Loading...
1973-0624_SULLY MILLER CONTRACTING_ContractCONSTRUCTION CONTRACT Assessment District No. 73-1 THIS AGREEMENT, made and entered into this Z /s day of Tln e. , 1973, by and between SULLY -MILLER CON- TRACTING COMPANY (hereinafter called "Contractor"), and GEORGE E. MADSEN (hereinafter called "Superintendent of Streets"), in his official capacity as Superintendent of Streets of the City of San Juan Capistrano, California, (hereinafter called "City"), under and by virtue of the authority granted to him as such officer and in accordance with the Improvement Act of 1911, Division 7 of the Streets and Highways Code; IT IS HEREBY AGREED BETWEEN THE PARTIES AS FOLLOWS: First. Contract Documents. The complete Contract includes all of the Contract documents, to -wit: (a) Notice Inviting Bids; (b) Instructions to Bidders; (c) Bid Proposal; (d) General Conditions; (e) Special Conditions; (f) Technical Provisions including the complete set of Plans for the Con- struction of Arterial Highway Financing Program, Project No. 641, Assessment District No. 73-1, A Municipal Improvement Act of 1911 and Underground Utility District No. 2 in Camino Capistrano, Alipaz Street, Paseo Adelanto, Del Obispo Street and Los Rios Street; (g) The Contract Agreement; (h) Performance Bond; (i) Labor and Material Bond; (j) duly issued Addenda and all modifications incorporated in the foregoing documents of the Contract Agreement. The fore- going contract documents are hereby incorporated by refer- ence and shall be deemed and considered as forming a part of this Contract Agreement as fully and to the same extent as if it were copied at length herein. Second. The Work. The CONTRACTOR agrees to furnish all tools, labor, materials, equipment, transportation, services and supplies necessary to perform and complete in a good and work- manlike manner the Construction of Arterial Highway Financing Program, Project No. 641, Assessment District No. 73-1, A Municipal Improvement Act of 1911 and Underground Utility District No. 2 in Camino Capistrano, Alipaz Street, Paseo Adelanto, Del Obispo Street and Los Rios Street, in strict con- formity with and in exact accordance with the Plans and Speci- fications and all other Contract Documents referred to above, which documents are on file at the office of the City Clerk, City Hall, 32400 Paseo Adelanto, San Juan Capistrano, California. Third. Payment. The work to be done under this contract is described in the Resolution of Intention, Resolution No. 73-1-22-8, as amended by Resolution No. 73-2-26-1, for Assessment District No. 1973-1. Reference is hereby made to said Resolution of In- tention for a description of the assessment district which the City Council of San Juan Capistrano has declared to be benefited by said work to be assessed to pay the cost and expenses thereof. This contract will be paid from assessments levied in said assess- ment district and by serial bonds to represent unpaid assessments as provided in the Improvement Act of 1911. Reference is further made to said Resolution of Intention for a description of the serial bonds. Fourth. Commencement and Completion of the Work. The CONTRACTOR agrees to begin and complete the work within the time specified in the Notice Inviting Bids. It is agreed that it would be im- practicable and extremely difficult to fix the actual amount of -2- damage and loss sustained should the CONTRACTOR fail to complete the work in the specified time, he shall pay, as liquidated damages, ascertain and agreed, and not in the nature of a penalty, One Hundred Dollars ($100) a day for each day delayed; provided that extensions of time with waiver of liquidated damages may be granted as provided in the Specifications. Fifth. Performance Bond and Labor and Material Bond. The CONTRACTOR agrees to furnish bonds guaranteeing the performance of this Contract and guaranteeing payment of all labor and material used under this Contract, as required by the laws of the State of California, in forms approved by the Superintendent of Streets. The Performance Bond shall be for an amount not less than one hundred percent (1008) of the amount of this Contract, and shall be conditioned on full and complete performance of the Contract, guaranteeing the work against faulty workmanship and materials for a period of one year after completion and acceptance. The Labor and Material Bond shall be in an amount not less than one hundred percent (1008) of the amount of this Contract, and shall be conditioned upon full payment of all labor and material enter- ing into or incident to the work covered by this Contract. The CONTRACTOR agrees to furnish the bonds on the forms bound within these specifications. Sixth. Insurance. The CONTRACTOR agrees to carry Public Liability Insurance, Property Damage Insurance, and Workmen's Compensation Insurance in amounts as required by the Specifications. Seventh. General Prevailing Rate of Per Diem Wages. The general prevailing rate of per diem wages and general prevailing rate for -3- holiday and overtime work in the locality in which the work is to be performed for each craft, classification, or type of workman needed to execute the Contract, have been determined by the City Council and are set forth in the Notice Inviting Bids. The general prevailing rate of per diem wages set forth in said documents is hereby incorporated herein and made a part hereof. The CONTRACTOR agrees that he, or any sub -contractor under him, will pay not less than the foregoing specified pre- vailing rates of wages to all workmen employed in the execution of the Contract. Eighth. Compliance with Other Provisions of Law Relative to Public Contracts. It is stipulated and agreed that all provisions of law applicable to public contracts are a part of this Contract to the same extent as though set forth herein and will be com- plied with by the CONTRACTOR. These include, but are not limited to, the stipulation that eight hours labor constitutes a legal day's work and the CONTRACTOR will, as a penalty, forfeit Twenty - Five Dollars ($25) for each workman employed in the execution of the Contract by the CONTRACTOR or by any sub -contractor for each calendar day during which such workman is required or permitted to work more than eight hours in violation of the provisions of Article Three, Chapter One, Part Seven, Division 2 of the Cali- fornia Labor Code, except as permitted by law. Ninth. City Not to be Liable. Pursuant to Section 5285 of said Streets and Highways Code, it is further agreed and expressly understood by the parties hereto that in no case, except where it is otherwise provided by law, will said City, or any official thereof, be liable for any portion of the expense of the work -4- aforesaid, or for any delinquency of persons or property assessed. IN WITNESS WHEREOF, the CONTRACTOR and the SUPERINTENDENT OF STREETS have hereunto set their hands and seals, all on the day and year first above written. SULLY -MILLER CONTRACTING COMPANY By-6�Z R. K. San Jua3K/Capistrano, California -5- STATE OF CALIFORNIA, COUNTY OF LOS ANGELES ` ss. ON JUNE 19th '19 —1-3, before me, the undersikkned, a Notary Public in and for said State, personally appeared R.K. MaCGREGOR known to me to be the PRESIDENT of the SULLY—MILLER CONTRACTING COMPANY the Corporation that executed the within Instrument, known to me to be the person who executed the within