
d
O
£
z
.-i 11
IL If
F-
a
a
Q
J
❑
<
u 11
11
z
m
LO
03H
V
W
Z
>
U
Z
U
S
=
U
m
U
a 11
11
Q
..
w
W
a
Q
F-
If
11
D
N
m
q
O
O
O
O
Q
Q
❑
N
in
W
> If
11
7
Q
O
O
Z
Z
S
S
Z
2
t-
0
U'
Z
W
Q
•+
q It
11
a
F-
U
F-
a
W
W
-
J
IL
O
CL
II
II
Z
—
J
J
£
£
D
Z
£
=)
Q
F-
F-
£
J
—
O
Q
❑ II
it
Q
J
W
W
Q
4
O
Q
Q
O
F-
m
a'
Q
Q
J
N
U
Ill
I
m
Q
A
❑
U
V
m
z
U
m
m
❑
O
V
V
Q
+
F II
11
£
Q
O II
11
7
in if
FW-
If
II
O
❑
O
O
O
In
cn
11
11
4
a
Z
z
Z
¢
Z
Y
Z
Z
Ln
Q N
" II
11
x
Q
Q
¢
m
IX
Y
En 0•
F- II
4� II
F-
a
F-
F
F-
W
>
F-
P
m 11
m II
W
m
Z
¢
O
m
m
m
O
W
O
Q
Z
IL ..
e.y 11
W II
>
m
w
>
W
❑
J II
F. If
Q
O
a.
>
O
❑
m
O
>
a
a
a
W
U
W
J
J
II
y II
a
4
3
a
U.
m
3
Q
Q
Q
-
.+
W
I-
W
>- H
m II
In it
Q
m
V
S
m
—
O
S
V
V
U
>
Z
>
❑
m
0
F- m
> 11
11
It
Q
Q
�-+ a
F- 11
it
>
m
❑
Q
m
Q
W
Q
O
O
O
O
7
O
O
N
Q
U Q
F 11
11
Z
O
z
W
O
U
IL
W
O
Z
Z_
Z
2
7
S
Z
Q
£
m II
11
J
£
F-
J
Q
Z
J
F
£
£
£
Z
Z
Z
£
�a+
11
II
Q
W
4
M
W
..
O
Q
w
Q
Q
Q
Q
Q
Q
Q
J
Z
Z 11 II
J
❑
U
O
❑
>
7
U
O
U
V
V
z
m
a
V
Q
W
42 ..
W II
11
O
N
o
a
u)
O
O
O
O
10
m
N
O
O
O
O
O
£
c
in 11
4• II
m-+
m
N
�+
in
C
O
N
nM
m
N
—
,a
N
r1
W
m m
W II
u 11
�+
!+
N
'+
m
N
N
N
N
N
+
>
_w +>
m 11
w 11
Q
-gym
au
mu
CL
V 0
11
0 0
�+ II
,0
h
m
01
It
01
m
W
-+
m
m
v
N
m
Fn
O
O
N
O II
a ii
o
a
r
o
in
0,
v
r;
ai
ai
t7
0�
I;
N
0i
m
•• If
01
o
..
n
it
v
O
0•
O
O
O
m II
..
N
0
`z'
ri
O
.+
vi
Oi
ai
O
C-
10
IN
�d
�0
w
O
Q II
rd
N
U
0�
W
O
O
V
O
O
W
O
O
N
N
N
m
a
N
U) If
C`
0Z
W
Q
W
O
O
0•
O
O
U
W
0Z
6
0
0
P
II
0.
O
O
O
O
O
U
O
U
0
N
O
tx
N
IN
.0
N
M
m
-t
M
N
N
N
N
N
m
a
C It
7
,0
7
d II
J 11
•
n
n
w
W
w
II
F-
w
w
¢
w
n
x
z
❑
o
❑
❑
n
Q
O
Q
...
lilt
J
>
>
>
w
Q
¢
>
11
m
¢
m
..
Oil
W
m
❑
d'
❑
LL
q
m
❑
m
Q
W
❑
F11
m
Q
Z
F-
>
In
O
m
m
II
J
O
"
❑
❑
3
O
q
I-
❑
w
m
❑
It
0
O
m
Z
Z
x
O
Z
❑
❑
m
Z
"
W
O
Z
II
m
U
>
m
W
W
W
W
Z
z
W
J
F-
m
W
II
W
m
m
W
Q
...
W
a
W
W
U
2
S
O
❑
x
J
a
Q
S
U
O
x
1If 1
«+
m
F-
H
W
F
2
0
a
F-
W
H
F-
11
z
Q
m
O
m
F-
Z
❑
O
Q
"
7
Q
m
z
m
II
7
�+
❑
0
0
O
m
Q
p
.+
W
J
O
❑
0
u�>
z
J
m
z
o
m
m
x❑
Q
m>
a
-�
z
If
11
In
z
W
w
m
m
z
I-
w
11
❑
Q
❑
Q
x
❑
If
>
E 11
'~
m
3
O
..
m
m
N
W
W
oil
m
W
>
❑
W
W
Q
>
❑
O
0
1- 11
I-
q
H
a
0
m
m
❑
m
Q
a
z
F -
z
.+ II
LL. II
m
Q
❑
m
q
a
m
Q
O
O
..
Q
U II
II
❑
£
z
V
O
It
z
0
O
m
W
Q
V
z
m
cr
m it
7
Q
W
Q
W
m
m
...
1•-
.+
>
W
¢
F
II
J
p
.W.
wa
III
En
11
11
a
=
Z
❑
W
x
a.
a.
0
❑
0
z
W
2
u
"
m>
>
J
F-
w
w
z
0
m
£
Z
J
m
Z
Z
J
m
£
m
D
m
Q
Oil
II
Q
.+
O
Q
¢
Q
❑
0
7
W
¢
Q
Q
7
O
0
U
W 11
If
J
S
U
z
V
m
V
z
7
7
❑
a
J
u
Z
m
J
En
Z
ix II
II
III
D
m 11
11
F-
7
11
11
0
11:10
0
❑
Q
En
Oil
If
z
m
Z
Z
m
J
>
Z
z It
II
Q
❑
❑
Q
Q
❑
q
p
q
❑
U)
Q N
" II
It
m
m
m
¢
m
m
m
m
Y
£
m
m
in 01
I- 11
Y 11
F-
m
I-
F-
F-
0•
to If
m 11
m
O
O
m
m
W
m
❑
O
W
m
0
O
Z
It
II
O
O
W
—
>
•+
W
O
J II
f- 11
a
W
0
W
m
a
Q
a
W
W
O
U
m
❑
W
w
II
¢
a
H
Q
¢
..
.+
I-
a
Q
a
••
«•
W
>"
m II
m II
V
>
m
>
❑
U
Q
V
>
>
m
m
z
J
m
>
>
O
H m
D II
11
�+
m
..
..
¢
..
Q
" a
I- n
II
O
O
m
0
W
0
>
0
❑
0
N
q
D
O
A
❑
0
z
V Q
Q 11
11
z
2
0
2
m
z
O
z
2
x
Q
❑
7
z
O
2
2
¢
E- 11
It
`.
V
V
.•
.,
Z
..
v
v
a
..
V
V
£
to 11
11
£
z
J
Z
z
£
£
Z
Z
J
Z
£
J
Z
z
II
11
Q
Q
W
Q
D
Q
¢
Q
Q
¢
J
W
Q
Q
W
Q
¢
Z
Z It
It
V
m
❑
m
7
U
J
V
m
m
¢
❑
m
U
❑
m
m
w n
If
a
O
O
O
O
O
-.
£
m It
11
m
N
01
m
M
N
P
r
O
N
N
O
OWC
W
m m
W II
u 11
M
M
N
>
•M Y
m II
(U II
¢
-gym
an
mu
IL
c) ❑
it
•M
0
W
U'
¢
CL
�
Z
�+
¢
V
tr
¢
F-
H
q
O II
CL 11
m
r-
a
CL
a
a
ui
ui
m
ucri
W
1;
n
ai
F
O
N
�+
a
m
oz
E
6
O
.:
O
m
F
.+
..
m
a
c�
Z
N
Q N
-
❑ II
U) If
m P
F
m
P
w
Z
IL
n
a
a
o;
❑J
J
E
o
o
0
o�
W
> `+
CO
Q
.~+ d
F= -
Z
U ¢
¢
m
P
a
a
a
N
Z
N
N
t o
++ o
a It
r 11
In
..
,OV
m
2
o
N
0
�+
o
o
0
N
P
m
n
N
W
n
n
N
N
n
0
0
o
7
w m
w
>
. +r
Ir
¢
-. m
a
CL
V q
�
s
O II
CL 11
m
r-
a
o;
a
a
ui
ui
m
a
a
1;
n
ai
a
a
O
N
�+
a
m
oz
m 11
N
.0
.:
O
m
0,
.+
..
.p
a
0�
.r
❑ II
U) If
o;
of
m
a
o;
n
Ir
o
o
n
a
a
o;
o
o
a
Ir
a
o;
o
o
0
o�
o
o
r)
c�
n
o;
In
0
In
o
o
m
m
P
a
a
a
o
..
N
N
t o
++ o
a It
r 11
In
..
,OV
m
n
..
N
o
N
0
�+
o
o
0
N
P
m
n
N
o
m
P
N
n
n
N
N
n
0
0
o
7
o
a
N
o
a
N
a
m
N
-+
m
ry
N
N
,o
�
m
�o
a
.•
4
-+
0
a
m
in
.+
c1
0
N
-+
J II
If
11
It
11
11
❑
O
w
❑
A
w
❑
Y
OF
W
O
Q
K
Q
q
H
to
2 Z
¢
m
Q
q
a
11
>
>
W
a
F-
>
J
J
>
>
II
II
w
a
m
❑
Z
III
❑
Z
w¢
Z
u
u
a¢
¢
0
¢
V
O
❑
Z
w
❑
z
W
q
z
W
111
w
Q
z
w
O
D
o
W
O
U'
w
-
❑
z
W
❑
Z
w
It
11
If
it
O
Z
¢
O
J
W
S
F-
>
O
2
F-
>
❑
7
Z
¢
F-
m
Q
F-
Z
W
>
.Z.
E
Q
2
D
O
Q
W
2
Z
D
O
m
H
2
2
n
O
m
¢
q
Q
W
=
j
O
11
J
❑
m
m
m
m
¢
U
m
❑
m
m
m
>
m
q
N
11
11
If
II
W
❑
r1
W
Z
¢
¢
¢
w
¢
W
Z
O
M
W
W
Z
w
O
E II
O II
I- II
q
z
Q
�>i
Q
J
N
Q
«.
w
a
W
m
J
m
O
J
N
F-
m
O
a
z
W
J
H
¢
❑
>
m
LL II
II
11
11
q
a'
J
O
a'
q
z
W
❑
Z
W
❑
D
O
O
m
a
z
W
M
E
J
OL
w
Z
W
O
Z
W
a
In
«+
¢
Q
q
a'
Q
Z
W
LL
"
J
Z
W
II
11
W
J
>
W
J
2
C
Z
2
O
IWn
¢
a
Z
2
¢
F
O
J
2
Q
O
J
111
A
W
W
J
2
7
V
¢
2
=
It
0
M
>
7
Z
0
U
D
N
Z
A
Q
>
m
>
II
11
II
II
11
4+ 11
❑
Ir
Y
W
o
Z
¢
a'
F-
❑
Ir
Y
W
o
Z
Q
C
f-
❑
z
Q
C
F-
❑
¢
o
Z
Q
¢
F-
❑
tr
Y
w
q
w
Y
W
Z
O
>
o
Z
Q
X
F-
❑
Z
Q
it
F-
¢
J
m
E
Q
q
m
w If
d 11
c If
�+ 11
In 11
W
U
Z¢
F-
m
m
.+
a
Q
V
W
It
u
Z¢
W
¢
M
m
a
Q
V
N
a
¢
U
it
Q
IL
N
d
¢
V
W
U
w
Z
W
u
Z
Q
J
W
0
m
d
Q
V
W
Q
Q
m
a
Q
U
¢
N
Q
J
O
CD
H
>
II
11
11
11
D
'7
Z
N
Q
a
-
O
Z
.
