1999-0316_PASEO MONTE VISTA SEWER_Agenda Report 32400 PASEO ADE4ANT0 v I I Q MEMBERS OF THE CITY COUNCIL
SAN JUAN CAPISTRANO,CA 92675 Il(.,,♦I OLLENE CAMPBELL
JOHNR
(949)493-I 171 � nununu WATT HART HART
(949)493-1053(FAX) auuuw N61 GILJONES
1776 DAVID M.SWERDLIN
C1N MANAGER
. • GEORGE SCARBOROUGH
MEMORANDUM
TO: Interested Persons
FROM: Cheryl Johnson, City Clerk
DATE: March 17, 1999
SUBJECT: Paseo Monte Vista Sewer
At their meeting of March 16, 1999, the City Council of the City of San Juan Capistrano
had been scheduled to consider accepting Easement Deeds providing for the Paseo Monte
Vista Sewer Facilities, and to consider the Plans and Specifications for the project.
The City Council received a memorandum from staff advising that the Easement Deeds
had not yet all been returned to the City and requesting that the item be removed from
consideration. The City Council approved the staff request and the item will be
rescheduled upon receipt of all Deeds.
The Plans and Specifications and call for bids for the project were approved. Staff will
being the bid process upon acceptance of the Deeds by the City Council.
Please feel free to contact Nancy Barney, project manager, at 443-6362 if you have any
questions.
cc: Jack Huiberts Raymond Leach
Carl Kniza Michael Tracy
David Ball Thomas Hribar
George Spaulding William Hoffman
Mary Ann Hanover Mary Carroll
Robert Lyons Engineering and Building Director
Nancy Barney
onuo USE
Is
s
San Juan Capistrano: Preserving the Past to Enhance the Future
081
4. STATUS REPORT ON NEW DEVELOPMENT APPLICATIONS (440.10)
The Report dated March 16, 1999, from the Planning Director, advising that three new
development applications had been received since the last Report on February 2, 1999, was
ordered received and filed.
5. ADOPTION OF RESOLUTION ACCEPTING A GRANT DEED FORA PORTION
OF CAMINO CAPISTRANO,SOUTHWEST OF STONEHILL DRIVE(LOT LINE
ADJUSTMENT 98-8,BLUE SKY PROPERTIES/CAPISTRANO FORD)(670.50]
(CONTINUED FROM MEETING OF FEBRUARY 16, 1999)
As set forth in the Report dated March 16, 1999, from the Director of Engineering and
Building, the following Resolution accepting a Grant Deed for a portion of Camino
Capistrano, southwest of Stonehill Drive was adopted in order to correct the Title to the
property prior to recordation of a Lot Line Adjustment which is necessary for development
of a Ford Truck dealership at Stonehill Drive and Camino Capistrano:
RESOLUTION NO. 99-3-16-1, ACCEPTING GRANT DEED - CAMINO
CAPISTRANO SOUTHWEST OF STONEHILL DRIVE (BLUE SKY
PROPERTIES/FORDI - A RESOLUTION OF THE CITY COUNCIL OF
THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, ACCEPTING
A GRANT DEED FOR A PORTION OF CAMINO CAPISTRANO
SOUTHWEST OF STONEHILL DRIVE TO ACCOMMODATE THE
PROCESSING OF LOT LINE ADJUSTMENT 98-8. (BLUE SKY
PROPERTIES/FORD)
The Mayor and City Clerk were authorized to execute the Resolution. The City Clerk was
directed to forward the Deed to the Orange County Recorder for recordation.
`.---16. APPROVAL OF PLANS AND SPECIFICATION, AUTHORIZATION TO
RECEIVE BIDS AND AUTHORIZATION FOR CITY MANAGER TO AWARD
CONTRACT - PASEO MONTE VISTA SEWER FACILITIES 600.30
As set forth in the Report dated March 16, 1999, from the Director of Engineering and
Building,the plans and specifications and call for bids for the for Paseo Monte Vista Sewer
Facilities project were approved. The City Manager was authorized to award the contract.
7. RECEIVE AND FILE CASH BALANCES BY FUND FOR MARCH 1998 (330.501
The Report of Cash Balances by Fund for the months ending July 31 through December 31,
1998, was ordered received and filed.
8. RECEIVE AND FILE REPORT OF INVESTMENTS - MONTH ENDING
FEBRUARY 28, 1999 (350.30)
The Report of Investments for the month ending February 28, 1999 was ordered received and
filed.
City Council Minutes -3- 3/16/99
AGENDA ITEM March 16, 1999
4
TO: George Scarborough, City Manager
FROM: William M. Huber, Director of Engineering & Building
SUBJECT: Consideration of Approval of Plans and Specifications, Authorization to
Receive Bids and Authorization for City Manager to Award Contract-Paseo
Monte Vista Sewer Facilities
RECOMMENDATION
By motion, approve the plans and specifications for Paseo Monte Vista Sewer Facilities. Authorize
Staff to receive bids and authorize the City Manager to award the contract.
SITUATION
A. Summary and Recommendation
Plans and specifications have been prepared to construct sewer facilities on Paseo Monte
Vista. Staff is recommending approval of plans and specifications and authorization to
receive bids. Staff is also requesting that the City Council authorize the City Manager to
award the contract in order to expedite the bid process and award of contract. Staff will
return the item to the City Council for ratification of the award following the bid process and
award of contract by the City Manager.
A copy of the plans and specifications is available for review in the City Clerks Office; a
copy has been placed in the City Council Office.
B. Background
In May, 1998, property owners approached the City with a request for sewer facilities on
Paseo Monte Vista. Construction of sewer facilities to replace the need for septic tanks
reduces the possibility of ground water intrusion and is, therefore, beneficial to the
community and its residents. In February, 1999, a Funding Agreement for construction and
funding of this capital project by the City was approved. The agreement results ultimately
in one hundred percent reimbursement by Paseo Monte Vista property owners upon
connection to the sewer system.
Easement Deeds have been offered by each of the private property owners located on Paseo
Monte Vista for the sewer facilities and the City Council has been requested,under a separate
item, to accept the Easements so that construction of the sewer facilities can proceed.
Initial request and development of this project began in May, 1998. Other on-site home
improvements by homeowners i e"4!b-#Wfc� pletion of the sewer line.
AGENDA ITEM March 16, 1999
Staff, therefore, wishes to expedite the project by reducing the time frame needed to complete the
bid process and award the contract. Staff is requesting approval of plans and specifications,
authorization to receive bids, and authorization for the City Manager to award the contract.
Following the bid process and award of contract by the City Manager, Staff will return the item to
the City Council for ratification of the award.
COMMISSIONBOARD REVIEW, RECOMMENDATIONS
N/A
FINANCIAL CONSIDERATIONS
The Funding Agreement approved on February 2, 1999, allows for construction of the sewer
facilities by the City,with reimbursement for actual costs by the homeowners. The City Council has
approved use of the Sewer Enterprise Fund for this project,estimated at$45,000. Collection of costs
and fees from the three homeowners initially participating in the agreement will generate
reimbursement of$22,926 upon project completion. Additional reimbursement to the fund will
occur as the other homeowners connect to the system.
NOTIFICATION
Each of the property owners along Paseo Monte Vista is being notified per the attached mailing list
(Attachment Q.
ALTERNATE ACTIONS
1. Approve the plans and specifications for Paseo Monte Vista Sewer Facilities, authorize Staff
to receive bids, and authorize the City Manager to award the contract;
2. Do not approve the plans and specifications, do not authorize Staff to receive bid, and do not
authorize the City Manager to award the contract;
3. Request additional information from Staff.
RECOMMENDATION
By motion, approve the plans and specifications for Paseo Monte Vista Sewer Facilities. Authorize
Staff to receive bids and authorize the City Manager to award the contract.
Respec)/fuU�lly Submitted, Prepared by
liam M. Huber, P.E. �cy Barney r
Director, Engineering & Building Management Analyst
Attachments: A. Location Map
B. Mailing List
WMHNB
CITY OF SAN JUAN CAPISTRANO
COUNTY OF ORANGE
STATE OF CALIFORNIA
SPECIFICATIONS
AND CONTRACT DOCUMENTS
PASEO MONTE VISTA SEWER
Members of the City Council
JOHN GREINER, MAYOR
DAVID SWERDLIN WYATT HART
COLLENE CAMPBELL GIL JONES
CITY MANAGER
GEORGESCARBOROUGH
DIRECTOR OF ENGINEERING AND BUILDING
WILLIAM M. HUBER
FEBRUARY 1999
®RAFT
TABLE OF CONTENTS
PASEO MONTE VISTA SEWER
TITLE PAGE
CONTRACT DOCUMENTS
Notice Inviting Bids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
BidProposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .-. . 3
Schedule of Work Items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Non-Collusion Affidavit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Designation of Sub-Contractors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Instructions to Bidders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
BidBond . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BB-1
Performance Bond . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PB-1
Labor& Material Bond . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LM-1
CONTRACT
Contract . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
SPECIAL PROVISIONS
Work to be Done . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-1
Section 1 Standard Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-1
Section 2 Terms Defined . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-3
Section 3 Flow and Acceptance of Water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-3
Section 4 Water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-3
Section 5 Insurance and Overhead Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-3
Section 6 Protection of Existing Utilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-3
Section 7 Protection of Private Property . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-4
Section 8 Construction Zone . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-4
Section 9 Pre-Construction Coordination Meeting . . . . . . . . . . . . . . . . . . . . . . . SP-4
Section 10 National Pollutant Discharge Elimination System . . . . . . . . . . . . . . . SP-4
Section 11 Preservation of Survey Monuments . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-5
Section 12 Monumentation Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-6
Section 13 Hours of Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-6
Section 14 Special Provisions for the Construction of Sanitary Sewer . . . . . . . . . SP-6
Section 15 Alternate Pipe Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-6
Section 16 Notification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SP-6
Project Schedule Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
DETAIL SPECIFICATIONS AND METHOD OF PAYMENT
Bid Item 1 Project Survey . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DS-1
Bid Item 2 Reestablish Center Line Ties and Monuments . . . . . . . . . . . . . . . . . DS-1
Bid Item 3 Off Street Storage of Equipment and Materials . . . . . . . . . . . . . . . . . DS-I
Bid Item 4 Connect to Existing 8" Diameter Sewer . . . . . . . . . . . . . . . . . . . . . . DS-1
Bid Item 5 Construct 8" Diameter Sewer in Paved Area . . . . . . . . . . . . . . . . . . . DS-2
Bid Item 6 Construct 4" Diameter Sewer Lateral in Paved Area . . . . . . . . . . . . . DS-2
Bid Item 7 Construct 48" Diameter Manhole . . . . . . . . . . . . . . . . . . . . . . . . . . . DS-3
Bid Item 8 Unsuitable Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DS-3
Bid Item 9 Additional Bedding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DS-3
APPENDICES
1. Special Provisions for the Construction of Sanitary Sewers
2. City Existing Street Trench Detail
PASEO MONTE VISTA SEWER
NOTICE INVITING BIDS
Public notice is hereby given that the City of San Juan Capistrano will, up to xx p.m.. on the xx day
of xx 1999,receive sealed proposals or bids for the Paseo Monte Vista sewer in accordance with the
approved Plans, Specifications, Special Provisions,and the Standard Specification for Public Works
Construction. 1997 Edition, including all supplements therefore, on file in the office of the City
Clerk of the City of San Juan Capistrano, California. Bids will be received until the time
hereinbefore stated at the City Clerk's Office,San Juan Capistrano City Hall,32400 Paseo Adelanto,
San Juan Capistrano, California.
No bid will be received unless it is made on a proposal provided within these specifications. Any
person desiring to submit a bid proposal in response to this bid package must first purchase the bid
package. Each proposal or bid must be accompanied by a certified check, cash, cashier's check, or
bidder's bond payable to the City of San Juan Capistrano in the sum of not less than ten percent of
the total bid amount.
The bid check,cashier's check or bidder's bond of the successful bidder will be forfeited to the City
of San Juan Capistrano in the event such successful bidder fails to enter into the required contract
within 15 days after the written notice that said contract has been awarded to him for the work.
A pre-bid conference is scheduled at xx a.m. on the xxth day of xx 1999, in the City Council
Chambers. The contractor shall have the opportunity for clarification or interpretation of any point
or points of question within the plans and contract documents or specifications. It is the contractor's
responsibility to be in attendance at this conference to receive any information disclosed during the
proceedings,for the City of San Juan Capistrano shall not disseminate any records of the conference.
Exclusive of written addenda and this pre-bid conference, the City of San Juan Capistrano shall not
be responsible for any instructions, explanations, or interpretation of the plans, specifications, and
contract documents presented to the bidders in any manner.
The successful bidder, simultaneously with the execution of the contract,will be required to furnish
a Faithful Performance Bond equal in the amount of one-hundred percent (100%) of the contract
price. The surety bond company must be selected from among the surety companies set forth in the
Standard Specifications.
The City Council reserves the right to reject any and all bids received and to compare the relative
merits of the respective bids and to choose that, which in the opinion of the City of San Juan
Capistrano, will best serve the interests or needs of the City of San Juan Capistrano.
