1988-1004_FOUR-WAY CONSTRUCTION_Contract•89-071208 *111 OF ORANGE COUNTY, CALIFORNIA
230
P.M.
P.M. F E 8 9 1989
EXEMPT ,,Qp /
C10C4 Q• CRECORDER
RECORDED AT THE REQUEST OF
AND RETURN TO:
City of San Juan Capistrano
City Clerk's Department
37400 Paseo Adelanto
Sa^ Juan Capistrano, CA 92675
RECORDING FEES EXEMPT DUE TO
GOVERNMENT CODE SECTION 6103
Mary An anover, City Clerk
City of San Juan Capistrano, CA
NOTICE OF COMPLETION
NOT CE IS HFREPY C SVEN that a contact was heretofore awarded by the Citv Council
of the City of San Juan Capistrano, California, to Four -Way Construction, 835 #5
Arcadia Avenue, Arcadia, California 91006, for the performance of the following work:
CONSTRUCTION OF MISSION HILL SEWER REHABILITATION
That said work was completed by said company according to plans and specifications and
to the satisfaction of the City Engineer of the City of San Juan Capistrano, and that said
work was accepted by the City Council of the City of San Juan Capistrano, at a regular
meeting thereof held on the 7th day of February, 1989, by Resolution
No. 89-2-7-1 11.71
That upon said contract, the Fidelity & Deposit Company of Maryland was surety for the
bonds given by the said company as required by law.
Dated at San Juan Capistrano, California, this 8th day of February ,
1989.
Mary Ann HaX&ef, City Clerk
City of San Juan Capistrano
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF SAN JUAN CAPISTRANO )
I, MARY ANN HANOVER, the duly appointed and qualified City Clerk of the City
Council of the City of San Juan Capistrano, California, do hereby certify under penalty
of perjury that the foregoing Notice of Completion is true and correct, and that said
Notice of Completion was duly and regularly ordered to be recorded in the Office of the
Orange County Recorder by said City Council.
Dated at San Juan Capistrano, California, this 8th day of February_ _,
1989.
Mary Ann H v 7, City Clerk
City of San Juan Capistrano
• "CI*OPY
CONTRACT
This contract is made and entered into by and between the CITY OF SAN JUAN
CAPISTRANO, hereinafter referred w as City and Four -Way Construction, Inc.
hereinafter referred to as CONTRACTOR.
IT IS HEREBY AGREED BETWEEN THE PARTIES AS FOLLO\(S
FIRST. CONTRACT DOCUMENTS. The contract documents shalt be considered to
include the Notice Inviting Bids, the Instructions to Bidders, the Proposal, the Bid Bond,
the Non -Collusion Affidavit, the Designation of Sub -Contractors, the Contract which is
prepared for execution by the City and the Contractor, Plans, Specifications and Special
Provisions, the Standard Specifications for Public \;orks Construction, 1985 Edition,
including all Supplements, Contract Bonds, Resolutions adopted by the City Council
pertaining to the work, insurance policies and certificates, and any supplemental written
agreements amending or extending the scope of the work originally contemplated that
may be required to complete the work in a substantial and acceptable manner.
SECOND. THE \CORK. CONTRACTOR agrees to furnish all tools, labor, material,
equipment, transportation, and supplies necessary to perform and complete in good and
workmanlike manner the construction of Old Mission Hill Sewer Rehabilitation in strict
conformity with the Plans, Specifications and all other contract documents, which
documents are on file at the Office of the City Clerk, City Hall, 32400 Paseo Adelanto,
San Juan Capistrano, California.
THIRD. PAYMENT. City agrees to pay, and CONTRACTOR agrees to accept, the lump
SUM adjusted for variations of quantities, at the prices designated in bid proposal at the
time and in the manner set forth in the Specifications.
FOURTH. COMMENCEMENT AND COMPLETION OF THE \;ORK. CONTRACTOR
agrees to begin and complete the work within the time specified in the Notice Inviting
-14-
0 0
Bids. It is agreed that it would be impracticable and extremely difficult to fix the actual
amount of damages, and loss sustained by City, should CONTRACTOR fail to complete
the work in the specified time; therefore, CONTRACTOR shall pay City, as liquidated
damages, not in the nature of a penalty, one hundred dollars ($t00) per calendar day for
each day delayed; provided that extensions of time with waiver of liquidated damages,
may be granted as provided in the Specifications.
FIFTH. PERFORMANCE BOND AND LABOR AND MATERIAL BOND. CONTRACTOR
agrees to furnish bonds guaranteeing the performance of this contract and guaranteeing
payment of all labor and material used under this contract, as required by the laws of the
State of California, on forms approved by City. The Performance Bond shall be for an
amount of one hundred percent (100%) of the amount of this contract and shall be
conditioned on full and complete performance of the contract, guaranteeing the work
against faulty workmanship and materials for a period of one (1) year after completion
and acceptance. The Labor and Material Bond shall be for an amount of one hundred
percent (100%) of the amount of this contract and shall be conditioned upon full payment
of all Labor and Material entering into or incidental to the work covered by this
contract. CONTRACTOR agrees to furnish the bonds on the forms found within the
Specifications.
CONTRACTOR agrees to pay City such sum as the Court may judge as reasonable for
the legal services of any attorney representing the City in any action brought to enforce
or interpret the obligations of this agreement, and such sums shall be made a part of any
judgment in such action against CONTRACTOR if such action is determined in favor of
said City. The required Performance, Labor and :Materials Bonds, and Bid Bond shall
provide that the surety shall pay attorney's fees incurred by City in enforcing this
agreement.
SIXTH. GENERAL PREVAILING RATE OF PER DIEM WAGES. Pursuant to the Labor
Code of the State of California, copies of the prevailing rate of per diem wages, as
determined by the Director of the State Department of Industrial Relations, are on file
in the offices of the City Clerk, 32400 Paseo Adelanto, San Juan Capistrano, California,
and are hereby incorporated and made a part hereof. CONTRACTOR agrees that he, or
-15-
0 0
any SUB -CONTRACTOR under him, shall pay not less than the foregoing specified
prevailing rates of wages to all workmen employed in the execution of the contract.
SEVENTH. INSURANCE. CONTRACTOR shall maintain at all times during this
contract liability and property damage insurance naming the City and its elected and
appointed officials as a named insured, which such policies shall be of an amount not less
than One Million Dollars combined single limit. Insurance certificates shall be for a
minimum period of one year.
The insurance policies shall bear an endorsement or shall have an attached rider
providing that in the event of expiration or proposed cancellation of such policies for any
reason whatsoever, the City shall be notified by registered mail, return receipt
requested, giving a sufficient time before the date thereof to comply with the applicable
law or statute but in no event less than 30 days before expiration or cancellation is
effective. CONTRACTOR shall provide to City the policy certificate establishing that
the required level of insurance has been satisfied.
CONTRACTOR shall indemnify and save harmless the City, its officers, agents, and
employees from and against any and all claims, demands, loss or liability of any kind or
nature which Lessor, its officers, agents and employees may sustain or incur or which
may be imposed upon them or any of them for injury to or death of persons, damage to
property as a result of, or arising out of, or in any manner connected with the
performance of the obligations under this construction agreement.
EIGHTH. COMPLIANCE WITH OTHER PROVISIONS OF LAW RELATIVE TO PUBLIC
CONTRACTS. City is sub}ect to the provisions of the Government Code and the Labor
Code of the State of California. R is stipulated and agreed that all provisions of law
applicable to public contracts are a part of this contract to the same extent as though
set forth herein and shall be complied with by CONTRACTOR. These include, but are
not limited to, the stipulation that eight (8) hours labor constitute a legal day's work and
CONTRACTOR shall, as a penalty to City, forfeit twenty-five dollars ($25) for each
workman employed in the execution of the Contract by CONTRACTOR, or by any SUB-
CONTRACTOR, for each calendar day during which such workman is required or
-16-
permitted to work more than eight (S) hours in violation of the provisions of Article
Three, Chapter One, Part Seven, Division 2, of the California Labor Code, except as
permitted by law.
IN WITNESS WHEREOF, this contract is executed by the duly authorized agent(s) of
City, pursuant to Council action, and by CONTRACTOR on the date set before the name
of each.
DATED:
.ATTEST:
CITY OF SAN JUAN CAPISTRANO
DRAGO RBAVAC
FOUR—WAY CONSTRUCTION, INC.
APPROVED AS TO FORM -
John R. 7aw, City Attorney
-17-
0
mm.vo Hl�o
nlHntxm 1961
1776
�Q4Few�►o�
February 14, 1989
Four -Way Construction, Inc.
835 #5 Arcadia Avenue
Arcadia, California 91006
Re: Completion of Mission Hill Sewer Rehabilitation
Gentlemen:
MEMBERS OF THE CITY COUNCIL
ANTHONY L. BLAND
LAWRENCE F. BUCHHEIM
KENNETH E. FRIES$
GARY L. HAUSOORFER
PHILLIP R. SCHWARTZE
CITY MANAGER
STEPHEN B JULIAN
The City Council of the City of San Juan Capistrano at its regular meeting held
February 7, 1989, adopted Resolution No. 89-2-7-1, accepting the work completed
for the construction of the Mission Hill Sewer Rehabilitation, in the amount of
$70,683.23.
A Copy of Resolution No. 89-2-7-1 is enclosed for your information.
The retention will be payable upon 35 days from recording of the Notice of
Completion. The Notice was recorded on February 9, 1989; therefore, the final
payment, in the amount of $7,068.32, may be released on March 16, 1989.
Thank you for your cooperation.
Very truly yours,
Mary Ann Wanover, CMC
City Clerk
MAH/cj
Enclosure
cc: Director of Public Works
Director of Administrative Services
Accounts Payable
32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 0 (714) 493-1171
7.
9.
0
• 420
REPORT OF TRAFFIC AND TRANSPORTATION COMMISSION (590.20)
The Report dated February 7, 1989, from the Secretary of the Traffic and
Transportation Commission, regarding actions taken at the meetings of
January 11 and January 25, 1989, was received and filed.
AY
600.30 ) <__
As set forth in the report dated February 7, 1989, from the Director of
Public Works, the construction of the Mission Hill Sewer Rehabilitation
was completed.
Acceptance of Work:
The following Resolution was adopted:
RIGIMPS•114MAN
EaRAD1Ll 1'A11VN - A MLOULU'LLVN VF 'Lha U1'1:1 VUUNUIL V£ Tht;
CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, DECLARING WORK TO
BE COMPLETED AS TO PLANS AND SPECIFICATIONS FOR THE
CONSTRUCTION OF MISSION HILL SEWER REHABILITATION (FOUR-
WAY CONSTRUCTION)
The Resolution accepted the work as complete in the amount of $70,683.23
and directed the City Clerk to forward a Notice of Completion to the
County Recorder. Staff was authorized to release the 10% retention in
the amount of $7,068.32 thirty-five days after recording the Notice of
Completion.
AWARD OF CONTRACT - IRRIGATION
As set forth in the report dated February 7, 1989, from the Director of
Public Works, the contract for a Central Irrigation Control System was
awarded to Motorola, Inc. in the amount of $108,383.64. The Mayor and
City Clerk were authorized to execute the contract on behalf of the City.
10. CONSULTANT AGREEMENT - INSPECTION SERVICES FOR DEVELOPMENT PROJECTS (BSI
As set forth in the report dated February 7, 1989, from the Director of
Public Works, the consultant agreement with BSI Consultants, Inc. for
inspection services for large private development projects was approved,
with $80,000 already budgeted for this purpose. The projects include
Marbella, Lacouague Ranch, San Juan Corporate Plaza, and Plaza Del
Obispo.
-5-
2/7/89
AGENDA ITEM
TO:
FROM:
SUBJECT:
SITUATION
0 0
February 7, 1989
Stephen B. Julian, City Manager
W. D. Murphy, Director of Public Works
Mission Hill Sewer Rehabilitation - Resolution, Notice of Completion
and Final Report (Four Way Construction)
The construction of the Mission Hill Sewer Rehabilitation has been completed to the
satisfaction of the City Engineer and is ready for acceptance by the City Council and
recordation of a Notice of Completion with the County Recorder.
NOTIFICATION
Four Way Construction
COMMISSION/BOARD REVIEW, RECOMMENDATIONS
Not applicable.
FINANCIAL CONSIDERATIONS
The contract was awarded to Four Way Construction for $55,350.00 and has been
completed for $70,683.23. The increased cost is due to minor increases in estimated
quantities and utility conflicts. Funds are available in Account No. 17-6900-4717-719.
ALTERNATE ACTIONS
1. Accept the improvements.
2. Do not accept the improvements.
3. Refer to Staff for additional information.
RECOMMENDATION
By resolution, determine that the work for the Mission Hill Sewer Rehabilitation has been
completed and declare the work to be accepted; direct the City Clerk to forward a
Notice of Completion to the County Recorder for recording; and authorize Staff to
release the 10 percent retention in the amount of $7,068.32 thirty-five (35) days after
the recordation of the Notice of Completion.
(Respectfully submitted,
W. D. Murphy
WDM/BP: nb
FOR CITY COUNCIL AGEN Q
RESOLUTION NO. 89-2-7-1
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN
JUAN CAPISTRANO, CALIFORNIA, DECLARING WORK TO BE
COMPLETED AS TO PLANS AND SPECIFICATIONS FOR THE
CONSTRUCTION OF MISSION HILL SEWER REHABILITATION
(FOUR-WAY CONSTRUCTION)
WHEREAS, on the 4th day of October, 1989, the City of San Juan Capistrano
entered into a contract with Four -Way Construction, for the Mission Hill Sewer
Rehabilitation; and,
WHEREAS, the Director of Public Works has evaluated the final quantities and
cost figures and recommends approval.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of San
Juan Capistrano, as follows:
SECTION 1. That the work required to be performed by said contractor
has been completed.
SECTION 2. That the total cost of said work is in the amount of
$70,683.23.
SECTION 3. That the work is hereby accepted and approved.
SECTION 4. The City Clerk is directed to forthwith forward a "Notice of
Completionto " the County Recorder of the County of Orange for recording.
PASSED, APPROVED, AND ADOPTED this 7th day
of February , 1989.
ARY AUSDORFER, MAY
JPR
ATTEST:
/�L•>o
-1-
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss
CITY OF SAN JUAN CAPISTRANO )
I, MARY ANN HANOVER, City Clerk of the City of San Juan Capistrano,
California, DO HEREBY CERTIFY that the foregoing is a true and correct copy of
Resolution No. 89-2-7-1 adopted by the City Council of the City of San Juan
Capistrano, California, at a regular meeting thereof held on the 7th day
of February , 1989, by the following vote:
AYES: Councilmen Schwartze, Friess, Buchheim, Bland,
and Mayor Hausdorfer
NOES: None
ABSENT: None
(SEAL)
MARY ,,"OVER, CITY CLERK
-2-
i,
r
V
ION Hl�i
36 3131
116
0
REPLACE
ri
i - •
Please sign, date and return
to the City Clerk's Department.
Thank you.
IY�
1-%� n YUARII
IL
.777i" V�� 1961
1
NOTICE TO PROCEED
TO: Four -Way Construction
835 #5 Arcadia Avenue
Arcadia, California 91006
/,�{
RECEIVED
Do 21 25 2"NT "L. BILANDOUNCIL
LAWRENCE F. BUCHHEIM
KENNETH E. FRIES$
CITY CLERISARY L. HAUSDORFER
DEPARTMENIFHILLIP R. SCHWARTZE
CITY �OER
JUAN CA R pHEN B JULIAN
Project: Old Mission Hill Sewer Rehabilitation
Amount of Contract: $55,350.00
You are hereby notified to commence work on the referenced contract on or before
October 24, 1988, and to fully complete all of the work of said contract within 45
consecutive calendar days thereafter. Your completion date is December 8, 1988.
The contract provides for an assessment of the sum of $100.00 as liquidated damages for
each consecutive calendar day after December 8, 1988, that the work remains
incomplete.
Dated this 20th day of October, 1988.
Mary An anover, CMC
City Cle k
ACCEPTANCE OF NOTICE
Recei t going Notice to Proceed y h reby acknowledged
K. e - this '�J 4Jday of , 1988.
32400 PASEO ADELANIU. SAN JUAN CAPIb TRANO, CALIFORNIA 92675 0 (714) 493-1171
•
RECEIVED
OcT 14 1 33 FM '88
^ITY CLERK
DEPARTMENT
r;qy Dl SAN
JUAN C,c►ISTRANO
October 6, 1988
Four -Way Construction, Inc.
835 #5 Arcadia Avenue
Arcadia, California 91006
0 (000.30
L MEMBERS OF THE CITY COUNCIL
I
ANTHONY L. BLAND
_ it T� LAWRENCE F. BUCHHEIM
'iIn(OevoXFnO KENNETH E. FRIESS
61MIlifMH I96I GARY L. HAUSDORFER
1776 PHILLIP R. SCHWARTZE
�^^ CITY MANAGER
_� STEPHEN B JULIAN
Re: Award of Contract - Mission Hill Sewer Rehabilitation
Gentlemen:
The City Council of the City of San Juan Capistrano at its regular meeting held
October 4, 1988, awarded the contract for the Mission Hill Sewer Rehabilitation to your
company at $55,350.
Enclosed is a fully executed copy of the Agreement for your records. The City has
received all bonds and insurance. You are required to return an acknowledged copy of
this Notice of Award.
Thank you for your cooperation. If we can be of further assistance, please call.
Very truly yours,
Mary Annnover, CMC
City Clerk
MAHJcj
Enclosures
cc: Director of Public Works
Director of Administrative
Receipt
of Award is hereby acknowledged:
v - r .i,
This 'i day of ®CIQ ('— , 1988.
i
32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 • (714) 493-1171
C, ; I L b
Bond No
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS:
301685 30
That Four way Construction, Inc.
as Principal, hereinafter called CONTRACTOR, and Fidelity and Deposit Company of
ma ancr
as Surety, hereinafter called SURETY, are held and firmly bound unto the City of San
Juan Capistrano, as Obligee, hereinafter called CITY, in the amount of Fifty -Five
Thousand Three Hundred Fifty ---------------Dollars for payment whereof Contractor
and Surety bind themselves, their heirs, executors, administrators, successors, and
assigns, jointly and severally, fairly by these presents.
WHEREAS, Contractor has by written agreement dated
entered into a (describe agreement): Old Mission Hill Sewer
Rehabilitation
which contract is by reference made a part hereof;
NOW, THEREFORE, the condition of this obligation is such that, if Principal
shall promptly and faithfully perform said agreement, then this obligation shall be null
and void; otherwise it shall remain in full force and effect. Surety waives whatever legal
right it may have to require that a demand be made first against the principal in the
event of default.
BE IT FURTHER RESOLVED, that:
1. As a part of the obligation secured hereby, and in addition to the face
amount specified, there shall be included' costs and reasonable expenses and fees,
including reasonable attorney's fees, incurred by City in successfully enforcing such
obligation, all to be taxed as costs and included in any judgment rendered.
-20-
2. Said Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alteration, or modification of the contract documents or of the work
to be performed thereunder, shall in any way affect its obligations or this bond, and it
does hereby waive notice of any such change, extension of time, alterations, or
modifications of the contract documents or of work to be performed thereunder.
Executed this 26th day of September P 19 88 at
Pasadena, California.
APPROVED AS TO FORM
1
PRINCIPAL
Four Way Const ructio Inc.
(NOTARIZATION AND SEAL)
SURETY
Fidelity and Deposit Company o Maryland
Kent T. Roberts, Attorney -in -Fact
(NOTARIZATION AND SEAL)
-21-
3RIPORATE ACKNOWLEDGMENT
State of California
County of Los Angeles
I
SS.
'�OYV N
H
OFC G.ItkURN1P
11�0N �.nY CUo`� OSS .•,c ��-(V
�O ExP�"es� �
• mss _—
":
COM
III
NO. 2W
On this the 26thday of September tg 88 before me,
Judith H. McNiff
the undersigned Notary Public, personally appeared
Mladen Crbavac
ffl personally known tome '
❑ proved to me on the basis of satisfactory evidence
to be the person(s) who executed the within instrument as
President or on behalf of the corporation therein
ed, and acknowledged tome that the corporation executed it.
WIT SS my hand and official seal. c
• Power of Attorney •
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
HOME OFFICE, BALTIMORE, MD.
KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the
State of Maryland, by C. M. PECOT, JR. , Vice -President, and C. W. ROBBINS
Assistant Secretary, in pursuance of authority granted by Article VI, Section 2, of the By -Laws of said Company, which
reads as follows:
"The Chairman of the Board, or the President, or any Executive Vice -President, or any of the Senior Vice -Presidents or Vice -Presidents
specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary
or any one of the Assistant Secretaries, to appoint Resident Vice -Presidents, Assistant Vice -Presidents and Attorneys -in -Fact as the business of the
Company may require, or to authorize any person or persons to execute on behalf of the Company any bonds, undertakings, recognixances,
stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of
mortgages.... and to affix the seal of the Company thereto."
does hereby nominate constitute and appoint Kent T. Roberts of Pasadena, California._
i s rue an lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as
itsactanddeed:any and all bonds and undertakings...........................�
n t e execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said
Company, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the
regularly elected officers of the Company at its office in Baltimore, Md., in their own proper persons.
The said Assistant Secretary does hereby certify that the aforegoing is a true copy of Article VI, Section 2, of the By-laws of .aid Company, and is
now in force.
IN WITNESS WHEREOF, the said Vice -President and Assistant Secretary have hereunto subscribed their names and
affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this ........3rd...................day
of............. ....................... . A.D. 19A6----
,r��.,asoo ^ a� FIDELITY AND DEPOSIT COMPANY OF MARYLAND
ATTEST:
7
SEAL
..,...•�r By /f
1 SS: Assistant Secretary
f VicePresi t
STATE OF MARYLAND
CITY Of BALTIMORE 1
On this 3rd dayof December ,A.D. 1986 .before thesubscriber,. Notary Public of the State of Maryland, in
and for the City of Baltimore, duly commissioned and qualified, came the above-named Vice -President and Assistant Secretary of the FIDELITY AND
DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers described in and who executed the preceding instrument,
and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and with, that they are
the said officers of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the
said Corporate Seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the
said Corporation.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed by Official Seal, at the City of Baltimore, thedavndy rfirstabov
--------------
Notary Public Commission E it lulg.l, 1990
"f CERTIFICATE
I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the original Power of
Attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date or this certificate; and I do further certify that the
Vice -President who executed the said Power of Attorney was one of the additional Vice -Presidents specially authorized by the Board of Directors to
appoint any Attorney in -Fact as provided in Article VI, Section 2 of the By-laws of the FIDELITY AND DEPOSIT COMPANY OF MARtuND.
This Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the FIDEun AND
DEPOSIT COMPANY OF MARYLAND al a meeting duly called and held on the 16th day of July, 1969.
RESOIAED: "That the facsimile or mechameally reproduced signature of any Assistant Secretary of the Company, whether made heretoforeor
hereafter, wherever appearing upon a certified co v of any Power of attorney issued by the Company, shall be valid and binding upon the Company
with the same force and effect as though manualPy affixed.' 26 t h
IN TESTIMONY' WHFn Eor. I have hereunto subscribed my name and affixed the corporate seal of the said Company. this_.......__...
..... . day
nr.......... Sep
tember--........ .19 88
—012
1_r ffea1�... T{rradp.ey�
{,ustanr Se...In,
FOR YOUR PROTECTION LOOT: FOR TIIF: F&D
alifornia
STATE oF_____C
____
f
SS:
L,aJ r11�UL`L.�.S 11
COUNTY OF______________—
On this ---------- —--------- 2 b t h ----day of -------- $ ep 19-91he r in the year---------_ 1988
---------' ----------------------' before me
NORMA 0. BURBANO
--------------------------------------_-____-_ __-__-_-____-____-__--____-____--___--__---___-__-__-___, .. ma -y a uuuc, pemw,auy appeareu
K
--------ENT—--T.------ROBERTS---------- --------------- ---------------------------------------------------------------' Personally known to me
(or proved to me on the basis of satisfactory evidence) to be the person who executed this instrument as attorney -in -tact of
the Fidelity and Deposit Company of Maryland, the corporation therein named, and acknowledged to me that the corporation
executed it.
-w eenti s
s a •++"-nf`•'+•• +'•+•••••"'y
.1 OFFI L.EAI ♦ .
e
*p ,
NORMA ,---- eaN---
------- ---- -
- ------ -
ArkomvleJgement Cendanm IF&DI
, jt$i
f' trry
�l ..
1'nn r rrt'r n
e
1�
o
t4421 ICA)—SM, 7-86 229660
-
0 0
Bond No
LABOR AND MATERIAL BOND
KNOW ALL MEN BY THESE PRESENTS: That
301685
WHEREAS, the City of San Juan Capistrano, a municipal corporalft04.41-Afange
County, California, has awarded to Four Way Constrction, Inc. License
No.527006 , hereinafter designated as "Principal", ua contract for of a M; Gci on lli l i
Sewer Rehabilitation ;and
WHEREAS, said Principal is required to furnish a bond in connection with the
said contract providing that if said Principal, or any of his or its sub -contractors, shall
fail to pay for any materials, provisions, provender or other supplies or teams used in,
upon, for or about the performance of the work contracted to be done, or for any work or
labor done thereon of any kind, the surety or this bond will pay the same.
NOW, THEREFORE, we Four Way Construction, Inc.
Principal, and Fidelity and Deposit Company of Maryland as surety, are
held firmly bound unto the City of San Juan Capistrano, a municipal corporation, in the
penal sum of Fifty -Five Thousand Three Hundred Fifty -------------- DOLLARS
($55,350.00), lawful money of the United States of America, for payment of which sum
well and truly to be made we bind ourselves, our heirs, executors, administrators and
successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that, if said Principal, his or its
heirs, executors, administrators, successors or assigns, or sub -contractors, shall fail to
pay for any materials, provisions, provender, or teams, or other supplies or equipment
used in, upon, for or about the performance of the work contracted to be done, or for any
work or labor done thereon of any kind, or for amounts due under the Unemployment
Insurance Act with respect to such work or labor as required by the provisions of Title 1,
Division 3, Chapter 3 of the Government Code of California as amended, that the surety
will pay for the same in an amount not exceeding the sum specified in this bond and also
in case suit is brought upon the bond, a reasonable attorney's fee to be fixed by the
court. This bond shall inure to the benefit of any and all persons, companies and
corporations entitled to file claims under said act, so as to give a right of action to them
or their assigns in any suit brought upon this bond.
FURTHER, the said surety, for value received, hereby stipulates and agrees that
no change, extension of time, alteration or modification of the contract documents or of
the work to be performed thereunder shall in any way affect its obligation on this bond
and it does hereby waive notice of any such change, extension of time, alteration or
modification of the contract documents or of work to be performed thereunder.
As a part of the obligation secured hereby, and in addition to the face amount
specified therefor, there shall be included costs and reasonable expenses and fees,
including reasonable attorney's fees, incurred by City in successfully enforcing such
obligation, all to be taxed as costs and included in any judgment rendered.
-22-
9
0
IN WITNESS WHEREOF three (3) identical counterparts of this instrument, each
of which shall for all purposes be deemed an original thereof, have been duly executed by
the Principal and surety herein named on the 26th day of September
19 88 . The name and corporate seal of each corporate party being hereto affixed and
these presents duly signed by its undersigned representatives pursuant to authority of its
governing body.
APPROVED AS TO FORM
Four Way Construction, Inc.
PRINCIPAL
BY
Fidelity and Deposit Company of Maryland
SURETY '
Kent T. Roberts, Attorney -
in -Fact
-23-
n.l-9fornia
STATEOF______________________________________
LOJ ANGELES ) SS:
On this ---------------- ----- 26th
--- _------- dav of__
KENT T. ROBERTS
September .
.__ ___________________, to the year
NORMA 0. RURRANn
1
___ 988 ________________ before me
Notary Public, personally appeared
personally known to me
for proved to me on the basis of satisfactory evidence) to be the person who executed this instrument as attomey-in-fact of
the Fidelity and Deposit Company of Maryland, the corporation therein named, and acknowledged to me that the corporation
executed it.
" J+�♦Nf.♦Ff.SEAL ... ..
CFflf.Al SEAL
;
R i
Ni1"A r ' iRRANO
R, P
O
fJ'Qf%------
(
AcknowledKment Guufhat Ih gnl
rL i'
Pi. . .r. ,• 1.',j
1.442, ICA) -5M, i-86224660
yc-♦.a.,. y.,.e mn.�mseo♦„,>,.
gRg
•,..oss.aJ
CORPORATE ACKNOWLEDGMENT
State of California
1 SS.
County of Los Angeles 1{
NO. 202
Onthisthe 26thdayof September tg $8-, before me,
Judith H. McNiff
the undersigned Notary Public, personally appeared
Mladen Grbavac
K) personally known to me
❑ proved to me on the basis of satisfactory evidence
to be the person(s) who executed the within instrument as
President or on behalf of the corporation therein
DajiQed, and acknowledged tome that the corporation executed it.
WIT hand and official seal.
1A xx
n2o un – NATIONAL NOTARY AS80CnTM -93M2 Vwaun BIrU. • P.O. Bm 4& • WmDynE NXb, G GI9M
0
MEMORANDUM
TO: Interested Persons
FROM: Mary Ann Hanover, City Clerk
DATE: October 6, 1988
0 r ( (�2_
SUBJECT: Award of Contract - Mission Hill Sewer Rehabilitation
MEMBERS OF THE CITY COUNCIL
ANTHONY L. BLAND
LAWRENCE F. BUCHHEIM
KENNETH E. FRIESS
GARY L. HAUSDORFER
PHILLIP R. SCHWARTZE
CITY MANAGER
STEPHEN B JULIAN
The City Council of the City of San Juan Capistrano at its regular meeting held
October 4, 1988, took action to award the contract for the Mission Hill Sewer
Rehabilitation to the low responsible bidder, Four -Way Construction. All other
bids were rejected.
Thank you for your interest in this project. If we can be of further assistance,
please call.
MARY ANN HANOVER, CMC
MAH/cj
cc: Wilson's Equipment Rental
Savala Construction Company
32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 0 (714) 493-1171
0 0
3. REPORT OF PARKS AND RECREATION COMMISSION ACTIONS (920.20)
The Report dated October 4, 1988, from the Secretary of the Parks and Recreation
Commission, regarding actions taken at the meeting of September 19, 1988, was
ordered received and filed.
4. REPORT OF PLANNING COMMISSION ACTIONS (440.40)
The Report dated October 4, 1988, from the Secretary of the Planning Commission,
regarding actions taken at the meeting of September 27, 1988, was ordered received
and filed.
6. COMPLETION OF A
As set forth in the report dated October 4, 1988, from the Director of Public Works,
the construction of the City Drainage Improvements on Avenida Aeropuerto, Via
Pastoral/Via Arboleda, and Casa Grande Drive, were completed.
Metance of Work:
he following Resolution was adopted:
COUNCIL OF THE CITY OF SAN JUAN CAPISTRANO,
CALIFORNIA, DECLARING WORK TO BE COMPLETED AS TO
PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF
CITY DRAINAGE IMPROVEMENTS (GILLESPIE CONSTRUCTION)
The Resolution accepted the work as complete in the amount of $63,859.56, and
directed the City Clerk to forward a Notice of Completion to the County
Recorder. Staff was authorized to release the 10% retention in the amount of
$6,385.96, 35 days after recording the Notice of Completion.
7. MISSION HILL SEWER REHABILITATION - AWARD OF CONTRACT
Fill IP -WAV (YIAICTD I Ir`TT()AI rnAADA AIv If nn 1n
As set forth in the report dated October 4, 1988, from the Director of Public Works,
the contract for the Mission Hill Sewer Rehabilitation was awarded to the low
responsible bidder, Four -Way Construction, Inc., of Arcadia, in the amount of
$53,350. All other bids were rejected. The Mayor and City Clerk were authorized
to execute the contract on behalf of the City.
8. DENIAL OF CLAIM, PROPERTY DAMAGE (KIMBERLY MORENO) (170.10)
As set forth in the report dated October 4, 1988, from the City Attorney, the Claims
for damage in the amounts of $545, filed on September 13, 1988, and $372.43, filed
on September 21, 1988, by Kimberly Moreno, were denied.
-3-
10/4/88
AGENDA ITEM
TO:
FROM:
SUBJECT:
SITUATION
0 •
October 4, 1988
Stephen B. Julian, City Manager
W. D. Murphy, Director of Public Works
Mission Hill Sewer Rehabilitation - Award of Contract (Four -Way
Construction)
Bids were opened September 6, 1988 for the Mission Hill Sewer Rehabilitation. The bids
are valid until October 21, 1988, a period of 45 days from the opening date.
The existing 6 inch diameter system was installed in the 1920's and some deficiencies had
become apparent during routine maintenance. Additional field review and television
inspection was carried out last year and the rehabilitation design was completed. The
project is budgeted for construction this year. Some cleanouts will be replaced with
manholes; several lateral connections need some making good; and some short lengths of
broken sewer line will be replaced.
Bids were received as follows:
Four -Way Construction $ 55,350.00
Wilson Equipment Rentals, Inc. 98,361.00
Savala Construction Co. 107,002.00
NOTIFICATION
Four -Way Construction, Inc.
Wilson Equipment Rentals, Inc.
Savala Construction Co.
COMMISSION/BOARD REVIEW, RECOMMENDATIONS
N/A
FINANCIAL CONSIDERATIONS
The Engineer's estimate for this project is $65,000. Ninety thousand dollars ($90,000) has
been budgeted in Account No. 17-6900-4717-719 this year and sufficient funds are
available for the construction of the project at the bid price of $55,350.00.
ALTERNATE ACTIONS
1. Award the contract for the Mission Hill Sewer Rehabilitation to the low responsible
bidder Four -Way Construction, Inc.
2. Do not award the contract.
3. Request further information from Staff.
FOR CITY COUNCIL AGENA.
7
AGENDA ITEM • •
October 4, 1988
Page 2
RECOMMENDATION
By motion, award the contract for the Mission Hill Sewer Rehabilitation to the low
responsible bidder Four -Way Construction, Inc. in the amount of $55,350.00 and reject all
other bids. Authorize the Mayor and City Clerk to execute the documents on behalf of
the City.
Respectfully submitted,
1'.> a ek
W. D. Murphy
WDM/BP:nb
LA
\
Q
ION
MFM
•
SEWED REPLACEMENT
REA
&mivalwlj
The bid totals are subject to correction after
the bids have been completely reviewed.
0
0
B I D
O P E N I N G R E P
O R T
Bids
opened September 6,
1988
at 2:00
XiQA/pm
Project Title Old Mission
Hill
Sewer Rehabilitation
Project Engineer Brian
Perry
Pre-Bid Estimate $65.000.00
Bid
Bid
Bidder:
Amount
Bond
1.
Four-Way Construction,
Inc.
mss, 350._
0,
2.
Savala Construction Co
0_
3.
Wilson's Equipment Rentals,
Inc.
3 e i,
_ef-
4.
5.
6.
7.
8.
9.
10.
cc:
City Clerk's Staff
(3)
Signed
Public Works
(3)
City Manager
(1)
Dated
The above bid
amounts have
not been checked.
The bid totals are subject to correction after
the bids have been completely reviewed.
0 BID PROPOSAL
For the: OLD MISSION HILL SEDER REHABILITATION
•
From: F(014 o' NmA e oivs'r TNS
Contractor
To the Honorable City Council
City of San Juan Capistrano
Gent ten ten:
The undersigned, as bidder, declares that he has carefully examined the location of the
proposed work as described, examined the Plans, Specifications, Special Provisions, and
the Standard Specifications for Public ACorks Construction 1985 Edition, including all
supplements therefor, read the Instructions to Bidders, and is familiar with all proposal
requireinents, and hereby proposes and agrees, if the proposal is accepted, to complete
the said construction in accordance with the Contract Documents, as defined in Section
t-2 of the Standard Specifications, in the time stated herein, for the unit price or lump
sum given on the following pages of this proposal, aniounting to a total of:
ures
Said amount to include and cover all taxes, the furnishing of all materials, the
performing of all the labor requisite or proper and the providing of all necessary
machinery, tools, apparatus, and other means of construction; also, the performance and
completion of all the work in the manner set forth, described and shown in the Specifica-
tions or the drawings for the work.
If the contract is awarded, the undersigned agrees to enter into a contract with the City
and to commence work within fifteen (15) calendar days from the date of execution
thereof, and to diligently prosecute the work to completion before the expiration of fort)
five (45) calendar days.
-3-
Lic '^7006
Four -Way Construction Inc.
General Engineering Contractor
Sewers - Storm Drains
MLADEN GRBAVAC 835 #5 Arcadia Ave.
DRAGO GRBAVAC Arcadia, Co. 91006
GORDON GRBAVAC Bus. (818) 446-5013
0 0
(If an individual, so state. If a firm or co -partnership, ,:,,Le the firm name and give the
names of all individual co-partners composing the firm: President, Secretary, Treasurer,
and Manager thereof.)
Dated:Gy 82susi5S AgCAd(i
4YC- flACAdiAp91
L0
06
ddress
Dated: 6 -A& &Iss—/S,913
Telephone Number
Further, the undersigned bidder certifies that he has thoroughly checked the figures set
forth in this proposal, that the} are correct to the best of his knowledge and that they
constitute his proposal for the work called out herein.
Dated: -g oy
Signature of Bidder
Dated: (^ �O -Cj g(g —4;q -u/3
'telephone Number
MIAWe,,
SAZAV4C- O -r"-
• 0Aat-
6A6AY4U V/C--PACS
,bAAgo
IS' "AvA C 6(0e PC?"' AY
4-.m
S A6AVA` T McAQ4Aeti.
•
-5-
•
•
0
0
SCHEDULE OF IXORK ITEMS
11
OLD MISSION HILL SEWER REHABILITATION
Approximate
tX'ork Items With Unit Price
Unit Price
Item Quantity
(written in XX'ords)
(In Figures)
Total Aniount
l 66 EA
Replace existing 4" diameter
lateral connection with saddle
tee connection per plan for the
unit price of /
$ %SO
$41SOO
—
dollars per each.
2 2 EA
Replace existing cleanout A ith
48" diameter manhole for the
unit pe of// /
'Tl, J.L.L
7-N;% o/1SO—Ar� A" $
$Tii
dollars per each.
3 37 L.F.
Remove and replace existing 6"
diameter sewer for the unit
price of
t/R7Y cL �L L�}Pai
dollart per lineal foot.
$
o
0
Total Bid Price (Enter here and on Page 3)
�SOep
ords
Figtires
•
•
•
NON -COLLUSION AFFIDAVIT TO BE EXECUTED By
BIDDER AND SUBMITTED WITH BID
STATE OF CALIFORNIA
County of
, being first duly sworn deposes
and says that he is"�' (-e_% k AeN,+ of _T N.-�, W p„ -a
Ck � the party making the foregoing bid; that such bid
is not made in the interest of or on behalf of any undisclosed person, partnership,
company, association, organization, or corporation; that such bid is genuine and not
collusive or sham; that said bidder has not directly or indirectly induced or solicited any
other bidder to put in a false or sham bid, and has not directly or indirectly colluded,
conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or
that any one shall refrain from bidding; that said bidder has not in any manner, directly
or indirectly, sought by agreement, communication or conference with any one to fix the
bid price of said bidder or of any other bidder, or to fix the bid price of or cost element
of such bid price, or of that of any other bidder, or to secure any advantage against the
public body awarding the contract of any one interested in the proposed contract; that all
statements contained in such bid are true; and further, that said bidder has not directly
or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof,
or divulged information or data relative thereto, or paid and will not pay any fee in
connection therewith, to any corporation, partnership, company, association,
organization, bid depository, or to any member or agent thereof, or to any other
individual except to any person or persons as have a partnership or other financial
interest with said bidder in this
general business.
DATED: z22L ju,,
S E
On this th ay of 19�befor i me, the undersigned, a
Notary Public in and for said State, personnally appeared _ l:' a :��
cf �O N 4�— , personally known to
me/proved to me on the basis of satisfactory evidence, to be the person(s) whose name(s)
S subscribed to the within instrument, and acknowledged that
_executed it.
-_
OFFICIAL SEAL
JUDITH H. McNIFF
WITNESS my hand and official seal.m R NOTARY vaeuO-CAUFURNIA
T PRINCIPAL OFFtGt IN
LOS A173ELES COUNTY
My Commission Expires March
-7-
ss.
