Loading...
1994-0621_HARRIS, PATRICIA_License AgreementLICENSE AGREEMENT TEMPORARY PUMPING STATION AND PIPELINES (SIERRA VISTA EQUESTRIAN CENTER - HARRIS) THIS LICENSE AGREEMENT AMENDMENT is made this � day of c% nv ,1994, by and between the CITY OF SAN JUAN CAPISTRANO, a Municipal corporation hereinafter referred to as "City" and Patricia Harris, an individual, hereinafter referred to as "Equestrian Center Owner". WHEREAS, Equestrian Center Owner operates a business more particularly described as Sierra Vista Equestrian Center on Assessor's Parcel No. 121-070-03; and, WHEREAS, City owns and operates a sewer facility in a 10 foot wide easement along and contiguous with the south property line of this property ; and, WHEREAS, City wishes to use an additional 10 foot width of the existing equestrian center access road adjacent to and contiguous with the existing easement for ingress and egress to the existing easement. NOW THEREFORE IN CONSIDERATION OF THE PREMISES, and the promises which follow, Equestrian Center Owner and City agree as follows: Grant of License. Equestrian Center Owner hereby grants to the City a temporary license for: Ingress and egress from Avenida de la Vista over Equestrian Center Owner's road for a width of 10 feet adjacent to and contiguous with the existing City sewer easement, 2. Term. This License will commence on the date this agreement is executed and will terminate when the first of the following events occurs: a. December 31, 1994. b. Filing a Notice of Completion of construction. 9 0 Consideration. In consideration of the granting of this License, the City shall: Safety of Premises Observe and maintain the safety and security of the Stable Owner's premises by: (1) Limiting its regular use of the road and site to Equestrian Center Owner's normal hours of operation, i.e., 7:30 a.m. to 4:30 p.m. Mondays through Fridays, emergencies excepted. (2) Keeping the gate at Avenida de la Vista closed and locked after each entry or exit when the Equestrian Center Owner is not open for business. Use of Road Use the road safely and in such a manner as not to disturb or create a hazard or nuisance to Equestrian Center Owner, his neighbors or any of the surrounding property, preparing and implementing a plan to maintain access to the Equestrian Center to the satisfaction of the Equestrian Center Owner. Any damages caused by the City or any of its agents, employees or contractors shall be promptly repaired by the City. 4. Indemnity and Hold Harmless, The City represents and warrants that the Equestrian Center Owner is adequately protected - through liability insurance or otherwise -- from any claim or liability arising from any injury or damage which might take place on the road by reason of its use and occupancy, and agrees to indemnify and hold Equestrian Center Owner, his successors and assigns, free and harmless therefrom. Restoration of Landscaping and Irrigation. The City will cause the existing landscaping and irrigation lines adjacent to the south property line to be protected in place or replaced in kind. 6. Extension. This License Agreement may be extended by mutual agreement of the parties hereto. DATED this Vt) day of NAY 1994 at San Juan Capistrano. ATTEST: Cheryl Johnson, City Clerk APPROVED AST ORM: 4 Richard K. Denhalter, City Attorney a:\briar\licag(l. CITY OF SAN JUAN CAPISTRANO BY C�GG— Collene Campbell, Mayor SIERRA VISTA EQUESTRIAN CENTE OWNER: r � Patricia Harris 0 January 6, 1995 Rancho Sierra Vista Equestrian Center 31441 Avenida De La Vista San Juan Capistrano, CA 92675 Re: Trabuco Sewer Emergency Repair Dear Sir: MEMBERS OF THE CITY COUNCIL COLLENE CAMPBELL WYATT HART GILJONES CAROLYN NASH DAVID SWERDLIN CITY MANAGER In June 1994, the City entered into a License Agreement with you to allow improved access during construction of the above subject project. The agreement would terminate on December 31, 1994 on the filing of the project Notice of Completion, unless extended by mutual agreement. This letter is to request your agreement to extend the agreement to terminate when the first of the following events occurs: a) June 30, 1995 b) Filing of a Notice of Completion of construction. All other terms of the agreement would remain in effect. Please sign below your concurrence with the extension of the agreement as outlined above. RANCHO SIERRA VISTA UEENTER OWNER Patricia Harris 32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 0 (714) 493-1171 • 0 Presentation of Resolution: Council Member Nash read the Community Service Award in full and presented it to Ms. Monique Rey of South Coast Audubon, and Mayor Campbell expressed appreciation to Ms. Rey and her volunteers for their efforts. CONSENT CALENDAR It was moved by Council Member Nash, seconded by Council Member Hausdorfer, that the staff recommendations be accepted for the following items listed on the Consent Calendar. The motion carried by the following vote: AYES: Council Members Hausdorfer, Jones, Nash, Vasquez, and Mayor Campbell NOES: None ABSENT: None L APPROVAL OF CITY COUNCIL MINUTES Regular Meeting of May 17. 