1
A time limit of tweaV five (25) calendar days has been set for the completion of the work, from the
date of the Notice to Proceed.
BIDDERS ARE HEREBY NOTIFIED THAT,pursuant to the Labor Code of the State of California,
copies of the prevailing rate of per diem wages, as determined by the Director of the State
Department of Industrial Relations, are on file in the office of the City Clerk and shall be made
available to any interested party on request.
Copies of plans and specifications are on file in the office of the City Clerk of San Juan Capistrano,
32400 Paseo Adelanto, San Juan Capistrano, California. Copies of the plans and specifications for
use in preparing bids may be obtained at the Office of the City Clerk, San Juan Capistrano, at the
address shown above. One set of plans and specifications is available for each general contractor
proposing to submit a bid for said work. A charge in the amount of$30,non-refundable,is required
for obtaining each set of plans and specifications. There will be a$5 charge for postage and handling
on all plans and specifications mailed.
Each bidder shall state the California Contractor's License Number and Classification of such bidder
so bidding, as no bid will be accepted from a Contractor who has not been licensed in accordance
with the provisions of the laws of the State of California relating to the licensing of Contractors.
This Notice is hereby given and published by order of the Councilmembers of the City of San Juan
Capistrano and is dated this day of
CITY CLERK
CITY OF SAN JUAN CAPISTRANO
ORANGE COUNTY, CALIFORNIA
2
BID PROPOSAL
For the: PASEO MONTE VISTA SEWER
From:
Contractor, License No. & Classification
To the Members of the City Council
City of San Juan Capistrano
Gentlemen:
The undersigned, as bidder, declares that he has carefully examined the location of the proposed
work as described, examined the Plans, Specifications, Special Provisions, and the Standazd
Specifications for Public Works Construction. 1997 Edition, including all supplements therefore,
read the Instructions to Bidders,and is familiar with all proposal requirements,and hereby proposed
and agrees, if the proposal is accepted, to complete the said construction in accordance with the
Contract Documents, as defined in Section 1-2 of the Standard Specifications, in the time stated
herein, for the unit price or lump sum given on the following pages of this proposal, amounting to
a total of:
Words Figures
Said amount to include and cover all taxes, the famishing of all materials, the performing of all the
labor requisite or proper and the providing of all necessary machinery, tools, apparatus, and other
means of construction; also,the performance and completion of all the work in the manner set forth,
described and shown in the Specifications or the drawings for the work.
If the contract is awarded, the undersigned agrees to enter into a contract with the City of San Juan
Capistrano and to commence work within fifteen (15) calendar days from the date of execution
thereof, and to diligently prosecute the work to completion before the expiration of twee five (25)
calendar days.
All bids are to be computed on the basis of the given Estimated Quantities of Work, as indicated in
this proposal, times the unit prices as submitted by the bidders. In case of discrepancy between
words and figures, the words shall prevail. In case of discrepancy between unit prices and the
extension thereof, the unit price shall prevail and bids will be computed as indicated above and
3
compared on the basis of corrected totals, given solely as a basis for comparison of bids. It is
understood that the City does not expressly,nor by implication,agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any item or
portion of the work or to omit portions of the work as may be deemed expedient by the Engineer.
It is also understood by Bidder that the City of San Juan Capistrano has the right to reject this
proposal or to award a contract to the undersigned at the prices stipulated. If the proposal is rejected,
then any check or cashier's check shall be returned to the undersigned within thirty (30) days. No
bid bonds will be returned. If the proposal is accepted and the undersigned fails to enter into a
contract within fifteen(15)days after the agreement is delivered to him for signature, or within such
further time as may be granted by the Members of the City Council,then said check shall be cashed
or said bond declared forfeit and an amount equal to the difference between the lowest bid and the
next lowest bid who will execute a contract shall be paid into the treasury of the City of San Juan
Capistrano as liquidated damages for the failure of the undersigned to comply with the terms of this
proposal.
Accompanying this proposal is (Insert
"$ cash," cashier's check,certified check or bidder's bond on the forms from Vages B-
I and BB-2 of these Contract Documents, as the case may be), in an amount equal to at least ten
percent(10%) of the total bid.
The following is the name and place of business of the surety company which will furnish the
required bonds as surety if the work is awarded to the undersigned:
Licensed in accordance with an act providing for the registration of contractors -- License No.
and Classification
Signature of Bidder:
4
(If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all
individual co-partners composing the firm: President, Secretary, Treasurer, and Manager thereof.)
Dated: _
Business Address
Dated:
Telephone Number
Further,the undersigned bidder certifies that he has thoroughly checked the figures set forth in this
proposal,that they are correct to the best of his knowledge and that they constitute his proposal for
the work called out herein.
Dated:
Signature of Bidder
Dated:
Telephone Number
5
SCHEDULE OF WORK ITEM
PASEO MONTE VISTA SEWER
Item Approximate Work Items With Unit Price Unit Price Total Amount
tit (Written in Words (In Figures)
1 L.S. Project survey for the lump sum price of
dollars. $
2 L.S. Reestablish centerline ties and
monuments for the lump sum price of
dollars. $
3 L.S. Off-street storage of equipment and
materials for the lump sum price of
dollars. $
4 L.S. Connect to existing 8" diameter sewer
for the lump sum price of
dollars. $
5 509 L.F. Construct 8" diameter sewer in paved
area for the unit price of
dollars per lineal foot. $ $
6 6 EA Construct 4" diameter sewer lateral in
paved area for the unit price of
dollars per each. $ $
7 2 EA Construct 48" diameter manhole for the
unit price of
dollars per each. $ $
8 50 Tons Excavation and disposal of unsuitable
material as directed by the Engineer for
the unit price of
dollars per ton. $ $
9 50 Tons Furnish and place additional bedding as
directed by the Engineer for the unit
price of dollars per ton. $ $
Total Bid Price (Enter here and on Page 3)
Words Figures
6
NON-COLLUSION AFFIDAVIT TO BE EXECUTED BY
BIDDER AND SUBMITTED WITH BID
STATE OF CALIFORNIA )
) SS. -
County of )
being first duly sworn deposes and says that
he is of
the party making the foregoing bid; that such bid is not made in
the interest of or on behalf of any undisclosed person, partnership, company, association,
organization or corporation; that such bid is genuine and not collusive or sham; that said bidder has
not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has
not directly or indirectly colluded,conspired, connived, or agreed with any bidder or anyone else to
put in a sham bid, or that anyone shall refrain from bidding; that said bidder has not in any manner,
directly or indirectly, sought by agreement, communication or conference with anyone to fix the bid
price of said bidder or of any other bidder,or to fix the bid price of or cost element of such bid price,
or of that of any other bidder, or to secure any advantage against the public body awarding the
contract of anyone interested in the proposed contract; that all statements contained in such bid are
true; and further, that said bidder has not directly or indirectly, submitted his bid price or any
breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid
and will not pay any fee in connection therewith, to any corporation, partnership, company,
association, organization, bid depository, or to any member or agent thereof, or to any other
individual except to any person or persons as have a partnership or other financial interest with said
bidder in this general business.
DATED:
SIGNATURE
On this the day of , 19 before me, the undersigned, a Notary
Public in and for said State, personally appeared
, personally known to me/proved to me on the
basis of satisfactory evidence, to be the person(s) whose name(s) subscribed to the
within instrument, and acknowledge that executed it.
WITNESS my hand and official seal.
Notary Public in and for said State
7
DESIGNATION OF SUB-CONTRACTORS
Submit with Proposal.
In compliance with the Provisions of Section 4100-4107 of the Government Code of the State of
California as amended,the undersigned certifies that he has used the sub-bids of the following listed
sub-contractors in making up his bid, and that the sub-contractors listed will be used for the work
for which they bid, subject to the approval of the Engineer, and in accordance with the applicable
provisions of the Specifications. It is understood and agreed that all those portions of the work
called for in the contract documents for which a sub-contractor is not listed will be performed by the
undersigned through his forces. If no sub-contractors are listed, all bonds and insurance will be
written in the name of the general contractor only.
Item of Work Sub-contractor License No. Address Phone
& Classification
1.
2.
3.
4.
5.
6.
7.
8.
BIDDER'S NAME
AUTHORIZED SIGNATURE
8
INSTRUCTION TO BIDDERS
Securing Documents
Plans, Specifications and other contract documents will be available for examination without charge
and copies may be secured in accordance with the "Notice Inviting Bids."
Examination of Plans Specifications and Site of Work
The bidder is required to examine the site of work, the Proposal, the Plans and the Specifications,
Special Provisions, and the Standard Specifications for Public Works Construction 1997 Edition
including all supplements, very carefully. He shall satisfy himself as to the character, quality and
quantities of the work to be performed, the materials to be furnished and the requirements of the
Contract Documents. The plans for the work show conditions as they are believed to exist, but it is
not to be inferred that all the conditions as shown thereon are actually existent, nor shall the City of
San Juan Capistrano or any of its officers or agents be liable for any loss sustained by the contractor
as a result of any variance between conditions shown on the plans and actual conditions revealed
during examination or progress of the work. The submission of a proposal shall be prima facie
evidence that the bidder has made such an examination.
Interoretation of Drawings and Documents
If any bidder should find discrepancies in, or omissions from the drawings, specifications or other
proposed contract documents, or if he should be in doubt as to the true meaning of any part thereof,
he shall at once make a written request to the Engineer for correction, clarification or interpretation
of the point or points in question. The person submitting such a request shall be responsible for its
prompt delivery.
In the event that the Engineer receives such a request and it should be found that certain essential
information is not clearly and fully set forth, or if the Engineer discovers errors, omissions, or points
requiring clarification in the drawings or documents, a written addendum will be mailed to each
person to whom a set of contract documents has been delivered. The City of San Juan Capistrano
will not be responsible for any instructions, explanations or interpretations of the documents
presented to bidders in any manner other than written addendum.
Addenda or Bulletins
The effect of all addenda to the contract documents shall be considered in the bid and said addenda
shall be made a part of the contract documents and shall be returned with them. Before submitting
his bid, each bidder shall inform himself as to whether or not any such addenda have been issued,
and failure to cover in his bid any such addenda issued may render his bid invalid and result in its
rejection.
9
pisqualification of Bidders
No person, firm or corporation shall be allowed to make, file or be interested in more than one bid
for the same work unless alternate bids are called for. A person, firm or corporation who has
submitted a sub-proposal to a bidder,or who has quoted prices on materials to a bidder,is not hereby
disqualified from submitting a bid in his own behalf.
Proposals
Bids to receive consideration shall be in accordance with the following instructions:
A. Bids shall be made only upon the forms provided within these specifications; all bid items
shall be properly filled out; bid prices shall be stated both in words and in figures; and the
signatures of all persons signing shall be in longhand. Where there is a conflict in the words
and the figures, the words shall govem.
B. All prices and notations must be in ink or typewritten. No erasures will be permitted.
Mistakes may be crossed out and corrections typed or written in ink adjacent thereto and
must be initialed in ink by the person or persons signing the bid.
C. Bids shall not contain any recapitulation of the work to be done. Alternate proposals will not
be considered except as required hereinabove. No oral, telegraphic or telephonic proposals
or modifications will be considered.
D. The City of San Juan Capistrano may require any bidder to furnish a statement of his
experience, financial responsibility, technical ability, equipment and references properly and
fully filled out.
E. Each bidder shall list his proposed sub-contractors on the form accompanying the proposal
in accordance with the provisions of the specifications.
F. Each bidder must accompany his bid with either a cashier's check upon some responsible
bank, or a properly certified check upon such bank, or an approved corporate surety bond
payable to the City of San Juan Capistrano for such a sum of not less than ten percent(10%)
of the aggregate sum of the bid, which check or bond and the monies represented thereby
shall be held by the City of San Juan Capistrano as a guarantee that the bidder, if awarded
the contract, will in good faith enter into such contract and furnish the required bonds.
The bidder agrees that, in case of his refusal or failure to execute said contract and give
bonds within the time required by these documents, such check or bond, and the money
represented thereby, shall remain the property of the City of San Juan Capistrano and, if the
bidder shall fail to execute said contract, said surety will pay to the City of San Juan
Capistrano the damages which the City of San Juan Capistrano may suffer by reason of such
failure not exceeding the sum of ten percent(10%)of the amount of the bid. A bid received
and not accompanied by such cashier's check, certified check or approved bond shall be
rejected.
10
G. Bids shall be delivered to the City of San Juan Capistrano at the location stipulated on or
before the day and hour set for the opening of bids, as hereinbefore specified in the "Notice
Inviting Bids." Bids shall be enclosed in a sealed envelope hearing the title of the work,the
name of the bidder, bid opening date and ti.:.c of bid opening.
Licensinia of Contractor
All persons, firms, partnerships or corporations shall be licensed in accordance with the Business
and Professions Code of the State of California and the applicable ordinances of the City and County
before doing any work of any kind.
Withdrawal of Bids
Any bidder may withdraw his bid in person or by written request at any time prior to the scheduled
closing time for receipt of bids.
Opening of Bid Proposals
The City of San Juan Capistrano will, in open session, publicly open, examine and declare the bids
at the time set forth in the "Notice Inviting Bids." Bidders or their authorized representatives are
invited to be present.