Instrument, on behalf of the Corporation, therein named, and acknowledged to me that such Corporation executed the same. ♦v�..wvv•v•♦•♦o••+o♦♦♦�eoo♦or• • OFFICIAL SEAL • DONNA M. TEPPER i • . WITNESS my hand and official seal. NOTARY PUBLIC -CALIFORNIA PRINCIPAL OFFICE IN O LOS ANGELES COUNTY My Commission Expires March 5, 1977 • ,r /i `� _� /1 �,, Notary Public in and for said State. ACKNOWLEDGMENT—Corpotation—Wolcotis Form Z!2—Rev. 566 BOND No. q I -7C� C) - x-. id PERFORMANCE BOND r" '1 ZIA." KNOW ALL MEN BY THESE PRESENTS: That WHEREAS, the City of San Juan Capistrano, State of California, hereinafter designated as the OWNER, has awarded to Sully -Miller Contracting Company as the PRINCIPAL, a Con- tract for the construction of Arterial Highway Financing Pro- gram, Project No. 641, Assessment District No. 73-1, A Municipal Improvement Act of 1911 and Underground Utility District No. 2 in Camino Capistrano, Alipaz Street, Paseo Adelanto, Del Obispo Street and Los Rios Street, for the OWNER; and WHEREAS, said PRINCIPAL is required under the terms of said contract to furnish a bond for the faithful performance of said contract; NOW, THEREFORE, we the PRINCIPAL, and HIGHLANDS r4SURANCE COMPANY as Surety, are held and firmly bound unto the OWNER in the penal sum of Nine Hundred Thirty Seven Thousand Five Hundred Thirty -One Dollars and Ten Cents ($937,531.10), lawful money of the United States for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that if said PRINCIPAL, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in said contract and any alteration thereof made as therein pro- vided, on his or their part, to be kept and performed at the time and in the manner therein specified and in all respects according to their true intent and meaning; shall guarantee all work required under the said contract against faulty materials or poor workmanship during the construction period and for one year after the date of completion and acceptance of the work under said contract; and shall indemnify and save harmless the OWNER, its officers and agents as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue. The Surety further agrees to pay reasonable attorneys fees of OWNER (as fixed by the Court) in any proceeding by said OWNER to enforce this bond. And the Surety, for value received, hereby stipulated and agrees that, no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed there- under or the specifications accompanying the same shall in any wise affect its obligations on this bond and it does hereby waive notice of any such change, extension of time, alteration or addi- tion to the terms of the contract, or to the work or to the specification. IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their seals this WA-) day of 1973, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. APPROVED AS TO FORM: Attorney for Owner SULLY -MILLER CONTRACTING COMPANY By R. K. MacGRiGOR - PRE C'I -2- STATE OF CALIFORNIA IS. COUNTY OF LOS ANGELES On this 19th day of JUNE before me, a Notary Public, within and for said County and State, personally appeored _ J.H. CAITHAMER 19 73 +o me Personally known, who being duly sworn, upon oath, did say shot he is the Agent and/or Attorney-in-fact of and for he HIGHLANDS INSURANCE COMPANY, a corporation created, organized and existing ander and by vi.rue of the lows cf the State of Texas +h., be Corporate seal affixed to the foregoing within instrument is the seal of said Company, ,hot the seal was affixed, and the said instrument was executed by authority of its Board of Direo tars, and the sold J.H. CAITHAMER did acknowledge that he executed the saidnstrum, .a. N `♦♦eo♦♦ e♦♦e♦♦e♦NN♦♦ •e" ♦ O'FTCIAL S L DIANE GOSLI FS'�EA INorApRy ru4uc - CAUFOq,wn J/ ant OFFICE IN LOS ANGELES COUNTY et", My Commission Expires February 1, 1977 STATE OF CALIFORNIA, and deed of said Company. Notary Public My Commission expires !2, - LOS ANGELES r as. COUNTY OF 1 ON JUNE 19th 19 7L., before me, the undersigned, a Notary Public in and for said State, personally appeared R.K. MacGREGOR known to me to be the ev._...wvv♦erve oervo4e ♦vs OFFICIAL SEAL SFAL c "" DONNA M. TEPPER NOTARY PUBLIC- CALIFORNIA IS PRINCIPAL OFFICE IN 0 If1 LOS ANGELES UoUNTY • My Commission Expires March 5, 1977 ♦ of the SULLY—MILLER CONTRACTING COMPANY the Corporation that executed the within Instrument, known to me to be the person who executed the within Instrument, on behalf of the Corporation, therein named, and acknowledged to me that such Corporation executed the same. WITNESS my hand and official seal. L..,Y-i Notary Public in and for sa d State. BOND No. G 170 a O -am" LABOR AND MATERIAL BOND PREMIUM: ME PREMIUM ON THIS BOND IS INCLUDED IN THAT OF THE PEWORMANCE BOND. KNOW ALL MEN BY THESE PRESENTS: That WHEREAS, the City of San Juan Capistrano, State of California, hereinafter designated as the OWNER, has awarded to Sully -Miller Contracting Company, hereinafter designated as the PRINCIPAL, a contract for the construction of Arterial Highway Financing Program, Project No. 641, Assessment District No. 73-1, A Municipal Improvement Act of 1911 and Underground Utility District No. 2 in Camino Capistrano, Alipaz Street, Paseo Adelanto, Del Obispo Street and Los Rios Street, for the OWNER; and WHEREAS, said PRINCIPAL is required to furnish a bond in connection with said contract, providing that if said PRINCIPAL, or any of his sub -contractors, shall fail to pay for any materials, provisions, provender or other supplies used in, upon, for or about the performance of the work contracted to be done, or for amounts due under the Unemployment Insurance Code of California, or for any work or labor done thereon of any kind, the Surety in this bond will pay the same to the extent hereinafter set forth: NOW, THEREFORE, we the PRINCIPAL and HIGHLANDS 1'NSURANCE GOMPAINT as Surety, are held and firmly bound unto the OWNER in the Penal sum of Nine Hundred Thirty Seven Thousand Five Hundred Thirty - One Dollars and Ten Cents ($937,531.10) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, succes- sors, or assigns jointly and severally, firmly by these presents. 0 THE CONDITION OF THIS OBLIGATION IS SUCH, that if said PRINCIPAL, his or its heirs, executors, administrator, succes- sors, or assigns, shall fail to pay for any materials, provisions, provender or other supplies used in, upon or about the performance of the work contracted to be done, or for amounts due under the Unemployment Insurance Code of California, or for any labor there- on of any kind, as required by the provisions of an act of the Legislature of the State of California entitled "An act to secure the payment of claims of persons employed by contractors upon public works, and the claim of persons who furnish materials, supplies, implements or, machinery used or consumed by such contractors in the performance of such work, and prescribing the duties of certain officers with respect thereto", approved May 10, 1919, as amended, provided that the persons, companies, or corporations so furnishing said material, provisions, provender, or other supplies, or power used in, upon, for or about the per- formance of the work contracted to be executed or performed, or any person, company, or corporation renting or hiring implements or machinery or power for or contributing to said work to be done, or any person who performs work or labor upon the same