E
n
7
Z
>
O
Z
❑
Z
E
O
Z
E
Y
Z
2
O
Z
E
n
7
Z
7
7
2
O
Z
E
❑
Z
E
>
❑
Z
❑
Z
E
❑
Z
E
❑
2
Z
If
Q
J
Q
Q
¢
Q
Q
O
¢
Q
¢
Q
Q
¢
Q
¢
¢
II
4+ It
u 11
CA II
N
-+
N
O
�
-+
a
n
m
N
O
n
-+
.0
W
.o
N
O
IN
n
a
N
N
1n
I7
N
a
N
.w
O
I0
O
I0
-+
7
10
O
N
O
a-
N
m 11
0
w
c�
a
O
z
F
Of
w
a
¢
v
m z
S ¢
H 7
N
Ell Q N
f m U
Z IL -+
W O
S J
W } r
C� F— Ix
Z U¢
Z
E c
W W d
> M •V
C.. U ❑
O
a
N
0
O ❑ n
z m z
¢ Q
m W N
a U a
U Z V
Q
O O
z 7 Z
¢ ¢ ¢
V m V
a o 0
N m an
N
u
• •
.+ u th C) a v n V• a v ID m m V' N r 0 .0
LLQ, tl (11 h n Iri N c1 Iri h ,0 h v 0 P 0 N .0
.. II 7 O .. .. N .. .y .. N 7' ID •. 0 N 0 n P
W N u 0 n h Iri O O0 .+ .0 .0 N �0 P Ili N a
Q
d A 11 ID -0 P P P O -. M n ID P P O O N N N
N U -0 hIf
h h n ID ID ID ID m ID ID P P P P P
.» II ID N N O Q O ,0 N N CI P
.o N N n In
s II O P O 7 O h 10 -0 •0 n .0 P P O P O
42 or 11 M N N N m n V' O fN7 a On U m n 100
G II '+ Rr N N a' N (•1 d
d
If
J II
. u
ii w w w z
If o z x Q
Q a c�
o 11 ., a Q z a a ID a w
~ h 3 N 3 F O Q W Q It.O Q d m m
II 2 J > S m 0 Z •+ z m Q z m w O
B Q } ❑ a N W W J W tr } Z W - E- 0:
no F- z S C� Q Q 2 V S O W w S O O d
II W •. Q U w a F- f- m Q F- W �+
n I- U N z F- " z D Q D J m Q n J w z
If 0: Q Q m J Q O O W O W O W Q O
II O z J A O a N m > m Q z Q m Q 1L 7
za < a 4 Q Z Q S
J m N m ,>., F- F- O J F- �.
H a Q fr H Q O W m m
> a M O a a ¢ F- � a a z I-
U 3 ❑ Q X 0_ Q Q Q J " J Q O m
L) W V 1--H Z V U O E W Q U
W w H «.
Q O A O ❑ J O > O m 7
1- 0 x z o O x z z
Ill
z O z w z
m W w F- .+
a F- O E m E E F- E Z
Ill J J E m N
F- m O a a W O a Q a Q a a O a
M ❑ m U d Q z V V U V U J U z J
EF)
Q Q Q A ¢ ¢ Z
Q
F- F- m F- a A H W F-
m m m M¢ ¢ z W m
W H W m it r
d IL m O O > y m m O O U > O d
a a a a 3 Q Q F- a IL 3 d a
U V O m m x U J O m m Z x m U
O O W m q a ❑ O W N q ¢ D Q q ❑
z z m O O 0 z Z m a O U 7 O O z
E E Z J J F E E Z .a. J Q Z N J E
Q a O W W ¢ Q Q ❑ a 0: W a
U U m O ❑ U
m ID � .. .•. N h �" � .moi P C7 N N O ID
11
II
11
u
a 11
li
LL If
a
o 11
In
K
m II
11
«�
En
11
❑
11
v
ii
a
w ii
U)
z
It It
u
W
D
N 11
11
1-
it
II
O
(n
0 11
II
z
En
¢ N
11
11
m
UI
~
F-
a
N 11
m 11
(A
Z
IL
6t It
`•+
W
❑
J II
F II
d
W
>H
OI 11
m II
V
�a
F-
Fo
11
o
U a
Q
F- It
it
•+
E
ID 1111
II
E
F-
• •
F- II
11
U
Z
z 11
W
111 11
11
0
III
ai> d�
W11
a11m
a
m
a 11
m u
IL
u Q
It
za < a 4 Q Z Q S
J m N m ,>., F- F- O J F- �.
H a Q fr H Q O W m m
> a M O a a ¢ F- � a a z I-
U 3 ❑ Q X 0_ Q Q Q J " J Q O m
L) W V 1--H Z V U O E W Q U
W w H «.
Q O A O ❑ J O > O m 7
1- 0 x z o O x z z
Ill
z O z w z
m W w F- .+
a F- O E m E E F- E Z
Ill J J E m N
F- m O a a W O a Q a Q a a O a
M ❑ m U d Q z V V U V U J U z J
EF)
Q Q Q A ¢ ¢ Z
Q
F- F- m F- a A H W F-
m m m M¢ ¢ z W m
W H W m it r
d IL m O O > y m m O O U > O d
a a a a 3 Q Q F- a IL 3 d a
U V O m m x U J O m m Z x m U
O O W m q a ❑ O W N q ¢ D Q q ❑
z z m O O 0 z Z m a O U 7 O O z
E E Z J J F E E Z .a. J Q Z N J E
Q a O W W ¢ Q Q ❑ a 0: W a
U U m O ❑ U
m ID � .. .•. N h �" � .moi P C7 N N O ID
•
S
• N
o f
-�
m
m
N
o`
o
N
.o
,o
.•
N
01
m
N
m
m
a 11
a
ri a 1:
�
m
c
o
ri
tri
a
o;
c;
o;
of
o
of
�+ II
-+
N
0•
O.
O
a
P
m
0•
�o
N
P
O
0
10
-+
O
Q 11
m 11
w
o ii
M
`�
`�
1H
m
N
NN
m
m
m
m
m
IL
U3 n
0-
o;
0;
0'
0;
0'
0-
D,
a
0�
o4
C;
a
o
o
�
a
�+ II
N
N
P
O
0
O
m
N
Co
,o
N
m
M
�o
m
N
Q
ri
=if
0
O
m
d'
0
N
07
O
N
N
O
O
O
O
7
,0
++ II
C
N
N
m
N
O
N
m
O
N
m
m
O
O
�o
N
m
m II
m
N
M
N
m
"
N
01
7
O
U
O
O
O
7
—
N
m 1
N
10
N
�c
N
N
N
N
N
M
..
J II
•
II
11
0
11
Q
0:
Z
W
W
W
a
0
II
m
Q
Q
II
N
3
J
Ir
N
N
.>r
�+
Q
O 11
M
Wo
q
❑
N
F n
a
(Wn
¢
o
o
a
a
II
Q
O
O
J
a
a
Q
U
A
A
A
J
It
A
U
a
W
7
O
O
m
m
U
U
z
Z
Z
A
O
A
11
w
W
o
0
m
u
'"
"
a
w
w
w
m
m
z
O
W
11
z
A
w
owi
d
W
o
o
z
F-
x
2
x
w
w
ll
m"
"
a
�••�
r.
11
Q
E
Z
II
W
Q
Q
2
`r
]
w
W
W
Q
1-
O
O
O
Q
Q
W
II
❑
U
m
m
>
7
>
A
Q
U
N
N
m
N
>
V
A
II
z
II
0
II
11
q
❑
A
A
❑
m
❑
O
>
II
q
Q
q
Q
O
Z O
Q
II
Q
H
r
..
Q
Q
r
m
J
F->
>
m
>
J
>
F-
W
E If
Z
.>.
m
❑
o II
m
Q
q
Ir
❑
N
W
A
N
A
H
o
s 11
O
o
❑
F
In
a
E
o
It
a
LL 1
N
A
m
A
F-
❑
•+
A
A
A
Q
Q
m
Q
Cl 1
.LL.
Zm
❑
Z
❑
m
z
E
O
z
Z
Z
V
U
m
It
m
W
m
w
Z
W
W
W
W
r
F-
II
11
Q
N
p
J
N
> n
n
Q
x
o
w
x
j
¢
x
a
z
x
x
x
o
m 11
it
F-
J
F-
x
a
F-
>
F-
1-
F-
..
O
CL
Q
<
.a+
m
J
J
O
G
�+
O
F-
Z
m
7
O
E
O
J
Q
A II
II
Q
Z
U
w 11
If
>
q
>
N
2
Q
(00
V
7
Z
N
N
U
.N-�
A
F 11
zQ
E
O II
II
~
II
IIJ
Z
U
Z
z
z
z
2
¢
C(0
>
z
z II
11
m
Q
O
A
Q
O
Q
Q
❑
En
Q N
." II
II
E
m
.+
m
m
m
U3 0�
F- 11
+> II
Q
I..
>
>
F
IX
H
W
W
W
Z
P
m II
II
m
N
Q
W
O
O
Q
w
m
O
W
w
W
LL.
a
W
O
J it
t- II
m
O
a
J
Q
W
W
J
a
a:
a
W
U
U
U
E
J
II
4� II
Q
a
Q
W
W
> •+
m II
m II
J
mU
q
Q
>
>
p
V
a
U
>
z
2
z
m
N
0
F- a'
:)II
II
�•+
r
Q
" a
F• 11
It
O
m
O
O
>
O
O
O
O
?
O
O
7
7
7
N
N
U Q
O
N
O
x
2
Z
z
z
Z
2
7
7
7
Q
Q
Q
F- 11
II
.z+
,z.
Z
E
m II
11
E
J
E
E
2
Z
Z
E
E
E
Z
Z
Z
Z
H
N
II
it
Q
W
Q
Q
Q
Q
Q
Q
Q
O
Q
Q
Q
Q
Q
J
J
z
z 11
W
4�
W II
11
O
N
-+
a
O
O
O
O
.0
O
0
O
O
O
O
O
E
c
U] II
4+ II
N
N
.0
O
N
N
N
v
m
U
N
M
—
r7
N
W
a s
W II
u II
.+
..
..
M
M
..
N
N
N
N
>
41
m II
d II
Q
-gym
au
to 11
a
u❑
11
0
z M
Q ❑
r m
m T
H q
a.A
V H
I-
U) z m
£ Q O
w 7 in
F- 7
> z z
in N �
Z LL 0 rm.