Award of Contract or Rejection of Bids
No bidder may withdraw his bid for a period of ninety(90)days after the date set for the opening of
bids. The contract for the work will either be awarded or the bids rejected within the ninety (90)
days from the date set for the opening of bids.
The contract for the work will be awarded to the lowest responsible bidder complying with these
instructions and with the"Notice Inviting Bids." The City of San Juan Capistrano,however,reserves
the right to reject any or all bids and to waive mere informalities, minor technical errors or
irregularities, obvious clerical errors or erasures.
The bidder to whom the award is made shall execute two copies of the written contract with the City
of San Juan Capistrano and fumish the stipulated bonds,insurance and bid breakdown within fifteen
(15) days after the bid opening date. The contract shall be made in the form adopted by the City of
San Juan Capistrano. The release of the successful bidder's surety deposit, as previously stipulated
(page 5), shall be made upon the City of San Juan Capistrano's acceptance of the Labor and Materials
Bond and the Faithful Performance Bond.
If the bidder to whom the award is made fails to enter the contract as herein provided, the award may
be annulled and an award may be made to the next lowest responsible bidder; and such bidder shall
fulfill every stipulation embraced herein, as if he were the party to whom the first award was made.
11
A corporation to which an award is made shall furnish evidence of its corporate existence and
evidence that the officer signing the contract and bonds for the corporation is duly authorized to do
SO.
Bonds
The successful bidder, simultaneously with the execution of the Agreement, will be required to
furnish a Labor and Material Bond in a sum not less than one hundred percent (100%) of the total
amount payable by the terms of the contract and a Faithful Performance Bond in a sum not less than
one hundred percent(100%)of the amount of the contract, Said bonds shall be secured from a surety
company selected from the surety companies set forth in the standard specifications. Bonds must
be submitted on the forms contained in these specifications.
Time Performance
The work shall be commenced within fifteen (15) calendar days from the date of issuance of the
Notice to Proceed and shall be diligently prosecuted until completion. A time limit of twenty five
(25 )calendar days from the date specified in the Notice to Proceed has been set for completion of
the work. The bidder's attention is directed to the specifications as to provisions for extension of
time of completion and/or assessment of liquidated damages.
Assignment of Contract
No assignment by the Contractor of any contract to be entered into hereunder or any part thereof, or
of funds to be received thereunder by the Contractor, will be recognized by the awarding authority
unless such assignment has had prior approval of the awarding authority and the surety has been
given notice of such assignment in writing and has consented thereto in writing.
Workmen and Waees
Attention is specifically directed to all provisions of the Labor Code of the State of California with
regard to workmen and wages. Wages shall not be less than prevailing wage rates determined by
the City of San Juan Capistrano pursuant to said Code and as listed in the "Notice Inviting Bids."
Building Permits
It shall be the Contractor's responsibility to obtain all necessary permits, bonds and insurance, as
required, for the completion of the project. No extra compensation shall be made therefore.
12
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we,
as PRINCIPAL, and
as SURETY, hereinafter called Surety, are held and
firmly bound unto the CITY OF SAN JUAN CAPISTRANO, Obligee, hereinafter called
City, in the sum of $ for payment whereof Principal and Surety bind
themselves, their heirs, executors, administrators, successors, and assigns, jointly and
severally, fairly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas the Principal has
submitted the accompanying bid dated , 19_, for the construction
of for the
City of San Juan Capistrano, Orange County, California.
NOW, THEREFORE, if the Principal shall not withdraw said bid within thirty (30)
days after the opening of same, and shalt, within fifteen (13) days after the agreement
has been presented to him for execution, enter into a written contract with the City in
accordance with the bid as accepted, and if the Principal shall give the required bond
with good and sufficient sureties, or sureties for the faithful performance and proper
fulfillment of such contract and for the protection of laborers and materialmen, or in
the event of the withdrawal of said bid within the periods specified, or the failure to
enter into said contract and give said bond within the time specified, if the Principal
shall within sixty (60) days after request by the City, pay the City the difference
between the amount specified in said bid and the amount for which the City may procure
the required work and/or supplies if the latter amount be in excess of the former, then
the above obligation shall be void and of no effect, otherwise to remain in full force and
virtue.
Further, as a part of the obligation secured hereby, and in addition to the face
amount specified therefor, there shall be included costs and reasonable expenses and
fees, including reasonable attorney's fees, incurred by City in successfully enforcing such
obligation, all to be taxed as costs and included in any judgment rendered.
BB-L
IN WITNESS WHEREOF, the above-bounden parties have executed this
instrument under their several seals this day of 19the name and
corporate seal of each corporate party being affixed hereto and these presents duly
signed by its undersigned representative pursuant to authority of its governing body`,
Two Witnesses (If Individual)
PRINCIPAL
BY:
Title:
ATTEST (If Corporation)
Corporate Seal
SURETY
ATTEST BY:
Title:
Title
APPROV AS TO FORM:
(I Lq�4�
John Shaw, City Xttomey
IM-2
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS:
That
as Principal, hereinafter called CONTRACTOR, and
as Surety, hereinafter called SURETY, are held and firmly bound unto the City of San
Tuan Capistrano, as Obligee, hereinafter called CITY, in the amount of
_Dollars for payment whereof Contractor
and Surety bind themselves, their heirs, executors, administrators, successors, and
assigns, jointly and severally, fairly by these presents.
WHEREAS, Contractor has by written agreement dated
entered into a (describe agreement):
which contract is by reference made a part hereof;
NOW, THEREFORE, the condition of this obligation is such that, if Principal
shall promptly and faithfully perform said agreement, then this obligation shall be null
and void; otherwise it shall remain in full force and effect. Surety waives whatever legal
right it may have to require that a demand be made first against the principal in the
event of default.
BE IT FURTHER RESOLVED, that:
1. As a part of the obligation secured hereby, and in addition to the face
amount specified, there shall be included costs and reasonable expenses and fees,
including reasonable attorney's fees, incurred by City in successfully enforcing such
obligation, all to be taxed as costs and included in any Judgment rendered.
PI3-I
2. Said Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alteration, or modification of the contract documents or of the work
to be performed thereunder, shall in any way affect its obligations or this bond, and it
does hereby waive notice of any such change, extension of time, alterations, or
modifications of the contract documents or of work to be performed thereunder.
Executed this day of 19 , at
California.
PRINCIP AL
APPROVED AS TO FORM (NOTARIZATION AND SEAL)
JAM0
J N R. SHAW, CITY ATTORNEY
SURETY
(NOTARIZATION AND SEAL)
Premium included
LABOR AND MATERIAL BOND
KNOW ALL MEN BY THESE PRESENTS: That
WHEREAS, the City of San Juan Capistrano, a municipal corporation of Orange
County, California, has awarded to , License
No. , hereinafter designated as "Principal", a contract for
. and
WHEREAS, said Principal is required to furnish a bond in connection with the
said contract providing that if said Principal, or any of his or its sub-contractors, shall
fail to pay for any materials, provisions, provender or other supplies or teams used in,
upon, for or about the performance of the work contracted to be done, or for any work or
labor done thereon of any kind, the surety or this bond will pay the same.
NOW, THEREFORE, we
Principal, and as surety, are
held firmly bound unto the City of San Juan Capistrano, a municipal corporation, in the
penal sum of DOLLARS
($ ), lawful money of the United States of America, for payment of which sum
well and truly to be made we bind ourselves, our heirs, executors, administrators and
successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that, if said Principal, his or its
heirs, executors, administrators, successors or assigns, or sub-contractors, shall fail to
pay for any materials, provisions, provender, or teams, or other supplies or equipment
used in, upon, for or about the performance of the work contracted to be done, or for any
work or labor done thereon of any kind, or for amounts due under the Unemployment
Insurance Act with respect to such work or labor as required by the provisions of Title 1,
Division 3, Chapter 3 of the Government Code of California as amended, that the surety
will pay for the same in an amount not exceeding the sum specified in this bond and also
in case suit is brought upon the bond, a reasonable attorney's fee to be fixed by the
court. This bond shall inure to the benefit of any and all persons, companies and
corporations entitled to file claims under said act, so as to give a right of action to them
or their assigns in any suit brought upon this bond.
FURTHER, the said surety, for value received, hereby stipulates and agrees that
no change, extension of time, alteration or modification of the contract documents or of
the work to be performed thereunder shall in any way affect its obligation on this bond
and it does hereby waive notice of any such change, extension of time, alteration or
modification of the contract documents or of work to be performed thereunder.
As a part of the obligation secured hereby, and in addition to the face amount
specified therefor, there shall be included costs and reasonable expenses and fees,
including reasonable attorney's fees, incurred by City in successfully enforcing such
obligation, all to be taxed as costs and included in any judgment rendered.
LM-1
IN WITNESS WHEREOF three (3) identical counterparts of this instrument, each
of which shall for all purposes be deemed an original thereof, have been duly executed by
the Principal and surety herein named on the day of
19 . The name and corporate seal of each corporate party being hereto affixed and
these presents duly signed by its undersigned representatives pursuant to authority of its
governing body.
PRINCIPAL
By
SURETY
By
APPROVED AS TO FORM
(-�L e S Q LAI.J —
R. SHAW, CITY ATTORNEY
CONTRACT
This contract is made and entered into by and between the CITY OF SAN JUAN CAPISTRANO,
hereinafter referred to as "CITY" and
hereinafter referred to as
"CONTRACTOR."
IT IS HEREBY AGREED BETWEEN THE PARTIES AS FOLLOWS:
FIRST. CONTRACT DOCUMENTS. The contract documents shall be considered to include
the Notice Inviting Bids,the Instructions to Bidders,the Proposal,the Bid Bond,the Non-Collusion
Affidavit, the Designation of Sub-Contractors,the Contract which is prepared for execution by the
CITY and the CONTRACTOR. Plans, Specifications and Special Provisions, the Standard
Specifications for Public Works Construction. 1997 Edition, including all Supplements, Contract
Bonds, Resolutions adopted by the CITY pertaining to the work, insurance policies and certificates,
and any supplemental written agreements amending or extending the scope of the work originally
contemplated that may be required to complete the work in a substantial and acceptable manner.
SECOND. THE WORD. CONTRACTOR agrees to furnish all tools, labor, material, equipment,
transportation, and supplies necessary to perforin and complete in good and workmanlike manner
the construction of PASEO MONTE VISTA SEWER in strict conformity with the Plans,
Specifications and all other contract documents,which documents are on file at the Office of the City
Clerk, City Hall, 32400 Paseo Adelanto, San Juan Capistrano, California.
THIRD. PAYMENT. CITY agrees to pay, and CONTRACTOR agrees to accept, the lump sum
adjusted for variations of quantities, at the prices designated in bid proposal at the time and in the
manner set forth in the Specifications.
FOURTH. COMMENCEMENT AND COMPLETION OF THE WORK. CONTRACTOR agrees
to begin and complete the work within the time specified in the Notice Inviting Bids. It is agreed
that it would be impractible and extremely difficult to fix the actual amount of damages, and loss
sustained by CITY, should CONTRACTOR fail to complete the work in the specified time;
1
therefore, CONTRACTOR shall pay CITY, as liquidated damages, not in the nature of a penalty,
Two Hundred Fifty Dollars ($250)per calendar day for each day delayed; provided that extensions
of time with waiver of liquidated damages, may be granted as provided in the Specifications.
FIFTH. PERFORMANCE BOND AND LABOR AND MATERIAL BOND. CONTRACTOR
agrees to furnish bonds guaranteeing the performance of this contract and guaranteeing payment of
all labor and material used under this contract, as required by the laws of the State of California, on
forms approved by the CITY. The Performance Bond shall be for an amount of one hundred percent
(100%) of the amount of this contract and shall be conditioned on full and complete performance
of the contract, guaranteeing the work against faulty workmanship and materials for a period of one
(1)year after completion and acceptance. The Labor and Material Bond shall be for an amount of
one hundred percent (100%) of the amount of this contract and shall be conditioned upon full
payment of all Labor and Material entering into or incidental to the work covered by this contract.
CONTRACTOR agrees to furnish the bonds on the forms found within the Specifications.
CONTRACTOR agrees to pay CITY such sum as the Court may judge as reasonable for the legal
services of any attorney representing the CITY in any action brought to enforce or interpret the
obligations of this agreement, and such sums shall be made a part of any judgment in such action
against CONTRACTOR if such action is determined in favor of said CITY. The required
Performance, Labor and Materials Bonds, and Bid Bond shall provide that the surety shall pay
attorney's fees incurred by CITY in enforcing this agreement.
SIXTH. GENERAL PREVAILING RATE OF PER DIEM WAGES. Pursuant to the Labor Code
of the State of California, conies of the prevailing rate of per diem wages, as determined by the
Director of the State Department of Industrial Relations, are on file in the Office of the City Clerk,
32400 Paseo Adelanto, San Juan Capistrano,California, and are hereby incorporated and made a part
hereof. CONTRACTOR agrees that he, or any SUB-CONTRACTOR under him, shall pay not less
than the foregoing specified prevailing rates of wages to all workmen employed in the execution of
the contract.