S
, being first duly sworn deposes
and says that he is"�' (-e_% k AeN,+ of _T N.-�, W p„ -a
Ck � the party making the foregoing bid; that such bid
is not made in the interest of or on behalf of any undisclosed person, partnership,
company, association, organization, or corporation; that such bid is genuine and not
collusive or sham; that said bidder has not directly or indirectly induced or solicited any
other bidder to put in a false or sham bid, and has not directly or indirectly colluded,
conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or
that any one shall refrain from bidding; that said bidder has not in any manner, directly
or indirectly, sought by agreement, communication or conference with any one to fix the
bid price of said bidder or of any other bidder, or to fix the bid price of or cost element
of such bid price, or of that of any other bidder, or to secure any advantage against the
public body awarding the contract of any one interested in the proposed contract; that all
statements contained in such bid are true; and further, that said bidder has not directly
or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof,
or divulged information or data relative thereto, or paid and will not pay any fee in
connection therewith, to any corporation, partnership, company, association,
organization, bid depository, or to any member or agent thereof, or to any other
individual except to any person or persons as have a partnership or other financial
interest with said bidder in this
general business.
DATED: z22L ju,,
S E
On this th ay of 19�befor i me, the undersigned, a
Notary Public in and for said State, personnally appeared _ l:' a :��
cf �O N 4�— , personally known to
me/proved to me on the basis of satisfactory evidence, to be the person(s) whose name(s)
S subscribed to the within instrument, and acknowledged that
_executed it.
-_
OFFICIAL SEAL
JUDITH H. McNIFF
WITNESS my hand and official seal.m R NOTARY vaeuO-CAUFURNIA
T PRINCIPAL OFFtGt IN
LOS A173ELES COUNTY
My Commission Expires March
-7-
•
DESIGNATION OF SUB -CONTRACTORS
Submit with Proposal.
In compliance with the Provisions of Section
4100-4107 of the Government Code of the State of California as amended, the
undersigned certifies that he has used the sub -bids of the following listed sub -contractors
in making up his bid, and that the sub -contractors listed will be used for the work for
which they bid, subject to the approval of the Engineer, and in accordance with the
applicable provisions of the Specifications. It is understood and agreed that all those
portions of the work called for in the contract documents for which a sub -contractor is
not listed will be performed by the undersigned through his forces. If no sub -contractors
are listed, all bonds and insurance will be written in the name of the general contractor
only.
Item of Work Sub -Contractor- Address Phone No.
1. 0 _
• 2. _
3.
4.
5.
M
7.
8.
010,WQ
O,IZED SIGNATURE
- -
-8-
• INSTRUCTION TO BIDDERS
Securing Documents
Plans, Specifications and other contract documents will be available for examination
without charge and copies may be secured in accordance with the "Notice Inviting Bids".
Examination of Plans, Specifications and Site of Work
The bidder is required to examine the site of work, the Proposal, the Plans and the
Specifications, Special Provisions, and the Standard Specifications for Public Works
Construction, 1985 Edition including all supplements, very carefully. He shall satisfy
himself as to the character, quality and quantities of the work to be performed, the
materials to be furnished and the requirements of the Contract Documents. The plans
for the work show conditions as they are believed to exist, but it is not to be inferred
that all the conditions as shown thereon are actually existent, nor shall the City or any of
its officer or agents be liable for any loss sustained by the Contractor as a result of any
variance between conditions shown on the plans and actual conditions revealed during
examination or progress of the work. The submission of a proposal shall be prima facie
•
evidence that the bidder has made such an examination.
4
Interpretation of Drawings and Documents
If any bidder should find discrepancies in, or omissions from the drawings, specifications
or other proposed contract documents, or if he should be in doubt as to the true meaning
of any part thereof, he shall at once make a written request to the Engineer for
correction, clarification or interpretation of the point or points in question. The person
submitting such a request shall be responsible for its prompt delivery.
In the event that the Engineer receives such a request and it should be found that certain
essential information is not clearly and fully set forth, or if the Engineer discovers
errors, omissions, or points requiring clarification in the drawings or documents, a
written addendum will be mailed to each person to whom a set of contract documents has
been delivered. The City will not be responsible for any instructions, explanations or
interpretations of the documents presented to bidders in any manner other than written
addendum.
•
-9-
0 0
Addenda or Bulletins
The effect of all addenda to the contract documents shall be considered in the bid and
• said addenda shall be made a part of the contract documents and shall be returned with
them. Before submitting his bid, each bidder shall inform himself as to whether or not
any such addenda have been issued, and failure to cover in his bid any such addenda
issued may render his bid invalid and result in its rejection.
Disqualification of Bidders
No person, firm or corporation shall be allowed to make, file or be interested in more
than one bid for the same work unless alternate bids are called for. A person, firm or
corporation who has submitted a sub -proposal to a bidder, or who has quoted prices on
materials to a bidder, is not hereby disqualified from submitting a bid in his own behalf.
Proposals
Bids to receive consideration shall be in accordance with the following instructions:
A. Bids shall be made only upon the forms provided within these specifications; all bid
items shall be properly filled out; bid prices shall be stated both in words and in
figures; and the signatures of all persons signing shall be in longhand. Where there is
a conflict in the words and figures, the words shall govern.
• B. All prices and notations must be in ink or typewritten. No erasures will be
permitted. Mistakes may be crossed out and corrections typed or written in ink
adjacent thereto and must be initialed in ink by the person or persons signing the bid.
C. Bids shall not contain any recapitulation of the work to be done. Alternate proposals
will not be considered except as required hereinabove. No oral, telegraphic or
telephonic proposals or modifications will be considered.
D. The City may require any bidder to furnish a statement of his experience, financial
responsibility, technical ability, equipment and references properly and fully filled
out.
E. Each bidder shall shall list his proposed sub -contractors on the form accompanying
the proposal in accordance with the provisions of the specifications.
F. Each bidder must accompany his bid with either a cashier's check upon some
responsible bank, or a properly certified check upon such bank, or an approved
corporate surety bond payable to the City for such a sum of not less than ten (10)
percent of the aggregate sum of the bid, which check or bond and the monies
represented thereby shall be held by the City as a guarantee that the bidder, if
awarded the contract, will in good faith enter into such contract and furnish the
• required bonds.
-10-
0
0
The bidder agrees that, in case of his refusal or failure to execute said contract and
give bonds within the time required by these documents, such check or bond, and the
money represented thereby, shall remain the property of the City and, if the bidder
shall fail to execute said contract, said surety will pay to the City the damages
which the City may suffer by reason of such failure, not exceeding the sum of ten
(10) percent of the amount of the bid. A bid received and not accompanied by such
cashier's check, certified check or approved bond shall be rejected.
G. Bids shall be delivered to the City at the location stipulated, on or before the day
and hour set for the opening of bids, as hereinbefore specified in the "Notice Inviting
Bids". Bids shall be enclosed in a sealed envelope bearing the title of the work, the
name of the bidder, bid opening date and time of bid opening.
Licensing of Contractor
All persons, firms, partnerships or corporations shall be licensed in accordance with the
Business and Professions Code of the State of California and the applicable ordinances of
the City and County before doing any work of any kind.
• Withdrawal of Bids
Any bidder may withdraw his bid in person or by written request at any time prior to the
scheduled closing time for receipt of bids.
Opening of Bid Proposals
The City will, in open session, publicly open, examine and declare the bids at the time set
forth in the "Notice Inviting Bids". Bidders or their authorized representatives are
invited to be present.
Award of Contract or Rejection of Bids
No bidder may withdraw his bid for a period of forty five (45) days after the date set of
the opening of bids. The contract for the work will either be awarded or the bids
rejected within the forty five (45) days form the date set for the opening of bids.
The contract for the work will be awarded to the lowest responsible bidder complying
with these instructions and with the "Notice Inviting Bids". The City, however, reserves
• the right to reject any or all bids and to waive mere informalities, minor technical errors
or irregularities, obvious clerical or erasures.
-11-
•The bidder to whom the award is made shall execute a written contract with the City and
furnish the stipulated bonds, insurance and bid breakdown within fifteen (15) days after
the notice of award of contract. The contract shall be made in the form adopted by the
City. The release of the successful bidder's surety deposit, as previously stipulated (page
5), shall be made upon the City's acceptance of the Labor and Materials Bond and the
Faithful Performance Bond.
If the bidder to whom the award is made faits to enter the contract as herein provided,
the award may be annulled and an award may be made to the next lowest responsible
bidder; and such bidder shall fulfill every stipulation embraced herein, as if he were the
party to whom the first award was made. A corporation to which an award is made shall
furnish evidence of its corporate existence and evidence that the officer signing the con-
tract and bonds for the corporation is duly authorized to do so.
Bonds
The successful bidder, simultaneously with the execution of the Agreement, will be
required to furnish a Labor and Material Bond in a sum not less than one hundred percent
000%) of the total amount payable by the terms of the contract and a Faithful
Performance Bond in a sum not less than one hundred percent (100%) of the amount of
the contract. Said bonds shall be secured from a surety company listed as acceptable on
• the list included in these specifications. Bonds must be submitted on the forms contained
in these specifications.
Time of Performance
•
The work shall be commenced within fifteen 05) calendar days from the date of issuance
of the Notice to Proceed and shall be diligently prosecuted until completion. A time
limit of forty five (45) calendar days from the date specified in the Notice to Proceed
has been set for completion of the work. The bidder's attention is directed to the
specifications as to provisions for extension of time of completion and/or assessment of
liquidated damages.
Assignment of Contract
No assignment by the Contractor of any contract to be entered into hereunder or any
part thereof, or of funds to be received thereunder by the Contractor, will be recognized
by the awarding authority unless such assignment has had prior approval of the awarding
authority and the surety has been given notice of such assignment in writing and has
consented thereto in writing.
-12-
0
0
• Workmen and Wages
Attention is specifically directed to all provisions of the Labor Code of the State of
California with regard to workmen and wages. Wages shall not be less than prevailing
wage rates determined by the City pursuant to said Code and as listed in the "Notice
Inviting Bids".
Building Permits
It shall be the Contractor's responsibility to obtain all necessary permits, bonds and
insurance, as required, for the completion of the project. No extra compensation shall be
made therefore.
•
•
-13-
Bond No. 30168507
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we; Four Way. Construction, Inc.
_ as PRINCIPAL, and Fidelity and Deposit Company
of Maryland as SURETY, hereinafter called Surety, are held and
firmly bound unto the CITY OF SAN JUAN CAPISTRANO, Obligee, hereinafter called
City, in the sum of $ 10% , for payment whereof Principal and Surety bind
themselves, their heirs, executors, administrators, successors, and assigns, jointly and
severally, fairly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas the Principal has
submitted the accompanying bid dated September 6, 19 88_., for the construction
of Old Mission Hill Sewer Rehabilitation fer the
City of San Juan Capistrano, Orange County, California.
NOW, THEREFORE, if the Principal shall not withdraw said bid within thirty (30)
days after the opening of same, and shall, within fifteen (15) days after the agreement
has been presented to him for execution, enter into a written contract with the City in
accordance with the bid as accepted, and if the Principal shall give the required bond
with good and sufficient sureties, or sureties for the faithful performance and proper
fulfillment of such contract and for the protection of laborers and materialmen, or in
the event of the withdrawal of said bid within the periods specified, or the failure to
enter into said contract and give said bond within the time specified, if the Principal
shall within sixty (60) days after request by the City, pay the City the difference
between the amount specified in said bid and the amount for which the City may procure
the required work and/or supplies if the latter amount be in excess of the former, then
the above obligation shall be void and of no effect, otherwise to remain in full force and
virtue.
Further, as a part of the obligation secured hereby, and in addition to the face
amount specified therefor, there shall be included costs and reasonable expenses and
fees, including reasonable attorney's fees, incurred by City in successfully enforcing such
obligation, all to be taxed as costs and included in any judgment rendered.
I
k.
„r California
..................................................................
ss:
1 .,mnty ur....... Lq§... &q.L S ......................
On this
..............day of ........... _........_. Eill$.t1,S t....__........ ..... in the year ._..1988..._.. ............ before me
th H. McNiff
................... ......
..................................................................... Notary Public, personally appeared
.
Michael R.
personally known to me
Qv proved to me on the basis of satisfactory evidence) to be the person who executed this instrument as attorney-in-fact of the Fidelity
and Deposit Company of Maryland, the cos ration therein
4"il dc;diFF
"y j.:,' 0 AR1 URNIA
��� �tC1� Jrrd.i: I
%WI LOS A'NUELES COUNTY
MY Commission Expires March 1, 1992
to me that the corporation executed it.
C�
IN WITNESS WHEREOF, the above -bounden parties have executed this
instrument under their several seals this 28th day Of Aug. , 19 88. the name and
corporate seal of each corporate party being affixed hereto and these presents duly
signed by its undersigned representative pursuant to authority of its governing body,
Two Witnesses (If Individual)
ATTEST (If Corporation)
Corporate Seal
ATTEST
Title
Four Way Construction, Inc.
PRINCIPAL
BY:
Mladen Grbavac
Title: President
Fidelity and Deposit Co:ppany of Maryland
SURETY
BY. t �
Michael R. angan
Title: Attorney -in -Fact
-19-
0 Power of Attorney 0
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
HOME OFFICE, BALTIMORE, MD.
KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the
State of Maryland, by C. M. PECOT, JR. , Vice -President, and C. W. ROBBINS
Assistant Secretary, in pursuance of authority granted by Article VI, Section 2, of the By -Laws of said Company, which
reads as follows:
"The Chairman of the Board, or the President, or any Executive Vice -President, or any of the Senior Vice -Presidents or Vice -Presidents
specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary
or any one of the Assistant Secretaries, to appoint Resident Vim -Presidents, Assistant Vice -Presidents and Attorneys -in -Fact as the business of the
Comppaadny may require, or to authorize any person or Persons to execute on behalf of the Company any bonds, undertakings, recognizances,
stipulations, policies, contracts, agreements, eeds, and releases and assignments ofjudgemems, decrees, mortgages and instruments in the nature of
mortgagee.... and to affix the seal of the Company thereto."
does hereby nominate constitute and appoint Michael R. Langan of Pasadena, Cal
e an aw ul agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as
its act and deed: any and all bonds and undertakings ............................... . .
Xt%T-tVe execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said
Company, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the
regularly elected officers of the Company at its office in Baltimore, Md., in their own proper persons.
The said Assistant Secretary does hereby eartify that the aforegoing is a true copy of Article VI, Section 2, of the By -taws of said Company, and is
now in force.
IN WITNESS WHEREOF, the acid Vice -President and Assistant Secretary have hereunto subscribed their names and
affixed the Corporate Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this .........latIl..............day
of .................December.................................. A.D.19._BS...
u%, FIDELITY AND DEPOSIT COMPANY OF MARYLAND
air44,
c ATTEST:
n
SERL
"• .rrr..........�_�...,`..���:"".............. By ............................. !
...................................
AuAuant Vice-Preidnu
STATE OF MARYLAND j SS:
CrrY OF BALTIMORE
On this 13th day of December A.D. 19 85 , before the subscriber, a Notary Public of the State of Maryland, in
and for the City of Baltimore, duly commissioned and qualified, came the above-named Vice -President and Assistant Secretary of the FIDELATY AND
DEPOSIT COMPANY OF MARYLAND, to me Personally known to be the individuals and officers described in and who executed the preceding instrument,
and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and exists, that they are
the said officers of the Company aforesaid, and that the sed affixed to the preceding instrument is the Corporate Seal of said Company, and that the
said Corporate Sed and their signatures m such officers were duly affixed and subscribed to the Axid instrument by the authority and direction of the
Mid Corporstion.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed by Official Seal, at the City of Baltimore, the day and year first above writ en.
r s
i
................... ......
./-.. ....... ...... ... .... . . . ..... ...
soman
Notary Public �ommlaston e.. Tal Y-...I.r....1.9B.h.
•'� CERTIFICATE
I, the underr��yyooad, Ami taut Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the original Power of
Attorney of which the foregoing isa full, true and correct copy, is in full force and effect on the date of this certificate: and i do further certify that he
Vice-Prsaident who executed the said Power of Attorney was one of the additional Vice -Presidents specially authorised by the Board of Directors to
appoint any Attorney -in -Fact As provided in Article VI, Section 2 of the By-laws of the FIDELITY AND DEPosn COMPANY OF MARYLAND.
This certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the FIDmn AND
DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 16th day of July, 1969.
RESOLVED: 'That the facsimile or mechanically reproduced signature of any Assistant Secretary of the Company, whether made heretofore or
hereafter, whatever appearing upon a eartified wry of any Power of attorney issued by the Company, shall be valid and binding upon the Company
with the same force and effect sa though manually affixed. '
IN TESnMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said Company, this ..... 2 $ th........ day
of......... AU&US t..... 19--8-8--.
Users—rix —012-7454 •Nl. AsLevntSte
FOR YOUR PROTECTION LOOK FOR THE F&D \VATERNIARK
n
u
AFFIDAVIT OF PUBLICATION
STATE OF CALIFORNIA
County of Orange
I am a citizen of the United States and a resident of the
County aforesaid: I am over the age of twenty one years,
and not a party to or interested in the above -entitled
matter. I am the principal clerk of the Capistrano Val-
ley News, a newspaper of general circulation in the City
of San Juan Capistrano, County of Orange, and which
newspaper has been adjudicated to be a newspaper of
general circulation by the Superior Court of the County
of Orange, State of California, June 5, 1984, Case No.
A-122949 in and for the City of San Juan Capistrano,
County of Orange and the South Orange County Judicial
District; that the notice, of which the annexed is a true
printed copy, has been published in each regular and
entire issue of said newspaper and not in any supple-
ment thereof on the following dates, to wit:
July 28+ August 49 1988
I declare under penalty of perjury that the foregoing is
ture and correct.
Executed at Mission Viejo, Orange County
California,this ... 4.... dayof Aug 19 M.....
.,lh�/....................
Signature
Capistrano Valley News
23811 Via Fabricante
P.O. Box 3629
Mission Viejo, Calif., 92690
11
This space is for the County Clerk's Filing Stamp
RECEIVED
NG 5 3 06 N In
"ITI CLERK
pE?ARTMENT
;.QTY OF SAN
wAk NSTRANO
Proof of Publication of
NOTICE OF INVITING BIDS OLD MISSION HILL
.......................................................
SEWER RENABILITION
.—_ csiClA
0
NOTICE OF TRANSMITTAL - LEGAL PUBLICATIONS
TO: CAPISTRANO VALLEY NE'I S
Jody Kolar, Legal
FOR PUBLICATION ON:
DOCUMENT TO BE PUBLISHED:
PROOF OF PUBLICATION:
0
THURSDAY, JULY 28, 1988
THURSDAY, AUGUST 4, 1988
NOTICE INVITING BIDS - OLD MISSION
HILL SEWER REHABILITATION
Please send to:
City Clerk's Department
City Hall
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
(714) 493-1171
.AUTHORIZED BY:
DATE: July 20, 1988
Date of Bid Opening
- 9/06/88
Date (s) notice published
- 7/28/88
- 8/04/88
Date affidavit received
-—J�'B�5
Date notice posted in
designated posting places (3)
- 7/28/88
0
NOTICE INVITING BIDS
0
OLD MISSION HILL SEWER REHABILITATION
Notice is hereby given that the City of San Juan Capistrano will receive sealed
proposals or bids for the Old Mission Hill Sewer Rehabilitation until 2:00 P.M. on the 6th
day of September, 1988.
A pre-bid conference is scheduled at 10:00 A.M. on the 22nd day of
August, 1988, at the City offices to assist contractors.
Copies of Plans and Specifications are on file in the Office of the City Clerk
of San Juan Capistrano, 32400 Paseo Adelanto, San Juan Capistrano, California, and may
be obtained at the non-refundable charge of $10.00, plus a charge of $5.00 for each set of
Plans and Specifications mailed.
Dated: July 20, 1988
CITY CLE
CITY OF N JUAN CAPISTRANO
ORANGE COUNTY, CALIFORNIA
OLD MISSION HILL SEu ER REHABILITATION
NOTICE INVITING BIDS
Public notice is hereby given that the City of San Juan Capistrano will,
up to 2:00 p.m., on the 6th day of September, 1988, receive sealed proposals or bids for
the Old Mission Hill Sewer Rehabilitation in accordance with the approved Plans,
Specifications, Special Provisions, and the Standard Specification for Public corks
Construction, 1985 Edition, including all suppler ents therefor, on file in the office of the
City Clerk of the City of San Juan Capistrano, California. Bids will be received until the
tirne hereinbefore stated at the San Juan Capistrano City Hall, 32400 Paseo Adelanto,
San Juan Capistrano, California.