W O J
0U' 1T- ¢ ❑
Q H a 1-
zQ U Q H
£ m
W 4- .. W
W w w W
> N y It
Q .. m a.
a V A
0
0
"' II
IL 11
0
ai
0`
I:
0
Ir
v
m
D`
0)
m
m
0•
o;
-+
,o
m
o
n
ao
n
o
0
N
0,
N
m
o
m
ao
N
�
IT
6
"if
m 11
m
a
n
o
n
m
0
o
0•
m
m
N
o•
o
in
m
o
o
N
o;
o
o
N
it
n
o
,o
0
w II
A 11
m 11
m
0`
0�
a;
P
o;
01
o;
0•
o
01
o;
0•
0;
O
o
O
o
O
a
O
o
O
a
O
a
O
o
O
0
O
o
O
a
U II
It
11
('I
r,
O
r,
N
I`
m
r,a
N
�
0`
0
.+
r;
0`
ui
0
o
•
of
O
r-�
0
r;
.+
r-�
f7
m
N
m
t o
y n
W II
o
In
.r
0
In
0,
m
N
In
o
7
m
n
.N-1
N
..
t o
O
,o
N
In
o`
01
a
m
.N.
v
m
.A.
M
n
D.
—
.moi
m
N
.N.
O
-0
ry
-o
N
(V
o,
n
n
..
-•
J 11
II
It
II
u
II
w
❑
H
>
Y
W
W
q
>
W
z
Q
J
T
W
❑
H
>
W
Z
Q
J
W
z
Q
J
O II
~ 11
II
0
❑
O K
.~i
O
U
A
z
>
~
>
Q
N
O
T
>
Q
T
13i
Q
A
II
II
II
II
z
W
S
Ix
W
V
z
Q
7
W
S
¢
0:
w
U
Q
H
>
O
z
W
2
Q
W
Z
Q
o
Q
H
>
O
2
Q
0
(09
w
H
A
z
W
2
❑
z
W
A
z
Q
J
z
W
S
z
W
S
II
a
11
11
F
m
0O
Z
m
J
z
Q
m
F-
o
O
m
m
0
J
Z
Q
J
F
D
O
m
J
J
Q
u
w
1-
m
O
Z
Q
J
w
r
m
O
z
Q
m
F
lx
0
z
❑
Q
W
A
2
o
`+
S
E-
0
O
m
F
W
O
Z
11
II
if
E II
to
q
W
0
W
q
En
z
J
T
En
z
J
a
¢
m
En
z
J
O If
F 11
LL II
II
0
F-
H
x
m
A
W
Q
H
O
p
a
w
3
2
❑
❑
W
0:
U
Z
O
T
z
x
❑
')
N
>
O
T
z
0:
7
❑
Z
3
LL
O
0
N
❑
Z
¢
W
m
O
Y
¢
0_
❑
Z
II
II
II
11
W
U
m
2
¢
W
m
Q
b
O
J
Q
a9
W
N
W
J
J
W
O
Q
❑
7
Z
Q
W
J
J
0
2
V
Z
Q
w
J
J
w
2
F
D
.W.
❑
Z
W
2
f-
D
W
0.
H
Z
T
Z
W
S
W
2
F
D
II
II
II
O
J
O
Z
H
>
W
0
m
0
Q
>
w
❑
Q
m
Q
U
Q
0:
Q
V
O
m
Q
m
O
m
D
7
O
❑
O
m
it
II
II
.N 11
❑
w
A
¢
z
Q
0:
❑
¢
z
Y
¢
Y
❑
w
Im
z
Q
0:
z
z
Q
0:
Y
A
0:
z
Q
S
Q
a II
a
t- If
v II
0
0
w
H
O
0
w
H
w
>
Q
m
H
(L
0
0
w
W
M
u
W
�
c)
w
>
Q
w
>
¢
❑
T
❑
O
V'
w
m
a
m
+
a
W
11
0
U
O
U'
w
m
H
a
w
H
a.
(nil
11
11
>
O
2
>
0
2
.Q.
>
o
V
0
z
>
O
2
z
D
-)
Z
D
�
Q
>
o
Q
j
o
¢
Q
w
>
O
2
U
O
Z
V
❑
z
z
�
>
O
2
U
O
z
V
❑
z
II
II
II
11
U
z
Q
m
U
z
Q
Z
Q
J
H
£
Q
U
U
Z
Q
m
z
Q
m
z
Q
m
Z
Q
J
z
Q
J
J
Q
V
z
Q
0:
Z
Q
U
£
Q
U
Z
Q
m
Z
Q
m
£
Q
U
£
Q
U
u
v u
u II
W If
o
m
N
-+
m
N
o
n
'.
n
n
o
n
N
-+
N
In
m
N
o
m
.-�
o
0•
-.
o
o
N
o
,o
N
a
a
o
n
a
m
N
o
-.
m
o
0
It
N
N II
a
all
n
.
CIL t
►� 11
10 N
O
Q II
N 11
'+ t11
fn
W
If
M
11
O O
O
a
o
In i
o 0
0
V II
� if
n n
n
s II
n
N
++ II
n N
N
O
a II
N M
.+
d II
N
N
J If
•
11
It
II
FO [A
❑
II
W z
q
II
7 Q
..
If
O
0 11
¢ a
❑
F- II
W
II
¢ z
z
ii
o w
w
If
�+ =
2
II
w
5
11
Q (00
N
II
OF
fl
N
q
z
It
If
w
J
E 11
O
¢
0 If
a m
w
(A
Z
'+ 11
IL II
❑ Q
O
II
W O
Fes-
II
W
En
r 11
11
x
a
II
F- Z
�+
II
Q
❑ 11
> j
O
U
II
z Q
7
F II
11
E
¢
o 11
N
II
~
7
II
O O
EO
II
¢
>.
Z
z II
¢
q
N
6 N
11
11
w m
tr
N 0•
1- 11
11
F- 1-
F-
0•
O it
m If
N N
O
Z
LL
H 11
N If
O
W
O
J V
F II
0_ 0,
w
W
> rJr
W II
U) 11
U U
>
O
F I
J 11
11
a
F- u
n
o 0
0
U ¢
Q
F- II
If
.Z. .Z•.
U
O 11
II
< <
z
F-
• •
F- 11
If
U V
(r
z
z It
W
4+• •
W II
it
�0 O
r+
C
t•A If
11
fn .0
O
W
W W
W II
u 11
[`)
Q
'+ N
a II
N II
C
U ❑
11
0
0
a
O
a
m
a
N
on
a_ it
Ci
N
N
c7
cf•
In
N
In
ui
o'
vv
a'
In
Iri
Ci
Ili
ri
a
O
a
"
N
.0
,0
0
a
a
-+
N
n
N
a
10
U) 11
O
O
O
O
-+
.+
..
..
,•.
.•.
.�.
N
N
N
M
M
.
M
W
II
O
c
If
O
m
a
.0
M
O
O
IN
O
a
In
a
O
N
M
O
O
O
m 11
m
0
1`
0
m
O
O
a
O
U
a
m
O
U
oz
O
O
ll
N
m
M
M
N
'+
N
m
0
-•
O
O
a
M
n
O
M
U
1 11
0
O
a
m
m
a
n
m
0
m
m
a
O
m
a
y II
ad
M
vtO
,O
n
Dn
U
m
n
n
M
N
M
nII
If
0
a
N
M
•.
..
J If
•
II
O
W
II
W
Z
K
I-
W
Z
W
W
If
q
Z
¢
W
2
z
Q
❑
Z
11
N
II
m
O
3
0:
r
m
�+
0 3
q
W
a
�+
a:
w
m
a
¢
�+
❑
a
1- 11
r
r
o
a
w
Q
z
¢
a
II
H
3
3
d
Q
O
o
¢
¢
O
J
O
o
Il'
Q
O
O
II
m
2
2
w
Z
0
Z
U
0
O
Z
W
U
z
Z
W
w
W
Q
W
V
r
W
F
W
W
II
N
Q
Q
p
qM
II
Q
0
0
O
2
n
2
Z
Q
W
W
2
O
Z
2
2
II
IL
W
w
f•
h
rr
Z
m
h-
Wf-
II
�
I-
I-
J
O
z
m
2
WZ
¢
m
n
m
E
¢
O
If
J
m
m
W
O
¢
O
¢
>
¢
�+
7
O
¢
Q
O
O
I]<
O
O
In
to
m
Z
U
Q
m
>
z
m
0_
U
Z
m
II
II
Z
W
W
W
W
W
W
Ir
-
I.-
<
<
a
❑
z
z
Z❑
W
2
II
<
N
H
>
J
J
J
>
d
H
r
Ir
E
O II
Q
'+
❑
q
a
a
m
a
❑
m
m
13i
5
O
I- II
m
O
IL
I-
❑
H
W
z
K
z
II
w II
M
d
¢
q
❑
q
Q
.+
❑
q
..
Q
O
I-
O
¢
¢
II
II
w
H
U
z
Z
z
Z
r-
Z
z
m
z
m
0
d
(¢A
W
W
W
W
•+
W
W
Z
�+
Q
r
W
I-
II
II
p
O
J
J
q
In
q II
II
W
O
z
x
2
2
2
2
x
J
W
¢
q
Z
I-
1-
r
x
r
z
m
a
w
a
11
11
in
J
E
D
>
>
I-
¢
a:
❑
I-
w
z
z
x
Q
❑ 11
11
Q
W
Q
O
O
O
O
O
O
H
H
U
II
11
a
Q
U
m
Z
m
m
U
Z
z
2
U
Q
Z
Q
N
a
ca
Q
A II
II
W
D
in II
II
F-
•7
II
II
O
O
O
O
O
O
O
O
O
O
m
C9 II
II
z
z
zZ
z
Z
z
Z
z
Z
>
z
z 11
11
Q
Q
Q
Q
Q
Q
Q
O
Q
Q
Q
N
Q N
r It
11
lY
tr
a
0:
IZ
0:
2
m a
f- 11
y II
I-
H
I-
f-
H
¢
f-
N
I-
I-
I..
E-
a
m it
w II
m
m
m
m
m
m
m
O
m
in
in
W
If
r- II
J
t
O
a
O
0.
II.
a
a
¢
a
m
w
O
m
O
O
IL
a
S
J
11
y 11
0.
Q
a
¢
Q
Q
Q
Q
Q
¢
1L
Q
0_
m
¢
Q
W
r r
to II
m II
m
U
m
V
V
U
U
0_
V
U
>
m
V
m
m
V
V
O.'
Q
�-+ 0.
It
!z
II
I9
O
m
O
O
O
O
r
O
O
O
Im
O
m
m
O
O
z
U<
II
110
z
O
z
z
z
z
z
z
z
x
O
z
O
O
z
z
Q
r II
If
N
1••1
M
M
M
W
1••1
N
U
M
N
M
m If
It
J
m
J
E
s
r-
r
2
s
Z
J
r
J
J
s
s
II
11
W
Q
W
¢
Q
¢
Q
O
Q
Q
Q
W
Q
W
W
¢
Q
Z
••
Il
11
❑
U
O
U
U
U
U
q
V
V
m
❑
U
q
q
U
U
2
f
II
11
O
O
N
�0
a
a
a
O
.0
'+
O
O
O
O
N
O
O
C
iWA
y II
M
n
n
I0
In
a
In
n
N
a
.0
O
ti
n
m
W
tv a
W II
u tl
>
�y
a it
m 11
Q
m
a u
m n
a
U a
it
•
•
n
t
.o
.o
N
..
m
It
t
t
o
m
o
m
a
t
01
N
• N
0 11
a 11
10
'0
10
lr�
.o
6
.o
6
of
r�
m
r�
6
.o
r�
I-:
m
o-
a
o
-.