2
SEVENTH. INSURANCE. CONTRACTOR shall maintain at all times during this contract liability
and property damage insurance naming the CITY and its elected and appointed officials as a named
insured, which such policies shall be of an amount not less than One Million Dollars combined
single limit. Insurance certificates shall be for a minimum period of one year.
CONTRACTOR shall maintain in full force and effect comprehensive automobile liability coverage,
including owned, hired, and non-owned vehicles in the following minimum amounts:
$500,000 property damage;
$500,000 injury to one person/any one occurrence/not limited to contractual period;
$1,000,000 injury to more than one person/any one occurrence/not limited to contractual
period.
The insurance policies shall bear an endorsement or shall have an attached rider providing that in
the event of expiration of proposed cancellation of such policies for any reason whatsoever, the
CITY shall be notified by registered mail, return receipt requested, giving a sufficient time before
the date thereof to comply with the applicable law or statute but in no event less than 30 days before
expiration or cancellation is effective. CONTRACTOR shall provide to CITY the policy certificate
establishing that the required level of insurance has been satisfied.
CONTRACTOR shall indemnify, defend and save harmless the CITY, its officers, agents, and
employees from and against any and all claims,demands,loss or liability of any kind or nature which
CONTRACTOR, its officers, agents and employees may sustain or incur or which may be imposed
upon them or any of them for injury to or death of persons, damage to property as a result of, or
arising out of, or in any manner connected with the performance of the obligations under this
contract.
EIGHTH. COMPLIANCE WITH OTHER PROVISIONS OF LAW RELATIVE TO PUBLIC
CONTRACTS. CITY is subject to the provisions of the Government Code and the Labor Code of
the State of California. It is stipulated and agreed that all provisions of law applicable to public
contracts are a part of this contract to the same extent as though set forth herein and shall be
complied with by CONTRACTOR. These include, but are not limited to, the stipulation that eight
(8)hours labor constitute a legal day's work and CONTRACTOR shall, as a penalty to CITY, forfeit
Twenty-five Dollar ($25) for each workman employed in the execution of the Contract by
3
CONTRACTOR, or by any SUB-CONTRACTOR, for each calendar day during which such
workman is required or permitted to work more than eight (8) hours in violation of the provisions
of Article Three, Chapter One, Part Seven, Division 2, of the California Labor Code, except as
permitted by law. _
IN WITNESS WHEREOF, this contract is executed by the duly authorized agent(s) of CITY,
pursuant to City Council action, and by CONTRACTOR on the date set before the name of each.
City of San Juan Capistrano
DATED: BY:
JOHN GREINER, MAYOR
BY:
CONTRACTOR, LICENSE NO. AND CLASSIFICATION
ATTEST:
Cheryl Johnson, City Clerk
APPROVED AS TO FORM:
John Shaw, City Attorney
4
CITY OF SAN JUAN CAPISTRANO
PASEO MONTE VISTA SEWER
SPECIAL PROVISIONS
WORK TO BE DONE
The work to be done under this contract in general consists of the construction of approximately 509
linear feet of 8" diameter sanitary sewer and associated manholes and laterals in the private street
Paseo Monte Vista. The work shall also include all other miscellaneous items and appurtenant work
as contained in the contract documents.
SECTION 1 - STANDARD SPECIFICATIONS
The contractor shall perform his work in accordance with the Standard Snecifrcations for
Public Works Construction 1997 Edition, hereinafter referred to as the Standard
Specifications.
The Contractor shall maintain a copy of this book on the job-site at all times. Unless
otherwise specified, errata and supplements to the Standard Specifications shall be part of
these specifications. The provisions of the Standard Specifications shall be modified as
indicated below:
Change 1: Contract Termination
"If at any time, in the opinion of the Director of Engineering and Building, Contractor fails
to supply suitable equipment, an adequate working force, or material of proper quality, or
shall fail in any respect to prosecute any work with the diligence and force specified and
intended in and by the terms of the Contract, notice thereof in writing shall be served upon
him,and should he neglect or refuse to provide means for satisfactory compliance with the
contract, as directed by the Director of Engineering and Building, within the time specified
in such notice, the City of San Juan Capistrano, in any such case, shall have the power to
terminate all or any portion of the contract.
Upon receiving notice of such termination, Contractor shall discontinue said work or such
parts of it as the City of San Juan Capistrano may designate. Upon such termination, the
Contractor's control shall terminate and thereupon the Members of the City Council, or its
duly authorized representative, may take possession of all or any part of the Contractor's
materials, tools, equipment, appliances, and plant, and buy such additional materials and
supplies at the Contractor's expense as may be necessary for the proper conduct of the work
and for completion thereof; or may employ other parties to cavy the contract to completion,
employ the necessary workmen, substitute other machinery or materials and purchase the
materials contracted for, in such manner as the City of San Juan Capistrano may deem
proper; or the Members of the City Council may annul and cancel the contract and re-let the
work or any part thereof. Any excess of cost arising therefrom over and above the contract
price will be charged against the Contractor and his sureties, who will be liable therefore.
SP-1
In the event of such termination, all money due the Contractor retained under the terms of
this contract shall be forfeited to the City of San Juan Capistrano; but such forfeiture will not
release the Contractor or the sureties from liability or failure to fulfill the contract.
Contractor and sureties will be credited with the amount of monies so forfeited toward any
excess of cost over and above the contract price,arising from the suspension of the operation
of the contract and the completion of the work by the City of San Juan Capistrano as
provided above, and the Contractor will be credited with any surplus remaining after all just
claims for such completion have been paid."
Change 2: Section 7-13 - Laws to be Observed
Add: "All contractors and subcontractors shall comply with all sections of the Municipal
Code of the City of San Juan Capistrano, especially Section: 6-3.06(b), (c), (d) and
(e) and shall secure the services of the City's exclusive solid waste hauler for their
solid waste handling needs."
Change 3: Section 8 - Facilities for City Personnel
Delete this Section.
Change 4: Section 2-9.3 - Survey Services
The Contractor will perform and be responsible for the accuracy of survey adequate for
construction. The Contractor shall preserve construction survey stakes and marks for the
duration of their usefulness. If any construction survey stakes are lost or disturbed and need
to be replaced, such replacement shall be by the Contractor at his expense.
The Contractor shall dig all holes necessary for line and grade stakes.
Unless Otherwise specified, stakes will be set and stationed by the Contractor for curbs,
headers, sewers, storm drains, structures and rough grade and a corresponding cut or fill to
finished grade (or flowline) indicated on a grade sheet.
Change 5: Section 7-10.2 - Storage of Equipment and Materials in Public Streets
Construction equipment and materials shall not be stored in streets,roads,highways or public
right-of-way,nor in Paseo Monte Vista,which is a private street. All materials or equipment
not installed or used in construction within the daily work period shall be stored elsewhere
by the contractor at its expense.
Construction equipment shall not be stored at the work site before its actual use on the work.
Excavated material, except that which is to be used as backfill in the adjacent trench, shall
not be stored in public streets,roads,highways or public right-of-way. After placing backfill,
all excess material shall be removed immediately from the site.
SP-2
SECTION 2 - TERMS DEFINED
Whenever in the said Standard Specifications the following terms are used, it is hereby
provided that the following City departments or person shall be intended:
AGENCY shall mean City of San Juan Capistrano whenever appropriate.
BOARD shall mean the City Council of the City of San Juan Capistrano.
ENGINEER shall mean City Engineer or other person(s) designated by same.
SECTION 3 - FLOW AND ACCEPTANCE OF WATER
Surface or other waters may be encountered at various times during construction. The Contractor,
by submitting a bid, acknowledges that he has investigated the risks arising from surface or other
waters and has prepared his bid accordingly. It shall be the sole responsibility of the Contractor to
protect his work from danger due to any waters encountered. Should any damage to the work due
to surface or other water occur prior to acceptance of the work by the City,the Contractor shall repair
such damage at his expense.
SECTION 4 - WATER
Water will be available from the Capistrano Valley Water District. Arrangements for temporary
construction water services permit and water service may be made by contracting the Capistrano
Valley Water District at (714) 493-1515 one week prior to need for service. All water facility
construction shall conform to the "Standard Specifications," Capistrano Valley Water District, and
"The Uniform Plumbing Code," 1982 Edition.
SECTION 5 - INSURANCE AND OVERHEAD COSTS
The Contractor shall receive no direct compensation for insurance and overhead(move-in costs, for
example) costs. Accordingly, these costs should be prorated to the appropriate bid items.
SECTION 6-PROTECTION OF EXISTING UTILITIES (UNDERGROUND SERVICE ALERT)
The Engineer has endeavored to show all existing utilities. The Contractor must, however, take all
due precautionary measures to protect all of the existing utilities. The Contractor shall have all
utilities located by contacting the responsible agency at lease 48 hours prior to commencing any
construction work.
The Contractor's attention is directed to the utility notification service provided by
UNDERGROUND SERVICE ALERT (USA). USA member utilities will provide the Contractor
with the locations of their substructures in the construction area when the Contractor gives at least
48 hours notice to the USA by calling 1-800-422-4133. Other utility phone numbers are noted on
Sheet 1 of the plans.
SP-3
Full compensation for conforming to the requirements of this section shall be considered as included
in the contract bid prices paid for the various items of work, and no additional compensation will
be allowed therefore.
SECTION 7 - PROTECTION OF PRIVATE PROPERTY -
The Contractor must remain within the construction zone to the best of his ability. The Contractor
must protect all existing private property.
SECTION 8 - CONSTRUCTION ZONE
Contractor shall protect property and facilities adjacent to the construction zone,and all property and
facilities within the construction zone which are shown on the plans to be protected. After
completion of project, the construction zone shall be clean and in a presentable condition. All
public- or privately-owned improvements and facilities shall be restored to their original condition
and location. In the event improvements of farilities are damaged, they shall be replaced with new
materials equal to the original.
Nothing herein shall be construed to entitle the Contractor to the exclusive use of any public street,
way or parking area during performance of the contract work, and Contractor shall conduct his
operations so as not to interfere with the authorized work of utility companies or other agencies in
such streets, way or parking areas.
The Contractor shall be responsible for investigating conditions of available public and private roads
and of clearances, restrictions and other limitations affecting transportation and ingress and egress
to the site of the work.
SECTION 9 - PRE-CONSTRUCTION COORDINATION MEETING
Prior to the commence of construction, arrangements will be made for a meeting between the
Contractor, the Engineer, and involved utility representatives. The purpose of this meeting is to
coordinate the activities of the Contractor within the limits of this contract, review scheduling,
discuss construction methods and clarify inspection procedures. The Contractor will be required to
submit a complete schedule in the attached form showing the number of working days required to
complete each phase of the project. This schedule shall be approved by the City Engineer prior to
the start of construction.
SECTION 10 - NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
1. Construction sites shall be maintained in such a condition that an anticipated storm does not
carry wastes or pollutants off the site.
SP-4
Discharges of material other than Storm Water are allowed only when necessary for
performance and completion of construction practices and where they do not: cause or
contribute to a violation of any water quality standard; cause or threaten to cause pollution,
contamination, or nuisance; or contain a haz^-dous substance in a quantity reportable under
Federal Regulations 40 CFR Parts 117 and 302.
Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes
from paints, stains, sealants, glues, limes, pesticides, herbicides, wood preservatives and
solvents; asbestos fibers, paint flakes or stucco fragments, fuels, oils, lubricants, and
hydraulic, radiator or batter fluids; fertilizers, vehicle/equipment wash water and concrete
wash water;concrete detergent or floatable wastes;wastes from any engine/equipment steam
cleaning or chemical degreasing; and superchlorinated potable water line flushings.
During construction, disposal of such materials should occur in a specified and controlled
temporary area on-site,physically separated from potential storm water run-off,with ultimate
disposal in accordance with local, state and federal requirements.
2. Dewatering of contaminated groundwater, or discharging, contaminated soils via surface
erosion is prohibited. Dewatering of non-contaminated groundwater requires a National
Pollutant Discharge Elimination System Permit from the respective State Regional Water
Quality Control Board.
SECTION 11 - PRESERVATION OF SURVEY MONUMENT
Effective January 1, 1995, AB 1414 'Preservation of Survey Monumentation Compliance with
Section 8771 of the Business and Professional Code" provides for the preservation of Survey
Monuments in construction projects. This legislation mandates that prior to construction monuments
are to be referenced in the field and "Corner Records" prepared for filing in the Office of the County
Surveyor. It also mandates that after construction,monuments are to be reset and "Corner Records"
filed with the County Surveyor. This must be done prior to certifying completion of a project.
The City requires monumentation preservation on all capital improvement projects where
monumentation points are present and the contractor shall be responsible for submitting proper
documentation to the Office of the County Surveyor in compliance with AB 1414.
Project finalization, Notice of Completion and/or release of retention shall be contingent upon
obtaining documentation from the contractor's project surveyor or engineer that monuments have
been set or restored and Corner Records filed with, and to, the satisfaction of the County Surveyor.
All costs necessary to comply with this legislation shall be allocated to the appropriate bid item.