No bid will be received unless it is made on a proposal provided witt.n these specifi-
cations. Each proposal or bid must be accompanied by a certified check, cash, cashier's
check, or bidder's bond payable to the City of San Juan Capistrano in the sum of not less
than ten percent of the total bid amount.
The bid check, cashier's check or bidder's bond of the successful bidder will be forfeited
to said City in the event such successful bidder fails to enter into the required contract
within 15 days after the written notice that said contract has been awarded to him for
the work.
A pre-bid conference is scheduled at 10:00 a.m. on the 22nd day of August 1988, at the
City offices. The contractor shall have the opportunity for clarification or interpre-
tation of any point or points of question within the plans and contract documents or
specifications. It is the contractor's responsibility to be in attendance at this conference
to receive any information disclosed during the proceedings, for the City shall not dis-
seminate any records of the conference. Exclusive of written addendums and this pre-bid
conference, the City shall not be responsible for any instructions, explanations, or inter-
pretation of the plans, specifications, and contract documents presented to the bidders in
any manner.
The successful bidder, simultaneously with the execution of the contract, will be required
to furnish a Faithful Performance Bond equal in the amount of one -hundred percent
(100%) of the contract price. The surety bond company must be selected from among the
surety companies set forth in the surety list provided herein.
The City Council reserves the right to reject any and all bids received and to compare
the relative merits of the respective bids and to choose that which in the opinion of said
City will best serve the interests or needs of said City.
A time limit of forty five (45) calendar days has been set for the completion of the work,
from the date of execution of the contract.
BIDDERS ARE HEREBY NOTIFIED THAT, pursuant to the Labor Code of the State of
California, copies of the prevailing rate of per diem wages, as determined by the
Director of the State Department of Industrial Relations, are on file in the office of the
City Clerk and shall be made available to any interested party on request.
Copies of plans and specifications are on file in the office of the City Clerk of San Juan
Capistrano, 32400 Paseo Adelanto, San Juan Capistrano, California. Copies of the plans
and specifications for use in preparing bids may be obtained at the Office of the City
Clerk, San Juan Capistrano, at the address shown above. One set of plans and
specifications is available for each general contractor proposing to submit a bid for said
work. A charge in the amount of $10, nonrefundable, is required for obtaining each set _
of plans and specifications. There will be a $5 charge for postage and handling on all
plans and specifications mailed.
Each bidder shall state the California Contractor's License number of such bidder so
bidding, as no bid will be accepted from a Contractor who has not been licensed in
accordance with the provisions of the laws of the State of California relating to the
licensing of Contractors.
This Notice is hereby given and published by order of the City Council of the City of San
Juan Capistrano, and is dated: "1-)L /!] /&
�Crry CL K
CITY OMAN JUAN CAPISTRANO
ORANGE COUNTY, CALIFORNIA
-2-
0
9. REPORT OF MOBILEHOME PARK REVIEW COMMITTEE ACTIONS (430.50)
The Report dated July 19, 1988, from the Secretary of the Mobilehome Park Review
Committee, regarding actions taken at the meeting of July 12, 1988, was ordered
received and filed.
10. CHANGE OF MEETING DATE, MOBILEHOME PARK
REVIEW COMMITTEE 430.50
As set forth in the report dated July 19, 1988, from the Secretary to the Mobile
Home Park Review Committee, the change of meeting date from the first Tuesday
of the month at 2:00 p.m., in the City Council Chamber to the second Tuesday of
each month at 2:00 p.m., in the City Council Chamber, was approved.
11. REPORT OF PARKS AND RECREATION COMMISSION ACTIONS (920.20)
The Report dated July 19, 1988, from the Secretary of the Parks and Recreation
Commission, regarding actions taken at the meeting of June 20, 1988, was ordered
received and filed.
12. REPORT OF PLANNING COMMISSION ACTIONS (440.40)
The Reports dated July 19, 1988, from the Secretary of the Planning Commission,
regarding actions taken at the meetings of June 28 and July 12, 1988, were ordered
received and filed.
13. REPORT OF TRAFFIC .AND TRANSPORTATION COMMISSION ACTIONS (590.20)
The Report dated July 19, 1988, from the Secretary of the Traffic and
Transportation Commission, regarding actions taken at the meetings of June 8 and
June 22, 1988, was ordered received and filed.
14. CAMINO CAPISTRANO ASPHALT
--> 15.
As set forth in the report dated July 19, 1988, from the Director of Public Works,
the contract for the asphalt concrete overlay of Camino Capistrano from Junipero
Serra Road to Trabuco Creek Bridge was awarded to Sully -Miller Contracting
Company of Orange, in the amount of $43,143.50. All other bids were rejected. The
Mayor and City Clerk were authorized to execute the contract on behalf of the City.
- PLANS, S
The Plans and Specifications for the rehabilitation of the existing sewer system in
the Mission Hill area of the City were approved and staff was authorized to call for
bids, as set forth in the report dated July 19, 1988, from the Director of Public
Works.
-4-
7/19/88
Y
AGENDA ITEM July 19, 1988
TO: Stephen B. Julian, City Manager
FROM: W. D. Murphy, Director of Public Works
SUBJECT: Mission Hill Sewer Rehabilitation - Plans and Specifications and
Authorization to Receive Bids
SITUATION
Staff is requesting approval of plans and specifications and authorization to receive bids
for the rehabilitation of the existing sewer system in the Mission Hill area of the City.
The existing 6 inch diameter system was installed in the 1920's and some deficiencies had
become apparent during routine maintenance. Additional field review and television
inspection was carried out last year and the rehabilitation design was completed. The
project is budgeted for construction this year. Some cleanouts will be replaced with
manholes; several lateral connections need some making good; and some short lengths of
broken sewer line will be replaced.
NOTIFICATION
N/A
COMMISSION/BOARD REVIEW, RECOMMENDATIONS
N/A
FINANCIAL CONSIDERATIONS
The Engineer's estimate for this project is $65,000. Ninety thousand dollars ($90,000) has
been budgeted in account #17-6900-4717-719 this year and sufficient funds are available
for the construction of the project.
ALTERNATE ACTIONS
1. Approve the plans and specification for the Mission Hill Sewer Rehabilitation and
authorize Staff to receive bids.
2. Do not approve the plans and specifications.
3. Request additional information from Staff.
RECOMMENDATION
By motion, approve the plans and specifications for the Mission Hill Sewer Rehabilitation
and authorize Staff to receive bids.
Respectfully submitted,
W. D. Murphy
WDM/BP:dc
E15
N H141
36 31
•moi
REPLACEIAENT
T AREA
a
r�
C CO(Ca Ka
TYPE OF INSURANCE
SIMI
PR )UCER
THIS TII
POUR. EXPIPATION
IGH
NO RIGHTS
LANGAN BONDS & INSURANCE AGENCY, INC.
END OR
100 N. Hill Ave. 11105
MM
DATE (ODYY)
Pasadena, CA. 91106
1
C< MPANY A
LE TER
GENERAL
G. MPANY
INE : RED
Lf ITER B
LE CC MPPRNY CFOUR
WAY CONSTRUCTION, INC.
835-5 Arcadia Ave.
Arcadia, CA. 91006
CCMPANY p
LETTER
C('MPANY E
LE ETER
WED AS A MATTER OF INFl:RMATION ONLY AND COIIFERS
ERTIFlCAT: HOLDER. THIS C ERTIFICA" E DOES NOT A IAEND,
COVERAGI: AFFORDED BY EHE POLIraES BELOW.
COItAPANIES AFFORDING COVEFIAGE
FREMONT COMPENSATION INSURANCE COMPANY
CO
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFrECTIVE
POUR. EXPIPATION
LIABILITY LIMITS IN THOUSANDS
LTR
MM
DATE (ODYY)
DATE (MMNDHYIEACH
M:GREGATE
GENERAL
LIABILITY
-PCC_URRENCE
BODILY
COMPREHENSIVE FORM
IWURY $
$
PREMISES/OPERATIONS
PROPERTY
UNDERGROUND
DAMAGE $
$
EXPLOSION A COLLAPSE HAZARD
PRODUCTSICOMPLETED OPERATIONS
CONTRACTUAL
BIA PD
COMBINED $
$
INDEPENDENT CONTRACTORS
BROAD FORM PROPERTY DAMAGE
PERSONAL INJURY -
PERSONAL INJURY
$
AUTOMOBILE
LIABILITY
BODILYIRY
ANY AUTO
_
((P R PERSOM
$
ALL OWNED AUTOS (PRIV. PASS.)
a".
BODII Y
ALL OWNED AUTOS ( TH RPTTHAASSN) (PLLEPPPYDE.OEM)
$PRI
HIRED AUTOS
NON -OWNED AUTOS
PROPERTY
$
i;
4-7,4
GARAGE LIABILITY
'{.
BI & PD
COMBINED
$
EXCESS LIABILITY
UMBRELLA FORM
el & PO
COMBINED
$
$
OTHER THAN UMBRELLA FORM
STATUTORY %'-;
WORKERS COMPENSATION
A
WP88-468820-01
5-5-88
5-5-89
$1 000(EACH ACCIDENT)
AND
$ 1, OOQDISEASE-POLICY LIMIT)
EMPLOYERS' LIABILITY
�,. $ 1 OOQ(DISEASE-EACH EMPLOYEE)
OTHER
DESCRIPTION OF OPERATIONS/LOCATIONSNEHICLES/SPECIAL ITEMS Project: Mission Hills Sewer Rehabilitation.
1411191:1.
City of San Juan Capistrano OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EX -
ATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO
32400 Paseo Adelanto DAYS WRITTEN NOTICE TO THE CERTIF TE HOLDER NAMED 70 THE
rUTHORIZED
San Juan Capistrano, CA. 9 26 75 LURE TO MAIL SUCH NOTKE SHALL IM OBLIGATION OR UAW
UPON THE COMPANY, ITS A NTS PRESENTATIVES.
PRESENTA
SI 6
S:
FF 9-19-88
PRODUCER
THIS CERTIFICATE IS ISSUED Aa A =d4!T. ER OF !NFOR'M.I"..N -NL, AND C, .iRS
LANGAN BONDS & INSURANCE AGENCY, INC.
NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CER 1;1U; ATE DOES NOT AMEND
100 N. Hill Ave. #105
EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW
Pasadena, CA. 91106
COMPANIES AFFORDING COVERAGE
COMPANY
LETTER A FIREMEN'S INSURANCE COMPANY OF WASHINGTON
COMPANY B D. C.
LETTER
INSURED
FOUR WAY CONSTRUCTION, INC.
835-5 Arcadia Ave.
COMPANY C
LETTER
Arcadia, CA. 91006
COMPANY D
LETTER
COMPANY E
LETTER
THIS IS TO CERTIFY THAT POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED,
NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY
BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS, AND CONDI-
TIONS OF SUCH POLICIES.
CO
LTR
TYPE OF INSURANCE
POLICY NUMBER
POLICY EFFECTIVE
DATE (MM/DO/YYI
POLICY EXPIRATION
DATE (MM/DDIYYI
ALL LIMITS IN THOUSANDS
GENERAL LIABILITY
GENERAL AGGREGATE $1.000
X COMMERCIAL GENERAL LIABILITY
PRODUCTS COMP/OPS AGGRECATE $- 1 0-0-0-
00-
CLAIMS
CLAIMS MADE OCCURRENCE
PERSONAL 8 ADERTISAG NJU_Y $- 1 00-0
5
X OWNERS B CONTRACTORS PROTECTIVE
F88 CF00026
7-5-88
7-5-89
EACH OCCURRENCE $1.000_._.
FIRE DAMAGE (ASY ONE FIRE $ rDN
A
MEDICAL FXPE%SE ANY ONE PERSONI $
AUTOMOBILE
LIABILITY
ANY AUTO
CSL $
ALL OWNED AUTOS
BODILY
INJURY
SCHEDULED AUTOS
(PR PERSON) $
HIRED AUTOS
BODILY
INJURY
NON OWNED AUTOS
�,a RIDErvn $
GARAGE LIABILITY
PROPERTY
DAMAGE $
EXCESS LIABILITY
EACH AGGREGATE
occORRENCE
$ $
OTHER THAN UMBRELLA FORM
STATUTORY
WORKERS' COMPENSATION
$ (EACH ACCIOENTI
AND
$ (DISEASEPOLICYLIMIT)
K
EMPLOYERS' LIABILITY
$ —
(DISEASE EACH EMPLOYEE)tiH
OTHER
tr
.f
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/RESTRICTIONS/SPECIAL ITEMS The City of San Juan Capistrano, its electe
Sad appointed officials, its officers, agents, and employees shall be named as additional insur'A
ith respect to the work performed by the insured. In the event of a proposed cancellation of
this policy for any reason whatsoever, the City shall be notified by registered mail, return
receipt requested thirtv days before cane
• .
Cit n Juan
City of San Juan Capistrano
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EX
2Cit Paseo
PIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO
MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE
an Juan Capistrano, CA. 92675
I
LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR
LIABILITY OF ANY KIND UPON THE COMPANY, GENTS OR REPRESENTATIVES.
UTHORIZED RE RES TATIVE
0 0
CITY OF SAN JUAN CAPISTRANO
COUNTY OF ORANGE
STATE OF CALIFORNIA
SPECIFICATIONS
AND CONTRACT DOCUMENTS
OLD MISSION HILL SEu'ER REHABILITATION
CITY COUNCIL
GARY L. HAU'SDORFER, MAYOR
PHILLIP R. SCH\X ARTZE KENNETH E. FRIESS
LAXX RENCE F. BUCHHEINi ANTHONY L. BLAND
CITY .MANAGER
S. B. JULIAN
DIRECTOR OF PUBLIC IX OR
XX'. D. MURPHY
MAY, 1988
•
0 0
. TABLE OF CONTENTS
OLD MISSION HILL SEu ER REHABILITATION
TITLE PAGE
CONTRACT DOCUMENTS
Notice Inviting Bids...........................................................1
BidProposal..................................................................3
Schedule of Work Items........................................................6
Non -Collusion Affidavit........................................................7
Designation of Sub-Contractors.................................................9
Instructions to Bidders........................................................10
Contract....................................................................16
BidBond .................................................................20
Performance Bond............................................................22
Labor & Material Bond........................................................24
Listing of Surety Companies...................................................26
SPECIAL PROVISIONS
WORK
TO
BE DONE
Section
I
Standard Specifications.......................................SP-1
Section
2
Terms Defined...............................................SP-2
Section
3
Flow and Acceptance of Water.................................SP-2
• Section
4
I'ater......................................................SP-2
Section
5
Insurance and Overhead Costs..................................SP-2
Section
6
Protection of Existing Utilities
(Underground Service Alert)...................................SP-2
Section
7
Protection of Private Property.................................SP-3
Section
8
Construction Zone...........................................SP-3
Section
9
Pre -Construction Coordination Meeting .........................SP
-3
Section
10
Alternate Pipe Materials......................................SP-3
Section
I I
Special Provisions for the Construction
of Sanitary Sewers...........................................SP-3
DETAIL SPECIFICATIONS AND METHOD OF PAYMENT
Bid Item I Replace Existing 4" Diameter Lateral Connection with
Saddle Tee Connection..... ............ ............ DS -I
........ ..
Bid Item 2 Replace Existing Cleanout with 48" Diameter Manhole ........... DS -1
Bid Item 3 Remove and Replace Existing 6" Diameter Sewer ................ DS -I
APPENDIX
Special Provisions for the Construction of Sanitary Sewers
0
0 0
OLD MISSION HILL SEDER REHABILITATION
NOTICE INVITING BIDS
Public notice is hereby given that the City of San Juan Capistrano will,
up to 2:00 p.m., on the 6th dap of September, 1988, receive sealed proposals or bids for
the Old Mission Hill Sewer Rehabilitation in accordance with the approved Plans,
Specifications, Special Provisions, and the Standard Specification for Public works
Construction, 1985 Edition, including all supplements therefor, on file in the office of the
City Clerk of the City of San Juan Capistrano, California. Bids will be received until the
time hereinbefore stated at the San Juan Capistrano City Hall, 32400 Paseo Adelanto,
San Juan Capistrano, California.
No bid will be received unless it is made on a proposal provided within these specifi-
cations. Each proposal or bid must be accompanied by a certified check, cash, cashier's
check, or bidder's bond payable to the City of San Juan Capistrano in the sum of not less
than ten percent of the total bid amount.
The bid check, cashier's check or bidder's bond of the successful bidder will be forfeited
to said City in the event such successful bidder fails to enter into the required contract
within 15 days after the written notice that said contract has been awarded to him for
the work.
A pre-bid conference is scheduled at 10:00 a.m. on the 22nd day of .August 1988, at the
City offices. The contractor shall have the opportum ty for clarification or interpre-
tation of any point or points of question within the plans and contract documents or
specifications. It is the contractor's responsibility to be in attendance at this conference
to receive any information disclosed during the proceedings, for the City shall not dis-
seminate any records of the conference. Exclusive of written addendurns and this pre-bid
conference, the City shall not be responsible for any instructions, explanations, or inter-
pretation of the plans, specifications, and contract documents presented to the bidders in
any manner.
The successful bidder, simultaneously with the execution of the contract, will be required
to furnish a Faithful Performance Bond equal in the amount of one -hundred percent
(100%) of the contract price. The surety bond company must be selected from among the
surety companies set forth in the surety list provided herein.
0
0 0
• The City Council reserves the right to reject any and all bids received and to compare
the relative merits of the respective bids and to choose that which in the opinion of said
City will best serve the interests or needs of said City.
A time limit of forty five !45) calendar days has been set for the completion of the work,
from the date of execution of the contract.
BIDDERS ARE HEREBY NOTIFIED THAT, pursuant to the Labor Code of the State of
California, copies of the prevailing rate of per diem wages, as determined by the
Director of the State Department of Industrial Relations, are on file in the office of the
City Clerk and shall be made available to any interested party on request.
Copies of plans and specifications are on file in the office of the City Clerk of San Juan
Capistrano, 32400 Paseo Adelanto, San Juan Capistrano, California. Copies of the plans
and specifications for use in preparing bids may be obtained at the Office of the City
Clerk, San Juan Capistrano, at the address shown above. One set of plans and
specifications is available for each general contractor proposing to submit a bid for said
work. A charge in the amount of $10, nonrefundable, is required for obtaining each set
of plans and specifications. There will be a $5 charge for postage and handling on all
plans and specifications mailed.
• Each bidder shall state the California Contractor's License number of such bidder so
•
bidding, as no bid will be accepted from a Contractor who has not been licensed in
accordance with the provisions of the laws of the State of California relating to the
licensing of Contractors.
This Notice is hereby given and published bb-�yy order of the City Council of the City of San
Juan Capistrano, and is dated: �Szl /,�/- /YL
CFFY CL K
CITY OF AN JUAN CAPISTRANO
ORANGE COUNTY, CALIFORNIA
-2-
•
•
0
BID PROPOSAL
For the: OLD !MISSION HILL SEA ER REHABILITATION
From:
Contractor
To the Honorable City Council
City of San Juan Capistrano
Gentlemen:
0
The undersigned, as bidder, declares that he has carefully examined the location of the
proposed work as described, examined the Plans, Specifications, Special Provisions, and
the Standard Specifications for Public \orks Construction, L985 Edition, including all
supplements therefor, read the Instructions to Bidders, and is familiar with all proposal
requirements, and hereby proposes and agrees, if the proposal is accepted, to complete
the said construction in accordance with the Contract Documents, as defined in Section
1-2 of the Standard Specifications, in the time stated herein, for the unit price or lump
sum given on the following pages of this proposal, amounting to a total of:
:gures
Said amount to include and cover all taxes, the furnishing of all materials, the
performing of all the labor requisite or proper and the providing of all necessary
machinery, tools, apparatus, and other rneans of construction; also, the performance and
completion of all the work in the manner set forth, described and shown in the Specifica-
tions or the drawings for the work.
If the contract is awarded, the undersigned agrees to enter into a contract with the City
and to commence work within fifteen (15) calendar dans from the date of execution
thereof, and to diligently prosecute the work to completion before the expiration of fort)
five (45) calendar days.
-3-
0 0
• All bids are to be computed on the basis of the given Estimated Quantities of U ork, as
indicated in this proposal, times the unit prices as submitted by the bidders. In case of
discrepancy between words and figures, the words shall prevail. In case of discrepancy
between unit prices and the extension thereof, the unit price shall prevail and bids will be
computed as indicated above and compared on the basis of corrected totals.