-.
.0
.+
ro
ri
a
In
In
o
n
o
m if
t
v
Cr
at
N
vi
vi
16
.0
.o
.o
.o
.o
.o
o
6
r�
w
ca
a
o 11
M
.0
N
t
o
m
o,
N
m
01
0
N
a
o
P
o
ll
ED 11
ai
o4
o;
o
o;
r�
13
ai
o`
m
o
ai
o;
C�
o
r�
1
o
m
o�
o-
-+
m
N
N
.+
N
a
N
N
m
�o
o
0
m ri
r:
.Ji
.o
r�
1,.�
�o
6
o
6
r�
r�r�
r;
fl�
11i
r�
Id
t o
,o
0
o
t
N
t
-+
o
N
o
N
N
.o
0
01
o
o-
4� If
N
m
0
m
O
N
m
.0
N
0
.+
0
N
o
N
N
0
m 11
Q
01
�o
N
0•
N
t
t
t
'+
M
t
01
t
N
w II
N
t
t
J 11
•It
II
III
A
❑
O
O
11
Q
Q
.+
H
II
J
F•
X
>
O
F-
>
>
=
Z
>
It
m
a
❑
O
m
3
Z
m
F
o u
t
w
a
p q
z
�
tl
❑
m
w
w
Jr
0
o
F- II
❑
m
0
Q
W
O
O
m
O
H
£
11
a
a
❑
J
m
O
❑
a
1L
❑
I••I
11
Z
m
O
W
Z
O
>
m
U'
Z
m
O
H
Z
a
m
J
11
W
"
m
❑
W
x
W
W
w
IY
J
W
Z
a'
n
m
W
.+
o
o
.+
m
w
Q
w
w>
u
x
❑
(L
m
x
w
x
❑
❑
x
❑
a
V
x
t)
F
a
f-
J
cJ
F
..
F-
❑
II
O
J
Z
"
O
J
z
J
z
m
J
z
Q
7
Q
m
V
II
O
W
D
x
❑
Q
Q
W
Q
O
W
7
•+
O
W
O
11
m
❑
m
m
U
z
❑
m
z
❑
7
>
m
❑
J
z
II
z
11
O
11
�+
itz
it>W
Q
z
W
z
O
W
II
<
❑
z
❑
Q
J
Q
¢
¢
11
F-
E ll
m
N
a
❑
m
m
m
0
�•+
m
O
0 11
M111
-t
z
«+ n
a 11
Q
F-
m
a
Q
0
Q
a
J
❑
Q
(L
J
❑
u
Q
a n
11
c)
m
m
o
❑
z
0
m
w
o
z
m
W
Z
U
m
m n
11
Q
..
m
w
..
¢
cr
w
..
w
a
F-
II
11
o
N
'7
q
W
m
O
0
W
O
A
O
m
> II
11
Z
Q
Z
❑
a
-
x
z
O
V
W
x
z
O
z
x
F-
a
11
It
£
N
J
z
O
O
£
J
m
J
O
£
J
£
m
Q
Q
❑ II
If
Q
J
Q
W
D
N
O
Q
W
O
Q
O
Q
W
Q
O
F-
U
F"
It
U
Q
J
q
7
m
V
0
J
U
m
V
❑
V
z
m
En
z
£
Q
O II 11
W
7
m II
If
m
F-
7
II
11
❑
❑
❑
Q
O
O
m
Oil
11
0:
Z
z
Z
0:
J
z
z
Y
z
z 11
11
O
Q
O
q
❑
❑
q
Q
❑
Q
U')
Q N
.. II
11
Q
a
+
m
Q
m
m
£
Q
o
a
m 0.
1- 11
++ 11
2
>
F-
>
m
Q
F-
I-
F
P
m 11
al 11
W.
Q
m
Q
O
It
O
O
m
m
z
O
m
Z
LL
m It
W
r
111
W
O
J II
F It
m
J
a
J
W
W
m
>
>
W
m
a
O
W
11.
£
J
Il
4+ II
W
Q
W
F+
F-
3
3
F-
Q
It
..
Q
W
>—
m II
m 11
❑
Q
V
❑
>
m
❑
x
2
>
m
0
F- a:
7 11
It
m
¢
J
Q
"a
F- II
11
W
O
O
O
O
N
W
Q
Q
O
N
O
O
O
Q
O
O
V Q
II
II
Z
N
x
Q
a
0
U'
x
Q
x
z
z
U
x
z
1¢-
a.
rZ.�
CL
£
m n
11
z
£
£
£
z
z
I-
F-
z
z
E
s
Q
z
E
II
It
7
Q
Q
Q
Q
J
n
Q:
m
Q
J
Q
Q
Q
Q
Q
F-
Z 11
II
7
V
V
U
m
Q
7
O
W
4+ ..
W 11
11
O
O
t
t
O
O
O
t
O
O
O
O
r
O
-+
m
£
r
m 11
4+ It
m
N
m
N
O
m
It
0
m
m
t
O
-+
t`
rl
m
m
LJ
m m
W 11
u 11
rJ
..
.+
rJ
.+
M
N
N
N
rJ
N
'>
•m 4.
m II
d 11
Q
- +m
au
mu
a
cJ o
11
•"
0
W
C9
Q
a
0 9
n m W P m
a 11 ri m m m o- .0 in D` 0Z m 0� 1� O) P o4 o` Un
Q 11
Ulu n n m m W m m W m W P P P P P P O
" II P P O m M O m P n P O n O W O P O
❑ 11
U) II N 0� o a o- o o� 0, o� o� o; a o a o a o
n ..
N H N �O P M P P +
U 11
Ix u .o r r: r: m v -o I: co .o r ui m n: r: r�
r 11
O
N
,0
Q
QI
n
m
Fes-
I
0
I
►m+
R>J
O
O
6
❑I
U
(7
F I
U) Z
¢I
2: Q
01
W 7
ml
r 7
I
m
z1i
r z
0
in 03a,
m
a II
�
10
N
7- w ..
N
O
J
£ J
I
0
m
P
0
a .~+ a
r'-
U Q
N
4
F-
E
m
in
2
Z
W +� ••
W
+
co
W m a
•+
y . +1
cc
Q +m
al
0. U 0
0 9
n m W P m
a 11 ri m m m o- .0 in D` 0Z m 0� 1� O) P o4 o` Un
Q 11
Ulu n n m m W m m W m W P P P P P P O
" II P P O m M O m P n P O n O W O P O
❑ 11
U) II N 0� o a o- o o� 0, o� o� o; a o a o a o
n ..
N H N �O P M P P +
U 11
Ix u .o r r: r: m v -o I: co .o r ui m n: r: r�
r 11
O
N
,0
�a
m
n
o
P
'+
0
P
O
a
O
O
O
Q
++ If
(7
N
0
v
P
,0
m
m
n
v
m
0
O
0
o
m
a II
m
10
N
0
m
P
n
O
0
m
P
0
O
•+
+
N
in
N
N
+
N
N
•+
N
N
N
.-i
J II
n
n
ii
w❑
z
a
z
11
Y
.a
w
Q
Q
11
W>
>
J
J
11
W
O
W
..
m
o It
>
Ix
>
w
❑
O
Q
>
N
N
H II
h
Q
Q
❑
U
II
m
❑
p
U
❑
❑
3
II
Q
❑
❑
w
Z
Z
w
2
U
Q
Z
❑
Z
S
11
Q
�+
Z
z
Z
Z
4
Q
m
Q
Wm
III
W
aW
Z
W
11
>
Q
W
W
W
>
>
W
a
II
z
Z
O
J
W
W
7
2
U
2
O
S
S
11
Q
Z
2
p
❑
J
J
F
m ¢
Z
❑
H
W
W
D
n
11
Q
Q
�+
W
W
Q
¢
¢
O
O
O
F
Q
O
W
❑
w
11
11
J
J
S
p
❑
U
>
m
m
J
m
m
J
W
❑
In
O
If
in
11
Ix
z
III
III
III
it
Q
p
p
p
z
11
Q
Q
s
z
Q
x
..
Q
II
It
J
E
Z
W
N
W
¢
O
O
11
>
W
p
N
>
I-
>
wO
O
❑
Q
O_
.Qi
Q
m
w
LL 11
3
a
LL
Q
O
p
3
❑
p
11
2
❑
O
m
H
Z
U
D
Z
2
a
O
>
Z
Z
Q
m
It
ct:
m
"
J
Q
Ow
•
K
W
W
Z
Q
11
a
W
I5
Q
D
O
W
Q
>
W
O
W
II
O
W
a
O
U
7
z
m
2
U'
O
a
2
2
2
W
II
W
J
I-
W
Z
•
U
F-
l-
II
11
F-
J
Z
J
Q
Z
E
a
O:
f-
Z
Z
>
>
Q
J
11
Q
O
W
—
a
Q
"
O
o:
a
7
Q
O
O
w
a
II
O
>
7
❑
>
m
U
>
Z
O
J
7
¢
m
m
❑
U
II
11
m
11
z
m
U
a:
-1
m
m
z
m
x
II¢
m
Y
¢
E
Y
¢
s
Y
Y
Y
y II
F-
W
Q
W
W
F
W
W
W
oil
m
W
O
¢
W
W
W
O
O
W
m
O
W
W
W
W
oil
"
w
O
>
m
>
O
0
C
"
>
It
It
O
>
c. 11
a
U
w
m
a
U
Q
w
w
U
a
0
U
U
U
a
4111
Q
•.
F-
a
..
..
m n
U
zQ
>
m
J
a
zQ
H
>
>
z
U
m
z
z
z
Q
11
❑
7
❑
N
O
>
7
>
❑
O
n
O
7
>
>
>
11
Z
7
2
Q
Z
O
O
2
S
7
Z
W
O
11
.
U
a
"
z
Z
U
U
N
J
z
11
E
Z
Z
i
E
z
Z
Z
Z
E
J
z
Z
z
II
Q
Q
Q
J
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
It
U
in
m
Q
U
J
m
J
m
m
m
U
U
m
m
m
J
n
N
N
O
O
O
O
O
O
O
O
O
d
O
O
R
N
O
4+ 11
W
In
N
m
—
n
P
n
N
m
O
m
m
m
P
U
N
-+
N
N
N
N
N
N
N
-+
11
mn 11
d'
a H
IT
IT
U
•+ it
O
O
O
au
NII
O
O
O
C'!
�+ II
m
N
O
d
A II
NII
P
P
O
n
..