SP-5
SECTION 12 - MONUMENTATION IDENTIFICATION
In accordance with the Professional Land Surveyor Act, Section 8772, any monument set by a
licensed land surveyor or registered civil engineer to mark or reference a point on a property or land
line shall be permanently and visibly marked or tagged with the certificate number of the surveyor
or civil engineer setting it,each number to be preceded by the letters "LS." or"R.C.E.," respectively,
as the case may be or, if the monument is set by a public agency, it shall be marked with the name
of the agency and the political subdivision it serves.
Nothing in this section shall prevent the inclusion of other information on the tag which will assist
in the tracing or location of the survey records which relate to the tagged monument.
Centerline ties filed with the Orange County Surveyor will be checked for compliance with this law.
SECTION 13 - HOURS OF WORK
The hours of work shall be 8:00 a.m. to 4:00 p.m., Monday through Friday.
SECTION 14 - SPECIAL PROVISIONS FOR THE CONSTRUCTION OF SANITARY SEWERS
All work shall conform to the Special Provisions for the Construction of Sanitary Sewers, City of
San Juan Capistrano, hereinafter referred to as "City Sewer Special Provisions". A copy of this
document is made a part hereof. Sewer bedding material B shall be 6" minimum thickness under
the pipe, crushed stone,with the following grading (see Standard Specifications Section 306.1.2.1).
%Passine Sieve Size
100% V
90% - 100% 3/4"
20% - 55% 3/8"
0% _ 10% 44
0% - 5% #8
SECTION 15 - ALTERNATE PIPE MATERIALS
The contract is advised that SDR35 PVC pipe is the only City-approved alternate material for use
in sewer line construction in lieu of extra strength vitrified clay pipe. The minimum requirements
for PVC pipes shall be SDR35 conforming with ASTMD-3034. All pipes shall conform to the
requirements set forth in the standard specifications for the use intended. For SDR35 PVC pipe
bedding, material B shall be used instead of bedding material A in the pipe zone, Appendix 4.
SECTION 16 -NOTIFICATION
The contractor shall notify residents of Paseo Monte Vista 72 hours prior to the start of construction
with an approved written notice.
SP-6
• tl• • 191• •1 •_• _ • - •- • • • •• • -
41,
R.
• 1 1 1 1 1 • 1 1 : 1 ' 1 11
101
1soon
own
�soon=
mmmm �soon �
����
CITY OF SAN JUAN CAPISTRANO
PASEO MONTE VISTA SEWER
DETAIL SPECIFICATIONS AND METHOD OF PAYMENT
BID ITEM 1 - PROJECT SURVEY
The work for this item shall consist of project survey by a licensed engineer or surveyor-and
certification of construction to the required line and grade. The contractor shall ensure that the intent
of the design will be met by checking existing construction elevations for compatibility with the
proposed construction. Any discrepancies shall be reported to the engineer for review.
PAYMENT
The lump sum price for this item shall include all labor, materials, tools and equipment necessary
to carry out the work as specified and no additional compensation shall be made therefor.
BID ITEM 2 - REESTABLISH CENTERLINE TIES AND MONUMENTS
The work for this item shall consist of the reestablishing of center control ties and monuments by
a Registered Civil Engineer or licensed surveyor removed, disturbed or covered during the course
of construction.
PAYMENT
The lump sum price for this item shall include all labor, materials, tools and equipment necessary
to carry out the work as specified and no additional compensation shall be made therefor.
BID ITEM 3 - OFF-STREET STORAGE OF EQUIPMENT AND MATERIALS
The work for this item shall consist of complying with the modified requirements of Section 7-10.2,
Storage of Equipment and Materials in Public Streets, in the contract Special Provisions.
PAYMENT
The lump sum price for this item shall include all labor, materials, tools and equipment necessary
to carry out the work as specified and no additional compensation shall be made therefor.
BID ITEM 4 - CONNECTION TO EXISTING SEWER
The work for this bid item shall consist of connecting 8" diameter new sewer to existing 8" diameter
sewer and removing the existing plug.
Excavation, dewatering, bedding, temporary by-passes, trench shoring, compacted backfill, street
reconstruction, potholing for existing utilities, plating and all other items of work as prescribed in
the Special provisions for the City of San Juan Capistrano are included in the lump sum bid price.
Elevations of all connecting inverts shall be verified in the field prior to commencement of
construction.
DS-1
PAYMENT
The lump sum price bid for connecting the 8" diameter new sewer to the existing 8" diameter sewer
shall include all labor, materials, tools and equipment necessary for the work, and no additional
compensation will be made therefor.
BID ITEM 5 - CONSTRUCT 8" DIAMETER SEWER
The workmanship and materials included in the work prescribed for Bid Item 5 shall be in
conformance with the provisions of the standard specifications and sewer special provisions.
The contractor shall famish and place the 8" diameter sewer with bedding material per Section 14,
and Section 15,to the line and grades as shown on the plans or staked in the field, and shall include
a terminal cap or plug.
Excavation including asphalt to 6" greater each side than the trench width, dewatering, bedding,
temporary by-passes, trench shoring, compacted backfill within the excavated trench, street
reconstruction to the underside of pavement asphalt; potholing for existing utilities, plating, and all
other related items of work as prescribed in the Special Provisions for the City of San Juan
Capistrano are included in the unit price bid.
Elevations of all connecting inverts shall be verified in the field prior to commencement of
construction. The contractor shall excavate so that this can be accomplished.
Protection of all existing utilities and sewer lines shall be the contractor's responsibility and included
in the unit price bid.
The length of trench opened shall be only that amount in which pipe can be laid and backfilled with
temporary AC on one work period.
Streets shall be swept twice at a minimum during sewer construction. One sweeping shall be on
each Friday after work completion. Spoils shall be removed daily, no stockpiling on Paseo Monte
Vista will be allowed.
PAYMENT
The unit price per linear foot for bid item 5, 8" diameter sewer in paved areas shall include all labor,
materials, tools and equipment for the placement of the 8" diameter sewer, and no additional
compensation will be made therefor.
BID ITEM 6 - CONSTRUCT 4" DIAMETER SEWER LATERAL IN PAVED AREAS
The work for this item shall consist of furnishing and placing 4" diameter sewer laterals from the
new 8" diameter sewer as shown on the plans, and shall include a terminal cap or plug.
Excavation, dewatering, bedding, temporary by-passes, trench shoring, compacted backfill, street
reconstruction, potholing for existing utilities, plating and all other related items of work as
prescribed in the Special Provisions for the City of San Juan Capistrano are included in the unit bid
price.
DS-2
The contractor shall provide all material, labor, tools and equipment and all other related items of
work as prescribed in the Special Provisions for the City of San Juan Capistrano.
PAYMENT
The unit price per lineal foot for Bid Item 6 shall include all labor, materials, tools and equipment
for the grouting of abandoned sewer line, and no additional compensation will be made therefor.
BID ITEM 7 - 48" SEWER MANHOLE
The workmanship and materials included in the work prescribed for Bid Item 7 shall be in
conformance with the provisions of the Standard Specifications and City Sewer Special Provisions
and per Standard Drawing No. S-1.
The contractor shall famish and construct 48" sewer manholes to the lines and grades as shown on
the plans or staked in the field.
PAYMENT
All excavation,dewatering,bedding,temporary by-passes,compacted backfill, street reconstruction,
plating, shoring and removals of interfering portions of the existing sewer line and temporary by-
passes shall be to the satisfaction of the Engineer and are included in the unit price bid and no
additional compensation will be made therefor.
BID ITEM 8 - UNSUITABLE MATERIAL
The contractor shall inform the Engineer immediately if unsuitable material is encountered upon
which the bedding material or pipe is to be placed. This unsuitable material should be removed to
a depth ordered by the Engineer and replaced with bedding material suitably densified in accordance
with Section 306-1.2.1 of the Standard Specifications.
For this bid item,the unit price should reflect that any quantity from zero to 50 tons may be required
and that no adjustment to the unit bid price will be made.
PAYMENT
The unit price bid for unsuitable material shall include all labor, materials, tools, equipment and
dump fees necessary to complete the work as specified and no additional compensation shall be
made therefor. This item can be deleted or reduced at the direction of the Engineer.
BID ITEM 9 - ADDITIONAL BEDDING
The work for this item shall include furnishing and placing additional bedding to replace unsuitable
material excavated under Bid Item 8 to the requirements of Section 306-1.2.1 of the Standard
Specifications. For this bid item, the unit price should reflect that any quantity from zero to 50 tons
may be required and that no adjustment to the unit bid price will be made.
DS-3
PAYMENT
The unit price bid for replacement of unsuitable material shall include all labor, materials, tools and
equipment necessary to complete the work as specified and no additional compensation shall be
made therefor. This item can be deleted or reduced at the direction of the Engineer.
DS-4
SPECIAL PROVISIONS
FOR THE
CONSTRUCTION OF SANITARY SEWERS
CITY OF SAN JUAN CAPISTRANO
SAN JUAN CAPISTRANO, CALIFORNIA
ADOPTED BY RESOLUTION NO. 78-2-15-3
ON FEBRUARY 15, 1978, BY THE CITY COUNCIL
OF THE CITY OF SAN JUAN CAPISTRANO,
CALIFORNIA.
RESOLUTION N0. 78-2-15-3
PUBLIC WORKS CONSTRUCTION STANDARDS 'MODIFICATION
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
01 SAN JUAN CAPISTRANO, CALIFORNIA, MODIFYING
TNL PUBLIC WORKS CONSTRUCTION STANDARDS BY
ZSVMISHING SPECIAL PROVISIONS FOR SANITARY
=182, CONSTRUCTION IN ACCORDANCE WITH THE
FFMISIONS OF ORDINANCE NO. 349; STANDARD -
SEECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION
WHEREAS, the City Council has adopted Ordinance No. 3.19,
Standard Specifications for Public works Construction; Section 2
of said Ordinance permitting the modification or amendment to the
approved Public Works Construction Standards; and,
MWREAS, the City Engineer has established that the
Special Provisions for the Construction of Sanitary Sewers
are comparable to existing construction methods throughout the
County of Orange. Three (3) copies have been and now are filed
in the office of the City Clerk for examination.
NOW, THEREFORE, BE IT RESOLVED that the effective
date of this Resolution shall be March 2, 1978.
PASSED APPROVED AND ADOPTED this 15th day of
February 1 1978 by the following vote, to wit: .
AYES: Councilmen McDowell, Friess, Nash
and Mayor Heckscher
NOES: None
ABSENT:. Councilman Sweeney
O. HECKSCHER, MAYOR
ATTEST:
CITY CLERIC
!/
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) as.
CITY OF SAN JUAN CAPISTRANO )
I, NARY ANN HANOVER, City Clerk of the City of San Juan
Capistrano, California, DO HEREBY CERTIFY that the foregoing is a
true and correct copy of Resolution No. 78-2-15-3 adopted by
the City Council of the City of San Juan Capistrano, California,
at a regular meeting thereof held on the 15th day of
February 1978 -
(SEAL) L i ) 4-f %'�".Y -
MARY AN HANOVER, CITY CLERK
I
TABLE OF CONTENTS =
SECTION I: EXECUTION OF WORK PAGE
I-01 TRENCH EXCAVATION AND BACKFILLING . . . . . . . . . 1
I-02 PROTECTION OF EXISTING UTILITIES . . . . . . . . . 3
1-03 PIPE LAYING . . . . . . . . . . . . . . . . . . . . 4
1-04 MANHOLES . . . . . . . . . . . . . . . . . . . . . 6
I-OS CONNECTION TO EXISTING MANHOLES . . . . . . . . . . 7
I-06 MUSE CONNECTIONS . . . . . . . . . . . . . . . . . 7
I-07 SEPARATE WYES AND TEES . . . . . . . . . . . . . 7
1-08 TESTS .FOR LEAKAGE . . . . . . . . . . . . . . . 8
LIST OF STANDARD DRAWINGS . . . . . . . . . . . . . . . . 10
THE CONSTRUCTION OF SANITARY SEWERS SHALL BE DONE IN ACCORDANCE
WITH THE PROVISIONS OF THE STANDARD SPECIFICATIONS FOR PUBLIC
WO S CONSTRUCTION, 19? EDITION, AND THESE SPECIAL PROVISIONS.
A COPY OF EACH SHALL BE MAINTAINED AT THE PROJECT SITE AT
LL TIMES.
SECTION I
EXECUTION OF .WORK
I-01 TRENCH EXCAVATION AND BACKFILLING:
A. Excavation: Excavation for trenches shall include the re-
moval o! all material of any nature for the installation
of the pipes or structure and shall include the construc-
tion of trench shoring and timbering and all negessary
installations for dewatering as required.
The Contractor shall familiarize himself with, and shall
conform to the regulations of the "General Construction
Safety Orders" and "Trench Construction Safety Orders,, of
the State of California, Department of Industrial Relations,
Division of Industrial Safety.
Whenever the trench excavation is made in undisturbed
ground and. the earth is of a stable, well-consolidated
material, tunnels connecting open trenches may be con-
structed provided the roof of the tunnel slopes at a mini-
mum of one (1) foot vertical to three (3) feet horizontal
and a minimum clear space of two (2) feet is allowed above
the top of the pipe.