or any person who supplies both work and materials therefor, shall have complied with the provisions of said Act, then said Surety will pay the same in or to an amount not exceeding the amount herein- above set forth, and also will pay in case suit is brought upon this bond, such reasonable attorney's fee as shall be fixed by the Court. This bond shall inure to the benefit of any and all persons, companies, and corporation entitled to file claims under Section 1192.1 of the California Code of Civil Procedure, so as to give a -2- 0 right of action to them or their assigns in any suit brought upon this bond. And the Surety, for value received, hereby stipulated and agrees that, no change, extension of time, alteration or addi- tion to the terms of the contract, or to the work to be performed thereunder, or the specifications accompanying the same, shall in any wise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alter- ation or addition to the terms of the contract or to the work or to the specifications. IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their seals this I q'o-, day of 1973, the name and corporate seal of each corporate party being affixed hereto, and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. SULLY -MILLER CONTRACTING COMPANY By / R. K. M,,GREGOR - PR � ANT HIGHLANDS IN3URANCE 9OMPANY Surety By APPROVED AS TO FORM: J.AIT MEH A1T0nNEY-1t1-FACJ Attorney for OWNER -3- STATE OF CALIFORNIA a a. COUNTY OF LOS ANGELES On rhea 19th day of JUNE before me, a Notary Public, within and for said County and State, personally appeared J.H. CAITHAMER 19 73 ro me personally known, who being duly sworn, upon oath, did soy that he is the Agent and/or Attom♦y-in-Fact of and for the HIGHLANDS INSURANCE COMPANY, a corporation created, organized and existing under and by virtue of the laws of the Store of Texas that the Corporate seal affixed to the foregoing within instrument is the seal of said Company, chat rhe seal was offLaed, and the said instrument was executed by authority of its Board of Direc- tors, and the said J.H. CAITHAMER did acknowledge that he executed rhns" r as the • OFFICIAL • DIANE. 0066 _ S • °} Q A WUTARY PUBLIC - CALL FORK • PRINCIPAL OFFICE IN ♦ LOS ANGELES COUNTY e e, o. MyCommission Expires February 1, 1977 - wwaawePe♦°eeeweea,..a eee aa0 4611♦ STATE OF CALIFORNIA I and deed of said Company. Notary Public My Camm,es,on expires /j ?7� COUNTY OF LOS ANGELES i ss. ON JUNE 19th 19 73 before me the undersiggned a Notary Public in and for said State, personally appeared R. MacGREG0i2 PRESIDENT known to me to be the _ oftheSULLY—MILLER CONTRACTING COMPANY the Corporation that executed the within Instrument, known to me to be the person who executed the within Instrument, on behalf of the Corporation, therein named, and acknowledged to me that such Corporation executed the same. � .. vvteeeeea'>G3000e0ee0ee ' c OFFICIAL SEAL e ° DONNA M. TEPPER O .'t-.�'-.ry NOTARY PUBLIC- CALIFORNIA ; WITNESS my hand and official seal. s \ - PRINCIPAL OFFICE IN e LOS ANGELLS WUIrrY ° My Commission Expires March 5, 1977 It eee0ees100 ee Oeeeee•♦66666 e0e°� tx—,vclt�) t • �✓%L/1� Notary Public in and for said State. MEMORANDUM 0 0 r�5 April 2, 1974 TO: Donald G. Weidner, City Manager FROM: W. D. Murphy, Director of Public Works SUBJECT: Change Order No. 7 - Sully Miller Contracting Co. Camino Capistrano Improvement Dist. 73-1 SITUATION: As a result of field conditions and minor changes in design, attached is a contract change order #7 reflecting an increase in the total contract price of $2,555.43. All items have been reviewed and approved by our field inspector. This change order reflects a final clean up and adjustment of contract quantities. ALTERNATE ACTIONS: 1. Approve the change order. 2. Request more information. RECOMMENDATION: Approve Change Order #7 to Sully Miller Contracting Co. in the amount of $2,555.43. Respectfully submitted, (� FOR CITY COUNCIL' W . D Mu y WDM: rm Attach. .,( O '/ / ............AGENDA Change Order No. 7 0 'Date March 26, 1974 Project No. Camino Capistrano Improvement District - Location— _ Beginning Cont*t Date June 19, 1973 Contract Amount $_ 937,531.10 Previous Change Orders $ 12,694.74 This Cha_nsp n,-.lor Adjusted Contract $ 2,555.43 S 952,781.27 Item No. Description of Changes Decrease In Contract Price Increase In Contract Price 1 Install 6"' A.C. Drain @ Mission 307.84 2 Rebuild Sewer Manhole Camino Cap 521.34 Sta 560+58 3 Install Curb Drains at tennis courts on Camino Cap. 102.75 4 Const. PCC steps at 32091 Alipaz St 371.65 5) New Sewer Manhole Rings & Covers 10 Ea. 1,032.40 6) Install metal beam guard rail at RR crossing on Del Obispo 219.45 Change In Contract Price Due to This Change Order $ $ 2,555.43 Net Change In Contract Price $ s 2,555.43 TIME SCHEDULE: Total Contract Days 210 Amount Prior C.O.(s) 65 Amount This C.O. - - Adjusted Contract Days 275 ACCEPTANCE: DATE: Accepted by:. -j% Recommended by: Approved by Superin en en -ous New Date of Completion March 22, 1974 WOOOEIOt/KUnOTA A ASSOCIATES. INC. MEMORANDUM TO: FROM: SUBJECT: SITUATION: FEBRUARY 21, 1974 W. D. MURPHY, DIRECTOR OF PUBLIC WORKS CITY ENGINEER'S OFFICE CHANGE ORDER NUMBER 5, CAMINO CAPISTRANO IMPROVEMENT DISTRICT -TIME EXTENSION DUE TO RAIN AND TRUCKING DELAYS, SULLY -MILLER HAS REQUESTED AN EXTENSION OF TIME FOR THE SUBJECT CONTRACT. THE INITIAL CONTRACT CALLED FOR 210 DAYS. ON DECEMBER 17, 1973 THE COUNCIL APPROVED AN EXTENSION OF 45 ADDITIONAL DAYS DUE TO RAIN RELOCATION OF A STREET GAS LINE, DELAY REQUESTED BY THE CITY TO POSTPONE THE CONSTRUCTION ON DEL OBISPO UNTIL AFTER THE HOLIDAY SEASON. THERE HAVE BEEN ADDED DELAYS AS NOTED ON THE ATTACHED CONTRACT CHANGE ORDER NUMBER 5. ALTERNATE ACTION: 1. DENY THE REQUEST FOR A TIME EXTENSION. 2. APPROVE A TIME EXTENSION OF LESS DAYS THAN REQUESTED. RECOMMENDATION: APPROVE CHANGE ORDER NUMBER 5, ALLOWING A TIME EXTENSION OF 20 DAYS. THIS WILL EXTEND THE COMPLETION DATE FROM MARCH 2p 1974 TO MARCH 22� 1974• REVIEWED BY, WILLIAM D. MURPHY PUBLIC WORKS DIRECTOR GEM:MM FOR CITY COUNCIL .....................Cf.'„'fX.: J, ........ ....:AGENDA SJC 0703 RESPECTFULLY SUBMITTED, JACK Y. KUBOTA, CITY ENGINEER cv GEORGE E. /�I' DSEN SENIOR PROJECT ENGINEER IAULLWL. UL UL.1% Change Order No. 5 Beginning Contact Date June 19, 1973 Date February 20, 1974 Contract Amount $ 937,531.10 Project No.Camino Capistrano Im- Previous Change Orders $ provement District 73-1 Location This Change Order $ -0- Adjusted Contract $ 949.847.84 Item Decrease In Increase In No. Description of Changes Contract Price Contract Price 1 Time Extension Only 20 Calendar days total Breakdown'as follows: 18 calendar days - rain and wet conditions 2 calendar days - truck strike nge In Contract Price Due to This Change Order e In Contract91 4 $... -0- $ c -0- c -0- -0- i 0 W003 SIDE/KUS0TA A ASSOCIATSS. me. MEMORANDUM JANUARY 9, 1974 TO: WILLIAM D. MURPHY, PUBLIC WORKS DIRECTOR FROM: CITY ENGINEER'S OFFICE SUBJECT: CHANGE ORDER N0. 