If
V)
O
0
U II
If
II
n
N
0
11
0
10
M
+� 11
O
In
n
II
N
C
Q
a If
J 11
•
n
u
A
If
w
n
A
n
••
n
>
If
.+
A
It
T
f
0
11 z
i
D
n
w
v
n
w
11
N
►_-
W
11
o
¢
II
N
>
O
It
If
N
II
W
II
Z
II
Q
11
J
E 11
O
o II
N
T
it
0
Z
11
LL 11
A
m
II
W
(D
II
¢
Q
En
TII
II
z
W
w
�+
q II
If
F-
J
J
Q
A II
II
O
Q
Q
U
II
N
>
U
II
a
O II
II
N II
F
'=J
II
A
T
z
z II
II
A
CO
Q N
If
II
Y
cc
N
If
III
F-
P
N 11
m W
W
0
Z
LL
II
m II
¢
>
O
111
A
J
U
¢
r
J
II
� II
.w.
W
> i-+
N II
N If
Z
Q
>
D n
It
¢
.�
.. a
t- u
u
>
>
o
U Q
F 11
11
Z
U
N
II
11
Q
Q
Q
F-
Z
Z II
W
W II
11
O
O
E
c
N II
If
0
O
�o
W
m w
W II
u 11
N
-+
N
>
¢ II
a II
a 11
N
IL
U A
11
w
0 0
r 11 M N It 10 m a N m m O
oil
CL n cv ni ri ri ri v v v v ui Iri N N ui N ui N
U) II O O O O r1 + N
A 11 to D. O 0 M M 0 a P O O N •+ O 0` N O
to II �0 N m U 0• m 0• U m O O 0• m O 0 O
" II m M N M N O O O
U It
it It v ui t` 0 v ri ri ri ri Ol ri ri N 6 N ri ri
F 11 0 a O N O ,0 N m .0 0, N N N .. .. 01 m
1p II �a N . O N N N to O N N N .. m O N
= 11 M m N a N O N M N 0 0 O a N 01 .+ M
r II M N
J II
O
If Q O 0 D C Q I 4
II } 0_ F- } J 6 J
II m .�
Oil .. q w w LL ¢ �•+ tai a O� ¢ a
r II } } ❑ a ¢ z w a w 0:
II 3 3 F- Il ¢ q J O O O ¢ Q ❑ 0 N 0: ❑
II x x CO m V Z O 0 a V 0 Z > W Z
11 .+
II Q Q N m O W m O .w.+ a: H q ❑ .+ W F- W
II 0 0 ¢ O Z x W 0 W Q • Z ❑ x x O x
II W W a. r F- m Z �-+ F- U w I.-
IIF- Z m Z W E Z M Z m 7
II Cr m J W Q O .. Q 7 Q > Q Q O Q Q O
11 O O Q ❑ U In > m Z m Q U m Z M a_ N
11
II
II 0 ❑ a Q m m m m l'-
11 Z W W W W W W W I- 0:
it Q 0 q 0 Z z Z Z x W
it It H H H
E J JJ OIIIn¢>
In o
0 11
¢
f 11 0 a- m ❑ 1- F- O z w
iiEn U W z m z A Z E z Z E m Z z
II F- W W Z W w w�•+ �•+
11 m O N ¢ J J❑ W W X ❑
II Cl Z O x Q x J x x x O x x W -
11 w F- a. F- x F- } I- F- } I- F- m Z
II J E m ❑ .. o_ 0 Cr F- 7 X F- J 7 7 ¢ w
II W Q ¢ O J O - O H O O W O O > >
11 ❑ U a_ m Q z x z U m z U m m m z Q
n
ii
11 ❑ O O 0 O O O ❑ O
II z Z z z z Z Z ¢ Z
IF Q ¢ Q q Q Q Q Q ¢
11 0: ¢ a: 0: a: a_ o m ¢ it
+> 11 F- F- F F- F- I- m F- ¢ F-
a, 11 In m m 0 m m m mm m
N II — �-+ i -r 0 N w w 5 ♦r
F- n a_ o ❑ a 0 a w a. 0 n. a m } a M o a
r it ¢ a IL ¢ n ¢ - Q m Q ¢ ¢ 3 Q a. Q
N n U In N ci In U > 3 Zn U 0 a. x U O m 0
II 0 m m O m O O O m 0 O } Q 0 w m O
11 z 0 O z 0 z x z O z z z 0 z 0. O z
11 — ...1 .. u .. .. .. W w .. .-� ..
HE J J E J E z E J E E x F- E z J E
11 Q w W Q w Q Q Q w Q Q O D: Q D w ¢
Il U ❑ q V A U D: U ❑ U U A O U 7 A V
II O N O 10 N a O .. O It 0 O a IT O O O
4J 11 u 11 m .-i ,moi N ti N N N U 10 N an N Cr O 10
N II M CJ M
N It
¢
oil
a If
H
m II
U
w it
F 11
E
¢
o If
w
D
mu
F-
7
11
(n
Oil
?
0 0
m
m
01
o
N
a. If
6
.o
0
0
o
u
�d
o
o-
o
.o
o
m 11
ri
ro
v
o
ui
v
ui
vi
ri
t;
v
o
o
w
c�
CIL
U) II
O
O
6
P
0`
0z
UZ
O
O
h
n
t•
m
0)
0Z
0Z
11
•+ 11
O
�0
O
-0
N
m
01
m
'+
f7
n
0
P
N
a
O
O
z 11
n
a
n
In
o
0
0
.d
n
m
o
-o
n
n
n
n
n
s II
m
IA
.0
0
O
O
O
C
N
0•
0
O
ct
�0
n
O
N
p 11
O
0
n
n
0
m
0
N
O
n
O
[)
m
C7
-.
m
O
c" 11
m
0-
.0
0-
n
0•
.0
.-�
.+
n
N
M
N
M
It
tT
•+
r It
-'
N
a
CI
N
t
N
-+
N
N
m 11
J 11
•
II
II
W
W
W
W
II
A
Z
A
z
If
H
J
II
>
F
F
O
>
J
.¢r
m
II
O}
m
m
m
A
�+
t-
Z
m
o
A
7
A
cr
H II
O
O
O
wQ
£
1-
Q
0
O
0
m
11
A
M
A
0-
a_
J
A
A
-
m
w
a.
"
11
W
Q
W
Z
w
O
O
z
z
J
W
�+
m
m
O
N
w
w
O
11
w
m
m
W
>
7
Q
M
W
W
11
F
❑
O
m
w
2
x
I-
z
m
U
O
V
a.
16-J
A
a.
II
w
J
O
Q
J
J
z
J
>
j
V
N
.
Q
J
m
Z
II
0
Q
O
W
W
W
D
Q
O
O
¢
x
"
W
O
D
11
z
v
m
A
A
A
7
V
N
N
z
J
m
>
A
J
7
11
z
11
O
II
II
Z
¢
O
Z
Q
z
W
W
It
¢
Z
¢
Q
A
A
F-
O
>
>
0 11
K
0
w
A
D:
m
A
l3i
A
A
❑
1- II
U
a
a
1-
£
w¢
Y
O
m
Q
Z
11
LL II
O
Q
J
Q
F-
m
¢
¢
U
3
a.
Q
J
A
A
K
Oa. II
11
W
Q
V
w
U
m
U
O
a_
V
2
m
U
O
Z
Z
a
o
w
w
n
11
D
❑
0
0
N
m
w
}
¢
p
0
rn
11
It
A
7
Z
Z
Z
Q
Z
-
IL
z
0
0
z
w
x
x
n
IL
Q
o
«.
w
¢
w
«.
J
1 --
IL
II
11
Z
Z
£
£
£
O
z
x
Q
1-
J
£
J
m
O
Q
Oil
11
¢
Q
Q
Q
Q
J
Q
N
7
O
1-
m
W
Q
Q
O
O
V
11111
11
m
m
U
U
V
Q
J
�+
7
A
N
O
A
U
V
z
m
to
z
¢ II
II
F
7
m If
11 O
A
O
O
O
O
Q
Z 11
11
Z
Z
Z
Z
z
J
>
Z
z¢
z
m
¢ N
�+ 11
II
0:
¢
Q
¢
¢
¢
m
—O
x
x
¢
in U
f II
4+ II
f-
it
0•
ami
m 11
w
d 11
W
z
Q
p
Vl
I~If
N
Q
¢
O
O
Z
IL
>
W
0:
fr
C'J
w
n.�
�..
O
0
w
O~
J If
4 11
0-
Q
Ul
O
>
J
a_
W
a
a
a_
J
N
w
w
£
J
II
4+ II
Q
IL
3
W
¢
1-
.+
Q
Q
Q
w
Q
H
`+
«+
W
>—
m 11
m 11
U
Q
O
`+
x
A
U
m
>
V
V
U
A
J
m
>
>
0
1- /r
D 11
11«.
Ir
J
Q
" a
1- It
11
0
>
w
Q
¢
o
o
N
o
0
0
0
0
o
N
o
0
Z
Q
<11
11
Z
z
a.
u
O
z
z¢
x
z
z
z
z
z¢
x
x
W
..
..
a_
u
••
...
.
..
a
V
u
£
m 11
11
£
Z
Q
F-
£
£
.+
Z
£
£
£
£
£
Z
Z
II
II
Q
Q
D
r.
K
Q
¢
J
Q
Q
Q
Q
¢
¢
J
¢
Q
2
2 11 11
U
J
7
>
O
U
U
Q
U
U
V
U
U
Q
m
D:
W
4+ ..
W II
II
O
O
O
O
O
O
7
O
^+
O
m
CJ
a'
O
O
-+
O
£
C
m II
4� 11
N
m
m
m
In
N
m
IM
O
N
m
m
N
-+
IT
m
O
w
m a
w II
u II
-.
m
N
-+
-+
m
N
M
>
•M 4�
a: II
m If
0_ 11
m
IL
U A
11
0 0
-11
O
It
N
N
m
m
m
0•
.+
N
❑
N
N
h
m
m m
• N
a if II
m
m
m
m
m
m
m
m
0•
0`
0•
0`
P
P
0Z
0• U
�+ 11
M
In
N
-0
O
m
O
0•
N
n
N
P
O
�o
O n
¢II
U) 11
0
0
0
0]
0]
f`
a0
07
O]
0
O]Ci40)
O
U
O 0
LU
II
0
11
m
o
O
m
m
a
O
Ir
m
O
�
n
N
O
m
O o
a
a if
U) II
P
Q-
O
U
0-
P
O
0
It
0•
0
0
c�
O
c•
O O
II
..
..
..
., ..
�-+ 11
N
m
01
�o
N
C
In
N
N
0
�0
N
0
M
0`
V II
It
I:
r
ri
0
1:
o
m
of
o
co
r n
O
N
a
o
o
N
.o
M
M
0-
0-
O
..
0
O
v O
+� n
In
o
M
.o
N
••
N
N
a•
a
m
M
m
IS
O
N �o
an
a
a
N
d
o
N
N
m
m
n
a
O
O
O
N -•
mII
N
N
N
-+ N
J II
It
ti
If
W
11
W
W
0:
w
W
II
q
A
q
A
z
II
w
>
J
.>i
.>•+>
0 II
q
q
>
>
m
O
O
w
A
N
F 11
Q
Q
A
f-
V
>
?