Bell holes shall be excavated in the bottom of the trench,
when required, of sufficient size and depth to permit con-
structing the joints. Between bell holes, the entire
length of the pipe shall have a uniform bearing upon undis-
turbed soil.
Excavations for manholes shall be of sufficient width to
leave at least six (6) inches in the clear between their
outer surface and the embankment or timbering which may be
used.
B. Minimum Width of Trench: The minimum width of pipe trenches,
measured at the crown of the pipe, shall not be less than
twelve (12) inches greater than the exterior diameter of the
pipe, exclusive of bells, and the minimum base width of
such trench shall not be less than twelve (12) inches greater
than the exterior diameter of the pipe exclusive of special
structures or connections, and such minimum width shall be
exclusive of all trench timbers.
C. Maximum Length of Open Trench: Except by special permission
Fy the Engineer, the trench shall not be open for a total
of more than 500 feet at any given time for the total project .
D. Maximum width of Trench: The maximum allowable width of
trench for all pipelines measured at the top of the pipe
Shall be the outside diameter of the pipe (exclusive of
bells or collars) plus sixteen (16) inches, and such maxi-
mum shall be inclusive of all timbers. A trench wider
than the outside diameter plus sixteen (16) inches may be
used without special bedding if the Contractor, at his
expense, will furnish pipe of the required strength to
carry the additional trench load. Such modifications
shall be submitted to the Engineer and approved in writing.
whenever such maximum allowable width of trench is exceeded
for any reason except as provided for in the .plans or
specifications, or by the written direction of the Engineer,
the Engineer may require, at his discretion, that the Con-
tractor, at his expense for all labor and materials, cradle
the pipe in Class 420-C-2000 concrete.
E. Backfillin Excess Trench Dept : If any trench, through
two neg act of the Contractor, be excavated below the
botton► grade as required by the profiles, it shall be
refilled to grade, at the Contractor's expense for all
labor and material, with clean sand or sand and gravel
well tamped in place.
F. Bracin Trenches : The sides of the trenches shall be sup-
' porta with p ank sheeting and bracing, and all tunnels
shall be timbered wherever the ground will not stand un-
supported. In all cases the sheet piling or timbering
Shall be redrawn as the work progresses, in such manner as
to prevent as much as possible the caving inward of the
sides of the trench.
All excavations shall be done is accordance with all laws
and ordinances of the County or State as they may apply.
G. Crushed Rock Bedding: where ground water is encountered
or the native material does not afford a sufficiently
solid foundation for pipe sub-grade as specified above,
the Contractor shall excavate to such depth below sub-
grade as the Engineer decides is necessary and shall con-
struct a stable base by placing crushed rock bedding upon
which sub-grade can be prepared. Crushed rock for bedding
shall be two-inch (211) maximum size.
M. pipe Zone Backfilling: The pipe zone shall be considered
to extend from the grade line to a minimum of twelve (12)
inches above the top of the pipe. In the pipe zone, the
backfill material shall consist of sand or select backfill
material . Placing of the backfill material in the pipe
zone shall be as determined by the Engineer. Particular
attention is to be given to the underside of the pipe and
fittings in order to provide a firm support along the full
length of the pipe.
-2-
1, pi Zone to To of Trench Backfilling: From the top of
t e selected backfill to the top of the trench, the material
for backfill shall be free from stones or lumps of material
exceeding three (3) inches in greatest dimension. This
backfill material shall be compacted to a minimum relative
density of ninety (90) percent of maximum. This compaction
shall be obtained by means of water settlement or tamping,
depending on the nature of the material. Sandy, granular
soils may be compacted by means of water settlement. The
area to be backfilled by water settlement shall be diked
at suitable intervals so that water will be impounded to
sufficient depth so that earth pushed or shoveled into
the area will be falling into water at all times and will
be completely saturated. Soils not having a sand or granu-
lar nature shall be backfilled and compacted by either of
the following methods:
1. The material shall be placed in layers not exceeding
eight (8) inches in thickness, loose measurement, and
each layer compacted to a relative density of ninety
(90) percent or more, of maximum by means of hand or
pneumatic tampers.
2. The material shall be placed in layers measuring at
least four (4) feet in thickness; loose measurement,
and each layer compacted to a relative density of
ninety (90) percent or more.
On steep slopes and other locations where compaction
by flooding is not practicable, the backfill shall be
compacted by means of either of the above tamping
methods.
Backfill material .placed within twelve (12) inches or
less of base of pavement, sidewalk, curb, or concrete
structure, shall have an expansion, when saturated with
water, of less than one and one-half (1-1/2) percent,
and a minimum compacted density of ninety (90) percent
of maximum. Any excavated material which does not con-
form to these specifications shall not be used for this
portion of the backfill and new material conforming to
these requirements shall be obtained and placed at the
Contractor's expense.
I-02 PROTECTION OF EXISTING UTILITIES:
A. General: Utilities for the purposes of these specifica-
tions shall be considered as including but not limited to :
Pipelines , conduits, transmission lines, and appurtenances
of "Public Utilities" (as defined in the Public Utilities
Act of the State of California) and those of private indus-
try, businesses, or individuals solely for their own use
or for use of their tenants ; and storm drainage, sanitary
sewers, street lighting, and traffic signal systems . The
-3-
accuracy or completeness of the utilities indicated on the
drawings is not guaranteed. Service connections to ad-
jacent property may or may not be shown on the drawings.
It shall be the responsibility of the Contractor to deter-
mine' the exact location of all utilities and their service
connections. The Contractor shall make his own investi-
gations as to the location and type of existing utilities
and their appurtenances and service connections which may
be affected by the contract work and shall notify the
Engineer as to any utility located by him which has been
incorrectly shown or omitted from the drawings.
H. Res nsibilit of 'the Contractor: The Contractor shall be
e reap0 mi le for all costs, for the repair of any and
all damage to the contract work or to any utility (whether
previously known or disclosed during the work) , as say be
caused by his operations. Utilities not shown on the draw-
ings to be relocated or altered by others, shall be main-
tained in •place by the Contractor. At the completion of
the contract work, the Contractor shall leave all utilities
and appurtenances in a condition satisfactory to the owners
and the City.
I-03 PIPE LAYING:
After the trench for the pipe has been excavated to the proper line
and grade in the manner before specified, the pipe shall be laid
therein in the following manner:
Before lowering, and while suspended or standing vertically at trench
side, the pipe shall be inspected for defects and rung with a light
hammer or other metal object to detect cracks. Any defective, damaged,
or unsound pipe shall, be rejected. Before any pipe is lowered into
place, the trench bottom shall be prepared so that each length of pipe
shall have a firm and uniform bearing over the entire length of the
barre3: All adjustments in line and grade shall be made by scraping
away or filling and tamping in under the barrel of the pipe and not
wedging or blocking. The faces of all spigot ends and all shoulders
in the hubs or sockets must be true and brought into firm contact,
and any lumps and excrescences on said faces shall be cut away before
the pipe is lowered into the trench. The pipe shall be laid , without
break, upgrade from structure to structure and with the socket upgrade.
Whenever the work ceases for any reason, the unfinished end of the
pipeline shall be securely closed with tight fitting plug or cover.
The interior of each pipe, after being laid, shall be thoroughly
cleaned.
A. Jointing Vitrified Clay Pipe: Mechanical compression
joints for vitrified clay pipelines shall be assembled in
accordance with the manufacturer's recommendation. Care
shall be taken to insure that a tight compression joint is
effected upon assembly.
_,4-
B. Jointing Cast-Iron Pipe:
1. Lead Joints: The spigot end of the pipe shall be
nserted for the full length of the socket in such a
manner that the inside surface of the pipe shall be
flush and even. For leaded joints a gasket of oakum
shall be driven tightly into the joint from the outside
using a caulking iron, leaving a depth of at least
2-1/2 inches of the annular space clear to receive the
lead. The oakum shall be so placed that a gasket of
uniform thickness is obtained. It shall be. driven
back solidly so that there are no loose ends protruding.
A suitable runner mudded with clay shall then be placed
around the pipe and the ends of the runner shall be
clamped, leaving an opening at the top of the pipe
slightly off center and sufficiently large to allow the
lead to be poured.' The lead shall be heated to a
temperature such that when stirred it will show a rapid
change in color. Scum shall be removed before pouring.
Lead shall be poured at a good speed to fill the joint
completely in one continuous operation. The runner
shall not be removed until the lead has solidified.
After the runner has been removed, the .lead sball be
thoroughly caulked in such a manner as to secure a
watertight joint without overstraining the cast iron
bell. The face of the completed joint shall be flush
with the face of the bell. Spongy or imperfectly filled
Joints shall be burned out and repoured.
2. Mechanical- Joints: Joints shall be in accordance with
lI1fA C-111-64. When tightening bolts the gland is to
be brought up toward the pipe flange evenly, maintain-
ing approximately the same distance between the gland a
and the face of the flange at all points around the
socket to provide an effective joint seal.
3. Neoprene-Ring Joints: Between lengths of cast iron
pipe, neoprene gasket joints can be used. Joints shall
be "Tyton" as manufactured by the United States Pipe
and Foundry Company or approved equal. Installation
shall be in accordance with the Manufacturer's recom-
mendations. Gasket seats and neoprene gaskets shall
be thoroughly cleaned before assembly. The completed
joint shall have a uniform contact by the gasket between
the outer surface of the spigot and the gasket seat of
the bell.
C. Horizontal Separation: See Standard Drawing S-5.
D. Vertical Se oration: Whenev6r a sanitary sewer, including
house atera s , must cross a pressure water main, the sewer
shall be of one of the following types of construction:
-5-
Class 150 or heavier cast-iron pipe with hot-dip
bituminous coating and with lead or mechanical
,joints.
Vitrified clay pipe with reinforced concrete
encasement, which encasement shall have a minimum
thickness of 6 inches.
Vitrified clay pipe within a continuous steel
casing, which casing shall have a thickness of not
less than 1/4 inch and with all voids between sewer
pipe and casing pressure grouted with sand-cement
grout.
If the sewer is above the water main, the special construc-
tion shall extend a sufficient distance on both sides of
the crossing to provide 10 feet of horizontal clearance
with the water main. If the sewer is located below the
water main and within a vertical distance of 3 feet clear-
ance distance, the special construction shall extend a suf-
ficient distance on both sides of the crossing to provide
4 feet of horizontal clearance with the water main. These
construction requirements shall not apply to those house
laterals that cross below a pressure water main.
S. S1 hon Criteria: Siphons are unacceptable to the City
un eon ®111 mely unusual circumstances prevail.
I-04 MANHOLES:
Manholes shall be constructed of precast reinforced concrete sections.
The bottoms of all such structures are to be formed of concrete of the
full thickness shown on the plans and the concrete shall be propor-
tioned as herein before specified. The inside bottom of the manholes
shall rise above the footing a distance equal to the diameter of the
largest pipe entering or leaving the manhole, and the flow-through
channel shall conform to the inverts of the sewer pipes. The surface
of the channel shall be troweled to a smooth and even surface. Man-
hole steps shall be uniformly spaced at a maximum of 16 inches with
the top step placed ,just under the manhole frame. The lowest step
shall be placed not more than 24 inches above the shelf. The top
step shall project 3 inches inside the manhole and all others 5 inches .
The tops of all manholes located in paved areas shall be set flush
with final paving grade. The tops of manholes located in improved
but unpaved areas shall be set to be even with finished grade. Tops
of manholes and cleanouts located in unimproved areas shall be set
to prevent the entry of surface water as directed by the Engineer.
Precast manhole sections shall be ,laid concentrically to
provide a smooth interior manhole surface. Joints shall be
completely filled with mortar to provide watertight seals.
-6-
I-05 CONNECTION TO EXISTING MANHOLES:
In the locations as shown on the drawings the Contractor shall break
into existing manholes structures and install the new inlet lines as
specified.
New flow-through channels shall be constructed in each manhole base
to accommodate the new sewer lines. Smooth transitions shall be--
. installed
e-. installed from the inverts of the newly installed pipes to the exis-
ting manhole outlets.
Openings in the sides of the manholes shall be sufficient to permit
the inserting of the sewer pipes and the forming o1 5-sack grout
around the newly installed pipes. Other details shall be in accor-
dance with the Standard Drawings.
I-06 HOUSE CONNECTIONS:
The term "house connection" as used in these specifications or on the
plans is used to designate a lateral sewer, laid from a main sewer to
a point at the property line, or other location, as shown on the plans,
from which sewer service can be obtained by proper extension. The
house connection shall be constructed on an unyielding foundation,
with joints closely and accurately fitted, true to line, and on a
straight grade from the bend joining the main sewer to their upper
ends, unless otherwise indicated on the plans. House connections
shall not be laid on a slope greater than 45 degrees from a horizon-
tal line unless required or approved by the Engineer. Wyss for house
connections shall be installed as specified below. The house connec-
tions sewer lines shall be jointed to Y branches by eighth bends.