4 — CAMINO CAPISTRANO IMPROVEMENT DISTRICT SITUATION: AFTER REVIEWING DETAILS OF CONSTRUCTION ON DEL OBISPO STREET BETWEEN THE TRABUCO CREEK BRIDGE AND THE RAILROAD TRACKS, IT WAS DETERMINED THAT A CONSIDER— ABLE AMOUNT OF OBSTRUCTION TO TRAFFIC WOULD BE CREATED ACCORDING TO THE EXISTING STREET SECTION WHICH REQUIRED 411 OF ASPHALT CONCRETE OVER 14" OF AGGREGATE BASE. THIS WOULD REQUIRE AN EXCAVATION 18" DEEP AND THEN THE COMPACTION OF THREE LAYERS OF AGGREGATE BASE BEFORE WE COULD PLACE PAVEMENT. WE ASKED FOR ALTERNATE STREET SECTIONS FROM THE ORANGE COUNTY ROAD DEPARTMENT LAB, WHO SPECIFIED A TOTAL OF 11" OF ASPHALT ON TOP OF NATURAL SOIL. THIS CAN BE PLACED IMMEDIATELY AFTER EXCAVATION AND WE DO NOT NEED THE STREET CLOSURE FOR THE LENGTH OF TIME IT TAKES TO COMPACT THE BASE AND THEN PLACE THE ASPHALT. IN THE STUDY WE ALSO DETERMINED THAT WE WOULD NEED A SLIGHTLY THICKER STREET SECTION ON THE NEW FILL AREAS AS THE SOIL TESTS ON THIS FILL REQUIRE AN INCH MORE OF ASPHALT. THIS WOULD HAVE REQUIRED 211 MORE OF AGGREGATE BASE. WE REQUESTED THAT SULLY—MILLER SUBMIT TO US A PRICE FOR THIS ALTERNATE STREET SECTION. WE ALSO INCLUDED A THICK LIFT SECTION FOR PASEO ADELANTO WHICH WOULD BE 5j" OF ASPHALT CONCRETE IN LIEU OF 311 OF ASPHALT OVER /11 OF AGGREGATE BASE. ATTACHED IS A COPY OF THE RESPONSE FROM SULLY—MILLER INDICATING THAT THEY WOULD PUT THE ALTERNATE dp SECTION ON PASEO ADELANTO AT NO ADDED COST. THEY GAVE US A PRICE OF AN ADDED $0.103 PER SQUARE FEET FOR BOTH THE dp 11" AND 12" ASPHALT SECTIONS ON DEL OBISPO STREET. THIS WOULD ADD A TOTAL OF $3,759.50 TO THE EXISTING CONTRACT. WE WOULD HAVE ADDED APPROXIMATELY $1,200.00 TO THE CONTRACT JUST FOR THE EXTRA AGGREGATE BASE DUE TO THE CONDITION OF THE NEW FILL MATERIAL FOR THE WIDENED PORTION OF DEL OBISPO STREET. THIS CHANGE WILL ELIMINATE SOME EXCAVATION OF THE EXISTING ROAD BUT WILL REQUIRE EXTRA FILL ON THE WIDENED PORTION. THE CONTRACTOR HAS INCLUDED ALL CHANGES IN COST ON THE OVERALL COST FOR THE ASPHALT. THIS PRICE COMES TO A TOTAL OF $0.593 PER SQUARE FEET. THIS COMPARES WITH THE $0.597 PER SQUARE FEET WITH THE 14" TO 112" OF ASPHALT PLACED ON CAMINO CAPISTRANO. WE FEEL THIS IS A fair PRICE AND IS NECESSARY IN ORDER TO CONTROL THE TRAFFIC WHICH HAS MORE THAN DOUBLED ON DEL OBISPO SINCE THE START OF CONSTRUCTION. FOR CITY COUNCIL ......................... F.••1/.••Y•"J...T...........AGENDA #E--2 0 w0 0 o1101oencuwTA a ASSMIAns, INC. PAGE 2 WILLIAM D. MURPHY JANUARY 9, 1974 ALTERNATE ACTION: 1. HOLD FOR ADDITIONAL INFORMATION. 2. DENY THE CHANGE ORDER. RECOMMENDATION: 1. APPROVE THE ALTERNATE SECTION OF 5P' OF ASPHALT CONCRETE ON PASEO ADELANTO AT NO ADDITIONAL COST. 2. APPROVE THE ALTERNATE STREET SECTION ON DEL OBISPO STREET AT 11« OF i ASPHALT CONCRETE IN EXISTING STREET AREAS AND 1211 IN FILL AREAS AT A V TOTAL INCREASE IN PRICE OF $0.103 PER SQUARE FEET OVER 36,500 SQUARE FEET WHICH EQUALS $3,759.50. THESE COST FIGURES CONSIDER THE CHANGES IN EXCAVATION AND COMPACTION AND THE QUANTITIES FOR BID ITEMS NO. 2 AND 3 WILL REMAIN ACCORDING TO THE ORIGINAL BID. RESPECTFULLY SUBMITTED, JACK Y. KUBQTA, CITY ENGINEER BY GE GE E- MADSEN SENIOR ROJECT ENGINEER i REVIEWED BY ' J- ��� WILLIAM D. MURPHY PUBLIC WORKS DIRECTOR SJC 0703 SULLY- IM5LLFHR i ) a CONTRACTING CO. 3000 EAST SOUTH STREET/ BOX 5399/ LONG BEACH, CALIFORNIA 90eO5/(213) 531-3550 (213) 774-0714 December 11, 1973 City of San Juan Capistrano City Hall San Juan Capistrano, CA Attention: Mr. George E. Madsen Gentlemen: RE: ASSESSMENT DISTRICT 73-1, CITY OF SAN JUAN CAPISTRANO Thick Lift A.C., Alternate for Del Obispo Street and Paseo Adelanto Street Regarding your letter of December 4, 1973, we submit the following cost breakdown pursuant to your request for alternate paving sections. 1. Paseo Adelanto - 51," A.C. Alternate 20,400 SF @ no additional cost 2. Del Obispo Street - 1111 Alternate (Fill Areas 1211 A.C.) 36,500 SF @ $0.103 $3,759.50 Excavation and compacted fill have been considered in the above prices. Therefore, quantities for pay purposes for Items 2 and 3 are to remain as per original bid. Very truly yours, SULLY -MILLER CONTRACTING COMPANY D. E. Branch `� G v Chief Estimator ev by J S CITY OP Atk JUAN CAA(37-RAC�IO' GENERAL ENGINEERING CONTRACTOR SINCE 1923 ASPHALT 6 ROCK PRODUCTS MANUFACTUL r.R Change Order No. 4 Date_' January 10, 1974 Project No. Camino Capistrano Im- provement Dist. 73-1 Location No. 1 Descrivtion of Chanties RANGE ORDER • Beginning Contract Date June 19, 1973 Contract Amount $" 9371531.10 Previous Change Orders $ This Change Order Adjusted Contract 1 Change street section on Paseo Adelanto to 5�" AC 2 Change street section on Del Obispo to 11" AC in existing street area and 121, AC in fill areas. There will be no change in quantities for excavation or compaction on Del Obispo St. (Bid items 2 &.3) $0.103 sq.ft. x 36,500 sq.ft. Decrease In Contract Price Change In Contract Price Due to This Change Order $_ Net Change In Contract Price TIME SCHEDULE: ACCEPTANCE: Total Contract Days 210 Amount Prior C.O.(s) 45 Amount This C.O. -0- Adjusted Contract Days 255 New Date of Completion March 2, Accepted by: Q� 8,557.24 $ 3,759.50 $ 949,847.84 Increase In Contract Price 3,759.50 -0-I$ 3,759.50 -0- $ 3,759.50 DATE: Recommended by: Approved by Superintendent of Streets 1974 City Council action of MEMORANDUM December 13, 1973 TO: Donald G. Weidner, City Manager FROM: W. D. Murphy, Director of Public Works SUBJECT: Time Extension - Camino Capistrano Improvement District 73-1 SITUATION: As a result of traffic conflicts anticipated during the holiday period, this office has directed the contractor, Sully Miller Company to alter his schedule to delay improvements on Del Obispo Street. This change order further includes time extension for rain and gas main relocation. ALTERNATE ACTION: 1. Do not approve. 2. Request more information. RECOMMENDATION: Approve Change Order No. 3 to Sully Miller Company for a time extension of 45 calendar days. Respectfully submitted, b. (//�'y�i1 W. D. Murphy WDM:rm Encl. FOR CITY COUNCIL IR W E MeOn wz-�- I -.Zap. .. ..�1....�../....................AGENDA Change Order No. 3 Date November 29, 1973 CONTRACT CHANGE ORDER Beginning Cont t Date ;e 19, 1973 Cnntract Amrnint S 937,531.10 Project No. Camino Capistrano Previous Change Orders $ 8,557.24 Improvement District 73-1 Location This Change Order $ -0- Adjusted Contract No. Description of Changes 1 Time Extension only 45 Calendar days total Breakdown as follows: 31 days extension at the request of City to postpone construction on Del Obispo for the holiday period. 7 calendar days - rain - 7 calendar days - due to delay in gas main relocation for storm drain construction. In Contract Price Due to This Change Order Net Chance In Contract Price Decrease In Contract Price t... -0- $ 946,088.34_ Increase In Contract Price WE TIME SCHEDULE: ACCEPTANCE: DATE: Total Contract Days 210 Accepted by:— v Con ractor Amount Prior C.O.