11
U
A
3
Q
3
11
z
z
¢
q
q
Q
q
w
A
z
z
U
z
S
z
S q
II
w
W
"
w
z
z
w
z
W
a
a
w
W
z
11
>
w>
a
w
w
a
¢ w
II
2
S
O
w
O
J
U
2
7
F
S
C9
x
O
Z
J
q
z
x
A
1-
w
I-
W
F-
w q
II
m
J
a
O
m
Q
n
Z
Q
D
1-
7
h ¢
II
O
O
a
¢
W
Q
"
O
W
O
¢
F
O
K
O
m W
II
11
Z
m
J
>
❑
J
S
J
A
m
m
m
m
O
N
O a
II
11
0
a
En
II
❑
Q
O
A
z
II
0:
0:
¢
Q
a
Q
"
�
J
Ell
m
O
N
m
z
W
¢
O
Oil
O
7
.+
W
¢
>
a
W
A
Y
a
>O N
O
G. II
1-
O
w
a
O
m
Y
O
Q
—
m
O
O
z
It
LL It
..
a
a
a
3
1L
❑
q
z
A
m A
a
all
II
m
m
>
V
m
A
O
x
�+
¢
7
O
z
m
z
m z
a 11
It
w
a
w
¢ w
Imo-
w
p
❑
❑
caIr
w
a
a
w
w
m
> II
It
❑
❑
S
z
❑
W
m
0
u
❑
m
m
x
w
x
w x
..11
A
11
z
a
If
11
m
J
z
E
J
J
z
F
Q
¢
z
¢
J
D
J 7
¢
Oil
II
❑
W
a
¢
W
a
O
w
�+
¢
�+
O
O
¢
O
Q O
U
� II
II
J
In
U
A
>
7
O
>
J
>
7
z
V
m
U m
ED
z
0: II
II
E
a
oil
it
W
D
m 11
11
In
F
7
II
II
O
q
A
Q
A
p
A
in
N
Oil
II
z
2
J
a:
z
m
a:
}
z
z If
tl
A
a
q
A
A
a
q
A
E0
a N
" II
11
¢
w
5
s
m
x
E
s
m
¢
¢
Y
X
m 01
1- 11
4+ II
f-
W
w
a
W
I-
w
W
0•
to II
w 0
0
w
w
w
O
O
¢
w
W
w
O
O
W
w W
Z
tt
O
m
a
0
¢
>
..
0
0
¢
> a
❑
J ii
ii
a
❑
w
W
m
u
a
a
w
w
u
a u
J
WQ
>
m II
U7 II
>
V
¢
Z
N
Z
>
>
J
Z
Q
U
>
>
Z
Q Z
H a.
m
p II
If
Q
a
Q
¢
w
Qa
�-+ a
F It
11
❑
O
7
N
�
p
❑
O
7
>
O
❑
O
7
>
> �
Q
V a
H
J
7
a
?
x
T
Z
70
Z
S
2
7
O ")
H II
II
U
z
z
E
m 11
It
Z
E
J
Z
H
z
z
Z
E
z
E
z
z
z
z
II
11
a
Q
Q
a
J
Q
Q
a
a
a
a
Q
a
a
Q
¢ a
Z
Z II
11
¢
V
v
m
Q
to
¢
V
m
J
U
¢
a
m
J to
W
4�••
W II
II
O
n0
O
O
0
O
O
O
O
O
.0
O
O
O
O Q
E
G
m II
4� 11
m
n
O
V'1
N
m
>
m m
w 11
u 11
N
N
N
�+
N
N
N
N
N
N
N
- N
•M 4y
m II
m 11
a
' M
a 11
N II
a
U ❑
11
0
a
�+ II
au
P
P
P
n
�+ If
O
O
P
N 11
O
O
U
U'
Q
II
N
O
P
a
11
Oil
U) II
II
01
P
II
O
N
P
U II
W- II
II
m
n
N
If
N
O
w 11
O
O
�+
NIt
-6
N
N
J II
If
II
❑
to
II
q
Z
II
>
J
II
M
F II
w
q
N
11
If
7 Z
Z
u
w
w
w
11
N
F-
11
Q
>
>
11
O
O
11
>
IJ)
In
II
II
In
11
W
II
Z
II
Q
II
J
E II
0 11
N
Z
11
IL 11
In
it
11
11
W
z
EL
cr
w
U)>
II
II
W
S
�-+
¢I II
II
J
r
q
II
Q
q
11
Q
O
W
U
w II
11
>
UI
q
ru
E
a
o n
11
w
7
In If
II
rn
I
vii
ii
m
�
H
11
I}n
¢N
If 11
s
s
III
F-
IT
m II
m II
W
W
-
INIyy
W
O~
J II
F II
Q
u
U
W
> •+
m II
O 11
Q
Z
2
v
r m
D II
11
..
Q
Q
Q
—a
1- If
u
>
>
>
u Q
Q
f- it
II
Z
O II
II
Q
Q
Q
r
r II
II
J
m
w
W
W II
II
O
N
E
C
in If
II
,n
I7
179
w
m m
W II
u 11
.+
N
N
>
•�+ -P
m It
m it
Q
.+ m
CL 11
In II
d
U q
it
•
E
J
Q
N r m w w"
N m N M r
w
0) co
O
N
Dorai64Lrim
oio
1:
cli
F
O
Z
z
z
I
N
OW
CO
N
O N
U) CD
(O m
n (O
sf
(O
T
Nm
IW,r-0)0
mm�
N
J
O
r r
C 0
0 (7
r O
O
N
N
5
N
}
LLJ
Z
C
o
m
M
J
=
a)
O
U
a
w
N
at
N R
V V
J
M<
R
V
m<
Z
a)
C
Q
J
U
R
L
=Q0
F
to
n
tOwoo
O N
n 0
rnn
O n
CO
Eao
a) m
(•z
M
co
R O
O
L
m
O
E N
Z
r
—
o
O
`°
WQ=
w
o
❑>
c
2m
> N}
O
N
¢
=c~n
}
3cc
W }
pdZ
R0•.
co
�LL�
o¢
W
m
a
�,0
_~_COWU}
CL
p W
ami
m
cw(p9>a-
O F W
w
U'
W
N (D
Q WOP
m 2
W
`oaw❑U
u
2
(D
0
F
(1 F
J D
2¢
m (D Z
Z
E
a3 J
O¢
�¢
w O
Q>>
d
> W❑
F000❑(n0Z
>3auaj¢
c
O
o
Z
a
W W
>>
2
W
N
w
Q
F-
Q¢00
w
00 ¢
o
c
T-
U)
NF>_>
¢
0
r
�[..
—
d
a)
Q
..aF
F-
J
Oca
(L0
w
O
v
m
� w
H
Nw
c�oa
wn
Fm -
N¢
CL
0
LU LU(0zz
zHHa�
—'-W m=om
ON
V
O
mowco
U
¢
w
a a
0 0
a
0-0
z—
o
E❑ w
Q
cr
LL❑a
U(4
ZQU
-X Z❑(A
'3
as
a
0
00
L
�a
o
mo
=__
J
Z
Z Z
Cl
¢=
m
c Z
Z
j
¢
¢Q¢
a)y
as
°_O
QW
U)
(n (1)y
L
¢
L
ro>
Q
LL
a a
Q Q
a C
j
a=
m
U
Za
r
43
c W
00
C7
FOmm0Omm
w?oOZ?o0
W.
D
30w
a
Eo
U)
W
¢
rC
J J
rL <
J J
a)
cc
oZ
U
�
F
Q
W W
Q Q
W W
L
W Q
L
L Q
(nU❑❑UU❑❑
_
y❑O-�FFU
Z
O
O M
w V
N O
O eT
0
O
O
n n
rn
Or LO
F
r r
N
c;r
U
W
m
0 0
• Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SAN JUAN CAPISTRANO, CALIFORNIA, ADOPTING
THE GROWTH MANAGEMENT PROGRAM AS A POLICY PLAN
DURING THE INTERIOR PERIOD PRIOR TO FORMAL
ADOPTION OF A GROWTH MANAGEMENT ELEMENT TO THE
CITY'S GENERAL PLAN.
WHEREAS, the City of San Juan Capistrano has initiated the
preparation of an amendment to the General Plan that would
incorporate a Growth Management Element; and,
WHEREAS, the adoption of a Growth Management Element is
• required by the provisions of Measure M in order to qualify to
receive funds distributed from sales tax proceeds collected in
accordance with Measure M; and,
WHEREAS, a draft element has been prepared for public review
and comment in accordance with procedures of the California
Government Code and the City's Municipal Code; and,
WHEREAS, the City's Environmental Review Board has reviewed the
initial study prepared for both the interim policy plan and draft
Growth Management Element and has determined that these documents
will not result in a significant impact on the Environment and has
issued a Negative Declaration; and,
WHEREAS, the draft document will not complete this formal
review process until after June 30, 1992; and,
WHEREAS, the City currently has through its existing General
Plan Public Safety, Public Facilities Elements and Circulation
Elements policies that support the intent of Measure "M" and the
new policies outlined in the draft Growth Management Element.
NOW THEREFORE BE IT RESOLVED, that the City Council does hereby
certify the Negative Declaration and, adopt the draft Growth
Management Program attached and identified as Exhibit "A" policy
plan based upon the following findings:
1. The interim policy plan is consistent with the overall
goals, policies and objectives of the Circulation, Public
Safety, Public Facilities and Utilities and other
applicable elements of the General Plan; and,
2. The interim policy plan is consistent with the adopted
Air Quality Implementation Plan as it relates to policies
regarding Transportation Demand Management and
jobs/housing balance provisions of the Air Quality
Management Plan and provisions of Measures M; and,
• Resolution No.
Page 2
•
0 0
3. Development applications currently under review will
comply with the level of service standards for both
traffic and public services during the interim period
prior to final adoption of the Growth Management
Element;and,
4. The draft Growth Management Element is currently
undergoing formal public review and is scheduled for
formal adoption by City Council prior to August 1992.
PASSED, APPROVED AND ADOPTED TEIB day of June, 1992, by
the following vote, to wit:
AYES:
NOES:
ABSENT:
TT: mjm
wp50\tt\gmp.92r
Gil Jones, Mayor
ATTACHMENT 3n - MAINTENANCE OF EFFORT REQUIREMENTS
(See Line 16, Schedule 2 of attached report)
0
0
§
|
§
�
#
B
,-
_
�
.
Eli
�r
�
ENO
54
E
!
§
/
�
f
E;
n
u
(Rev. 8/91) Schedule 1
rens ftly present a statement of all Tome
ws the requsrements as prescribedy th
September 13, 1991
•
•
City of San Juan Canistra o
• SCHEDULE OF MON&ADE AVAILABLE
Fiscal Year Ended June 30, 19 91
SCHEDULE 2
ANNUAL S1R11:T REPORT
TO STATE CONTROIIEA
per Sections 2151-5,
Streets and Highways Code
DESCRIPTION
LINE
NO.