All eighth bends are a part of the house connection sewer line. The
top of pipe of the upper end d each house connection shall be built
to a depth of 5 feet below the surface of the ground, except where
different depths are indicated on the plans. Where a house connec-
tion sewer is to be connected with a chimney, all bends leading
away from the Y branch are a part of said house connection sewer
line. All house connections shall be installed with a suitable stopper
of the size of the connection. House connections shall be properly
field marked by means of an "S" on the top of the curb or by other
means, approved by the Engineer, where necessary.
I-07 SEPARATE WYES AND TEES;
Commercially manufactured wyes and tees shall be installed where
indicated on the plans and/or at such other locations required by
the Engineer. Where conditions are such that the connecting pipe
cannot be adequately supported on undisturbed earth or tamped• back-
fill, the pipe shall be encased in concrete or supported on a concrete
cradle as directed by the Engineer. Concrete required shall be in-
stalIed at the Contractor 's expense. All wye and tee branches not to
be joined to house connections shall be installed with a suitable
stopper of the size of the wye or tee branch. The Y branches, unless
-7-
otherwise specified, will be inclined upward at an angle not greater
than 45 degrees from a horizontal line. If so shown on the plans, T
branches shall be substituted for Y branches. No Y or T branch shall
be placed closer than 5 feet to the centerline of any manhole or clean-
out.. The use of double wyes will not be permitted except as specified
or required for chimneys.
I-08 TESTS FOR LEAKAGE:
Tests for pipeline leakage shall be in accordance with the following
specifications:
A. Leska a Due to Internal Pressure: In sections of line
w re significant ground water is not present above the
average pipe invert, the Engineer. shall inspect all pipe-
line Joints after completion of final pipe Jointing.
Based on this inspection the Engineer shall decide whether
water pressure tests or air pressure tests shall be conduc-
ted and shall stipulate the pipeline sections to be tested
In all sewer lines. If required, water pressure tests
shall be conducted as follows:
The pipeline between manholes is the sections to be tested
shall be filled with water and the ends of the line plugged
with a plumbers plug. Sufficient time shall be permitted
to elapse between the filling and the testing of the line
to permit absorption of water by the pipe walls. The man-
hole shall be filled to a level not less than four feet
above the level of the sewer in the upper manhole. One
gallon of water shall be added and the time required for
the water level to return to the mark shall be measured.
The 'time so measured shall not be less than that computed
by the following formula:
Minimum Time (minutes? - 7 063
Diameter inches) x Test Length (feet)
If the leakage is greater than allowed, the pipe shall be
overhauled by the Contractor at his. expense until the joints
shall hold satisfactorily under this test.
B. Leaka a Due to Infiltration: If, in the construction of a
sec oa o e sewer or any size, excessive ground water is
encountered, the test for leakage, described in Section "A,,
above, shall not be used, but instead a test- for infiltra-
tion shall be conducted for each section of the work if
ordered by the Engineer. The end of the sewer at the upper
structure shall be closed sufficiently to prevent the entrance
of water; pumping of ground water shall be discontinued for
at least three days and the section shall be tested for in-
filtration. The infiltration shall not exceed 1,000 gallons
per diameter inch per mile per, day of main line sewer being
tested and does not include the length of house connections
entering that section. Where any infiltration in excess of
-8-
this amount is discovered before completion and acceptance
of the sewer, the sewer shall be overhauled by the Con-
tractor at his expense and the amount of infiltration re-
duced to a quantity within the specified amount before the
sever is accepted. Should, however, the infiltration be
less than the specified amount, the Contractor shall stop
any individual leaks that may be observed, when ordered to
do so by the Engineer.
C. Leaks a Measured Usia the Air Pressure Method: The Con-
tor
aha p ug t ends o the sewer iaes being tested
with plugs and brace the ends of the pipe where needed. It
is recommended that the Contractor make an initial air test
of the sever main after installation and backfill and
consolidation of the trench, and prior to installation of
the fuse laterals. Such preliminary tests shall not con-
stitute the final test.. The final leakage test shall be
conducted in the following manner, and shall include the
sever main and laterals as a unit:
The line shall be supplied with air until 3-1/2 pounds per
square inch guage (psig) pressure has been reached, at
which time the flow to the pipe shall be shut off. The
Inspector will then accurately determine the time loss of
1/2 psig pressure, to 3 psig pressure. The input air pres-
sure shall not exceed 5 psig and shall be regulated by a
suitable regulator valve. The air test equipment is to be
approved by the Engineer.
The pressure loss of 1/2 psig pressure shall not occur in
a time period of less than 1 minute. If the time loss is
less than 1 minute, the Contractor shall make such repairs
as are necessary to the satisfaction of the Engineer to
eliminate the excessive leakage.
-9-
REPLACEMENT PAVEMENT
A.C. OR- P.C.C.
EXISTING
tMPAVEMENT 0.35' KIN.
EELCUT OR SANCUT
REPLACEMENT
p•L. PAVEMENT
0.65'KIN. C.A.B. OR SLURRY
B, A. FOR LOCAL STREETS,
SEE NOTE 11 I.0' KIN. C.A.B. OR SLURRY
AND TABLE HEREON FOR HIGHER TRAFFIC DESIGN
STREETS.
1_ o BACKFILL MATERIAL
JV
7� "' SLURRY OR UNTREATED
UNDER 2' 0.50' �/ �, BASE. SEE NOTE 3.
ovm 2' 1.0'
Y
S
*WHICHEVER IS
LESS BUT NOT - BEDDING MATERIAL A: PEP. SUBSECTION
LESS THAN .35 I p. <�� T�FTLzimu RD SPECIFICATION
MIN. MIN. S.E. = 30. COMPACTED TO THE
SATISFACTION OF THE CITY ENGINEER.
SEE NOTE 3.
O.SO' 0.50'
g SPRING ORAD' OR D'
LINE
ER
D
BHANIO. SANDALCBUSHEO ROCK ORTCONCRETE
UNDISTURBED �� AGGREGATE. MAX GRADATION NO.2.
FOUNDATION
EXISTING STREET TRENCH DETAIL
NOTES
�. ALL EXCAVATION AND CONSTRUCTION OPERATIONS SHALL COMPLY WITH THE REQUIREMENTS OF THE CALIFORNIA DIVISION OF
INDUSTRIAL SAFETY AND THE WORK AREA TRAFFIC CONTROL HANDBOOK(LATEST EDITION).
2. ALL TRENCHES WHICH ARE TRANSVERSE OR DIAGONAL TO EXISTING OR FUTURE STREETS(INCLUDING ALL INTERSECTION CROSSINGS),
ALL LONGITUDINAL TRENCHES IN THE STREET WITHIN 1.5 FEET OF THE EDGE OF THE GUTTER OR EDGE OF CURB IF THERE IS NO
GUTTER, AROUND MANHOLES,AND ALL NARROW(LESS THAN 2')LONGITUDINAL TRENCHES WHICH ARE LESS THAN 20'LONG, SHALL
BE BACKFILLED WITH CLASS 700-E-100 SAND CEMENT SLURRY.
3. WHERE SLURRY IS NOT REQUIRED FOR BACKFILL AND BEDDING 'A' CRUSHED MISCELLANEOUS BASE PER THE STANDARD
SPECIFICATIONS SECTION 20D-2.4 CLASS 2,AGGREGATE BASE AND UNTREATED BASE PER SECTION 200.2 OR 400.2 SHALL BE USED. ALL
SOIL MATERIALS FOR BACKFILL,BEDDING,AND FILL SHALL BE GRADED PER SECTION 200-2 OR 400.2 AND SHALL BE FREE OF 1)CLAY;
2)GREATER THAN 2 INCHES ROCK OR GRAVEL;3)DEBRIS;4)WASTE;5)VEGETABLE AND DELETERIOUS MATTER, SATISFACTORY SOIL
MATERIAL THAT MAY BE APPROVED SHALL BE THOSE DEFINED BY ASTM D 2467 AS GW,SP,GM,SM,SW,AND SP. UNSATISFACTORY
SOILS ARE GC,SC,ML,MH,CL.CH,OL,OH,AND PT.
BACKFILL AND COMPACTION METHODS SHALL CONFORM TO SUBSECTION 306-1.3 OF STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION(CURRENT EDITION),EXCEPT THAT 95%MINIMUM RELATIVE COMPACTION SHALL BE REQUIRED WITH THE STRUCTURAL
SECTION AND 0.5 FEET BELOW IT AND 90%COMPACTION IN THE REMAINDER OF THE BACKFILL ZONE.
5. ALL REFERENCES TO SLURRY SHALL MEAN CLASS 100-E-1DO SAND/CEMENT SLURRY_
ALL A.C.REPLACEMENT REQUIRES TACK COAT ON EXISTING EDGES AND A SEAL COAT ON THE SURFACE.
PRIOR TO PLACING BACKFILL,CALL CITY ENGINEERING DIVISION FOR BEDDING INSPECTION,
THE WHEEL OR SAWCUT OF A.C.SHALL BE A STRAIGHT,CLEAN LINE ACCEPTABLE TO THE CITY ENGINEER.
9. WHERE EXISTING A.C. EXCEEDS 0.5 FEET IN THICKNESS,ALTERNATE PAVEMENT REPLACEMENT THAN REQUIRED HEREON WILL BE
SPECIFIED BY THE CITY ENGINEER.
PRIOR TO PERFORMING ANY WORK IN THE PUBLIC RIGHT-OF-WAY A PERMIT MUST BE OBTAINED FROM THE CITY ENGINEERING DMSION.
ON ALL HIGHWAYS SHOWN ON THE MASTER PLAN OF HIGHWAYS THE A+B'+B'SHALL BE OF A WIDTH SUFFICIENT TO ACCOMMODATE A
SELF-PROPELLED STEEL ROLLER,
d/95
•11[" SIMCO lNO Or MK U M17MIN NANAMN.,S►IAN
I SKS/LUSH 1ITN Iflslol W NAAAW_[ WALL AN rLASTIN
NoGgm VMS SWMTN, 1019" UIINONIN 1140 W IIP%
IS SINA0II11LI.L94V9 SO11AK 900 A"PILL FILL!TS
AT UMI" StCTlO"TO HAIR t-ft•LOM'AC.N JONITS
Twill 9140114 K.LVrT101I a ALL NNISf • ; e INUITS AID OUTLIT.
tlltlL N TNI somm M Two am '
ILIVATIOM Or M LANNST NIR 0.
llLiN OM8wM9 IIIIIIam
IPON wmiilMN/w Dora fIRAIS Kra 70
"IIE "NST TWO rlrl JONN1 MIO ATS S-G.STANDING NMldll FROM
0�SCTI�IINlN10Ii t+NLi
wool" ew r OPOWIS A K
RACto OI paSNIT"lAN NK orI. - s
sms O1isZ-uKVM a -- r/t lT0-f
f L
s 1
1 + 1
A IN :,:
.:..
SIIIKD TW4 SYR"tTRq yA� IA"0.G AK 1
OAR M".AOI AT THUS O/NANlIMC11NR. —1
STEP DETAIL
rRLR
TV OF MUINMR N Rs NRC
QISTIII/MAOI. TTLA SIGNAL-18ON -W OWNING O rTa +TO
& TM
w � M son"MIN"TAL A-ML
� • f 1 1 l�KN9NT MNT1M
If 24'
p =' COK MALL _-
96CMRIUC TDKM OWN
STIMAN $IK Or THE o
NAw10L9.
/2 SNOIFT KT1KN
KVCL ia"rS.
1t" 1
-- CONE DETAIL
ti sK STRIP GRAIL
w
� 4TlN TIMIT 11/ra N'uff' to
.VWSfTTM
> eVf IVY"2
CROWN lLMTION TOK SSl1AL
JOINT DETAIL
MK r0UN90 AGAINST UNOISTIIIIKo SON..
STANDARD 48" MANHOLE
NOTE: 46"1.0 MANHOLE TO /E USED ON SEWERS 2d' IN DIAMETER AND UNDER.
CITY OF SAN JUAN CAPISTRANO
STANDARD MANHOLE DETAILS
1978 �T O• IS- 1
INIT IIFE FIYMSRTM MMAa Igo SECTION-IML[T AMOun[T I TTP.)
a PLAS.MAER ENA MMI.1.
A KASTEIIEO SRTN AGEMENT
WORM TO OIYR A 1R100'TN SA'LON$ fECT1011 rrU1
' _ __ __go n"DE TO 00 hK MAINLINE If =I• vCF ON
TII[ONORREL rows"MALL LANDSS• IIILCT AND OOTL[TITTF.1
FIFEO SMALL A T1s EAR1
AE MNDEM CLLEVOTSM d
THE LARAOT MR O LM _ -•
O'TISROSE sS omm ►', - it.LONG VCP JOINT
• AT IML9TS(TTF.1 =
Ftp • •• E-1 It- 460800=0
mgmmtm
THE *ARNOLD
sm" WINNING
SMALL A FLACA N•fEO
OR TME 1RNMf7NCAM
got 01 ?1111 1„
MAOI.;LE.