(s) -0- Recommended by Amount This C.O. 45 Adjusted Contract Days 255 Approved by Superintendent of Streets New Date of Completion March 2, 1974 WD®DSCDE/7CUMOTA & ASSOCIATIZZZ, INC. CONHUITINO HN OIN HRRH 2415 South Birch Street • Santa Ana, California 92707 • Phone: (714) 979-5240 AUGUST 17, 1973 MR. DAVE BRANCH .SULLY—MILLER CONTRACTING COMPANY 6145 SANTIAGO CANYON ROAD ORANGE, CALIFORNIA 92669 SUBJECT: CAMINO CAPISTRANO IMPROVEMENT DISTRICT ASSIGNMENT DEAR MR. BRANCH: ATTACHED ARE TWO COPIES OF THE ASSIGNMENT FOR THE SUBJECT ASSESSMENT DISTRICT NO. 1973-1 ASSIGNING TO STONE & YOUNGBERG ITS RIGHTS, TITLE, AND INTEREST TO THE WARRENT, DIAGRAM, AND ASSESSMENT FROM SULLY—MILLER. BY A COPY OF THIS LETTER I WILL TRANSFER A SIGNED COPY OF THE ASSIGNMENT TO STONE & YOUNGBERG AT THEIR SAN FRANCISCO OFFICE. I WILL ALSO FILE A COPY WITH THE CITY CLERK AND THE FINANCE DIRECTOR OF THE CITY OF SAN JUAN CAPISTRANO. IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT THE UNDERSIGNED. VERY TRULY YOURS, JACK Y. KUBOTA, CITY ENGINEER CITY OF SAN JUAN CAPISTRANO By GEORGE E,' MADSEN SENIOR PROJECT ENGINEER CC: PUBLIC WORKS DIRECTOR TONE & YOUNGBERG CITY CLERK FINANCE DIRECTOR In San Diego County, Carlsbad SIC 0703 ASSIGNMENT FOR VALUABLE CONSIlE:RATION, receipt of which is hereby acknowledged, the undersigned hereby sells, assigns, transfers and sets over to STONE & YOUNGBERG, 1314 Russ Building, San Francisco 4, California, all its right, title and interest in and to that certain WARRANT, DIAGRAM and ASSESSMENT and all moneys, bonds and payments of every kind and character due or to become due or hereafter issued or paid under that certain contract dated June 19, 1973 between SULLY -MILLER CONTRACTING CO.. INC. , Contractor, and AM=X&XW GEORGE MADSEN , Superintendent of Streets of CITY OF SAN JUAN CAPISTRANO (executed in his official capacity as such Superin- tendent of Streets), for the construction of improvement work in ASSESSMENT DISTRICT NO. 1973-1 pursuant to Resolution of Intention No. 73-1-22-8 of said CITY OF SAN JUAN CAPISTRANO BY THESE PRESENTS we hereby direct and authorize said Superintendent of Streets to deliver to said STONE & YOUNGBERG, its successors or assigns, as our assignee, said WARRANT, DIAGRAM and ASSESSMENT; and do authorize and appoint the said STONE & YOUNGBERG to receive, receipt for and enforce delivery of all WARRANTS, ASSESSMENTS, MONEYS, BONDS and PAYMENTS assigned hereby, and to give receipts, releases and satisfactions in the name of the undersigned or in the name of said assignee in the same manner as the assignor. Dated at Long Beach, Calif. , the 28thday of June �9 73 SULLY -MILLER CONTRACTING CO. C. By. FRANK E. HOLLAND, Assistant Secretary FILED and RECORIED: A i -i to S + 1 � 192.3L. Capistrano 1 Deputy STATE OF CALIFORNIA, Los Angeles Ss. COUNTY OF g ,,,, June 28, OFFICIAL SEAL DONNA M. TE'PPER e ♦ ®' NOTARY PUBLIC -CALIFORNIA PRINCIPAL OFFICE IN ♦ LOS ANGELES COOP:ix My Commission Expires March 5, 1977 s ♦♦♦♦♦♦♦♦♦♦♦♦♦110♦♦♦6♦♦♦♦♦aseO♦ before me, the undersigned, a Notary Public _Frank E Holland tg 7 3 and for said State, personally appeared known to me to be the sistant Secretary of the DU11y-1°filler uonTracting uomnan the Corporation that executed the within Instrument, known to me to be the person who executed the within Instrument, on behalf of the Corporation, therein named—,and acknowledged to me that such Corporation executed the same. WITNESS my hand and official sea Notary Public in and for said State. wood MEMORANDUM a ASSOCIA 0nc. TO: DONALD G. WEIDNER, CITY MANAGER CITY OF SAN JUAN CAPISTRANO FROM: CITY ENGINEERIS OFFICE AUGUST 8, 1973 FOR CITY COUNCIL SUBJECT: ADDITION TO THE CONTRACT FOR CAMINO CAPISTRANO IMPROVEMENT DISTRICT 73-1 SITUATION: J_?., 2 A CONDITION OF DEDICATION OF RIGHT-OF-WAY BY CHADE ALONG ALIPAZ STREET WAS THAT THE CITY WOULD CONSTRUCT AN ADDITIONAL LANE IN THE SOUTHBOUND DIRECTION. THE EXISTING IMPROVEMENTS OF ALIPAZ STREET IN THIS AREA TERMINATE AT THE CENTER LINE OF THE STREET. IT WAS PROPOSED TO ADD THIS CONSTRUCTION ALONG WITH THE IMPROVEMENT DISTRICTS HOWEVER, OUR LEGAL COUNCIL RECOMMENDED AGAINST ADDING IT INTO THE CONTRACT DOCUMENTS OF THE 1911 ACT PROCEEDINGS AS THE COST WOULD BE OUTSIDE THE IMPROVEMENT DISTRICT. SEE ATTACHED MAP FOR LOCATION) IN ORDER TO UTILIZE THE SERVICES OF THE CONTRACTOR ON THE SITE, WE REQUESTED THAT SULLY -MILLER CONTRACTING COMPANY GIVE US A QUOTE FOR COMPLETING THIS WORK ACCORDING TO OUR PLANS SEE ATTACHED LETTER). WE WOULD RECOMMEND THAT THE WATER METER BE RELOCATED BY ORANGE COUNTY WATERWORKS DISTRICT No. 4 AND THAT WE DELETE THE 2X4 REDWOOD HEADER FROM THE PROJECT. THIS WOULD REDUCE THE ESTIMATED COST TO $9,619.20 WHICH WOULD BE WITHIN THE BUDGET FIGURE OF $10,000.00. ALTERNATE ACTION: 1. HOLD FOR ADDITIONAL INFORMATION. RECOMMENDATION: APPROVAL OF CHANGE ORDER N0. 2 FOR ADDING ONE LANE OF PAVEMENT ON ALIPAZ STREET BETWEEN STATION 130+65 AND STATION 141+54 FOR THE FOLLOWING AMOUNTS: UNIT N0. ITEM QUANTITY UNIT COST COST 1. CLEAR & GURB 2. EXCAVATION 3. 411 AC, 1311 AB, PRIME & SEAL 4. ADJUST MANHOLE 5. ADJUST VALVE BOXES TOTAL . . . . . . . . . . . . . FINAL COSTS WILL BE CONSTRUCTION. CITY THIS PROJECT. 1 LS 11,175.00 692 CY 2.85 1,972.20 12,200 SF 0.51 6,222.00 2 EA 100.00 200.00 1 EA 50.00 50.00 . . . . . . . . . . . . . $9,6 19.20 BASED ON THE ACTUAL QUANTITIES OF WORK INCORPORATED IN THE FUNDS ACCORDING TO THE 1973-74 BUDGET SHALL BE UTILIZED FOR CC: PUBLIC WORKS DIRECTOR SJC RESPECTFULLY SUBMITTED, JACK ZYTA, CITY BY GEORGE rK MADSEN 0 0 6145 SANTIAGO CANYON ROAD/ P.O. BOX 432/ORANGE, CALIFORNI A 92669/j114j 639-1400 (714j5�i7-0J/o July 9, 1973 Cil -y of San Juan Capistrano 821,06 Paseo Adelanto Sa.: 1uan Capistrano, California A� e.. ior.: Mr. George Madsen Sulec Quotation for Street Work or. Alipaz Street between Station 130+65 and 141+54. Gentlemen: We propose to construct street improvements on Alipaz Street located outside of Assessment District No. 73-1 as per drawings dated 2-22-73 for the unit prices listed below: No. Item Quantity Unit Unit Cost Cost 10,757.20 E'xc usions: Engineering, testing and permits Very truly yours, o SULLY -MILLER CONTRACTING COMPANY D. E. Branch Estimator Di, 5 : -="p cc: lie -.'L:A,_ ZNGINCCRING CONTRACTOR SINCE 1923 • ASPHALT 6 ROOK PRODUCTS MANUFACTUnFR Clear & gurb 1 LS $1,175.00 -2. Excavation 692 CY $ 2.85 1,972.26 4" AC, 13" AB, prime & seal 12,200 SF 0.51 6,222.00 Adjust Manhole 2 EA 100.00 200.G0 --o. Adjust Valve Boxes 1 EA 50.00 50.00 C). <elocated water meter 1 EA 250.00 250.00 7. 2" x 4" R.W. Headers 1,110 LF 0.80 888.00 10,757.20 E'xc usions: Engineering, testing and permits Very truly yours, o SULLY -MILLER CONTRACTING COMPANY D. E. Branch Estimator Di, 5 : -="p cc: lie -.'L:A,_ ZNGINCCRING CONTRACTOR SINCE 1923 • ASPHALT 6 ROOK PRODUCTS MANUFACTUnFR • M1� L' rJ \r' �`• cc w .-1-7IT CL L.7 �� _____ T ♦r� ���• ��`1"� A... u., � i � "_ I_ , T ��/,Q�'- l �1 L� fir, , M� b;+ (+i � ftj.- ` .� � \�'t 116�J! I��I�.l i�"'w�—l•.. _—'an5--sef.�T—xe,. _� JJ�' ._ N'iailil�l 1i .pp�yw�,l . '� 1 �'• ��� f vN '.. .!I �.,' 1 I X11 t nliivuI n ... K r' - �l \'x,•11 \-0\\'\1 1� \1� 0a,.._=j,�/••. r `;" /;. /;, �,1'.r^�',�W' pl -- ,�x �`V, ,�— 0. X11((„//rr , ,,, .b�bV i i R Form recommended and supplied by EGCA 0 0 4 If PRELIMINARY NOTICE n L J Public Works ti 6 4�1 O (Sections 3091 and 3098, California Civil Code) 1' . 0 ,9V ..>L111.'r—;.]-I,7_7"L, ,Or', rT C-lotri:,11"iv (name of original contractor) (Generat or Prime Contractor) Address . C . _ C', r �4" ') 1'^ _ , a' i :a) =- AND (name of public agency) 9.0 W I Nvo You are hereby notified that the undersigned has furnished within 20 days last past or will furnish hereafter: (general but substantially accurate description of labor, services, equipment, or materials furnished or to be furnished to the jobsite) for the building, structure or other work of improvement consisting of: (general nature and location sufficient or identification) The estimated total cost of said labor, services, equipment or materials is: $ r, ^(.' The name of the party to whom said labor, services, equipment or materials were furnished or are to be furnished is: i pit i-4.