MONIES MADE AVAILABLE BY STATE OF CALIFORNIA:
Gas Tax Appeardormenn:
Section 2105, Streets & Highways Code
1.0
$ 75,897
Section 2106, Streets & Highways Code
1.1
110,093
Section 2107, Streets & Highways Code
2.0
212,186
Section 2107, Streets & Highways Code - Snow Removal
3.0
Section 2107.5, Streets & Highways Code
4.0
6,000
Total Gas Tax Apportionments
5.0
$ 404 176
Motor Vehicle License (In -Lieu Tax)
6.0
898,289
Flexible Congestion Relief
6.1
Traffic Systems Management
6.2
Other State Aid (Schedule 6e, Line 8.0)
6.3
89,825
Total Monies Made Available by State (Tool Linn 5.0 through 63)
7.0
$ 1,392,290
MONIES MADE AVAILABLE BY OTHER GOVERNMENTAL AGENCIES:
Federal Government (Schedule 6e, Line 13.0)
8.0
Local Sources:
County (Schedule fie, Line 16.0)
9.0
356,060
Other (Schedule 6e, Line 20.0)
10.0
Total Local Sources (Total Lines 9.0 + 10.0)
11.0
S 356,060
Total Moines Made Available by Other Governmental Agencies (Total Lines 7.0 + 11.0)
12.0
$ 356,060
MONIES MADE AVAILABLE FROM CITY AND LOCAL. SOURCES:
Revenues Derived from Investment of Gas Tax Monies (Schedule 6e, Line 4.0)
13.0
5,124
Proceeds from Sale of Bonds for Street Purposes
14.0
Special Street Assessment Levies (Excluding Levies under Improvement Act of 1911
or Similar Acts)
15.0
General Fund Monies Used for Street Purposes
16.0
693,731
Traffic Safety Fund Monies Used for Street Purposes
17.0
Other (Schedule 6e, Line 26.0)
18.0
982,357
Section 99734, Public Utilities Code:
Allocation
19.0
55,325
Interest and Other Revenue
20.0
Total Section 99234, Pu Ale UNitie_. Code (notal Lines 19.0 4 20.0)
21.0
$ 55,325
Sections 99400x, Public Utilities Code:
Allocation
22.0
Interest and Other Revenue
23.0
Total Sections 99400x, Public Unlides Code (Tool Lines 220 + 23.0)
24.0
$ -0-
-0-
T Ci and Local Sources
Total Monies Available from ry
(Total Line 13.0 through 18.0 + 21.0 + 24.0)
25.0
$ 1,736,S37
GRAND TOTAL. MONIES MADE AVAILABLE (Transfer in Schedule 1, Line 18)
(Tool Line 7.0+12.0+25.0)
26.0
$ 3,484,887
(Rev. 8/91)
Schedule 2
•
•
• aty of San Juari Canis ran
�
P'sol Y., EMM June 30, 19 91
SCIIEDUIE 3
ANNUAL STREET RE1pRT
TO STATE QDNTVCElt
Pa Sectlau 2151.5.
SRaeta aM High., Cade
TYPE OF WENDFNRE
UNE
NO.
FORCE GOVERNMENT PIWATE
ACCOUNT (1) CONTRACT (3) CONTRACT (3)
TOTAL (4)
UNDLSTR®vIPD ADMIWIS RATION &IMINIMIR D
1.0
s 445,785 s 13,204 s 238.892 s
697,881
CONSTRULTION AND RIGHT OF WAY
New Street Cen;Mction
24
street Remnswcuon
3.0
8,296 275 832 303
840j74
Sigmis, Safety Devices, Sheet Ughu
4.0
343 464.299
464 642
Pedanian ways aM BikepaUu
5.0
3.301, 107.396 1
110,697
Stone Dtaw
6.0
8,0391
1.452 1
9,491
Storm Damage
7.0
TMI OAutmcuon
0.0
S
s
1,42S,704
S07,818
1,933,522
Right a Way Acqubiuon 9.0
Tout O.wtrc3br aM Right of Way 10.0
MAINTENANCE
Parching
1110
211,810
S9.193
271,003
nervy, Sealing
12.0
Shea Ughu & Tuff. Signab
13.0
108,780 00$ 187
090
296 97S
Straw Renmwl
14.0
Stam menage
IS.o
70,619
S0,579
121 198
Other Soeet wrlmae Maincauna
16.0
82,941
9.536
92 477
TOW 34aintmaRm 17.0 s
ACQUISITION OF PROPERTY, PLANT & EQUIPMENT 16.0
(Reach Deuil (Per S .k N a 9)
CONTRIBUTION 10 OTHER GOVERNMENTAL AGENOES
(Mach Deail) 19.0
Told spec ftn aweedime 20.0 s
FUND ADNSTMENTS (Per Schedule 6b, Um 20.0) 21.0
GRAND 301AL (Tlaoafes a9 Stbedtge Ll2ae ma) 22.o s
SCII. 6B
PER Serf. 6A ADJUSTMENTS
p@PNI=RE PIIIIDIsc UNE NO. (2) (3)
781 S53 _
14,S80
796,133
3.427.S36
TOTAL
(4)
Semon 2105, Streets & Highw ten, case
23.0
46,659
46,059
Seen. 2106, Soeen & Highways Code
23.1
113,449
113,449
SeW. 2107, Sema & Highways CMe
u.0
18S,841
185,841
Section 2107, SRan & Highways Code - Snow Removal
Scctwn 2107.5, StrcD & Highways Cade
6 000
6A00
Station 9934, wale UtUida Cade
55 32S
55
Satiau 9WK , wblle Utilities cede
County ConOibulioro
M29.0
356,060
1 072 182
356,060
1 072-187
All ONer Sources-Non.D'ua ,%ary
All ONer Sourm - Dbcaeoorury
592
1
t
3,427,S36
RDCAP M AS TAX & 5/J,ES TAX IllAe -
G
PROMS IE�tIft
UNE
NO.
(1) (3)
ACQUIS110N OF UNDISTRIBUTED
PROPERTY. PIT & ADMIN.&
MI
EQUIPMENT ENGINEERING
(3)
CONSTRUCTION
AND NW
-7
MAIN
SNOW
Seeuon 2105, Soeeu & Highways Cade
32.0
46,659
Senior 2106, Sueeu & High.p Cade
32.1
113,449
Section 2107, Sixeeu&Highways Code
33.0
1,301
184,540
Section 2107, St u & Highways Code -
Snow Removal
34.0
S ion 21 MS, Sneeze & Highways Cade
35.0
6,000
Secrion 99234, Public Utilium G e
36.0
S5,325
Sauon 99400x, Public Utilities Cade
370
(Rev. 6/91)
Schedule 3
Ll
0
• City of San Juan Aftistraxto
SCI -MULE OF XNDITURFS
SECTIONS 99234 & 99400a PUBLIC UTILITIES CODE
Fiscal Year Ended June 30, 19 91
SCHEDULE
ANNUAL STREET REPORT
TO STATE CONYROLIFR
per Section 99406
Public Utilities Code
TYPE OF EXPENDITURE
LINE
NO.
FORCE GOVT
ACCOUNT CONTRACT
PRIVATE
CONTRACT
TOTAL
UNDISTRIBUTED ADMINISTRATION &
ENGINEERING
1.0
$ $
$
$
CONSTRUCTION AND RIGHT OF WAY
New Street Construction
2.0
Street Reconstruction
3.0
Signals, Safety Devices, Street Light
4.0
Pedestrian Ways and Bikepaths
5.0
3 060
52 265
Storm Drains
6.0
Storm Damage
7.0
Total Construction
8.0
„,,,
p b,
f,
$ SS 325
Right of Way Acquisition
9.0
Tool Construction and Right of Way
10.0
$ 55 325
MAINTENANCE
Patching
11.0
Overlay, Sealing
12.0
Street Lights & Traffic Signals
33.0
Snow Removal
14.0
Storm Damage
15.0
Other Street Purpose Maintenance
16.0
$ -0-
Total Maintenance
17.0
TYPE OF EXPENDITURE
LINE
NO.
TOTAL
ACQUISITION OF PROPERTY, PLANT AND EQUIPMENT
(Attach Detail) (Per Schedule 6a, Coluttm 7)
18.0
CONTRIBUTIONS TO OTHER GOVERNMENTAL AGENCIES FOR STREET ROAD
PURPOSES
19.0
Sub -Total Expenditures (Lines 1.0 + 10.0 + 17.0 + 1&0 + 19.0)
20.0
$ -0-
FUND ADJUSTMENTS (Per Schedule 6b Lines 25.0 + 26.0)
21.0
PLANNING AND CONTRIBUTIONS TO THE TRANSPORTATION PLANNING PROCESS
22.0
ACQUISITION OF FACILITIES AND BUILDINGS
23.0
GRAND TOTAL (must equal sum of Schedule 3, Column 4, Linea 27.0 & 28.0,
Schedule A. Line 7.0)
24.0
S
EXPENDITURE FUNDING -_
Section 99234, Public Utilities Code
25.0
SS,325
Section 99400a, Public Utilities Code
26.0
GRAND TOTAL (Must equal Line 24.0 above)
27.0
S S 5 , 32 S
OBLIGATIONS AND OTHER COMMITMENTS (Sections 99234 and 99400a)
(must be less than or equal to sum of Schedule 1, Lines 25.0 + 26.0 + 33.0 +
34.0)
28.0
$
(Rev. 8/91)
Schedule 4
•
City of San Juan LaPlstran0
SCHEDULE 5
SCF$DUIB EMITIVRFS
• POR STREET'
ANNUAL STREET RFS
TO STATE CONTROL
ROVFh1FIJl5
NOT PAID FOR BY CITY
per Sections 215
Fiscal Year Ended June 30, 19 91
Streets and Highways
(Rev. 8/91)
Schedule 5
LINE
NO.
TOTAL
STATE Otemize):
29
WWWWW ;4,::.,.�
$
Urban Evension 1.0
Grade Separation
2.0
3.0
4.0
Total State
5.0
$
COUNTY AGENCY (Itemize):
Road Department Construction
6.0
Engineering
7.0
Right of Way
8.0
9.0
Total Construction and Right of Way
10.0
$
Maintenance
11.0
Total county
12.0
S
OTIM CITIES AND DISTRICTS (Itemize):
=
MEMNSAWFIMM
Flood Control District
13.0
14.0
15.0
16.0
Total Other Governmental Agendes
17.0
S
PRIVATE PARTIES (Itemize):
Railroad Crossing Protection
18.0
19.0
�
20.0
OTIM PRIVATE PARTIES:
21.0
22.0
j
23.0
24.0
Total Private Partin
25.0
S
1911 or Similar Acts
26.0
j
GRAND TOTAL
27.0
$
(Rev. 8/91)
Schedule 5
•
•
City of out Jug �avinu auv
• SUTPION R� T
7RANSPOATATION ALT (17)N
NON -STREET PURPOSE E)TENDITURFS
Fiscal Year Ended June 30, 19 91
Purpose of this Schedule and Instructions
per Section 99406
Public Utilities Code
1. The purpose of this schedule is to report TDA non -street purpose (PUC Sections 99234 or 99400a) data for inclusion in the
Annual Ration of Financial Transactions Concerning Transit Ooetamn and Non -Transit Claimants under the TDA Act.
2. Non -stmt purpose fund balance and revenue are not reported on my other schedule of this report. Non -street exoendirures.
however, are also reported in Schedule 4. Some examples of non -stmt purpose expenditures; are pedestrian ways and biltepaths
not alongside roadways, and planning and contributions to the transportation planning process. This schedule does no include
any Transit Funds.
(Rev. 8/91)
Schedule A
ZINE
NO.