The estimated quantities of work indicated in the proposal are approximate only being
given solely as a basis for comparison of bids. It is understood that the City does not
expressly, nor by implication, agree that the actual amount of work will correspond
therewith, but reserves the right to increase or decrease the amount of any item or
portion of the work or to omit portions of the work as may be deemed expedient by the
Engineer.
It is also understood by Bidder that the City of San Juan Capistrano has the right to
reject this proposal or to award a contract to the undersigned at the prices stipulated. If
the proposal is rejected, then any check or cashier's check shall be returned to the
undersigned within thirty (30) days. No bid bonds will be returned. If the proposal is
accepted and the undersigned fails to enter into a contract within fifteen (15) days after
the agreement is delivered to him for signature, or within such further time as may be
• granted by the City Council, then said check shall be cashed or said bond declared forfeit
and an amount equal to the difference between the lowest bid and the next lowest bidder
who will execute a contract shall be paid into the treasury of the City of San Juan
Capistrano as liquidated damages for the failure of the undersigned to comply with the
terms of this proposal.
•
Accompanying this proposal is
(Insert
"$ cash", cashier's check, certified check or bidder's bond on the forms from
Pages 18 and 19 of these Contract Documents, as the case may be), in an amount equal
to at least ten percent (10%) of the total bid.
The following is the name and place of business of the surety company which will furnish
the required bonds as surety if the work is awarded to the undersigned:
Licensed in accordance with an act providing for the registration of contractors --
License No.
-4-
Signature of Bidder:
0
0
• (If an individual, so state. If a firm or co -partnership, ,wte the firm name and give the
names of all individual co-partners composing the firm: President, Secretary, Treasurer,
and Manager thereof.)
Dated:
Dated:
Business Address
Telephone Number
Further, the undersigned bidder certifies that he has thoroughly checked the figures set
forth in this proposal, that they are correct to the best of his knowledge and that they
constitute his proposal for the work called out herein.
Dated:
Dated:
•
•
-5-
Signature of Bidder
Telephone Number
•
SCHEDULE OF WORK ITEMS
OLD MISSION HILL SEWER REHABILITATION
Approximate ACork Items With Unit Price
Unit Price
Item Quantity (Written in Words)
(In Figures)
l 66 EA Replace existing 4" diameter
lateral connection with saddle
tee connection per plan for the
unit price of
$
dollars per each.
2 2 EA Replace existing cleanout with
48" diameter manhole for the
unit price of
dollars per each.
3 37 L.F. Remove and replace existing 6"
diameter sewer for the unit
price of
•
dollars per lineal foot.
$
Total Bid Price (Enter here and on Page 3)
3
LJ
gures
Total Amount
$
0
0
• NON -COLLUSION AFFIDAVIT TO BE EXECUTED BY
BIDDER AND SUBMITTED WITH BID
STATE OF CALIFORNIA
County of
and says that he is
of
Ss.
being first duly sworn deposes
the party making the foregoing bid; that such bid
is not made in the interest of or on behalf of any undisclosed person, partnership,
company, association, organization, or corporation; that such bid is genuine and not
collusive or sham; that said bidder has not directly or indirectly induced or solicited any
other bidder to put in a false or sham bid, and has not directly or indirectly colluded,
conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or
that any one shall refrain from bidding; that said bidder has not in any manner, directly
or indirectly, sought by agreement, communication or conference with any one to fix the
bid price of said bidder or of any other bidder, or to fix the bid price of or cost element
of such bid price, or of that of any other bidder, or to secure any advantage against the
public body awarding the contract of any one interested in the proposed contract; that all
statements contained in such bid are true; and further, that said bidder has not directly
or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof,
or divulged information or data relative thereto, or paid and will not pay any fee in
• connection therewith, to any corporation, partnership, company, association,
organization, bid depository, or to any member or agent thereof, or to any other
individual except to any person or persons as have a partnership or other financial
interest with said bidder in this general business.
DATED:
SIGNATURE
On this the _ day of , 19_ before me, the undersigned, a
Notary Public in and for said State, personnally appeared
, personally known to
me/proved to me on the basis of satisfactory evidence, to be the person(s) whose name(s)
subscribed to the within instrument, and acknowledged that
executed it.
WITNESS my hand and official seal.
• Notary Public in and for said State
-7-
•
0
Submit with Proposal.
0
DESIGNATION OF SUB -CONTRACTORS
In compliance with the Provisions of Section
4100-4107 of the Government Code of the State of California as amended, the
undersigned certifies that he has used the sub -bids of the following listed sub -contractors
in making up his bid, and that the sub -contractors listed will be used for the work for
which they bid, subject to the approval of the Engineer, and in accordance with the
applicable provisions of the Specifications. It is understood and agreed that all those
portions of the work called for in the contract documents for which a sub -contractor is
not listed will be performed by the undersigned through his forces. If no sub -contractors
are listed, all bonds and insurance will be written in the name of the general contractor
only.
1.
• 2.
3.
4
5.
6.
7
8.
•
Item of Work Sub -Contractor Address Phone No.
BIDDER'S NAME
AUTHORIZED SIGNATURE
-8-
0 0
• INSTRUCTION TO BIDDERS
Securing Documents
plans, Specifications and other contract documents will be available for examination
without charge and copies may be secured in accordance with the "Notice Inviting Bids".
_Examination of Plans, Specifications and Site of Work
The bidder is required to examine the site of work, the Proposal, the Plans and the
Specifications, Special Provisions, and the Standard Specifications for Public Works
Construction, 1985 Edition including all supplements, very carefully. He shall satisfy
himself as to the character, quality and quantities of the work to be performed, the
materials to be furnished and the requirements of the Contract Documents. The plans
for the work show conditions as they are believed to exist, but it is not to be inferred
that all the conditions as shown thereon are actually existent, nor shall the City or any of
its officer or agents be liable for any loss sustained by the Contractor as a result of any
variance between conditions shown on the plans and actual conditions revealed during
•examination or progress of the work. The submission of a proposal shall be prima facie
evidence that the bidder has made such an examination.
•
Y
Interpretation of Drawings and Documents
If any bidder should find discrepancies in, or omissions from the drawings, specifications
or other proposed contract documents, or if he should be in doubt as to the true meaning
of any part thereof, he shall at once make a written request to the Engineer for
correction, clarification or interpretation of the point or points in question. The person
submitting such a request shall be responsible for its prompt delivery.
In the event that the Engineer receives such a request and it should be found that certain
essential information is not clearly and fully set forth, or if the Engineer discovers
errors, omissions, or points requiring clarification in the drawings or documents, a
written addendum will be mailed to each person to whom a set of contract documents has
been delivered. The City will not be responsible for any instructions, explanations or
interpretations of the documents presented to bidders in any manner other than written
addendum.
10
0 0
Addenda or Bulletins
The effect of all addenda to the contract documents shall be considered in the bid and
• said addenda shall be made a part of the contract documents and shall be returned with
them. Before submitting his bid, each bidder shall inform himself as to whether or not
any such addenda have been issued, and failure to cover in his bid any such addenda
issued may render his bid invalid and result in its rejection.
Disqualification of Bidders
No person, firm or corporation shall be allowed to make, file or be interested in more
than one bid for the same work unless alternate bids are called for. A person, firm or
corporation who has submitted a sub -proposal to a bidder, or who has quoted prices on
materials to a bidder, is not hereby disqualified from submitting a bid in his own behalf.
Proposals
Bids to receive consideration shall be in accordance with the following instructions:
A.
Bids shall be made only upon the forms provided within these specifications; all bid
items shall be properly filled out; bid prices shall be stated both in words and in
figures; and the signatures of all persons signing shall be in longhand. Where there is
a conflict in the words and figures, the words shall govern.
B.
All prices and notations must be in ink or typewritten. No erasures will be
permitted. Mistakes may be crossed out and corrections typed or written in ink
adjacent thereto and must be initialed in ink by the person or persons signing the bid.
C.
Bids shall not contain any recapitulation of the work to be done. Alternate proposals
will not be considered except as required hereinabove. No oral, telegraphic or
telephonic proposals or modifications will be considered.
D.
The City may require any bidder to furnish a statement of his experience, financial
responsibility, technical ability, equipment and references properly and fully filled
out.
E.
Each bidder shall shall list his proposed sub -contractors on the form accompanying
the proposal in accordance with the provisions of the specifications.
F.
Each bidder must accompany his bid with either a cashier's check upon some
responsible bank, or a properly certified check upon such bank, or an approved
corporate surety bond payable to the City for such a sum of not less than ten (10)
percent of the aggregate sum of the bid, which check or bond and the monies
represented thereby shall be held by the City as a guarantee that the bidder, if
awarded the contract, will in good faith enter into such contract and furnish the
•
required bonds.
-10-
C
•
The bidder agrees that, in case of his refusal or failure to execute said contract and
give bonds within the time required by these documents, such check or bond, and the
money represented thereby, shall remain the property of the City and, if the bidder
shall fail to execute said contract, said surety will pay to the City the damages
which the City may suffer by reason of such failure, not exceeding the sum of ten
(10) percent of the amount of the bid. A bid received and not accompanied by such
cashier's check, certified check or approved bond shall be rejected.
G. Bids shall be delivered to the City at the location stipulated, on or before the day
and hour set for the opening of bids, as hereinbefore specified in the "Notice inviting
Bids". Bids shall be enclosed in a sealed envelope bearing the title of the work, the
name of the bidder, bid opening date and time of bid opening.
Licensing of Contractor
All persons, firms, partnerships or corporations shall be licensed in accordance with the
Business and Professions Code of the State of California and the applicable ordinances of
the City and County before doing any work of any kind.
• Withdrawal of Bids
Any bidder may withdraw his bid in person or by written request at any time prior to the
scheduled closing time for receipt of bids.
Opening of Bid Proposals
The City will, in open session, publicly open, examine and declare the bids at the time set
forth in the "Notice Inviting Bids". Bidders or their authorized representatives are
invited to be present.
Award of Contract or Rejection of Bids
No bidder may withdraw his bid for a period of forty five (45) days after the date set of
the opening of bids. The contract for the work will either be awarded or the bids
rejected within the forty five (43) days form the date set for the opening of bids.
The contract for the work will be awarded to the lowest responsible bidder complying
with these instructions and with the "Notice Inviting Bids". The City, however, reserves
• the right to reject any or all bids and to waive mere informalities, minor technical errors
or irregularities, obvious clerical or erasures.
-11-
0 0
• The bidder to whom the award is made shall execute a written contract with the City and
furnish the stipulated bonds, insurance and bid breakdown within fifteen (15) days after
the notice of award of contract. The contract shall be made in the form adopted by the
City. The release of the successful bidder's surety deposit, as previously stipulated (page
5), shall be made upon the City's acceptance of the Labor and Materials Bond and the
Faithful Performance Bond.
If the bidder to whom the award is made fails to enter the contract as herein provided,
the award may be annulled and an award may be made to the next lowest responsible
bidder; and such bidder shall fulfill every stipulation embraced herein, as if he were the
party to whom the first award was made. A corporation to which an award is made shall
furnish evidence of its corporate existence and evidence that the officer signing the con-
tract and bonds for the corporation is duly authorized to do so.
Bonds
The successful bidder, simultaneously with the execution of the Agreement, will be
required to furnish a Labor and Material Bond in a sum not less than one hundred percent
(100%) of the total amount payable by the terms of the contract and a Faithful
Performance Bond in a sum not less than one hundred percent (100%) of the amount of
the contract. Said bonds shall be secured from a surety company listed as acceptable on
• the list included in these specifications. Bonds must be submitted on the forms contained
r�
U
in these specifications.
Time of Performance
The work shall be commenced within fifteen (15) calendar days from the date of issuance
of the Notice to Proceed and shall be diligently prosecuted until completion. A time
limit of forty five (45) calendar days from the date specified in the Notice to Proceed
has been set for completion of the work. The bidder's attention is directed to the
specifications as to provisions for extension of time of completion and/or assessment of
liquidated damages.
Assignment of Contract
No assignment by the Contractor of any contract to be entered into hereunder or any
part thereof, or of funds to be received thereunder by the Contractor, will be recognized
by the awarding authority unless such assignment has had prior approval of the awarding
authority and the surety has been given notice of such assignment in writing and has
consented thereto in writing.
-12-
11
Workmen and Wages
Attention is specifically directed to all provisions of the Labor Code of the State of
California with regard to workmen and wages. Wages shall not be less than prevailing
wage rates determined by the City pursuant to said Code and as listed in the "Notice
Inviting Bids".
Building Permits
It shall be the Contractor's responsibility to obtain all necessary permits, bonds and
insurance, as required, for the completion of the project. No extra compensation shall be
made therefore.
•
-13-
•
0 0
• CONTRACT
This contract is made and entered into by and between the CITY OF SAN JUAN
CAPISTRANO, hereinafter referred to as City and
hereinafter referred to as CONTRACTOR.
IT IS HEREBY AGREED BET%VEEN THE PARTIES AS FOLLOW S:
FIRST, wNTRACT DOCUMENTS. The contract documents shall be considered to
include the Notice Inviting Bids, the Instructions to Bidders, the Proposal, the Bid Bond,
the Non -Collusion Affidavit, the Designation of Sub -Contractors, the Contract which is
prepared for execution bq the City and the Contractor, Plans, Specifications and Special
Provisions, the Standard Specifications for Public Aorks Construction, 1985 Edition,
including all Supplements, Contract Bonds, Resolutions adopted by the City Council
pertaining to the work, insurance policies and certificates, and any supplemental written
agreements amending or extending the scope of the work originally contemplated that
•may be required to complete the work in a substantial and acceptable manner.
SECOND. THE %CORK. CONTRACTOR agrees to furnish all tools, labor, material,
equipment, transportation, and supplies necessary to perform and complete in good and
workmanlike manner the construction of Old Mission Hill Sewer Rehabilitation in strict
conformity with the Plans, Specifications and all other contract documents, which
documents are on file at the Office of the City Clerk, City Hall, 32400 Paseo Adelanto,
San Juan Capistrano, California.
THIRD. PAYMENT. City agrees to pay, and CONTRACTOR agrees to accept, the lump
sum adjusted for variations of quantities, at the prices designated in bid proposal at the
time and in the manner set forth in the Specifications.
FOURTH. COMMENCEMENT ,AND COMPLETION OF THE \CORK. CONTRACTOR
is agrees to begin and complete the work within the time specified in the Notice Inviting
-14-
0 0
•Bids. It is agreed that it would be impracticable and extremely difficult to fix the actual
amount of damages, and loss sustained by City, should CONTRACTOR fail to complete
the work in the specified time; therefore, CONTRACTOR shall pay City, as liquidated
damages, not in the nature of a penalty, one hundred dollars ($100) per calendar day for
each day delayed; provided that extensions of time with waiver of liquidated damages,
may be granted as provided in the Specifications.
FIFTH. PERFORMANCE BOND AND LABOR AND MATERIAL BOND. CONTRACTOR
agrees to furnish bonds guaranteeing the performance of this contract and guaranteeing
payment of all labor and material used under this contract, as required by the laws of the
State of California, on forms approved by City. The Performance Bond shall be for an
amount of one hundred percent (100%) of the amount of this contract and shall be
conditioned on full and complete performance of the contract, guaranteeing the work
against faulty workmanship and materials for a period of one (1) year after completion
and acceptance. The Labor and Material Bond shall be for an amount of one hundred
percent (100%) of the amount of this contract and shall be conditioned upon full payment
of all Labor and Material entering into or incidental to the work covered by this
• contract. CONTRACTOR agrees to furnish the bonds on the forms found within the
Specifications.
CONTRACTOR agrees to pay City such sum as the Court may judge as reasonable for
the legal services of any attorney representing the City in any action brought to enforce
or interpret the obligations of this agreement, and such sums shall be made a part of any
judgment in such action against CONTRACTOR if such action is determined in favor of
said City. The required Performance, Labor and Materials Bonds, and Bid Bond shall
provide that the surety shall pay attorney's fees incurred by City in enforcing this
agreement.
SIXTH. GENERAL PREVAILING RATE OF PER DIEM 'AGES. Pursuant to the Labor
Code of the State of California, copies of the prevailing rate of per diem wages, as
determined by the Director of the State Department of Industrial Relations, are on file
in the offices of the City Clerk, 32400 Paseo Adelanto, San Juan Capistrano, California,
• and are hereby incorporated and made a part hereof. CONTRACTOR agrees that he, or
-15-
• any SUB -CONTRACTOR under him, shall pay not less than the foregoing specified
prevailing rates of wages to all workmen employed in the execution of the contract.
SEVENTH. INSURANCE. CONTRACTOR shall maintain at all times during this
contract liability and property damage insurance naming the City and its elected and
appointed officials as a named insured, which such policies shall be of an amount not less
than One Million Dollars combined single limit. Insurance certificates shall be for a
minimum period of one year.
The insurance policies shall bear an endorsement or shall have an attached rider
providing that in the event of expiration or proposed cancellation of such policies for any
reason whatsoever, the City shall be notified by registered mail, return receipt
requested, giving a sufficient time before the date thereof to comply with the applicable
law or statute but in no event less than 30 days before expiration or cancellation is
effective. CONTRACTOR shall provide to City the policy certificate establishing that
• the required level of insurance has been satisfied.
CONTRACTOR shall indemnify and save harmless the City, its officers, agents, and
employees from and against any and all claims, demands, loss or liability of any kind or
nature which Lessor, its officers, agents and employees may sustain or incur or which
may be imposed upon them or any of them for injury to or death of persons, damage to
property as a result of, or arising out of, or in any manner connected with the
performance of the obligations under this construction agreement.
EIGHTH. COMPLIANCE WITH OTHER PROVISIONS OF LAW RELATIVE TO PUBLIC
CONTRACTS. City is subject to the provisions of the Government Code and the Labor
Code of the State of California. It is stipulated and agreed that all provisions of law
applicable to public contracts are a part of this contract to the carne extent as though
set forth herein and shall be complied with by CONTRACTOR. These include, but are
not limited to, the stipulation that eight (8) hours labor constitute a legal day's work and
CONTRACTOR shall, as a penalty to City, forfeit twenty-five dollars ($25) for each
workman employed in the execution of the Contract by CONTRACTOR, or by any SUB-
40
CONTRACTOR, for each calendar day during which such workman is required or
-16-
i
•
• permitted to work more than eight (8) hours in violation of the provisions of Article
Three, Chapter One, Part Seven, Division 2, of the California Labor Code, except as
permitted by law.
IN WITNESS WHEREOF, this contract is executed by the duly authorized agent(s) of
City, pursuant to Council action, and by CONTRACTOR on the date set before the name
of each.
CITY OF SAN JUAN CAPISTRANO
DATED: BY:
MAYOR
•
ATTEST:
Mary Ann Hanover, City Clerk
APPROVED AS TO FORM:
John R. Shaw, City Attorney
•
BY:
CONTRACTOR
-17-
• BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we,
, as PRINCIPAL, and
as SURETY, hereinafter called Surety, are held and
firmly bound unto the CITY OF SAN JUAN CAPISTRANO, Obligee, hereinafter called
City, in the sum of $ , for payment whereof Principal and Surety bind
themselves, their heirs, executors, administrators, successors, and assigns, jointly and
severally, fairly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas the Principal has
submitted the accompanying bid dated , 19_ , for the construction
of
City of San Juan Capistrano, Orange County, California.
for the
NOW, THEREFORE, if the Principal shall not withdraw said bid within thirty (30)
• days after the opening of same, and shall, within fifteen (15) days after the agreement
has been presented to him for execution, enter into a written contract with the City in
accordance with the bid as accepted, and if the Principal shall give the required bond
with good and sufficient sureties, or sureties for the faithful performance and proper
fulfillment of such contract and for the protection of laborers and materialmen, or in
the event of the withdrawal of said bid within the periods specified, or the failure to
enter into said contract and give said bond within the time specified, if the Principal
shall within sixty (60) days after request by the City, pay the City the difference
between the amount specified in said bid and the amount for which the City may procure
the required work and/or supplies if the latter amount be in excess of the former, then
the above obligation shall be void and of no effect, otherwise to remain in full force and
virtue.
Further, as a part of the obligation secured hereby, and in addition to the face
amount specified therefor, there shall be included costs and reasonable expenses and
fees, including reasonable attorney's fees, incurred by City in successfully enforcing such
obligation, all to be taxed as costs and included in any judgment rendered.