1994 The Minutes of the Regular Meeting of May 17, 1994, were approved as submitted. b. Adjourned Regular Meeting of May 24. 1994 The Minutes of the Adjourned Regular Meeting of May 24, 1994, were approved as submitted. 2. APPROVAL OF COMMUNITY REDEVELOPMENT AGENCY MINUTES Regular Meetine of May 17. 1994 The Minutes of the Regular Meeting of May 17, 1994, were approved as submitted. b. Adjourned Regular Meeting of May 24, 1994 The Minutes of the Adjourned Regular Meeting of May 24, 1994, were approved as submitted. 3. STATUS REPORT ON NEW DEVELOPMENT APPLICATIONS (440.10) The Report dated June 21, 1994, from the Planning Director, advising that seven new development applications were received by the City since the last report of May 17, 1994, was received and filed. —� 4. APPROVAL OF LICENSE AGREEMENT FOR PROPERTY LOCATED AT 31441 AVENIDA DE LA VISTA (TRABUCO SEWER EMERGENCY REPAIRS) (RANCHO SIERRA VISTA EQUESTRIAN CENTER/P. HARRIS) (600.30) T As set forth in the Report dated June 21, 1994, from the Director of Engineering and Building, the License Agreement with Mrs. Patricia Harris was approved allowing the City to have improved access to the existing sewer easement located at Sierra Vista Equestrian Center to make emergency sewer repairs. The Mayor was authorized to execute the Agreement on behalf of the City. U • tet. • • : ulu_._ • JI4.�i]�\�l` 1.Y.I:II�IJ4���1:�I[9. • • • • • If As set forth in the Report dated June 21, 1994, from the Assistant to the City Manager, the Agreement with the County of Orange for Animal Control Services was approved for the period of July 1, 1994, to June 30, 1995, City Council Minutes -3- 6/21/94 9 1] AGENDA ITEM June 21 , 1994 TO: George Scarborough, City Manager FROM: William M. Huber, Director of Engineering & Building SUBJECT: Approval of License Agreement - Trabuco Sewer Emergency Repairs (Harris) RECOMMENDATION By motion, approve the License Agreement with Mrs. Patricia Harris to allow the City to have improved access to the existing sewer easement at Sierra Vista Equestrian Center and authorize the Mayor to execute the Agreement on the City's behalf. SITUATION Last winter's storms damaged the City's sewer crossing of Trabuco Creek in the vicinity of Mission Street. Since that time, the City Staff and consultants have been working on a design as an emergency measure to bypass the damaged crossing. Part of this emergency effort is the installation of a temporary force main in an existing easement on the Sierra Vista Equestrian Center property. Staff is recommending that the City enter into an agreement with Mrs. Patricia Harris to use an additional ten foot width of the existing Equestrian Center access road adjacent to the existing easement for ingress and egress to the existing easement. Staff is recommending that the City enter into an agreement with Mrs. Harris to allow the City to use this additional access. B. Background The City of San Juan Capistrano operates a 15" diameter sewer in an easement adjacent to Trabuco Creek along the east side of the creek. This is an important City sewer facility serving a substantial area of the City to the north of this area, as well as Capistrano Villas. In the vicinity of Mission Street the sewer crosses Trabuco Creek to Alipaz Street and ultimately to the SERRA Treatment Plant in Dana Point. The sewer crossing of Trabuco Creek was damaged in the storms of last winter. Although it is now operational again, it is highly susceptible to further storm damage. FOR CITY COUNCIL AGEN 3 Ll AGENDA ITEM -2- June 21, 1994 Ultimately, the City wishes to abandon the sewer along the east side of Trabuco Creek and reconstruct it in Avenida De La Vista. The new sewer would cross Trabuco Creek in the Ramos Street area downstream of the existing crossing where the channel is lined and where the sewer crossing will be protected. As a result of the winter's storm damage, the City hired Harris and Associates to design and manage the construction of an alternate sewer before the next winter storms. Most of this work will form the permanent reconstruction, however, part will be temporary, lasting maybe two years. The permanent reconstruction envisioned at this time will consist of the new crossing of Trabuco Creek near Ramos Street which was completed in January 1994, and a new sewer in Avenida De La Vista from the south cul-de-sac to Calle Santa Barbara. The temporary construction work at this time is envisioned to consist of some pipelines and a buried pumping station on private property adjacent to Trabuco Creek, shown on the attached location plan. Most of this work will be on Mr. Hideo