SECTION 99234
PEDESTRIAN &
BIKE PATHS
SECTION 99400a
TRANSPORTATION
PLANNING
DERIVED FROM TDA, NON -STREET PURPOSE_
BALANCE AT BEGINNING OF FISCAL YEAR:
Fund Balance Held in City
1.0 S
S
Fund Balance Held in Other Governmental Agencies
2.0
Total Fund Balance at July 1, 19 90
3.0 $
-0-
f
REVENUE:
Allocation
4.0
55,325
Interest
5.0
Total Resenue
6.0 $
55,325
S
EXPENDITURES
7.0
55,325
BALANCE AT END OF FISCAL YEAR:
Fund Balance Held in City
8.0
Fund Balance Held in Other Governmental Agencies
9.0
FUND BALANCE AT JUNE 3% 19 91
10.0 S
-0-
f
(Rev. 8/91)
Schedule A
- |§| �i
s
;■
ƒ!§k
`|
U00.i
=
| .
! k!!
� tz
_
.||.
�
ElEa
|§
®§||§
)
m!l
U00
�
■!ƒk
!}!|
u �
°4 |
�\®|
! -
-
_
E
•
9
ry
N
a
O
N
M
Q
CI
D
Jf
Q
O
in
.p
�
O
y
N
Q
✓1
N
Q
M
Q
p
O
01
O
Q
N
W
Vl
N
N
M
Q
N
O
N
M
N
Q
T
N
Y
Q
✓1
V
¢
O
m
Q
Q
Q
a
U o c .
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q
J1
N
Q
Q
N
�O
`O
O
O1
N
Q
✓1
tL
Vi
N
Z<
N
Ol
N
V1
O
N
N
N
OJ
N
i
N
woo.
ZOppp3p
N
M
N
W
N
<
{PPK3 O
i �
L
Q
GG
M
M
�
1 N
LL
K
N
N
<
2
M
O
a h
N
N
U
U
�g
n
y
N
f
6
N
N C
C
U
U
U
G
C
�
�
o
�
Y�
!.
>
U�
A�
U
W
.Cy
U
t0•
G
C
Y
O
O
O
N
N
N
M
M
Q
Q
Q
Q
Z 62
N
N
N
9
•
. City of San JHOE
istra
SCHEDULE OF ADJUSTMENTS AND
OTHER EXPENDITURES ALLOWED BY LAW
Fiscal Year Ended June 30, 19 91
SCHEDULE 6b
ANNUAL STREET REPORT
TO STATE CONTROLLER
per Sections 21515,
Streets and Highways Code
LINE
N0,
DETAIL OF ADJUSTMENTS
INCREASE
FUNDING (DECREASE)
LINE
NO.
1.0
$
1.0
2.0
2.0
3.0
3.0
4.0
4.0
5.0
S.0
6.0
6.0
7.0
7.0
8.0
8.0
9.0
9.0
10.0
10.0
11.0
11.0
12.0
12.0
13.0
13.0
14.0
14.0
15.0
15.0
16.0
16.0
17.0
17.0
18.0
18.0
19.0
19.0
20.0
TOTAL FUND AD USFM ENM AND EXPENDITURES
(Tratasfer to Schedule 3, Line 21.0)
S NSA
20.0
SOURCE FROM WHICH PAID
x
'A
21.0
Section 2105 Streets & Highways Code
(Transfer to Schedule 3, Line 23.0 Column 3)
$
21.0
21.1
Section 2106, Streets & Highways Code
(Transfer to Schedule 3, Line 23.1, Column 3)
21.1
22.0
Section 2107, Streets & Highways Code
(Transfer to Schedule 3, Line 24.0, Column 3)
22.0
23.0
Section 2107, Streets & Highways Code, Snow Removal
(Transfer to Schedule 3, Line 25.0, Column 3)
23.0
24.0
Section 2107.5, Streets & Highways Code
(Transfer to --dule 3, Line 26.0, Colurim 3)
24.0
25.0
Section 99234, Public Utilities Code
(Transfer to Schedule 3, Line 27.0, Column 3)
25.0
26.0
Section 99400a, Public Utilities Code
(Transfer to Schedule 3, Line 28.0, Column 3)
:26 0
27.0
County Contributions
(Transfer to Schedule 3, Line 29.0, Column 3)
27.0
28.0
All Other Sources - Non -Discretionary
(Transfer to Schedule 3, Line 30.0, Column 3)
28.0
28.1
All Other Sources - Discretionary
(Transfer to Schedule 3, Line 30.1, Column 3)
,xs,,, . ;
28.1
29.0
TOTAL FUND ADJUSTMENTS AND EXPENDITURES
"' 7, 77"
$
29.0
(Rev. 8/91) Schedule 6b
E
•
•
City of trano
SUI WFI.ffAE= OF
SNOW REMOVAL 11LLPEND17 ORFS
Fiscal Year Ended June 30, 1991
SCHEDULE 6c
ANNUAL STREET REPORT
TO STATE CONTROLLER
per Sections 2151.5,
Streets and Highways Code
LINE
NO.
DESCRIPTION
AMOUNT
LINE
NO.
1.0
1.0
2.0
2.0
3.0
3.0
4.0
4.0
S.0
5.0
6.0
SUB -TOTAL
6.0
7.0
Less: Depreciation
7.0
8.0
Total Snow Removal Expenditures
(Transfer to Schedule 3, Line 14.0, Columns 1, 2 and 3)
$
8.0
9.0
• Amount from fine 6.0 .
9.0
10.0
Pursuant to Streets and Highways Code Section 2107, leu SS,000
$ 5,000
10.0
11.0
Snow Removal Expenditures in Excess of SS,000 (Line 9.0 minus 10.0)
$
11.0
12.0
Amount to be claimed (50% of Line 11.0)
S
12.0
Section 2107 of the Streets and Highways Code, states that each city which ho filed a report containing prescribed information and
has had snow removal expenditures in excess of 5,000 during one fiscal year shall be allocated during the subsequent focal yew
a sum equal to 50% of this excess.
For guidance purposes, snow removal on city streets may be considered to include, but not limited to, the following:
(1) Actual removal of snow from traveled way, shoulders, road approaches, safety devices, structures, (such as bridges, underpasses,
overpasses, etc.) to alleviate or remove hazardous conditions and to facilitate passage of traffic,
(2) Installation and removal of guideposts to guide snow removal operations along traveled way.
(3) Spreading of send, sodium chloride, etc., to expedite melting of snow on winter dosed roads preparatory to spring opening.
(4) Spreading of sand, cinders, etc., at locations where snow causes hazardous road conditions.
(5) Traffic control measures necessitated by snow removal operations.
(6) Snowdrift preventive measures, such as installation and upkeep of snow fences, windbreaks, but excluding plantings.
Special Considentions Relative To Elements Of Costs
Expenditures to be reported on this supplemental schedule will include as applicable, the normal objects of labor, materials,
contract work, equipment expenditures and an equitable allocation of general or overhead expenditures. However, equipment
costs, for purpose of this supplementary schedule, we interpreted to mean not only the direct operating costs, such as fuel,
tires, supplies, maintenance, repair, insurance, etc., but also a depreciation factor. The full capital outlay expenditure for
specialized snow removal equipment or the pro rata portion of the capital expenditure for general purpose equipment used for
snow removal purposes will not be reported on this schedule at the time of acquisition.
(Rev. 8/91)
Schedule 6c
•REVENLMMAIL
•
•
Ciry of San JuaAloLapistrano
Fiscal Year Ended June 30, 19 91
SCHEDULE
ANNUAL STREET REPORT EPORT
TO STATE CONTROLLER
per Sections 2151-5
Streets and Highways Code
LINE
NO.
DESCRIPTION
LINE
DETAIL NO.
REVENUES DERIVED FROM @2VESIMEN'1' OF GAS TAX MONIES
1.0
DEPOSITED TO:
Interest - Section 2105
S 1,468rg,1 2.0
1.1
Interest - Section 2106
2.0
Interest - Section 2107
3 656 lo Mml 2.0
3.0
Interest - Section 2017.5''
°F; 3.0
4.0
Total Revenues From Investment of Gas Ta: Monies
(Transfer to Schedule 2, Lia 13.0)
S 5,124 4.0
5.0
OTHER STATE AID
Railroad Crossing
,yr 5.0
6.0
Park Bond Act - Bike Path
»s
89,825 g.. 6.0
7.0
plow- 7.0
8.0
Total Other Sum Aid (Transfer to Schedule; Linea 6.3)
MONIES MADE AVAILABLE BY OTHER GOVERNMENTAL AGENCIES
S 89,825 8.0
9.0
Federal Government
9.0
10.0
10.0
11.0
11.0
12.0
12.0
13.0
Total Federal Government (I'ransfc to Schedule 2, Lane 8.0)
S 13.0
14.0
Local Sources:
County Aid
14.0
15.0
County Other - AHFP Grant - Creek Bride
356 060 15.0
16.0
Total County (rranafer to Schedule 2, Lute 9.0)
E 356,060 16.0
17.0
Other I.eeal Sources:
Redevelopment Agency
„_ _m - 17.0
18.0
_. �. 18.0
19.0
19.0
20.0
Total other (Transfer to Schedule 2, Line 10.0)
MONIES MADE AVAILABLE FROM CITY SOURCES
S 20.0
21.0
959 020 .2.0
21.0
Other.
Interest Earned on County Aid
22.0
System Developtnent Fees
23.0
Drainage Fe,
11 026 -'..-„ 23.0
24.0
Park ✓; Recreation Fees
12,311 '"` ''�" 24.0
25.0.
25.0
26.0
Total Other (Trarufer to Schedule 2, Line 18.0)
mil"mS 982 , 357 26.0
(Rev. 8/91) Schedule 6e
•
0
. CITY OF San Juan Capistrano SCHEDULE
ANNUAL STREET REPORT
DETAIL OF ACQUISITION OF PR �EQUTPAffNT TO STATE CONTROLLER
per Sections 2151.5
Fiscal Year Ended June 30, 19 91 Streets and Highways Code
DATE VENDOR AMOUNT • CODE DESCRIPTION
0-18-9C Joe McPherson Chevrolet S 14,580 D
Total Acquinton of Properry. Plant and
Equipinera
(Enter on Schedule 3, La 18.0) S 14,580
• Funding Source: Use G for Gas Tax
Use D for Discretionary
(Rev. 8/91) Schedule 9
City of San Juamn isttano _
SCfffDUIE B
OBLIGATIONS AND ON COMMITMENTS
ANNl1AL STREET RETORT
TO STATE CONIROLIFJI
Fiscal Year Ended June 30, 19 91
per Sections 2151-5
Streets and Highways Code
PERTAINING TO
LINE
RESTRICTED
LINE
NO.
BALANCE
OTHER
NO.
1.0
Actual Encumbrances Per City Book,
S
S
1.0
Projects Approved by Council But Not Yet
2.0
Entered as Encumbrances
2.0
Money Being Accumulated for Specific Future
3.0
Projects
3.0
4.0
Maintenance
4.0
5.0
Purchase of Equipment
5.0
6.0
Condemnation Deposits
6.0
Monies on Deposit With Staff or Counties for
7.0
Speck Projects
7.0
40
8.0
Other Obligations and Com ninnents
8.0
9.0
1 9.0
10.0
10.0
11.0
Tomb
S
$
11.0
Total Pertaming to Restricted Balaocn
(Transfer to Schedule 1, line 38.0)
(must be less than or equal to Schedule 1,
12.0
Line 37.0)
S
32.0
(Rev. 8/91) Schedule B