Loading...
04-0629_CAPISTRANO VALLEY CHRISTIAN SCHOOL_Surety AgreementSURETY AGREEMENT THIS AGREEMENT is made by and between the CITY OF SAN JUAN CAPISTRANO, a municipal corporation, hereinafter referred to as the "City" and Capistrano Valley Christian School, a California Corporation, referred to as "Developer'. WITNESSETH WHEREAS, City will issue Grading Permit No. 48085 to Developerto construct certain designated improvements, more particularly described in Exhibit "A" attached and incorporated herein by reference, which said improvements constitute a portion of that real property at the location of 32032 Del Obispo, commonly referred to as Capistrano Valley Christian School. WHEREAS, San Juan Capistrano Municipal Codes Section 8-2.08 requires the posting of financial security to secure the faithful performance and labor and materials forthe grading and installation of improvements connected with issuance of grading permits including the construction of drainage and protection devices and any other corrective work to remove and eliminate engineering and geological hazards. WHEREAS, San. Juan Capistrano Municipal Code Section 8-2.09 authorizes the Building Official to require additional bonding as security to ensure against adverse aesthetic impacts arising from incomplete grading and/or improvements from development projects which have not been completed. WHEREAS, the Building Official finds thatthe proposed project site is highly prominent and visible to the community, has unique topographic features or involves substantial grading of slope areas. NOW, THEREFORE, in consideration of the premises and promises hereinafter contained, City and Developer agree as follows: SD 0 0 1. Developer's Improvements Obligations. Developer shall, at its sole cost and expense, provide and furnish all labor, materials and equipment for the installation of improvements set forth in Exhibit "A'. The grading permit and plans, which further defines the improvements in Exhibit "A", are on file in the office of the City's Building Official, and all documents referenced in Exhibit "A" are incorporated herein by reference. 2. Developers Security. Developer shall provide a cash bond by duly authorized corporate surety, subject to the approval of the City Attorney, to secure Developer's improvement obligations required under this agreement. The amount of the bond shall be $6,000 for that work described in Exhibit "A". This security of $6,000 shall also serve as security for restoration of the site. 3. Completion of Improvements. To ensure the protection of the public safety, health and welfare, Developer shall constructthe improvements described in Exhibit "A" in accordance with the schedule as set forth in Exhibit "B", and the conditions as set forth in Exhibit "C". 4. Developer Default. In the event Developer does not complete the required improvements, including erosion and silt control measures within the time required, using Best Management Practices (BMP) in implementing a Water Quality Management Plan in full compliance with Orange County National Pollutant Discharge Elimination System (NPDES) Storm Water Implementation Agreement and San Juan Capistrano Municipal Code Section 8-14, or abandons the project site, or suspends work for more than twentyworking days other than previously prescribed, City shall have the right to immediately declare a default and to make demand on the surety for performance. 5. Restoration of Site. San Juan Capistrano Municipal Code Section 8-2.09 allows the City to require bonding as security to ensure against adverse aesthetic impacts arising from uncompleted grading, drainage and/or improvements which includes illicit non - storm drain water discharge. The purpose of this bonding shall be to restore the property to its original condition if the Developer defaults. This restoration shall include but not be limited to the following: A. Dismantle and/or demolish improvements; B. Grade property to its original contours as shown on the grading plan referred to in Exhibit "A"; 0 Ll C. Remove all debris and construction materials from the site; and D. Install erosion and siltcontrol devices, including hydroseeding, to insure a uniform vegetative cover, or equivalent stabilization measures which include the use of such Best Management Practices as blankets, fiber matrices, catch basin filters, orothererosion resistant soil coverings or treatments to satisfaction of the Director of Engineering and Building. 6. Attomeys Fees. Developer agrees to pay City such sum as the court mayjudge as reasonable for the legal services of an attorney representing the City in an action brought to enforce or interpret the obligations of this agreement, and such sum shall be made a part ofanyjudgment in such action against Developer if such action is determined in favorof said City. 7. Developers Work inSafe Condition. Developer shall perform all work in a safe workmanlike manner and shall take such precautions as may be necessary to warn and protect the public from any dangerous condition caused by the construction of said improvements. 