-18-
0
• IN WITNESS WHEREOF, the above -bounden parties have executed this
instrument under their several seals this day of _ 1 19J the name and
corporate seal of each corporate party being affixed hereto and these presents duly
signed by its undersigned representative pursuant to authority of its governing body.
Two Witnesses (If Individual)
ATTEST (If Corporation)
Corporate Seal
ATTEST
•
Title
•
BY:
Title:
-19-
PRINCIPAL
SURETY
• PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS:
That
as Principal, hereinafter called CONTRACTOR, and
as Surety, hereinafter called SURETY, are held and firmly bound unto the City of San
Juan Capistrano, as Obligee, hereinafter called CITY, in the amount of
Dollars for payment whereof Contractor
and Surety bind themselves, their heirs, executors, administrators, successors, and
assigns, jointly and severally, fairly by these presents.
WHEREAS, Contractor has by written agreement dated
, entered into a (describe agreement):
which contract is by reference made a part hereof;
NOW, THEREFORE, the condition of this obligation is such that, if Principal
shall promptly and faithfully perform said agreement, then this obligation shall be null
and void; otherwise it shall remain in full force and effect. Surety waives whatever legal
right it may have to require that a demand be made first against the principal in the
event of default.
BE IT FURTHER RESOLVED, that:
1. As a part of the obligation secured hereby, and in addition to the face
amount specified, there shall be included" costs and reasonable expenses and fees,
• including reasonable attorney's fees, incurred by City in successfully enforcing such
obligation, all to be taxed as costs and included in any judgment rendered.
-20-
0 0
• 2. Said Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alteration, or modification of the contract documents or of the work
to be performed thereunder, shall in any way affect its obligations or this bond, and it
does hereby waive notice of any such change, extension of time, alterations, or
modifications of the contract documents or of work to be performed thereunder.
•
E
Executed this day of 19 at
California.
APPROVED AS TO FORM
PRINCIPAL
(NOTARIZATION AND SEAL)
SURETY
(NOTARIZATION AND SEAL)
-21-
0 0
• Premium Included
LABOR AND MATERIAL BOND
KNOW ALL MEN BY THESE PRESENTS: That
WHEREAS, the City of San Juan Capistrano, a municipal corporation of Orange
County, California, has awarded to . License
No. , hereinafter designated as "Principal", a contract for
WHEREAS, said Principal is required to furnish a bond in connection with the
said contract providing that if said Principal, or any of his or its sub -contractors, shall
fail to pay for any materials, provisions, provender or other supplies or teams used in,
upon, for or about the performance of the work contracted to be done, or for any work or
labor done thereon of any kind, the surety or this bond will pay the same.
NOW, THEREFORE, we ,
Principal, and as surety, are
held firmly bound unto the City of San Juan Capistrano, a municipal corporation, in the
• penal sum of DOLLARS
($ ), lawful money of the United States of America, for payment of which sum
well and truly to be made we bind ourselves, our heirs, executors, administrators and
successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that, if said Principal, his or its
heirs, executors, administrators, successors or assigns, or sub -contractors, shall fail to
pay for any materials, provisions, provender, or teams, or other supplies or equipment
used in, upon, for or about the performance of the work contracted to be done, or for any
work or labor done thereon of any kind, or for amounts due under the Unemployment
Insurance Act with respect to such work or labor as required by the provisions of Title 1,
Division S, Chapter 3 of the Government Code of California as amended, that the surety
will pay for the same in an amount not exceeding the sum specified in this bond and also
in case suit is brought upon the bond, a reasonable attorney's fee to be fixed by the
court. This bond shall inure to the benefit of any and all persons, companies and
corporations entitled to file claims under said act, so as to give a right of action to them
or their assigns in any suit brought upon this bond.
FURTHER, the said surety, for value received, hereby stipulates and agrees that
no change, extension of time, alteration or modification of the contract documents or of
the work to be performed thereunder shall in any way affect its obligation on this bond
and it does hereby waive notice of any such change, extension of time, alteration or
modification of the contract documents or of work to be performed thereunder.
As a part of the obligation secured hereby, and in addition to the face amount
• specified therefor, there shall be included costs and reasonable expenses and fees,
including reasonable attorney's fees, incurred by City in successfully enforcing such
obligation, all to be taxed as costs and included in any judgment rendered.
-22-
0 0
• IN WITNESS WHEREOF three (3) identical counterparts of this instrument, each
of which shall for all purposes be deemed an original thereof, have been duly executed by
the Principal and surety herein named on the day of
19. The name and corporate seal of each corporate party being hereto affixed and
these presents duly signed by its undersigned representatives pursuant to authority of its
governing body.
•
•
APPROVED AS TO FORM
By
-23-
PRINCIPAL
SURETY
•
•
Prepared By: Office of City Attorney
San Juan Capistrano
7/29/85
LISTING OF SURETY COMPANIES
QUALIFYING UNDER SURETY BOND COMPANY RATING CRITERIA
The following surety bond companies are qualified to submit surety bonds to the City of
San Juan Capistrano. The criteria utilized in rating surety bond companies are:
A.M. Best Company Rating of "A";
U.S. Treasury Underwriting Limitation of $1,000,000.00 or more.
Use of any other surety company may only be allowed with approval of the City
Attorney.
AID Insurance Company
Aetna Casualty and Surety Company of Illinois
Aetna Reinsurance Company
Affiliated FM Insurance Company
Alaska Pacific Assurance Company
Allendale Mutual Insurance Company
Allstate Insurance Company
American Automobile Insurance Company
American Casualty Company of Reading, Pennsylvania
American Centennial Insurance Company
American Credit Indemnity Company
American Economy Insurance Company
American Indemnity Company
The American Insurance Company
American Manufacturer's Mutual Insurance Company
American Motorists Insurance Company
American Mutual Liability Insurance Company
American Re -Insurance Company
American States Insurance Company
Argonaut Insurance Company
Arkwright-Boston Manufacturers Mutual Insurance Company
Associated Indemnity Corporation
Atlantic Mutual Insurance Company
W -M
E
• Listing of Surety Companies, Continued
Page Two
Auto -Owners Insurance Company
Balboa Insurance Company
Bankers Multiple Line Insurance Company
Boston Old Colony Insurance Company
The Camden Fire Insurance Association
Centennial Insurance Company
Central Mutual Insurance Company
11
The Central National Insurance Company of Omaha
The Charter Oak Fire Insurance Company
Cigna Insurance Company
Commercial Insurance Company of Newark, New Jersey
The Connecticut Indemnity Company
Continental Casualty Company
• The Continental Insurance Company
Continental Reinsurance Corporation
Dependable Insurance Company, Inc.
Employers Mutual Casualty Company
Employers Reinsurance Corporation
Fairmont Insurance Company
Farmers Alliance Mutual Insurance Company
Federal Insurance Company
Federated Mutual Insurance Company
The Fidelity and Casualty Company of New York
Fidelity and Deposit Company of Maryland
Fireman's Fund Insurance Company
Firemen's Insurance Company of Newark, New Jersey
First National Insurance Company of America
Foremost Insurance Company
Fremont Indemnity Company
General Accident Insurance Company of America
General Insurance Company of America
• General Reinsurance Corporation
-25-
i
• Listing of Surety Companies, Continued
Page Three
The Glens Falls Insurance Company
Global Surety & Insurance Co.
Globe Indemnity Company
Grain Dealers Mutual Insurance Company
Great American Insurance Company
Greater New York Mutual Insurance Company
Gulf Insurance Company
The Hanover Insurance Company
Harco National Insurance Company
Harleysville Mutual Insurance Company
Hartford Accident and Indemnity Company
Hartford Casualty Insurance Company
Hartford Fire Insurance Company
The Hawaiian Insurance & Guaranty Company
• Highlands Insurance Company
Highlands Underwriters Insurance Company
The Home Indemnity Company
The Home Insurance Company
Houston General Insurance Company
INA Reinsurance Company
ITT Lyndon Property Insurance Company
Imperial Casualty and Indemnity Company
Indemnity Insurance Company of America
Industrial Indemnity Company
Insurance Company of North America
Insurance Company of the West
Integrity Insurance Company
International Insurance Company
Iowa National Mutual Insurance Company
John Deere Insurance Company
Liberty Mutual Insurance Company
• Lumbermens Mutual Casualty Company
-26-
11
Cl
• Listing of Surety Companies, Continued
Page Four
n
L
Maryland Casualty Company
Mead Reinsurance Corporation
The Mercantile and General Reinsurance Company of America
Michigan Millers Mutual Insurance Company
Michigan Mutual Insurance Company
Mid -Century Insurance Company
The Millers Mutual Fire Insurance Company of Texas
Munich American Reinsurance Company
National Fire Insurance Company of Hartford
National Indemnity Company
The National Reinsurance Corporation
National Surety Corporation
Nationwide Mutual Insurance Company
• New Hampshire Insurance Company
New York Underwriters Insurance Company
Newark Insurance Company
North American Reinsurance Corporation
The North River Insurance Company
North Star Reinsurance Corporation
Northbrook Property and Casualty Insurance Company
Northwestern Pacific Indemnity Company
The Ohio Casualty Insurance Company
Ohio Farmers Insurance Company
Old Republic Insurance Company
Pacific Employers Insurance Company
Pacific Indemnity Company
Peerless Insurance Company
Pennsylvania Manufacturers' Association Insurance Company
Phoenix Assurance Company of New York
The Phoenix Insurance Company
Progressive Casualty Insurance Company
• Protective Insurance Company
-27-
E
• Listing of Surety Companies, Continued
Page Five
Prudential Reinsurance Company
Ranger Insurance Company
The Reinsurance Corporation of New York
Reliance Insurance Company
Republic Insurance Company
Republic Western Insurance Company
Royal Indemnity Company
Royal Insurance Company of America
SAFECO Insurance Company of America
St. Paul Fire and Marine Insurance Company
St. Paul Mercury Insurance Company
Seaboard Surety Company
Security Insurance Company
• Select Insurance Company
Skandia America Reinsurance Corporation
South Carolina Insurance Company
The Standard Fire Insurance Company
State Farm Fire and Casualty Company
Transamerica Insurance Company
Transamerica Premier Insurance Company
Transcontinental Insurance Company
Transportation Insurance Company
The Travelers Indemnity Company
The Travelers Indemnity Company of America
The Travelers Indemnity Company
Trinity Universal Insurance Company
Twin City Fire Insurance Company
Unigard Security Insurance Company
United Fire be Casualty Company
United Pacific Insurance Company
United States Fidelity and Guaranty Company
• United States Fire Insurance Company
-28-
11
Ll
• Listing of Surety Companies, Continued
Page Six
•
Universal Underwriters Insurance Company
Utica Mutual Insurance Company
Valley Forge Insurance Company
Vigilant Insurance Company
West American Insurance Company
Weschester Fire Insurance Company
The Western Casualty and Surety Company
The Western Fire Insurance Company
Western Surety Company
Westfield Insurance Policy
-29-
u
0 0
CITY OF SAN JUAN CAPISTRANO
OLD MISSION HILL SEWER REHABILITATION
SPECIAL PROVISIONS
tX'ORK TO BE DONE
The work to be done under this contract in general consists of the replacement of 66
existing lateral connections with new saddle tee connections, removing 2 existing
cleanouts and replacing with 2 new 48" diameter manholes, removing and replacing
approximately 37 lineal feet of 6" diameter sewer in short lengths, street reconstruction
and other miscellaneous work.
SECTION 1 - STANDARD SPECIFICATIONS
The contractor shall perform his work in accordance with the Standard Specifications for
Public Works Construction, 1985 Edition, hereinafter referred to as the Standard
Specifications. The Contractor shall maintain a copy of this book on the job -site at all
times. Unless otherwise specified, errata and supplements to the Standard Specifications
shall be part of these specifications. The provisions of the Standard Specifications shall
be modified as indicated below:
Change I: Contract Termination
"If at any time, in the opinion of the Public Works Director, Contractor fails to
• supply suitable equipment, an adequate working force, or material of proper quality,
or shall fail in any respect to prosecute any work with the diligence and force
specified and intended in and by the terms of the Contract, notice thereof in writing
shall be served upon him, and should he neglect or refuse to provide means for
satisfactory compliance with the contract, as directed by the Public Works Director,
within the time specified in such notice, the City in any such case shall have the
power to terminate all or any portion of the contract.
Upon receiving notice of such termination, Contractor shall discontinue said work or
such parts of it as the City may designate. Upon such termination, the Contractor's
control shall terminate and thereupon the City Council, or its duly authorized
representative, may take possession of all or any part of the Contractor's materials,
tools, equipment, appliances, and plant, and buy such additional materials and
supplies at the Contractor's expense as may be necessary for the proper conduct of
the work and for completion thereof; or may employ other parties to carry the
contract to completion, employ the necessary workmen, substitute other machinery
or materials and purchase the materials contracted for, in such manner as the City
may deem proper; or the City Council mac annul and cancel the contract and re -let
the work or any part thereof. Any excess of cost arising therefrom over and above
the contract price will be charged against the Contractor and his sureties, who will
be liable therefor.
In the event of such termination, all money due the Contractor retained under the
terms of this contract shall be forfeited to the City; but such forfeiture will not
release the Contractor or the sureties from liability or failure to fulfill the
contract. Contractor and sureties will be credited with the amount of monies so
• forfeited toward any excess of cost over and above the contract price, arising from
the suspension of the operation of the contract and the completion of the work by
SP -1
0
• the City as provided above, and the Contractor will be credited with any surplus
remaining after all just claims for such completion have been paid."
Change 2: Section 8 - Facilities for .Agency Personnel
Delete this Section.
SECTION 2 - TERMS DEFINED
Whenever in the said Standard Specifications the following terms are used, it is hereby
provided that the following City departments or persons shall be intended:
AGENCY shall mean City of San Juan Capistrano, whenever appropriate.
BOARD shall mean the City Council of the City of San Juan Capistrano.
ENGINEER shall mean City Engineer or other person(s) designated by same.
SECTION 3 - FLOW AND ACCEPTANCE OF U ATER
Surface or other waters may be encountered at various times during construction. The
Contractor, by submitting a bid, acknowledges that he has investigated the risks arising
from surface or other waters and has prepared his bid accordingly. It shall be the sole
responsibility of the Contractor to protect his work from danger due to any waters
encountered. Should any damage to the work due to surface or other water occur prior
to acceptance of the work by the City, the Contractor shall repair such damage at his
in expense.
SECTION 4 - WATER
Water will be available from the Capistrano Valley Water District. Arrangements for
temporary construction water services permit and water service may be made by
contacting the Capistrano Valley Water District at 714/493-1515 one week prior to need
for service. All water facility construction shall conform to the "Standard
Specifications," Capistrano Valley Water District, and "The Uniform Plumbing Code,"
1982 Edition.
SECTION 5 - INSURANCE AND OVERHEAD COSTS
The Contractor shall receive no direct compensation for insurance and overhead (move -in
costs, for example) costs. Accordingly, these costs should be prorated to the appropriate
bid items.
- PROTECTION OF EXISTING UTILITIES (UNDERGROUND '
The Engineer has endeavored to show all existing utilities. The Contractor must,
however, take all due precautionary measures to protect all of the existing utilities. The
Contractor shall have all utilities located by contacting the responsible agency at least
48 hours prior to commencing any construction work.
The Contractor's attention is directed to the utility notification service provided by
• UNDERGROUND SERVICE ALERT (USA). USA member utilities will provide the
Contractor with the locations of their substructures in the construction area when the
SP -2
0 0
• Contractor gives at least 48 hours notice to the USA by calling 1-800-422-4133. Other
utility phone numbers are noted on Sheet 1 of the plans.
Full compensation for conforming to the requirements of this section shall be considered
as included in the contract bid prices paid for the various items of work, and no
additional compensation will be allowed therefor.
SECTION 7 - PROTECTION OF PRIVATE PROPERTY
The Contractor must remain within the construction zone to the best of his ability. The
Contractor must protect all existing private property.
SECTION 8 - CONSTRUCTION ZONE
Contractor shall protect property and facilities adjacent to the construction zone, and all
property and facilities within the construction zone which are shown on the plans to be
protected. After completion of project, the construction zone shall be clean and in a
presentable condition. All public or privately owned improvements and facilities shall be
restored to their original condition and location. In the event improvements of facilities
are damaged, they shall be replaced with new materials equal to the original.
Nothing herein shall be construed to entitle the Contractor to the exclusive use of any
public street, way or parking area during performance of the contract work, and
Contractor shall conduct his operations so as not to interfere with the authorized work of
utility companies or other agencies in such streets, ways or parking areas.
• The Contractor shall be responsible for investigating conditions of available public and
private roads and of clearances, restrictions and other limitations affecting
transportation and ingress and egress to the site of the work.
SECTION 9 - PRE -CONSTRUCTION COORDINATION MEETING
Prior to the commencement of construction, arrangements will be made for a meeting
between the Contractor, the Engineer, and involved utility representatives. The purpose
of this meeting is to coordinate the activities of the Contractor within the limits of this
contract, review scheduling, discuss construction methods and clarify inspection
procedures. The Contractor will be required to submit a complete schedule showing the
number of working days required to complete each phase of the project. This schedule
shall be approved by the City Engineer prior to the start of construction.
SECTION 10 - ALTERNATE PIPE MATERIALS
The Contractor is advised that PVC and Armco "Truss" pipe are the only City approved
alternate materials for use in sewer line construction in -lieu of extra strength vitrified
clay pipe. "Carlon", "Certainteed", "Johns -Manville" and "Pacific Western" have been
previously confirmed as acceptable manufacturers of PVC. All pipe shall conform to the
requirements set forth in the Standard Specifications for the use intended.
All work shall conform to the Special Provisions for the construction of Sanitary Sewers,
•
City of San Juan Capistrano, which is made a part of these documents.
SP -3
0
0
• CITY OF SAN JUAN CAPISTRANO
OLD MISSION HILL SEu ER REHABILITATION
DETAIL SPECIFICATIONS AND METHOD OF PAYMENT
BID ITEM 1 - REPLACE EXISTING 4" DIAMETER LATERAL CONNECTION WITH
SADDLE TEE CONNECTION
This bid item shall include the replacing of the existing 4" diameter lateral connections
with a saddle tee connection as shown on the plans. Television inspection of the existing
lines has shown many of the existing laterals to be punched into the main lines. The work
for this bid item shall also include street reconstruction as shown on the plans.
PAYMENT
The unit price bid for each saddle tee connection shall include all labor, materials, tools,
equipment and incidentals to construct the item as specified and no additional
compensation shall be made therefor.
BID ITEM 2 - REPLACE EXISTING CLEANOUT WITH 48" DIAMETER MANHOLE
The work for this bid itern shall include the removing of the existing cleanout and the
furnishing and installation of 48" diameter sewer manholes in accordance with the
provisions of the Standard Specifications and the Special Provisions for the Construction
of Sanitary Sewers of the City of San Juan Capistrano. This item shall also include
• adjustment of frame and cover to final pavement grade or as directed by the Engineer
and street reconstruction.
PAYMENT
The unit price bid for replacing existing cleanout with 48" diameter sewer manhole shall
include all labor, materials, tools, equipment, and incidentals necessary to construct the
item, and no additional compensation will be made therefor.
BID ITEM 3 - REMOVE AND REPLACE EXISTING 6" DIAMETER SEWER
The workmanship and materials included in the work prescribed for this bid item shall be
in conformance with the provisions of the Standard Specifications and the Special
Provisions for the Construction of Sanitary Sewers of the City of San Juan Capistrano.
The work for this bid item shall include excavation, dewatering, bedding, removing
existing sewer furnishing and installation of 6" vitrified clay pipe or approved equal,
compacted backfill, street reconstruction, testing, connecting to manhole and all other
related items of work necessary or incidental to conform to the requirements of the
contract documents.
Sewer pipe shall be vitrified clay extra strength or approved equal.
PAYMENT
The unit price per lineal foot for this item shall include all labor, materials, tools,
equipment, and incidentals necessary to remove and replace existing 6" vitrified clay
• pipe or approved equal with Class B bedding, and no additional compensation shall be
made.