�i name By� (signature) - (street address)` (city) of person or firm furnishing labor, service, equipment or materials) (title) (state) If prepared and served in accordance with the instructions hereon, this form will constitute a "Preliminary 20 -Day Notice (Public Work), Stop Notice" (Section 3098, Calif. Civil Code) and a "Ninety -Day Public Works Preliminary Bond Notice" (Sec- tion 3091, Calif. Civil Code.) PUBLIC AGENCY COPY (104 (7/72) (sip code) WICIREQI.Ifl61!!'QTSI'ORPtBLICIMRNrFOE[111'110),I?`iE IS J007 ned 20W;. i'ahf. ( iri((2.Je! HJW) (41 11, 1(1MP lof mu -1 fee nnen Li =,nr ,-ho rear mart io wwrl dal, nuth" richt- c.r enlorcc a Arvin on a paw we"I band un a pohhc ,..n 4ruel ion nd, (e,,cc-lit the original contmMor a a uorLmau p,rfo ruing (Lo. labor {'or war,a). `?. ItIIO GIAN 771E 1O'17CE:' ttn puld, jobs. Be notice ow, to the public• ammo and orikival cantrac n. 3. (21'ITNIN OF IUF: %0FICE (1) -1 ceneral dewrq tion of the labow. mer k1e equipncenI or material, £'uroi=hed, and to be fin• 0hed: (2) the metre and Me, of Be ehaitnanC Cy Be mule and addm-r of III, f,ersmt www caahn't xl for Be punhaw of such labor. s•niee, ,equipment ar material;; {d) a description of the yKnie sobrient for Anadhatimm and (=t) the total price of thee later, etc (cr ' eyuipuienl or uiaJ"Inds ti,rniole d.,tr un he hani;he,l In the projeft. L 71171N G Of 771F. IOTHA On putdic,yd" now mu -I Q served na !&" t ban N das+ from the date Uig claimant fink or mater(a1> to thojoh>ita. a. 111)(1 111t V0 1If,'/; )fi ,4Is I'J 1). 'fhe notice can be ,versed either hr, hxod dcliNerr or lbw mail. Ailing numl he rnhrr b. regeal ,jrd or , m' 1bal mail. The notiec k rnn,idrred wrrd on the dar- c,.hett a i- del,a:.ited in the nu,ii, fhe notice can for .wrsed on the uronal coca w dor at ane place he ntainttcin, an off im, or conduct, his hnainow or at hi- residence, fn caw of my public works eonAr"Or 1 by the I lepartmmnt o1 Public tl orbs or the )rpar uneco of Mon ral ATS", 4 the *tale motion, muse he tnaih:d of hand deMisr•(I to llu di; bnr>inf,ah cr of 1 he I trlrcrtrn,.crt run; Lrui bni-, the +cork. b. ( 01SEQ1 li1C_Y:N OF F:17Lt'RV TO GIPF; t0"I7(T. i ehamnou who faih to give tirre1h; make uu a publicfah to -r;, hi- Stun una hl rinhts and h. 60d to enhorcc a rinin; against a paywent honrl. Us,', a ei licen.ed coutraricrr warn fail:, An rice notiec on a Q where the total ru=t of the work Q iagcro cern or it in ryc r., „r c: pw is zubjert to div-gwc, n ao mu hs the Contractor, gat, Licence Rased, 7. I. TECT OF h7Lt1G 7 M A01BY 1 K, noI,, -enc> as No b a "!'n liruinars Nd ),mere 4Polle R,AL `tap Notice'. and a "V'rortOhy Pnbliv 1lnrbc- VvItminay And lube, if prepared and ,mol in er(caeaiu"x Will, the in>inrstinn.= Irr"en_ it will 1cm:',rrc the elaim:tnt"> -top notice: richt; and right at wWre a chain x,immt a pay in"a hc,xtd. 'hhi:: notiec is rtot, hate rt er. a sop unties ceini, nor i, it an a,a iuu alai mat a pa}numt Iroud. %W0006MII K1.111 .IN= 3 MEMORANDUM TO: DONALD G. WEIDNER, CITY MANAGER FROM: GEORGE E. MADSEN, ACTING PUBLIC WORKS DIRECTOR JUNE 201 1973 SUBJECT: STATUS REPORT ON CAMINO CAPISTRANO IMPROVEMENT DISTRICT THE CONTRACTS WERE RETURNED BY SULLY -MILLER ON JUNE 19, 1973. FRITZ STRADLINGIS OFFICE IS REVIEWING THE AGREEMENT, BONDS, AND INSURANCE CERTIFICATES. PRIOR TO SIGNING THE CONTRACT, IT WILL BE NECESSARY FOR SULLY -MILLER TO PAY ALL COSTS TO THE CITY PRIOR TO THE APPROVAL OF THE CONTRACT ($106,029.10). THIS SHOULD ALL BE COMPLETED BY JUNE 21 OR 22, 1973. THE CONTRACTOR INTENDS TO START WORK IMMEDIATELY WITH HIS CLEARING AND GRUBBING OPERATION. THIS WILL TAKE APPROXIMATELY 5 DAYS AND THE CLEARING WILL BE DONE ON ALL STREETS WITHIN THE OVERALL IMPROVEMENT DISTRICT. OUR SURVEYORS HAVE MARKED ALL ITEMS TO BE REMOVED. OUR RESIDENT ENGINEER, MR. GLENN SELS, WILL BE IN CHARGE OF ALL CONSTRUCTION IN THE FIELD. HE WILL BE REPORTING TO THE CITY HALL EVERY MORNING AND AFTERNOON. MR. SELS WILL BE OUR SOLE CONTACT WITH THE CONTRACTOR. ANY DIRECTIONS FROM THE CITY WILL BE CHANNELED THROUGH MR. SELS. SULLY -MILLER HAS SET A CONSTRUCTION TRAILER ON THE LONG PARK SITE JUST NORTH OF LA ZANJA. THE EXCAVATION SUB, SAVALA, IS ESTABLISHING A STORAGE YARD NORTH OF SULLY?S TRAILER AND WILL CLEAR WEED AND DEBRIS OUT OF AN AREA WHERE TREES HAVE ALREADY BEEN TOPPED AND CONSTRUCT A FENCED AREA FOR KEEPING SOME OF THEIR SUPPLIES. NO TREES WILL BE REMOVED FOR THIS SITE. AS A CONDITION OF USING LONG PARK, WE HAVE REQUESTED THE CONTRACTOR TO CLEAR ALL THE WEEDS ON LONG PRK AND PROVIDE A SCREENING OR LANDSCAPING OF THE STORAGE YARD. ONCE THE CLEARING ALONG CAMINO CAPISTRANO IS COMPLETE, IT WILL BE DETERMINED HOW MUCH SCREENING WILL BE NECESSARY. THE CONTRACTOR WILL PROVIDE DUST CONTROL IN THIS AREA AS WELL AS THE ENTIRE CONSTRUCTION SITE. WE HAVE REQUESTED THE CONTRACTOR TO GIVE US A PRICE FOR ROUTING THE TRUCKS ON THE NORTHERN END OF THE CAMINO CAPISTRANO PORTION OF THE JOB VIA JUNIPERO SERRA TO THE FREEWAY, THUS AVOIDING THE DOWNTOWN AREA. WE HAVE JUST RECEIVED THE ATTACHED TENTATIVE SCHEDULE OF THE ENTIRE PROJECT. ANY PROBLEMS OR CONCERNS ABOUT THE CONSTRUCTION OF THIS PROJECT SHOULD BE DIRECTED TO OUR OFFICE SO THAT WE MAY ISSUE PROPER DIRECTIONS TO THE CONTRACTOR. FOR CITY COUNCIL .. fr, J ,,.,..I....3.............Ar F N D A SJC 0703 RESPECTFULLY SUBMITTED, BY � mac_ GEORGE MADSEN ACTING UBLIC WORKS DIRECTOR W J -S w000s"osncuwrw w wssocu Iwc MEMORANDUM JUNE 201 1973 TO: MR. DONALD G. WEIDNER CITY MANAGER FROM: GEORGE E. MADSEN ACTING PUBLIC WORKS DIRECTOR SUBJECT: CAMINO CAPISTRANO IMPROVEMENT DISTRICT EXCAVATION PERMIT AND SHORING PLAN SITUATION: ACCORDING TO THE STATE LABOR CODE,SECTION N0. 6 2L, IT IS NECESSARY FOR THE CONTRACTOR TO OBTAIN A PERMIT TO EXCAVATE FROM THE STATE OF CALIFORNIAy DEPARTMENT OF INDUSTRIAL RELATIONS, DIVISION OF INDUSTRIAL SAFETY. IT IS ALSO NECESSARY FOR THE CONTRACTOR TO SUBMIT TO THE CITY A COPY OF THE PERMIT, AS WELL AS A DETAILED PLAN SHOWING THE DESIGN FOR SHORING. IT IS NECESSARY FOR THE CITY TO APPROVE THE PLANS SUBMITTED. OUR SUB -CONTRACTOR FOR THE CAMINO CAPISTRANO JOB, SAVALA CONSTRUCTION COMPANYY HAS SUBMITTED A PLAN DESIGNED BY MR. JAY R. WAITED REGISTERED CIVIL ENGINEER No. 11916. THIS PLAN HAS BEEN REVIEWED BY THE SANTA ANA OFFICE OF WOODSIDE/KUBOTA & ASSOCIATES, INC. AND HAS BEEN APPROVED BY THEM AND BY THE STATE DIVISION OF INDUSTRIAL SAFETY. ALTERNATE ACTION: 1. DEFER AND ASK FOR ADDED INFORMATION. 2. APPROVE PLAN AS SUBMITTED. RECOMMENDATION: APPROVE THE PLAN AS SUBMITTED. FOR CITY COUNCIL ,,.,, ..•. V,,.............:AGENDA SJC 0703 RESPECTFULLY SUBMITTED BY e C:dfC l GEORG . MADSEN ACTING PUBLIC WORKS DIRECTOR %W000�11CUBOTA&ASSOCIATIM0INC. J 3' MEMORANDUM DATE: JUNE 19, 1973 TO: DONALD G. WEIDNER, CITY MANAGER FROM: GEORGE E. MADSEN, ACTING PUBLIC WORKS DIRECTOR SUBJECT: CAMINO CAPISTRANO IMPROVEMENT DISTRICT -STREET SUPERINTENDENT SITUATION: THE CONTRACT WITH SULLY -MILLER REQUIRES THE SIGNATURE OF THE STREET SUPERINTENDENT. THE CONTRACT WAS RECEIVED FROM SULLY -MILLER ON JUNE 19, 1973 AND WILL BE SIGNED BY THE UNDERSIGNED AS STREET SUPERINTENDENT. DUE TO THE TERMINATION OF T. J. MEADOWS AS PUBLIC WORKS DIRECTOR AND AS STREET SUPERINTENDENT, IT WOULD BE APPROPRIATE FOR THE CITY COUNCIL TO SPECIFY THAT THE APPOINTMENT OF AN ACTING PUBLIC WORKS DIRECTOR, IN ESSENCE, INCLUDED FULFILLING THE DUTIES OF STREET SUPERINTENDENT AS FAR AS THE CAMINO CAPISTRANO IMPROVEMENT DISTRICT IS CONCERNED. ALTERNATE ACTION: 1. APPROVE THE ABOVE RECOMMENDATION. 