--' ECCENTNIC FLAT TOP
►LAN ••
r «•
FLATTER /LLAT"M 1
AfOf MORTAR
L 'Q4-•� TopOF M1aNmr
y M EMIRTIM MAOI
LCCENTRIC FLAT TOP DETAIL
=• !S•COLL/IR ACTION -m�t-J/eC11ND/f MMRAN
M 1-O'COLLAR ACTION PRECAST CONCRETE a VOO
s w STANDARD SO•LWAM, S RIMS !ACTION E W E E/NI•
ACTIN ECCEISTRIC COM[ )O•!GO•■
•i !T-MNK WITH ! TNICR MALLS .-1
---- CEMENT MORTAR FILLET J.—
r ,n•Mp1T
FLAT TOF.COC[NTIIIC TO THE
001111 STREAM WE OF TM S i/V• E VP
MAcct N
r!hrs, � DKIARA JOINT DETAIL
so
OTEN :
FOO MM AMR ACOVER DETAILS HERRRAR^1 TO AT[ R-f,STANDARD MMOLE
vi ^• _ FORM AND CUM. -
iiI
T�
I
.� I
►DON RASE AGAINST ONOISTOASCO SOIL.
ELEVATION
NOTE: THE STANDARD RO INCH MANHOLE SHALL W USED
ON SEWERS 24" IN DIAMETER AND LARGER,OTHER SPECIAL CASES,OR
WHEN THE INVERT OF THE MANHOLE IS le DEEP.
CITY OF SAN JUAN CAPISTRANO
STANDARD 60INCH MANHOLE
1978 '
CITY I
CMTINYOYS
ICtA@@ t!6C-5000
OYUt
WE MEILS •� ' �
I OVERALL SELL \ /
CARRIEN PI DNSERD � —
060L AOINTO
I STRAP TSO SRI@@ 1•40a CL. �. T
TO PIP[ „NPS
AT SG' O.C. WCL
CARRIER PIP[ SMALL AS REINFORCED CONCRETE
Te' ANCHORED AMO/@@ 10E16WO
Daren[ OMOUTIMO TO ENCASEMENT
AVON FLOATIMO.
TYPICAL PIPE CASING ToN5,roomSSELALGAgoNA Ong row stcrTwi
Or PIPE SMALL Oe U@@O @@PORE AND AFTER
TRE ENCASEMENT.
APPLY PERM OR.ON TEM PLAIM SNRT OR OTHER
AMPrAILE MATERIAL TO PARMIT OOMD MO.
LOTafS WINES W"A I-Ve MMOR'S
QRS U KS OT TOP OF CUM WHERE TK
LABRAL CEOSS[S UNO[R TM CUM,
SAGE NO CIM EXISTS OR SMERE
TSE LATERAL ELM"4'0111009 OACK
M
OF CS .Pt4C[ .x.'x 3W STAKE
EXTERIORS E &am FpRIEM GRAOE.
SEVERE 1RCl SITE I MIOTALLae YMARIA
Ile
SETMOYT MOVIE LATERALTHE NYE
SMALL OR PUMM WITH A V.C.PUBO
OO N[OPRER[ STOPPRA.
b'MNLCOVER PROPERTY LSVE
AT PMPERTY
uHt
��PERTOOTNHISWP[ UC.MmOPIEIVE STOPPER
Teoe OrRa vO•0/1E .EH@@ u/
RaaNIEp '
s,
GRAVEL dE eRYOHM
NOCK n oTO
wmmiu OF love
MOLOPEET EACH
SW OF LATERAL
TYPICAL HOUSE LATERAL
CITY OF SAN JUAN CAPISTRANO
PIPE CASING , CONCRETE ENCASEMENT
6 HOUSE LATERAL
1978 � S- 3
CITY ENGIN - R C N 1 DA
NM. OSEA&own*=&&(TTN
PEATIEN To AM
oow vn • COE
ESEIrLL BE%COMPACTION OF A 6(T7N SACHlLL
ILL
SELECT MATEIGAL
02L. w fO Na..s�TIL
/ `\ if
sawn
aw am oa • � \ cLEM am*
o-�
i• FIFE SYFMAOE • /!f SYFNIABE
PON P�
Tm I TTK II
COMP"TgD CawCTED
EACImLL DACNFRL
SELECT MATCMAL SELECT MATERIAL
0 TO COMPACTED 70 b%
Ra.OEMrtT RLL,BENMTr
r ��S■
CLASS 410-C-2000.eoNCRan
PIPE EPI-«.BE5
`
PIPE FOUNDATION
some SHAPEo ►MAY L MAXIMUM TO SE DETERMINED
UNDISTURBED SOL IN FIELOBT THE CITY ON THE BASIS i
OF MAXIMUM OVERVIOTN EXCAVATED.
TTP[ III TT►E W
NOR}
I.THE rBENCM 710TH AT THE UrPtR LIMIT OF THE PIMELoan PE ZONE ALL DE WITM THE FOLLOWING Ln Mo TYPE Z.X.ANO3E GED0I1161
MAXIMUM TINACI171DTN-O.0.OF PIPE ON BELL PLUS IG'
MIEMUM TRENCH MOTH-D.O.OF PIPE OR SELL PLUS Ir
E.TTPE ZX BEDDING MALL SE USED WHERE THE TRENCH WIDTH AT THE UPPER LIMIT OF THE PIPE ZONE EXCEE00 THE MAXIMUM WIDTH
SPECIFIED ABOVE.
S,GACRFILL ABOVE THE PIPE ZONE MALL CONFORM TO TINE SEOYIREMEHTS OUTLINED IN SECTION 3061.3 OF THE STANOANO SPECS.
A.MINIMUM PAVING SECTION IS ZS AG OVER SOAA OR AS SPECWIEO AT THE CRT ENGINEER. RATHER AND JOIN TO THE EXISTING PAVEMENT TO
THE SATISFACTION of THE CITT ENGINEER.
CITY OF SAN JUAN CAPISTRANO
PIPE BEDDING DETAILS
1 c NO 17629 S- 4
ZITr EN
DESIGN REQUIREMENTS FOR SANITARY SEWERS IN THE
VICINITY OF PRESSURE WATER MAINS
,
�2 ZONE 0 x ZONE t
Illk-
Io
WATER 4• WATER •4'
IMM VAIN
Zo . — — zoME
la
3 Vj . .
IQ = _ _
A ZONE D A
�.
PARALLEL CONST. PERPENDICULAR CONST.
IF A SANITARY SEWER IS TO BE IF A MAIN `INE SEMER MUST CROSS A
LOCATED WITHIN 10 FEET OF A PRESSURE PRESSJRE WATER WITHIN ANY OF THE ABOVE
WATER MAIN WITHIN ANY OF THE ABOVE INDICATED ZONES, OR IF A HOUSE LATERAL
INDICATED ZONES.SPECIAL CONSTRUCTION MUST CROSS IN ZONE 8,SPECIAL CONSTRUCTION
MILL BE REWIRE6 AS SHOWN BELOW MILL BE REO;ARED AS SHOWN BELOW.
ZONE SEWER CONSTRUCTION RE7.MREMENTi
A Y.C.P. WITH COIAPRESSION JOINTS.
B OR C C L P. (CLASS ISO) APPROVED MECHANICAL JOINTS; OR V.C.P. WITH SPECIAL
CONCRETE ENCASEMENT PER 4 DETAIL I ); OR V.C.P. SROUTED IN CONTI-
NUOUS STEEL CASING.
D DO NOT LOCATE ANY PARALLEL SEWER IN THIS AREA WfobUT HEALTH
DEPARTMENT -APPROVAL.
GENERAL NOTES •� NIX
7
1. EXTEND BOTH ENOS ')F ENCASEMEIIT TO A POWT T
ONE INCH SHOAT OF FIRST PIPE JOINT DEIONC MO.4 HOpn
LOCATIONS SPECIFIED ON P-AN. USE ONE FOOT SECTION AT :1'ac
OF PIPE AT BOTH ENDS BEFORE USING STANDARD LENGTHS. d 6
2. APPIY FORM OIL, THIN PLASTIC SHEET, OR OTHER _ ;►.'
ACCEPTABLE MATERIAL TO PIPE, TO PREVENT BOND •+'•; �
BETWEEN PIPE AND CONCRETE. •. .:.• -
`a
3 USE CLASS -420-C-2000 PC.C. FOR ALL CASES. N `4 BARS
SPECIAL ENCASEMENT DETAIL I
Ao
444vw wuktA- fa. is- lju� (SEE STD. S(SEE STD. S-3))
CITY OF SAN JUAN CAPISTRANO
SEPARATION OF WATER AND SEWER LINES
I19 79 !'ITV cN:INcr c 1 !lp F S-5
TIE SELL OM THE COLLAR WTE "OGLE SMALL ROT
IN ENCASED IN CONCRETE.
TY TO K NAGE AT APPMOX. LOP 40101T. ENCASE
IieEAOI SEE N OPEGING MTM CLASS A20-C 2000 R C.C. M�
7A
j .
C GM � CONCRETE
f
Ir
LIM..A rw IN'NI
ELEVATION SECTION A-A
EXIST. V.C.P. EXIST. V.C.P. -
I I j DETAIL MAKING CONNECTION
TO AM EXISTING ![w1R:
j\ 1 I I i H PON MARINA G-LATERAL ON
11 I H I 11
S' WIN OR AS R[OYIR[0 1Y
THE a" omma 1.
%"-J -SANG TEAL- AD.IY11AGl[ REPAIR
NEW V.C.P. TEE OR WYE SECTION COUPLING, ON APPROVED EQUAL
WITH PLAIN [MOS 12 REO.0.1
COLLAR WYE SADDLE
NOTES,
1. THIS ASSIGN LINE SMALL 09 SCDIKD TO THE APPROXIMATE SHAM OF THE COLLAR WYE ON TEE PITTING.THE CONTRACTOR
SMALL EITHER CYT A NEAT OPENING MRM A CIRCULAR CERAMIC SAW OF E;A;G"OR S' pAIETENSI ON MAK[ A SMALL MOL[,
NOT LYG[R THAN SME-MMM IN DIAMETER,IN THE APPROXIMATE CENTER OF TME$CONGO MSA WITH A POINTED TOOL,SIMILAR
TOA MASON)PR:ILAMO C IPINTM A CHISEL AND SHORT MANOL[.NAND HELD MAGNER DI A SPINAL FASHION TO THE SCORED LIN[.
E. TNI[CONTRACM SMALL SECURE TME COLLAR WYE!ADDLE TO THE SEWER AS A/PROM BY TNG CIT' Ommo I.
S. THE CORTMAC70R SMALL ENCASE THE SADDLE CONNECTION WIT"CLASS'4204WOO NKAFTEG THE CONNECTION IS APPROVED
N THE CIA CHINA TO THE LIMITS INDICATED ABOVE
A TNG CONTRACTOR SMALL XEEP ALL CLAY CHH.DINT,EPDXY,MORTAR,AND CONE MET[OUT OF THE SEEING SADDLED,AND SHALL
PEMMICAN A CLEAENG AND GALLING Of THE REACH SADDLED M DIRECTED TO 0000 GT THE CITY ENGVEEII.
I. TIE CONTRACTOR SMALL REPAIR 011 REPLACE ANY DAMAGED PHIS,AS DIRECTED GT THE CITY 1NGEQR
G. THE CONTRACTOR SHALL EPDXY ALL SALOLS CORRECTIONS TO THE SATISFACTION OF THE CITY ENGIMEEN.
CITY. OF SAN JUAN CAPISTRANO
SADDLE CONNECTION
19T81 w. . S-6
o a o 0
0 0 o a o 0
C a s �W F a s C
ao y
0aaaaa0- 0
00 a a a a a a
0 0 0 0 o a
0 0 0
COVER — BOTTOM VIEW COVER —TOP VIEW
SECTION C—C
NOTES:
CAST INION SHALL HAVE MINIMUM
TENSILE STRENGTH OF 30,000 LBS.
PER SQUARE INCH.
ALHAMSRA FOUNDRY CO. TYPE A-1270
OR EQUAL.
WEIGHT OF FRAME AND COVER :440 LSS.
MINIMUM
'CASTINGS SHALL' CONFORM TO
RING PLAN A&tk A 48 CLASS 35.
34•
231/2"
1
SECTION B_—8
CITY OF SAN JUAN CAPISTRANO
STANDARD MANHOLE
FRAME 81 COVER
S^7
CITYEXONEEP"os .c
I
WOO,
AMIE
�a'7C\OW—
d,d,OR ' D SEW"
.
ATYPICAL FOR
II11
CO 1
ER
STREET SURFACE
CAdTINB
ke,
CLASS
II
N
880-C-3280 F.C.C.
_I
I i SIDE VIEW
� I I
1/15 BEND
I � �
FINGER HOLE
24" A
Pr-C. 25� �o,� TOP VIEW
N
N 1 r9 i
YE BRANCH
i
ALHAMORA . FOUNDRY PLUG
A-1240 OR; EQUAL
TOP VIEW
NOTES:
I. CLEAN-OUT PIPE MUST BE 2. CLEAN-OUTS ARE FOR COMMERCIAL OR
SAME DIAMETER AS MAINLINE INDUSTRIAL USE ONLY AND ARE TO BE
SEWER. LOCATED AT IL
CITY OF SAN JUAN CAPISTRANO
STD. CLEAN-OUT
19781 - j S' 8
CITY I I