8. Liability. Developer shall hold City, its officers, and employees harmless from any and all claims, demands, causes of action, liability or loss of any sort because of, or arising out of, the acts oromissions of Developer, his contractor, subcontractors, agents or employees in the performance of this agreement. In witness whereof, the parties have executed this agreement as of 2004 at San Juan Capistrano, California. Developer: Capistrano Valley Christian School By: (Signee) Bob Burlsoon City of San Juan Capistrano AfkiAd b. (Title) Treasurer Building Official Approved as to Form: (boa Io By: John Shaw City Attorney EXHIBIT "A" Capistrano Valley Christian School 32032 Del Obispo Item 1: Construction of all on-site grading (cut, fill and slope stabilization) operations in accordance with Grading Permit No. 48085 and the Developer's plans and supporting documents as listed below: (A) Grading Plan for (Project Name) Capistrano Valley Christian School, dated May 5, 2004, prepared by (Firm) Ron Martin & Associates, (Engineer) Ronald Martin, RCE No. 14456. (B) Geotechnical Report for (Project Name) Capistrano Valley Christian School, dated , prepared by (Firm), Lawson & Associates, (Engineer) Timothy Lawson No. CEG 1821. 0 0 EXHIBIT "B" SCHEDULE FOR COMPLETION OF IMPROVEMENTS Completion Date July 31, 2004 August 30, 2004 Task Rough Grade Certification Landscape Irrigation September 30, 2004 Landscape Planting 0 EXHIBIT "C" CONDITIONS FOR COMPLETION OF IMPROVEMENTS A. The grading forthis project shall be in strict conformance with the grading plans and related documents as described in Exhibit "A" and Grading Permit No. 48085. B. Grading operations shall commencewithin fourteen (14) calendardays afterissuance of Grading Permit No. 48085. Wintergrading will be conducted in strict accordance with the dynamic erosion and silt control plan submitted by the Developer, and approved bythe City. This erosion and silt control plan reflects erosion and silt mitigation measures for expected grading conditions as the work progresses through the winter season and shall not be amended except with the permission of the City. In the event Developerdoes notwish to implement winter grading, or permission for winter grading is rescinded, static erosion and silt control plans reflecting current conditions of grading shall be submitted within ten (10) days of cessation of work. These plans shall: 1. Identifyall pollutant sources including sources of sediment that may affect the quality of storm water discharges associated with the construction activity. 2. Include the erosion and sediment control planting and hydroseeding to insure a uniform vegetative cover or equivalent stabilization measures which include the use of such Best Management Practices as blankets, fiber matrices, catch basin filters or other erosion resistant soil covering or treatments to the satisfaction of the City Engineer. C. The supervising civil engineer and soils engineer shall file biweekly progress reports of all grading operations with the Building Official. An interim compaction report, for thatwork completed at the time work is suspended for the rainy season, shall be filed with the Building Official. This interim report shall conform to the grading code requirements for final compaction reports. D. Contractor shall control dust to the satisfaction of the Building Official or his deputy. During grading, Contractor shall keep water truck on site and dampen work area, grounds, and loaded trucks. 0 Ci E. Grading operations suspended during the rainy season shall be resumed no laterthan 15 days from date of suspension termination. F. Installation of interim erosion and sediment control devices and systems shall commence within seven (7) days after rough grade certification has been approved by the Building Official and must be completed within fifteen (15) days of rough grade certification. Final erosion and sediment control devices, planting, landscaping and irrigation systems shall be installed prior to final inspection of the grading permit. G. All work shall be performed in strict observation of the Hours of Operation in accordance with San Juan Capistrano Municipal Code Section 8-1.03. H. Parking for construction crew is to be on-site. 0 0 Plan Check Application No. v ae Permit No. CITY OF SAN JUAN CAPISTRANO MISCELLANEOUS RECEIPT Project Name Project Addre: Applicant Address Building Plan Check ...................................................... Grading Plan Check ...................................................... On -Site Plan Check ...................................................... Special Inspection/Re-Inspection.................................. Phone $ (01-4411) $ (01-4413) $ (01-4413) $ (01-4412) Geotechnical/Soils Plan Review .................................... $ (01-4419) ( Co�pieess /@0.200/// each.. ....................................... $ c�►� (0/1-4521) n Other L.T?'!:/L..J..../c..e5!►•V ....Ar -IT . ............ $ fO[�c.v. e�� (1�� �✓i�•v TOTAL....................................... $ NOTE: APPLICATIONS FOR WHICH NO PERMIT IS ISSUED WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION/DEPOSIT SHALL EXPIRE BY LIMITATION AND BECOME NULL AND VOID. UNIFORM.BUILDING CODE SECTION 304 (d) 008 M m 0� O X, Ep W W 0 a 0 0 O C y C.. � y N 0 Q f1J fLl O 133 0� O X, Ep W W 0 a 0 • Z- 2Dy Oz� 7 K y2 m m r m CD a_ Co i N a5*Z DSS Rc m O m