2. DEFER FOR FURTHER INFORMATION. RECOMMENDATION: APPROVE THE ABOVE RECOMMENDATION BY CITY COUNCIL MOTION. FOR CITY COUNCIL i ........................A •a �. 7-3 ...............:AGENDA SJC 0703 RESPECTFULLY SUBMITTED, AORVE. MADSEN ImJs WOODs,DMMUWTA & ASSOG1ATO. INC. ......... MEMORANDUM DATE: June §pR�WO-OUNC'L T0: Donald G. Weidner, City Manager City of San Juan Capistrano FROM: Jack Y. Kubota, City Engineer .............�F�......r� /.. ,.................:AGENDA ........... SUBJECT: Camino Capistrano Et Al, 1911 Act Project SITUATION: Following the formal actions of the City Council to autho- rize this construction project the proceedings have commenced with Sully -Miller Contracting Company and our office staff is now proceed- ing with the contract administration and the right-of-way acquisition programs. In view of the substantial scope of this project we shall from time to time provide written progress reports to the City Council so that the overall conduct of the project can be closely monitored by all interested parties. With respect to the actual construction program we have already con- ducted one pre -construction conference with our contractor and a detailed "pre -construction conference" is scheduled for Thursday, June 7, 1973 at which time all of the affected public utilities, those project representatives involving underground utilities con- version, and other interested parties will have an opportunity to go over the entire project in detail with the contractor and our project staff. At that meeting there will also be presented a preliminary construction schedule and we will be working closely with the contractor to minimize the disruptions to the local busi- nesses and residences as we carry forward with our project. Our contractor has made a specific request for the City to grant permission for the establishment of a "construction office" some- where in the arena of our Long Park area. If the Council is agree- able to this request the staff would work out the specific arrange- ments which would include dust and noise control, traffic problems, and other interim conditions that would exist during construction. The right-of-way acquisition program is proceeding with several parcels involved in intensive negotiations. We shall have an oral report for the Council Meeting Monday night at which time we will set forth those properties that will require a condemnation proceed- ings so that we can gain immediate possession. We have alerted the City Attorney's office of our needs and we shall be presenting to you the specific parcels of land as of that time. In addition, we have several parcels where negotiations should result in a settlement which would be subject to the approval of the City Council. These also will be presented to you for consideration. The engineering services contract provides for certain construction surveying which will be necessary for the project. Due to changing economic conditions the cost for construction surveying services have increased to the point where we believe it appropriate to con- sider an adjustment of those fee schedules as set forth in our engineering contract. Accordingly, we are requesting that the 4, • W000 IMMUMOTA i ASUOC1 •.INC. �wsunr.e Page 2 Memorandum June 6, 1973 "Schedule of Hourly Fees" be amended to read as follows: Field Surveying - 2 -man crew 3 -man crew $42.00/hr. $53.00/hr. Although there are other recent changes in this schedule that is a part of our contract we are asking that only the field surveying matter be considered. We have received a request from Mr. Bruce Swarthout to consider the practicability of saving the large Sycamore tree located on the south side of Del Obispo Street and just westerly of the Santa Fe Railroad tracks. This matter is now under evaluation and we shall have a report for the City Council for consideration of modification of our construction plans. ALTERNATE ACTION 1. Review report and request additional information as necessary. 2. Consider specific recommendations as outlined below RECOMMENDATION: 1. The engineering staff request review of this type of progress report and invites any suggestions and comments as to our procedure for communications to the City Council. 2. On the basis of our oral reports at the Council Meeting we ask your consideration for specific action on the right-of- way negotiations that are now under way. 3. We recommend approval of the proposal to modify the engineering services contract providing for the adjustment for the hourly rate for the field surveying portion only of this service contract. ick Y. Vb'ota, City Engineer JYK/le WOOc MEMORANDUM 0 A ASSOCIATES. INC. TO: DONALD G. WEIDNER, CITY MANAGER CITY OF SAN JUAN CAPISTRANO FROM: CITY ENGINEERtS OFFICE SUBJECT: CAMINO CAPISTRANO ASSESSMENT DISTRICT No. 73-1 AWARD OF CONTRACT SITUATION: ON APRIL 25, 1973, BIDS WERE OPENED ON THE SUBJECT PROJECT TABULATION SHEETS ARE ATTACHED. THE BID TOTALS WERE: MAY 21 1973 1. SULLY MILLER CONTRACTING COMPANY $937,531.10 2. RIVERSIDE CONSTRUCTION COMPANY $989,6+9.00 3. COX COMPANY, INC. $1,034,181.50 THE BID THE LOW BID IS SLIGHTLY ABOVE THE ENGINEERIS ESTIMATE OF $876,000 WHICH WAS NOT ADJUSTED TO REFLECT BOND DISCOUNTS. ACCORDING TO ORANGE COUNTY AHFP PROCEEDINGS IT IS NECESSARY TO HAVE APPROVAL OF THE ORANGE COUNTY ROAD DEPARTMENT PRIOR TO AWARD OF THE CONTRACT. WE SHOULD HAVE THIS APPROVAL BY MAY 7, 1973. OUR LEGAL COUNCIL FOR THIS PROJECT WILL BE PREPARING ALL NECESSARY DOCUMENTS. ALTERNATE ACTION: 1. AWARD CONTRACT 2. HOLD FOR FURTHER REVIEW. 3. REJECT ALL BIDS. RECOMMENDATION: 1. AWARD CONTRACT TO SULLY MILLER CONTRACTING COMPANY ACCORDING TO THE UNIT PRICES SUBMITTED FOR THE TOTAL ESTIMATED AMOUNT OF $937,531-10- 2. ADOPT RESOLUTION OF AWARD. FOR CITY COUNCIL ._1......._......._.....1J... �._!.. 73..........._..:AGENDA dc: T. J. MEADOWS RESPECTFULLY SUBMITTED, JACK Y. KUBOTA, CITY ENGINEER CITY OF SAUAN CAPISTRANO By VK GEORGE VMADSEN SENIOR PROJECT ENGINEER A. W. RUTAN (1880-1972) JAM E5 B. TUCKER, SR.( I BBB -1950) M IL FO RO W HL MILFORD W. OPHL.JR. NORMAN H MEOEGAARD THEODORE I. WALLACCJR. H. RODGER HOWELL COLLEEN M.CLAIRE JAMES S. TUCKER RONALD P. ARRINGTON GARVIN F. SHALLENBERGER STUART T. WALTRIP JAMES R. MOORE G RICHARD LEMON HERBERT W. WALKER RICHARD P. SIMS ROBERT L. RISLEY C.CRAIG CARLSON NICK E. YOCCA JOHN J. MURPHY FRITS R.STRADLING WILLIAM R. RAUTH F1 PAUL FREDERIC MARK M.STEPHEN COONTZ HOMER L. MCCORMICK, JR. ROBERT C. BRAUN EDMUND R.CA5EY EDWAR D D. BY BESMA, JR. HOWARD F HARRISON ALEC JEFFREY GLASSER JAMES E. ERICKSON DAVID P. BERGLAND WILLIAM R. BIEL THOMAS S.SALINGER RICHARD A. CURNUTT ROBERT S. LEWIN LEONARD A. HAMPEL PAUL C. LOCCAU%, JR. JOHN S. HURLBUT, JR. KENNETH S. TUNE MICHAEL W. IMMELL STEPHEN G. POE WILLIAM C. DEANS ROGER A. GRACILE RUTAN & TUCKER ATTORNEYS AT LAW THE BANK OF CALIFORNIA BUILDING 401 CIVIC CENTER DRIVE WEST POST OFFICE BOX 1976 SANTA ANA,CALIFORNIA 92702 (7141 835-2200 June 20, 1973 Mr. George Madsen Woodside/Kubota & Associates, Inc. 2415 South Birch Street Santa Ana, California Dear George: OF COUNBFL LINDSAY EMERETT A. MART LOS ANGELES OFFICE SUITE S.Z. 51S SOUTH FLOWER STREET LOS ANGELES, CALIFORNIA 90071 TELEPHONE (213) 489-3232 LAGUNA HILLS OFFICE 23521 EASED DE VALENCIA, SUITE 300 LAGUNA HILLS, CALIFORNIA 92653 TELEPHONE 1741 B35-2200 IN REPLY PLEASE REFER TO I am enclosing the original and four copies of the Construction Contract regarding Assessment District No. 73-1 with the correction duly made on page 1 thereof. The bond and insurance certificates were reviewed by John Murphy of our office and he stated that they were satisfactory. If you have any further questions regarding this matter, please let me know. Very truly yours, RUTAN & TUCKE Kate Hill, Secretary to ritz R. Stradling kh Enclosures ECE►VED 8Y, JUN 151973 CrTY ai, Union Oil Company of California (a cor ration SAN JU) N CI�gp1 FORM 1-2FO2 (NEW 4/71) PRINTED IN U.S.A. By MANAGER OF INSU ICE 0 A. W. RUTAN (IB RO -19 )21 JP ME ETUCKER, SR.