DS -1
i
J
SPECIAL PROVISIONS
FOR THE
r CONSTRUCTION OF SANITARY SEWERS
19
CITY OF SAN JUAN CAPISTRANO
SAN JUAN CAPISTRANO, CALIFORNIA
ADOPTED BY RESOLUTION NO. 78-2-15-3
ON FEBRUARY 15, 1978, BY THE CITY COUNCIL
OF THE CITY OF SAN JUAN CAPISTRANO,
CALIFORNIA.
Ll
OOLUTION N0. 78-2-15-3 •
PUBLIC WORKS CONSTRUCTION STANDARDS MODIFICATION
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SAN JUAN CAPISTRANO, CALIFORNIA, MODIFYING
THE PUBLIC WORKS CONSTRUCTION STANDARDS BY
bSTABLISHING SPECIAL PROVISIONS FOR SANITARY
SERER CONSTRUCTION IN ACCORDANCE WITH THE
PROVISIONS OF ORDINANCE NO. 349; STANDARD
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION
WHEREAS, the City Council has adopted Ordinance No. 339,
Standard Specifications for Public Works Construction; Section 2
of said Ordinance permitting the modification or amendment to the
approved Public Works Construction Standards; and,
WHEREAS, the City Engineer has established that the
■ Special Provisions for the Construction of Sanitary Sewers
{i are comparable to existing construction methods throughout the
County of Orange. Three (3) -copies have been and now are filed
in the office of the City Clerk for examination.
NOW, THEREFORE, BE IT RESOLVED that the effective
date of this Resolution shall be March 2, 1978.
PASSED i9 APPROVED AND ADOPTED this 15th day of
February , by the fallowing vote, to wit:
AYES: Councilmen McDowell, Friess, Nash
and Mayor Heckscher
NOES: `tone
ABSENT: Councilman Sweeney
YVO O. H£CKSCHER, MAYOR
ATTEST:
CITY CLPM
STATE OF CALIFORNIA )
COUNTY OF ORANGE
CITY OF SAN JUAN CAPISTRANO )
I, MARY ANN HANOVER, City Clerk of the City of San Juan
Capistrano, California, DO HEREBY CERTIFY that the foregoing is a
true and correct copy of Resolution No. 78-2-15-3 , adopted by
the City Council of the City of San Juan Capistrano, California,
at a regular meeting thereof held on the 15th day of
February 1 1978 .
(SEAL) i
MARY ANN MOVER, CITY CLERK
-1-
0 0
TABLE OF CONTENTS
SECTION I: EXECUTION OF WORK
PAGE
I-01 TRENCH EXCAVATION AND BACKFILLING . . . . . . . . . 1
I-02 PROTECTION OF EXISTING UTILITIES . I . . . . . . . 3
I-03 PIPE LAYING . . . . . . . . . . . . . . . . . . . . 4
I-04 MANHOLES . . . . . . . . . . . . . . . . . . . . . 6
I-05 CONNECTION TO EXISTING MANHOLES . . . . . . . . . . 7
I-06 HOUSE CONNECTIONS . . . . . . . . . . . . . . 7
I-07 SEPARATE WYES AND TEES . . . . . . . . . . . . . . 7
I-08 TESTS FOR LEAKAGE . . . . . . . . . . . . . . . . . 8
LIST OF STANDARD DRAWINGS . . . . . . . . . . . . . . . . . . 10
t
A COPY OF EACH SHALL BE MAINTAINED AT THE PROJECT SITE AT
f
SECTION I
EXECUTION OF WORK
I-01 TRENCH EXCAVATION AND BACKFILLING: _
A. Excavation: Excavation for trenches shall include the re-
moval o -all material of any nature for the installation
of the pipes or structure and shall include the construc-
tion.of trench shoring and timbering and all necessary
installations for dewatering as required.
The Contractor shall familiarize himself with, and shall
conform to the regulations of the ,General Construction
Safety Orders" and "Trench Construction Safety Orders" of
the State of California, Department of Industrial Relations,
Division of Industrial Safety.
B. Minimum Width of Trench: The minimum width of pipe trenches,
measured at the crown of the pipe, shall not be less than
L twelve (12) inches greater than the exterior diameter of the
pipe, exclusive of bells, and the minimum base width of
such trench shall not be less than twelve (12) inches greater
than the exterior diameter of the pipe exclusive of special
structures or connections, and such minimum width shall be
exclusive of all trench timbers.
C. Maximum Length of Open Trench: Except by special permission
* by the Engineer, the trench shall not be open for a total
y of more than 500 feet at any given time for the total project.
B
A
3
r
Whenever the trench excavation is made in undisturbed
ground and the earth is of a stable, well -consolidated
material, tunnels connecting open trenches may be con-
structed provided the roof of the tunnel slopes at a mini-
mum of one (1) foot vertical to three (3) feet horizontal
and a minimum clear space of two (2) feet is allowed above
the top of the pipe.
Bell holes shall be excavated in the bottom of the trench,
when required, of sufficient size and depth to permit con-
structing the joints. Between bell holes, the entire
length of the pipe shall have a uniform bearing upon undis-
turbed soil.
Excavations for manholes shall be of sufficient width to
leave at least six (6) inches in the clear between their
outer surface and the embankment or timbering which may be
used.
B. Minimum Width of Trench: The minimum width of pipe trenches,
measured at the crown of the pipe, shall not be less than
L twelve (12) inches greater than the exterior diameter of the
pipe, exclusive of bells, and the minimum base width of
such trench shall not be less than twelve (12) inches greater
than the exterior diameter of the pipe exclusive of special
structures or connections, and such minimum width shall be
exclusive of all trench timbers.
C. Maximum Length of Open Trench: Except by special permission
* by the Engineer, the trench shall not be open for a total
y of more than 500 feet at any given time for the total project.
B
A
3
r
r • •
D. Maximum Width of Trench: The maximum allowable width of
trench for all pipelines measured at the top of the pipe
shall be the outside diameter of the pipe (exclusive of
bells or collars) plus sixteen (16) inches, and such maxi-
mum shall be inclusive of all timbers. A trench wider
j than the outside diameter plus sixteen (16) inches may be
used"without special bedding.if the Contractor, at his
■ expense, will furnish pipe of the required strength to
j carry the additional trench load. Such modifications
shall be submitted to the Engineer and approved in writing.
Whenever such maximum allowable width of trench is exceeded
for any reason except as provided for in the plans or
specifications, or by the written direction of the Engineer,
p� the Engineer may require, at his discretion, that the Con-
tractor, at his expense for all labor and materials, cradle
the pipe in Class 420-C-2000 concrete.
E. Backfilling Excess Trench Depth: If any trench, through
the neglect of the Contractor, be excavated below the
bottom grade as required by the profiles, it shall be
refilled to grade, at the Contractor's expense for all
labor and material, with clean sand or sand and gravel
well tamped in place.
F. Bracin Trenches: The sides of the trenches shall be sup-
ported wlthp sheeting and bracing, and all tunnels
shall be timbered wherever the ground will not stand un-
supported. In all cases the sheet piling or timbering
shall be redrawn as the work progresses, in such manner as
to prevent as much as possible the caving inward of the
sides of the trench.
All excavations shall be done in accordance with all laws
and ordinances of the County or State as they may apply.
G. Crushed Rock Bedding: Where ground water is encountered
or the native material does not afford a sufficiently
solid foundation for pipe sub -grade as specified above,
the Contractor shall excavate to such depth below sub -
grade as the Engineer decides is necessary and shall con-
struct a stable base by placing crushed rock bedding upon
which sub -grade can be prepared. Crushed rock for bedding
shall be two-inch (211) maximum size.
H. Pi a Zone Backfilling: The pipe zone shall be considered
to extend rom the grade line to a minimum of twelve (12)
inches above the top of the pipe. In the pipe zone, the
backfill material shall consist of sand or select backfill
material. Placing of the backfill material in the pipe
zone shall be as determined by the Engineer. Particular
attention is to be given to the underside of the pipe and
fittings in order to provide a firm support along the full
length of the pipe.
-2-
I. P1 Zone to RHO!
Trench Backfillin From the top of
the selected ack i to the top of the trench, the material
for backfill shall be free from stones or lumps of material
exceeding three (3) inches in greatest dimension. This
backfill material shall be compacted to a minimum relative
density of ninety (90) percent of maximum. This compaction
shall be obtained by means of water settlement or tamping,
depending on the nature of the material. Sandy, granular
soils may be compacted by means of water settlement. The
area to be backfilled by water settlement shall be diked
at suitable intervals so that water will be impounded to
sufficient depth so that earth pushed or shoveled into
the area will be falling into water at all times and will
be completely saturated. Soils not having a sand or granu-
lar nature shall be backfilled and compacted by either of
the following methods:
1. The material shall be placed in layers not exceeding
eight (8) inches in thickness, loose measurement, and
each layer compacted to a relative density of ninety
(90) percent or more, of maximum by means of hand or
pneumatic tampers.
2. The material shall be placed in layers measuring at
least four (4) feet in thickness, loose measurement,
and each layer compacted to a relative density of
ninety (90) percent or more.
On steep slopes and other locations where compaction
by flooding is not practicable, the backfill shall be
compacted by means of either of the above tamping
methods.
Backfill material placed within twelve (12) inches or
less of base of pavement, sidewalk, curb, or concrete
structure, shall have an expansion, when saturated with
water, of less than one and one-half (1-1/2) percent,
and a minimum compacted density of ninety (90) percent
of maximum. Any excavated material which does not con-
form to these specifications shall not be used for this
portion of the backfill and new material conforming to
these requirements shall be obtained and placed at the
Contractor's expense.
I-02 PROTECTION OF EXISTING UTILITIES:
F A. General: Utilities for the purposes of these specifica-
tions shall be considered as including but not limited to:
Pipelines, conduits, transmission lines, and appurtenances
of ,Public Utilities" (as defined in the Public Utilities
Act of the State of California) and those of private indus-
try, businesses, or individuals solely for their own use
or for use of their tenants; and storm drainage, sanitary
sewers, street lighting, and traffic signal systems. The
-3-
t
1 0 •
accuracy or completeness of the utilities indicated on the
• drawings is not guaranteed. Service connections to ad-
jacent property may or may not be shown on the drawings.
It shall be the responsibility of the Contractor to deter-
mine the exact location of all utilities and their service
J connections. The Contractor shall make his own investi-
gations as to the location and type of existing utilities
■ and their appurtenances and service connections which may
1l be affected by the contract work and shall notify the
Engineer as to any utility located by him which has been
incorrectly shown or omitted from the drawings.
B. Rea naibilit of the Contractor: The Contractor shall be
ha reaponsi le for all costs, for the repair of any and
1 all damage to the contract work or to any utility (whether
previously known or disclosed during the work), as may be
caused by his operations. Utilities not shown on the draw-
ings to be relocated or altered by others, shall be main-
tained in place by the Contractor. At the completion of
the contract work, the Contractor shall leave all utilities
and appurtenances in a condition satisfactory to the owners
and the City.
r I-03 PIPE LAYING:
After the trench for the pipe has been excavated to the proper line
and grade in the manner before specified, the pipe shall be laid
therein in the following manner:
_ Before lowering, and while suspended or standing vertically at trench
side, the pipe shall be inspected for defects and rung with a light
hammer or other metal object to detect cracks. Any defective, damaged,
or unsound pipe shall be rejected. Before any pipe is lowered into
place, the trench bottom shall be prepared so that each length of pipe
shall have a firm and uniform bearing over the entire length of the
barrel. All adjustments in line and grade shall be made by scraping
away or filling and tamping in under the barrel of the pipe and not
wedging or blocking. The faces of all spigot ends and all shoulders
in the hubs or sockets must be true and brought into firm contact,
and any lumps and excrescences on said faces shall be cut away before
r the pipe is lowered into the trench. The pipe shall be laid, without
{i break, upgrade from structure to structure and with the socket upgrade.
Whenever the work ceases for any reason, the unfinished end of the
P pipeline shall be securely closed with tight fitting plug or cover.
The interior of each pipe, after being laid, shall be thoroughly
cleaned.
a
y A. Jointing Vitrified Clay Pipe: Mechanical compression
joints for vitrified clay pipelines shall be assembled in
accordance with the manufacturer's recommendation. Care
M shall be taken to insure that a tight compression joint is
effected upon assembly.
C -4-
A
s
In
i
L
ie
B. Jointing Cast -Iron Pipe:
1. Lead Joints: The spigot end of the pipe shall be
inserted for the full length of the socket in such a
manner that the inside surface of the pipe shall be
flush and even. For leaded joints a gasket of oakum
shall be driven tightly into the joint from the outside
using a caulking iron, leaving a depth of at least
2-1/2 inches of the annular space clear to receive the
lead. The oakum shall be so placed that a gasket of
uniform thickness is obtained. It shall be driven
back solidly so that there are no loose ends protruding.
A suitable runner mudded with clay shall then be placed
around the pipe and the ends of the runner shall be
clamped, leaving an opening at the top of the pipe
slightly off center and sufficiently large to allow the
lead to be poured. The lead shall be heated to a
temperature such that when stirred it will show a rapid
change in color. Scum shall be removed before pouring.
Lead shall be poured at a good speed to fill the joint
completely in one continuous operation. The runner
shall not be removed until the lead has solidified.
After the runner has been removed, the lead shall be
thoroughly caulked in such a manner as to secure a
watertight joint without overstraining the cast iron
bell. The face of the completed joint shall be flush
with the face of the bell. Spongy or imperfectly filled
Joints shall be burned out and repoured.
2. Mechanical Joints: Joints shall be in accordance with
AWWA C-111-64. When tightening bolts the gland is to
be brought up toward the pipe flange evenly, maintain-
ing approximately the same distance between the gland
and the face of the flange at all points around the
socket to provide an effective joint seal.
3. Neoprene -Ring Joints: Between lengths of cast iron
pipe, neoprene gasket joints can be used. Joints shall
be "Tyton" as manufactured by the United States Pipe
and Foundry Company or approved equal. Installation
shall be in accordance with the Manufacturer's recom-
mendations. Gasket seats and neoprene gaskets shall
be thoroughly cleaned before assembly. The completed
joint shall have a uniform contact by the gasket between
the outer surface of the spigot and the gasket seat of
the bell.
C. Horizontal Separation: See Standard Drawing S-5.
D. Vertical Se aration: Whenever a sanitary sewer, including
ouse a era s, must cross a pressure water main, the sewer
shall be of one of the following types of construction:
-5-
9 f •
Class 150 or heavier cast-iron pipe with hot -dip
bituminous coating and with lead or mechanical
Joints.
Vitrified clay pipe with reinforced concrete
11 encasement, which encasement shall have a minimum
thickness of 6 inches.
Vitrified clay pipe within a continuous steel
casing, which casing shall have a thickness of not
less than 1/4 inch and with all voids between sewer
pipe.and casing pressure grouted with sand -cement
grout.
If the sewer is above the water main, the special construc-
tion shall extend a sufficient distance on both sides of
the crossing to provide 10•feet of horizontal clearance
with the water main. If the sewer is located below the
water main and within a vertical distance of 3 feet clear-
ance distance, the special construction shall extend a suf-
ficient distance on both sides of the crossing to provide
4 feet of horizontal clearance with the water main. These
construction requirements shall not apply to those house
laterals that cross below a pressure water main.
E. Si hon Criteria: Siphons are unacceptable to the City
ua ess extreme y unusual circumstances prevail.
• I-04 MANHOLES:
Manholes shall be constructed of precast reinforced concrete sections.
The bottoms of all such structures are to be formed of concrete of the
full thickness shown on the plans and the concrete shall be propor-
tioned as herein before specified. The inside bottom of the manholes
shall rise above the footing a distance equal to the diameter of the
largest pipe entering or leaving the manhole, and the flow-through
channel shgll conform to the inverts of the sewer pipes. The surface
of'the channel shall be troweled to a smooth and even surface. Man-
hole steps shall be uniformly spaced at a maximum of 16 inches with
the top step placed just under the manhole frame. The lowest step
shall be placed not more than 24 inches above the shelf. The top
step shall project 3 inches inside the manhole and all others 5 inches.
The tops of all manholes located in paved areas shall be set flush
with final paving grade. The tops of manholes located in improved
E but unpaved areas shall be set to be even with finished grade. Tops
of manholes and cleanouts located in unimproved areas shall be set
to prevent the entry of surface water as directed by the Engineer.
Precast manhole sections shall be laid concentrically to
provide a smooth interior manhole surface. Joints shall be
completely filled with mortar to provide watertight seals.
•
-6-
i
1y I-45 CONNECTION TOOISTING MANHOLES- 0
1 In the locations as shown on the drawings the Contractor shall break
into existing manholes structures and install the new inlet lines as
specified.
New flow-through channels shall be constructed in each manhole base
to accommodate the new sewer lines. Smooth transitions shall be
installed from the inverts of the newly installed pipes to the exis-
ting manhole outlets.
Openings in the sides of the manholes shall be sufficient to permit
the inserting of the sewer pipes and the forming of 5 -sack grout
around the newly installed pipes. Other details shall be in accor-
dance with the Standard Drawings.
I-06 HOUSE CONNECTIONS:
The term "house connection" as used in these specifications or on the
plans is used to_ designate a lateral sewer, laid from a main sewer to
a point at the property line, or other location, as shown on the plans,
from which sewer service can be obtained by proper extension. The
house connection shall be constructed on an unyielding foundation,
r with joints closely and accurately fitted, true to line, and on a
straight grade from the bend joining the main sewer to their upper
ends, unless otherwise indicated on the plans. House connections
shall not be laid on a slope greater than 45 degrees from a horizon-
tal line unless required or approved by the Engineer. Wyes for house
connections shall be installed as specified below. The house connec-
tions sewer lines shall be jointed to Y branches by eighth bends.
All eighth bends are a part of the house connection sewer line. The
top of pipe of the upper end of each house connection shall be built
to a depth of 5 feet below the surface of the ground, except where
different depths are indicated on the plans. Where a house connec-
tion sewer is to be connected with a chimney, all bends leading
away from the Y branch are a part of said house connection sewer
line. All house connections shall be installed with a suitable stopper
F of the size of the connection. House connections shall be properly
field marked by means of an "S" on the top of the curb or by other
means, approved by the Engineer, where necessary.
I-07 SEPARATE WYES AND TEES:
Commercially manufactured wyes and tees shall be installed where
indicated on the plans and/or at such other locations required by
the Engineer. Where conditions are such that the connecting pipe
cannot be adequately supported on undisturbed earth or tamped back-
fill, the pipe shall be encased in concrete or supported on a concrete
cradle as directed by the Engineer. Concrete required shall be in-
stalled at the Contractor's expense. All wye and tee branches not to
be joined to house connections shall be installed with a suitable
stopper of the size of the wye or tee branch. The Y branches, unless
-7-
w
otherwise specified •ill be inclined upward a• n angle not greater
Z than 45 degrees from a horizontal line. If so shown on the plans, T
branches shall be substituted for Y branches. No Y or T branch shall
be placed closer than 5 feet to the centerline of any manhole or clean-
out. The use of double wyes will not be permitted except as specified
or required for chimneys.
I-08 TESTS FOR LEAKAGE:
Tests for pipeline leakage shall be in accordance with the following
specifications:
A. Leakage Due to Internal Pressure: In sections of line
1 where significant ground water is not present above the
average pipe invert, the Engineer shall inspect all pipe-
line joints after completion of final pipe jointing.
F Based on this inspection the Engineer shall decide whether
water pressure tests or air pressure tests shall be conduc-
ted and shall stipulate the pipeline sections to be tested
in all sewer lines. If required, water pressure tests
shall be conducted as follows:
The pipeline between manholes in the sections to be tested
shall be filled with water and the ends of the line plugged
with a plumbers plug. Sufficient time shall be permitted
to elapse between the filling and the testing of the line
to permit absorption of water by the pipe walls. The man-
hole shall be filled to a level not less than four feet
above the level of the sewer in the upper manhole. One
gallon of water shall be added and the time required for
the water level to return to the mark shall be measured.
The time so measured shall not be less than that computed
by the following formula:
Minimum Time (minutes) - 7 063
s
Diameter inchex Test Length(feet)
If the leakage is greater than allowed, the pipe shall be
overhauled by the Contractor at his expense until the joints
shall hold satisfactorily under this test.
B. kwan Due to Infiltration: If, in the construction of a
sec on o e sewer of any size, excessive ground water is
encountered, the test for leakage, described in Section "A"
6 above, shall not be used, but instead a test for infiltra-
tion shall be conducted for each section of the work if
ordered by the Engineer. The end of the sewer at the upper
structure shall be closed sufficiently to prevent the entrance
of water; pumping of ground water shall be discontinued for
at least three days and the section shall be tested for in-
filtration. The infiltration shall not exceed 1,000 gallons
t per diameter inch per mile per day of main line sewer being
tested and does not include the length of house connections .'
entering that section. where any infiltration in excess of
L
-8-
' this amount is discovered before completion and acceptance
of the sewer, the sewer shall be overhauled by the Con-
tractor at his expense and the amount of infiltration re-
duced to a quantity within the specified amount before the
sewer is accepted. Should, however, the infiltration be
less than the specified amount, the Contractor shall stop
any individual leaks that may be observed, when ordered to
do so by the Engineer.
10
C. Leaka a Measured Usia the Air Pressure Method: The Con-
tractor s 11 p ug the ends of the sewer lines being tested
with plugs and brace the ends of the pipe where needed. It
is recommended that the Contractor make an initial air test
of the sewer main after installation and backfill and
consolidation of the trench, and prior to installation of
the house laterals. Such preliminary tests shall not con-
stitute the final test. The final leakage test shall be
conducted is the following manner, and shall include the
sewer main and laterals as a unit:
The line shall be supplied with air until 3-1/2 pounds per
square inch guage (psig) pressure has been reached, at
which time the flow to the pipe shall be shut off. The
Inspector will then accurately determine the time loss of
1/2 psig pressure, to 3 paig pressure. The input air pres-
sure shall not exceed 5 psig and shall be regulated by a
suitable regulator valve. The air test equipment is to be
approved by the Engineer.
The pressure loss of 1/2 psig pressure shall not occur in
a time period of less than 1 minute. If the time loss'is
less than 1 minute, the Contractor shall make such repairs
as are necessary to the satisfaction of the Engineer to
eliminate the excessive leakage.
-9-
E
-10-
�
1
a
3
LIST
OF STANDARD DRAWINGS
DRAWING
NO.
TITLE
S-1
STANDARD MANHOLE DETAILS
S-2
STANDARD 60 -INCH MANHOLE
S-3
PIPE CASING, CONCRETE ENCASEMENT &
HOUSE LATERAL
S-4
PIPE BEDDING DETAILS
•
S-5
SEPARATION AND
OF WATER SEWER LINES
S-6
SADDLE CONNECTION
S-7
STANDARD MANHOLE FRAME AND COVER
S-8
STANDARD CLEAN-OUT
E
-10-
r
t
WREN ROKEN END OF NK O wITHINMMOOLt. MfAK
SACK, PLUSH 01710 INSIDE Of NAMROLt4ALL AMD PLASTER
OXEN 9D4" 3m6cTw. wNION n NA/NNOLE.LESQUARE ENOAMCFILL FIOXIIN END LL
PIPE
1ETS
AT UPPER SECTION TO DRAM. _
M CRom ELEVATION OF ALL PIPES
SHALL K TIM SANE AS TIO 010000
ELEVATION OF TIE LARSEST PIPE
up"so 014E10rISE IMOICATO.
rme FIRST TWD NPC JOINTS INTO
AND OUT OF EACH WARMS SINAL
SE A 1 SRTIGIL
MANHOLE SHAFT DOMING TO K PLOW
MANHOLE.PS LADDER MOM OiM 09 OF
RKMRO. Sa SECT. Z -os.
'Mt
AN
2.12* LONG VC.11 JOINTS
AT INLETS AND OUTLET.
R -t Xo
STIMUP TYPE CAPUT
CAST w PLACE AT TIIM
MOTs:
POR PRANG AND COVER DETAILS II@QI TO
PLATE 3--•E, STANDARD NNMI&E FMM
AM 074
TOP tro-S-
Dna STYE -E'
P ASrR FILLET
TOP OF MVIMKNT 011
EXISTING GRAINS.
CONESHALL K
E000ITRIC TO THE DO"
YSTR aC!O9 or THE o
I/Y0Ro12r KTWIEN ^�
KVEL JOINTS,
_, • mSTEP DETAIL
WATER nS0T UPPO1 RMHT.
JOINTS (TY R) . .
STEP DETAIL
STEP Nam
MATRIAL, SHALL R aw aa. SRO. aevalYMM n
A"JL A -IG 00 A -MT GALL MOM AFTER RNld
IN ACWM 010 A.LTJL A-ISi
Zojt
4- - ri
J,a=
CONE DETAIL
CROWN ELEVATgM -D a EQUAL JOINT DETAIL
SASE MIMED AGAINGT UNOISTIKO<D SOIL
STANDARD 48" MANHOLE
NOTE: 49"1.0. MANHOLE TO BE USED ON SEWERS 2d' IN DIAMETER AND UNDER.
CITY OF SAN JUAN CAPISTRANO
STANDARD MANHOLE DETAILS
CLT MRPum MTN MIRE OF
EANNOLLODEER OWES SMALL
EE PLAATEREO WMA GMM V
roRraR TO MARE A SMOM
OITRARSIE TO 771111 NPL
rw owm piMT10R OFALL
NPp iIALL SN?w WS
AS TIME CROEN ALlVMTIOR M
M LAMV NIE VULM
OTM[M1E•E MMArIM
rN[ rANNOLA
SNAIL OWING,
SMALL a PLACES
Or TN[ 0"084729"
SIDE OP '?7111
rASNOLE.
14mcOLLAR SECTION
STINUM 70•ULAK
i
R
4
PLAIN
ELL VATIO H
12• SECTION -INLET ANO OUTLET ITTPA
24 -LONE SECTION WHEN
MA1NLIN[ 13 21" VCP OR
LARGER -INLET ANO OUTLETITTP.1
2- 12•LON4 VCP JOII
AT INLETS (TTP-)
_ 2-1
eC81OW NWAAR
TOO OF PRV0101T
OR OOSTIM MAOL
IS NA
ECCENTRIC FLAT TOP
s�
ECCENTRIC FLAT TOP DETAIL
I/A'COIOIT WORRY
-PRECAST CONCRETE [ Jose
RING, SECTION S N/w A ONSR
-ECCENTRIC COME )O•$ SO•S
27•HIG,N WITH S TNICR WALL$
•�
— COMM MORTAR P2.LLT
►---70'LO.P 7G,•a69000ITM
�a
Rim
SIH•gne
S A"See PLATE PM
JOINT DETAIL
"N$
•
I• r
ELL VATIO H
12• SECTION -INLET ANO OUTLET ITTPA
24 -LONE SECTION WHEN
MA1NLIN[ 13 21" VCP OR
LARGER -INLET ANO OUTLETITTP.1
2- 12•LON4 VCP JOII
AT INLETS (TTP-)
_ 2-1
eC81OW NWAAR
TOO OF PRV0101T
OR OOSTIM MAOL
IS NA
ECCENTRIC FLAT TOP
s�
ECCENTRIC FLAT TOP DETAIL
I/A'COIOIT WORRY
-PRECAST CONCRETE [ Jose
RING, SECTION S N/w A ONSR
-ECCENTRIC COME )O•$ SO•S
27•HIG,N WITH S TNICR WALL$
•�
— COMM MORTAR P2.LLT
►---70'LO.P 7G,•a69000ITM
PLAT TOP. AOCOITI110 To TME
OOM1 STIIEAN SME W TIME
rAUIELL
SIH•gne
S A"See PLATE PM
JOINT DETAIL
NOTE,
POR PRAYS ANO COVER OATAILS ROM
To PLAT[ $-G,, SOIrOM o 2W/.NOLA
PRANG AYO COM.
IN
POUR EASE AG,AINST U1401STURSCO SOIL.
NOTE: THE STANDARD 40 INCH MANHOLE SHALL K USED
ON SEWERS 24• IN DIAMETER AND LAR6ER,0THER SPECIAL CASES,OR
WHEN THE INVERT OF THE MANHOLL IS IX DEEP.
t
CITY OF SAN JUAN -CAPISTRANO
STANDARD 60INCH MANHOLE
1978 1 62, 0 20 S.
r
CAf N/s
f ILT
OveRALL RLL
CARRICR III OWING
rte*. •olrrf
PTMA/ TWO fKlff 1'YrL CL.
To IIIt
CARRItR N►t $"ALL R
ANCNO1190 Aro/OR r9140110
WORK !ROUTING TO
AVOID FLOATING.
TYPICAL PIPE' CASING
imm KV 7Ts M ININTALLD
111TNOYT NOM LATSRAL.Tit*Ys
SNCL K PLUM MITN A YAG /LJN
OR IisO/R w STOMP.
'AGR W" y ll/f A 1/0 Kimme AO
-
IT 7.• 0.L FF''��'
REINFORCED CONCRETE'
ENCASEMENT
CORCRtTt 119CA891110 T !MALL se
To f• rmw !CLL Ars A one Ion► fsasLtGr ='
OI MK !MALL all us" salvo" AAMC
TNt trOAmmanT.
ATILT Pow M. OR ?m ASM tMtT att�ss;
AODVTA it Harp". TO pnvwr t� .✓':?'.
/ROOan cll� To /
t*LIfI LM O/ ws
AM LID MT 9ACN
fts M LABRAL.
TYPICAL NOUS[ LATERAL
ml t Ta OF Ltillt wM TI<...:
LA3AL oRtafs. UIt@ Tis OJT
tRs♦Ms go mtt sant OR tfsls
CITY OF SAN JUAN CAMSTRANO
10?tt I U. r).S-
MIN. 02oAC. OM OIDAM (TYR)
FEAT KR TO JOIN
of A.L(rT►)
GRAVEL OR
CRIIRICO ROCK
L
TYPE (
TYPE It
H
-
f
I
CONMCTTO
COMPAC
40NFlLL
�.
7R7lL-Ovw"'7
LCLiOr MATuIAL
TO 90%
�.ciiii
RR- O<Ntam
pow"m�-7
d
eeRa�.°i
FIFE F"OmIDN at
11"t raNIOA. �
T
"me SHAM 11601E MAEINUM Ira K oETuANNCO
UNOISTUNICO SOL IN F14D K TNI CITY DN M SAp
of MAXIMUM OVUWIOTH CXGAVATEOL
TYPE III TYPE IV
Rmw
1. THE T1IEIION 76TH ATTAR WMR UNIT OF TIM MK 20NO !MALL It WITHIN rMC FOLLOWING LIMITS FOR "PC I,Z.AMM SIMNGL
MAXIMUM TRtNeH WIOTN-O.D. OF NR ON TILL FLUS IG'
MINIMUM rNI MPI WIOTN-O.L a FIFE oR NLL FLIM Ii'
2.Tr/I3 Gm01NG MIALL t Ulto WNRIE THt TRRION WIDTH AT THI uRCR UNIT of THE M►I ZONE ZXCUDG THC MAXIMUM WIDTH
N4CIMO ACOVI.
i 6AOXFIu ASOVt THE FSR ZoME !MAUL Co1MO11M To TW RIOWNCMCHTS OUTLINCO IN LECTION SOL LS OF TNI STAMOAAO SFICS.
A MINIMUM FMNNG LECTION IS .26 A.O. CVM SOAL OR AS 6RCOM ST T149 CIT' RIGINQR. FEATHER AM JOIN TO TIII CXWTINS FAVI}oIr To
THS SATISFACTION OF THE CITY CIMIMQR. }
CITY OF SAN JUAN CAPISTRANO'
PIPE BEDDING DETAILS
I o, R W, n nm ,...r. M
6
z
1A
i
• .•
DESIGN REQUIREMENTS FOR SANITARY SEWERS IN THE
VICINITY OF PRESSURE WATER MAINS
I
�2 ZONE 0 2 ZONE e
!a 1
WATER 4' WATER �� �'
MAIN ,, MAIN. ,
ZONE .
A ZONE 0
zl
PARALLEL CONST.
A]
PERPENDICULAR CONST.
IF A SANITARY SEWER IS TO BE IF A MAIN NE SEWER MUST
LOCATED WITHIN 10 FEET OF A PRESSURE PRES%)RE WATER WITHIN ANY OF
WATER MAIN WITH!N ANY OF THE ABOVE INDICATED ZONES, OR IF A HOUSE
INOICATEO ZONES SPECIAL CONSTRUCTION MUST CROSS IN ZONE B, SPECIAL C
HILL SB REOUIRE6 AS SHOWN BELONG WILL BE REOURED AS SHOWN BEL
ZONE SEWER CONSTRUCTION REfUI
A 'I.C.P. WITH COMPRESSION JOINTS.
B OR C C' -P. (CLASS ISO) APPROVED MECHANICAL :DINTS; OR V.C.P.
CONCRETE ENCASEMENT PER ( DETAIL I ); OR V.C.P. SROUT!
NUOUS STEEL CASING.
O 00 NOT LOCATE ANY PARALLEL SEWER IN THIS AREA WIHTC
GENERAL NOTES
I. EXTEND BOTH ENOS l)F ENCASEMEIIT TO A POINT
ONE INCH SHORT OF FIRST PIPE JOINT BEfONC
LOCATIONS SPECIFIED ON P -AN. USE ONE FOOT SECTION
OF PIPE AT BOTH ENDS BEFORE USING STANDARD LENGTHS.
2. APPIY FORM OIL, THIN PLASTIC SHEET, OR OTHER
ACCEPTABLE MATERIAL TO PIPE, TO PREVENT BOND
BETWEEN PIPE AND CONCRETE.
3 USE CLASS 420-C-2000. PC.C. FOR ALL CASES.
4akA
h SFECL L
IN CDMT:.-
IIEAITfi _
SPECIAL ENCASEMENT DETAIL 1
( SEE STD, S-3)
t
CITY OF SAN JUAN CAPISTRANO
SEPARATION OF WATER AND SEWER LINE:
1979C-
`r
L
TME SQL ON THE CO-A� SADDLE SMALL NOT
EE ENCASED IN CONCRETE.
TAP TO BE MADE AT APPROX. l OF JOINT. ENCASE
12'EAOI MOE OF OPINIES WITM CLASS 420•C-2000 PC.C.
fA
460
7``AA
NOTES,
I. TRE SEVER LINE SMALL BE SCORED TO TNR APPROXIMATE SHAPE OF TME COLLAR WYE. ON TQ "Y-TIMS. THE CONTRACT**
SMALL ETHER COT A MEAT OMIIIO WITH A OI ROMLAR CERAMIC SAW OF 2I N' B, 011 S' DIAMETERS, 00 MAKE A SMALL **Lt.
NOT LARD M TIYN OMR-MICA IN DIAMETER, IN Tilt APPROXIMATE CENTER OF THE !COINED ARIA WITH A POINTED TOOL, *MAN
TOA MASON'S PICX.ANO OMIMTN A CIRM AND SNORT HANDLE, NANO HELD HAMMER III A SPIRAL FASHION TO THIS SCORED LIE.
2. THE CONTRACTOR SNALL 39CM THE COLLAR WTI SADDLE TO TIE SEWER AS 1PPROVm ST THE CRY ENGIILR
S. THE CONTRACTOR SMALL ENCASE TME SADDLE CONNECTION WITH CLASS AM -AMO RMWTtR THE CONNECTION IS APPROVED
NY TIME CITY COR TO TIME LIMITS IMOICATED ABOVE
1, THE CONTRACTOR SMALL KEEP ALL CLAY CHIPS, DIRT, EPDXY, MORTAR, AND CONCRETE OUT OF THE St'ER SADDLED, AND SHALL
PERFORM A CLEANING AND SALLIES Of THE WACM SADDLED IF DIRECTED TO DO 70 IT TIBC CRY Cuomo N.
L THE CONTRACTOR SMALL REPAIR OR REPLACE ANY DAMAGED PNP[ AS DIRECTED BY THE CITY EES1NOM
G. THE CONTRACTOR SMALL EPDXY ALL SADDLE CONNECTIONS TO TIM! SATISFACTION OF TME CITY ENGWIEEI.
IC17A
CITY. OF SAN JUAN CAPISTRANO
SADDLE CONNECTION
ELEVATION
SECTION A -A 40. -
-EXIST. V.C.P.
-EXIST. V.C.P.
s�
I
I I
j
OCTAIL MARINE CONNECTIOi"-
II
I
TO AN EXISTING SEWtRt-
jl
Ij
11
FOR EAKINS G-LATERA►ON1 .= --
..
I I
i I
I
7- MAIN OR AS REQUIRED. IV':'�
TMt CITY Oltllt<rt. ..'�Y
I
-GAMD
`-J
SEAL- ADJUSTABLE
REPAIR
NEM V.C.P. Ttt OR WYE SECTION
COUPLING, ON APPROVED
EQUAL--'�-
WITH PLAIN ENOS
l2 REO'D.1
6
COLLAR
WYE SADDLE
i
NOTES,
I. TRE SEVER LINE SMALL BE SCORED TO TNR APPROXIMATE SHAPE OF TME COLLAR WYE. ON TQ "Y-TIMS. THE CONTRACT**
SMALL ETHER COT A MEAT OMIIIO WITH A OI ROMLAR CERAMIC SAW OF 2I N' B, 011 S' DIAMETERS, 00 MAKE A SMALL **Lt.
NOT LARD M TIYN OMR-MICA IN DIAMETER, IN Tilt APPROXIMATE CENTER OF THE !COINED ARIA WITH A POINTED TOOL, *MAN
TOA MASON'S PICX.ANO OMIMTN A CIRM AND SNORT HANDLE, NANO HELD HAMMER III A SPIRAL FASHION TO THIS SCORED LIE.
2. THE CONTRACTOR SNALL 39CM THE COLLAR WTI SADDLE TO TIE SEWER AS 1PPROVm ST THE CRY ENGIILR
S. THE CONTRACTOR SMALL ENCASE TME SADDLE CONNECTION WITH CLASS AM -AMO RMWTtR THE CONNECTION IS APPROVED
NY TIME CITY COR TO TIME LIMITS IMOICATED ABOVE
1, THE CONTRACTOR SMALL KEEP ALL CLAY CHIPS, DIRT, EPDXY, MORTAR, AND CONCRETE OUT OF THE St'ER SADDLED, AND SHALL
PERFORM A CLEANING AND SALLIES Of THE WACM SADDLED IF DIRECTED TO DO 70 IT TIBC CRY Cuomo N.
L THE CONTRACTOR SMALL REPAIR OR REPLACE ANY DAMAGED PNP[ AS DIRECTED BY THE CITY EES1NOM
G. THE CONTRACTOR SMALL EPDXY ALL SADDLE CONNECTIONS TO TIM! SATISFACTION OF TME CITY ENGWIEEI.
IC17A
CITY. OF SAN JUAN CAPISTRANO
SADDLE CONNECTION
CI �
■ ■
�V\ ■ • ■ ■ ■ ■ ■ ■
COVER — BOTTOM VIEW COVER—TOP VIEW
:L
RING PLAN
SECTION C -C,
NOTES:
CAST IRON $WALL HAVE MINIMUM
TENSILE STRENGTH OF 30,000 LDS .
PER SQUARE INCH. '
ALHAMBRA FOUNDRY CO. TYPIE A-
OR EQUAL.
WEIGHT OF FRAME AND COVER + MO LDS'
MINIMUM
CASTINGS SHALL CONFORM -TO
ASTM. A 48 CLASS 33.
CITY OF SAN JUAN CARSTRANO
STANDARD MANHOLE
FRAME a COVER
5
COVER,01E & CONIC.
PAD TYPICAL FOR
6 ,8 ,OR 10 I.a SEWER.
T� STREET SURFACE
CASTING
•. r:: •: �•'. Vii'.•: � .a.
CLASS 540-C-3230 P.C.C.
Ic
ALHAMBRA .1 FOUNDRY
A-1240 OR' EQUAL -
TOP VIEW
NOTES:
1. CLEAN-OUT PIPE MUST BE
SAME DIAMETER AS MAINLINE
SEWER.
1/b SEND
He]
n
n
CIER
2 CLEAN -OUTS ARE FOR COMMERCIAL OR
INDUSTRIAL USE ONLY AND ARE TO BE
LOCATED AT R. t
CITY OF •SAN JUAN CAPISTRANO
STD. CLEAN-OUT
1978I W- EL .... .+Rea I S+'E
SIDE
VIEW
Ff NCR
TOP
VIEW
- =
BRANCH
CIER
2 CLEAN -OUTS ARE FOR COMMERCIAL OR
INDUSTRIAL USE ONLY AND ARE TO BE
LOCATED AT R. t
CITY OF •SAN JUAN CAPISTRANO
STD. CLEAN-OUT
1978I W- EL .... .+Rea I S+'E