(IBBB-I9SO) MILFORD W. DAHL MILE.RD w GAHL, JR. NORMAN H. SMEO EGAARO THEODORE I. WALLACEJR, RO DG ER HOWELL COLLEEN M.CLAIRE JAMES B. TUCKER RONALD FARRINGTON GARVIN F. SHALLENBERGER STUART T.WALDRIP JAMES R. MOORE 1. RICHARD LEMON HERBERT W. WALKER RICHARD P. SIMS ROBERT L. RISLEY C. CRAIG CARLSON NICK E YOCCA JOHN J. MURPHY FRITZ R.STRADLING WILLIAM R. FAITH IN PAUL FREDERIC MARX M. STEPHEN COONTZ HOMER L. MCCORMICK, JR. OBERT C. BRAUN EDMUND R.CAIIEY EOWAROO YSESMA, JR. HOWARD F. HARRISON ALEC JEFFREY GLASSER JAMES E. ERICKSON DAVID P. BERGLAND WILLIAM R. BIEL THOMAS S.SALINGER RICHARD A. CURNUTT ROBERT S. LEWIN LEONARD A. HAMPEL PAUL C. LOIZEAUK, JR. 11 N B.HU RUSUT JR. KENNETH S. TUNE MICHAEL W MELL STEPHEN G. POE WILLIAM C. DEANS ROGER A. GRABLE RUTAN & TUCKER ATTORNEYS AT LAW THE BANK OF CALIFORNIA BUILDING 401 CIVIC CENTER DRIVE WEST POST OFFICE BOX 1926 SANTA ANA,CALIFORNIA 92702 (J 141 635-2200 June 20, 1973 Mr. George Madsen Woodside/Kubota & Associates, Inc. 2415 South Birch Street Santa Ana, California Dear George: OF LEL INDSAY EVERETT A. HART LOS ANGELES OFFICE SUITE 2930 515 SOUTH FLOWER STREET LOS ANGELES, CALIFORNIA 90071 TELEPHONE (2131 489-3232 LAGUNA HILLS OFFICE 23521 EASED OE VALENCIA, SUITE 300 LAGUNA HILLS, CALIFORNIA 92653 TELEPHONE (714) B35-2200 IN REPLY PLEASE REFER TO I am enclosing the original and four copies of the Construction Contract regarding Assessment District No. 73-1 with the correction duly made on page 1 thereof. The bond and insurance certificates were reviewed by John Murphy of our office and he stated that they were satisfactory. If you have any further questions regarding this matter, please let me know. Very truly yours, RUTAN & TUCKE Kate Hill, Secretary to ritz R. Stradling kh Enclosures Insurance Certificat• Union all comoany of Canfomia union Certificate No. Date June 14. 1973 This certifies that Union Oil Company of California (a corporation) has provided for and will maintain in effect self-insurance as shown below for the account of: Sully -Miller Contracting Company and City of San Juan Capistrano 32400 Paso Adelanto San Juan Capristrano, California Kind of Coverage: Fire, lightning, explosion, windstorm, hail, riot, riot attending a strike, civil commotion, aircraft, vehicles and smoke - all as defined in and in accordance with the terms and conditions of a standard fire and extended coverage insurance contract. Location and Description of Property: Project No. 641, Assessment District No. 73-1, A Municipal Improvement Act of 1911 and Underground Utility District No.2 in Camino Capistrano, Alipaz Street, Paseo Adelanto, Del Obispo Street and Los Rios Street. VALUE: As required by Contract. It is understood and agreed that in case of loss or damage to the above described property by any of the perils specified above, such loss or damage shall be adjusted with self-insurance proceeds payable to the following as their interests may appear: Sully -Miller Contracting Company and City of San Juan Capistrano, California RECEIVEp BY_ JUN 151973 SAN Cfl_1! 4P Union Oil Company of California (a cor ration J ) UAN CApf sTRAP10 (�( FORM 1-ZF02 (NEW 4/71) va INIED IN U.5.n. By MPN44EP OF IN CE MARSH & McLENNAN, INCORPORATED CERTIFICATE OF INSURANCE union TO: CITY OF SAN JUAN CAPISTRANO 32400 Paseo Adelanto San Juan Capistrano, Calif. THIS IS TO CERTIFY that the following insurance policy has been issued to UNION OIL COMPANY OF CALIFORNIA and its subsidiary SULLY -MILLER CONTRACTING COMPANY and that said contract of insurance, subject to the respective terms and conditions, affords Bodily Injury, Property Damage Liability and Blanket Contractual Liability for all operations, including Automobiles, owned, hired or used. THE CONTINENTAL INSURANCE COMPANY POLICY NO. L 1477580 Term: November 1, 1972 Until Canceled COMBINED SINGLE LIMIT BODILY INJURY AND PROPERTY DAMAGE, EACH ACCIDENT OR OCCURRENCE- $1,000,000.00 MARSH 6 McLENNAN, INCORPORATED By� o Agent In the event of cancellation of the above contract of insurance, the Underwriters will give not less than ten (10) days advance notice by mail to the party or parties to whom this certificate is issued at the address stated herein which shall be sufficient proof of notice. ADDITIONAL INSURED: The party or parties to whom this Certificate of Insurance is issued is/y&%XBM covered as Insured(s) under the terms of the contract of insurance described above. If so covered, the insurance with respect to such party or parties is subject to all of the terms and conditions of said contract of insurance, and to the special conditions, if any, stated below. SPECIAL CONDITIONS: Applicable as respects to Contract for Construction of Arterial Highway Financing Program, Project No. 641, Assessment District No, 73-1, A Municipal Improvement Act of 1911 and Underground Utility District No. 2 in Camino Capistrano, Alipaz Street, Paseo Adelanto, Del Obispo Street and Los Rios Street. Dated: June 19, 1973 LOS ANGELES, CALIFORNIA CA IV Itk0 Ti ax�r�t rL�c�7 t�Y y Jtli iI r rJ jI jl JI' 4-4 1 �I i�r mol I I I � r4o'ShAtid I ftj r�C. { Jn�eh Sl,has� Ir'ti Sbo — 1—T, h { I ISI l d 1 Ll--Y--+'--I-- I���--� 4-t I - 4 -j o ___,,,___III 11 J ado n _ , IJ_t-{ - �e -' 1 ,,4 �IP ;;,q 1,1 k' i III�I��1 F fi� -{ �,I�f J_ 1 J` I J -i -j -I cor r iii s A ��•,S PI i =1_ 1 j h J�I�-I-�- I-1- L -'f af _ 1 I I I J 1 i~ -- - 1 I J 1 �1 t �� rtlI I�IJ1'7IfI ++'- Yee i l r— 7 1 1JI- —1111 f 1111 1! Ll 1 `1 -i I I I I +E 1 !•c v =I _1 Z:it Q��.'�I Y TV i;'I it I I I I �T� o+r•3u �„- t- -I I--I-'..;_I !-I � - :, . fi. t� I� _I+_- I �-`-� I--rlr- - i l 1� 1 � - I 1 I A I I I I 1 cis vIl­ I T' t 1 I J_ _1_4T 71 } _ I � I T 111 I �K�W.`wl 1, It ! i i 1 TJ I � 1-i1 I fjIL 1 1 4-1 4r �_1= '11 1 I 1:I 1}_ �H}_ 1 _����i��j�_ t I -i= ,i-r1I 1 I : EIS�!�I 11-r -I 1 1 I Certificate of Workmen's Compensation Coverage Sully Miller Contracting Company 3000 East South Street, P.O. Sox 5399 Long Beach, California 90805 CITY OF SAN JUAN CAPISTRANO 32400 Paseo Adelanto San Juan Capistrano, Calif. Re: Contract for Construction of Arterial Highway Financing Program, Project No. 641, Assessment District No, 73-1, A Municipal Improvement Act of 1911 and Underground Utility District No. 2 in Camino Capistrano, Alipaz Street, Paseo Adelanto, Del Obispo Street Date: and Los Rios Street, June 19, 1973 This is to certify that Sully Miller Contracting Company is self-insured under provisions of the California Workmen's Compensation Law and has in its files Certificate of Consent to Self -insure No. 1130, issued October 1, 1967 by the Director of Industrial Relations of the State of California. This coverage will not be canceled except on 30 days advance written notice tooyyou. /� By t...Q. ew, Title FRANK E. HOLLAND ASSISTANT SECRETARY FORM 6e25M (REV 4/69) PRINK D IN U.S.R.