Shibata's property and agreements are already in place for this work. The City already possesses a 10 foot wide sewer easement on the Sierra Vista Equestrian Center property. Temporary construction will also include a force main from the temporary pump station to Avenida De La Vista to be constructed in this easement. City Staff has discussed the situation with the Sierra Vista Equestrian Center owner, Mrs. Harris, and is recommending that the City enter into a License Agreement with her to have improved access to the existing sewer easement. The Agreement provides that construction work will not unduly impact access to the Equestrian Center and that the contract documents will require traffic control such as signs directing Equestrian Center traffic to the Center's north entrance. COMMISSION/BOARD REVIEW RECOMMENDATIONS N/A FINANCIAL CONSIDERATIONS There are no financial implications with this action. NOTIFICATION Mrs. Patricia Harris • • AGENDA ITEM -3- ALTERNATE ACTIONS June 21, 1994 Approve the License Agreement with Mrs. Harris and authorize the Mayor to execute the Agreement. 2. Do not approve the License Agreement. Request additional information from Staff. By motion, approve the License Agreement with Mrs. Patricia Harris to allow the City to have improved access to the existing sewer easement at Sierra Vista Equestrian Center and authorize the Mayor to execute the Agreement on the City's behalf. Respectfully submitted, Prepared by —� William M. Huber, P.E. Brian Perry, P.E. Project Manage: his WMH/BP:ssg Attachments: 1. Project Location Plan 2. License Agreement a:\agendas\6-21 hris.bp L IG l PROPOSED EMERGENCY SEWER TO BYPASS EXIST. TRABUCO CREEK CROSSING CITY OF SAN JUAN CAPISTRANO I TRABUC0 SEWER EMERGENCY REPAIRS CITY CLERK'S DEPARTMENT - ACTION REMINDER TO: Brian Perry, Senior Civil Engineer FROM: Dawn M. Schanderl, Deputy City Clerk DATE: June 15, 1995 SITUATION: At their meeting of June 21, 1994, the City Council approved the License Agreement with Patricia Harris (Rancho Sierra Vista Equestrian Center) to allow the City improved access during construction of a temporary sewer pipeline and a buried pumping station for the sewer which crosses Trabuco Creek. ACTION REQUESTED: Agreement states that the temporary license granted to the City will expire on either December 31, 1994, or at the filing of a Notice of Completion for the construction or an extension of the agreement. On January 5, 1995, agreement was extended to June 30, 1995. Please notify this office of agreement status. ACTION TO BE TAKEN: L�� L'�j - DATE WHEN NEXT ACTION (S) SHOULD BE TAKEN: Z C t' SIGNATURE OF OFFICIAL TAKING ACTION: J DATE SIGNED: 6 A ***EOR CITY CLERK'SDEPARTMENT USE ONLY"* Tickler Date: 12/01194 06115195 Deadline Date: 12131/94 06130/95 cc: Department Head City Attorney (600.301harrisp) 6/ 1q/g5 F Ci lny iq-? a r., CITY CLERK'S DEPARTMENT - ACTION REMINDER TO: Brian Perry, Senior Civil Engineer -7l 19q� FROM: Dawn M. Schanderl, Deputy City Clerk DATE: Decembers, tom' SITUATION: At their meeting of June 21, 1994, the City Council approved the License Agreement with Patricia Harris (Rancho Sierra Vista Equestrian Center) to allow the City improved access during construction of a temporary sewer pipeline and a buried pumping station for the sewer which crosses Trabuco Creek. ACTION REQUESTED: Agreement states that the temporary license granted to the City will expire on either December 31, 1994, or at the filing of a Notice of Completion for the construction or an extension of the agreement. Please notify this office of agreement status. ACTION TO� DATE WHEN NEXT ACTION (S) SHOULD BE TAKEN: SIGNATURE OF OFFICIAL TAKING ACTION: Zt�1 DATE SIGNED: r4-71Q� r* * *FOUR CITY CLERK'S DEPARTMENT USE ONLY*** Tickler Date: �il9if9! Y Deadline Date: 12131194 cc: Department Head City Attorney (600.301harris) 12117111/ � • DRUG USE IS B January 6, 1995 Rancho Sierra Vista Equestrian Center 31441 Avenida De La Vista San Juan Capistrano, CA 92675 Re: Trabuco Sewer Emergency Repair Dear Sir: MEMBERS OF THE CITY COUNCIL COLLENE CAMPBELL MATT HART OILJONES CAROLYN NASH DAVID SWERDLIN CITY MANAGER In June 1994, the City entered into a License Agreement with you to allow improved access during construction of the above subject project. The agreement would terminate on December 31, 1994 on the filing of the project Notice of Completion, unless extended by mutual agreement. This letter is to request your agreement to extend the agreement to terminate when the first of the following events occurs: a) June 30, 1995 b) Filing of a Notice of Completion of construction. All other terms of the agreement would remain in effect. Please sign below your concurrence with the extension of the agreement as outlined above. RANCHO SIERRA VISTA EQUESTRIAN CENTER OWNER Patricia Harris 32400 PASEO ADELANTO, SAN JUAN CAPISTRANO. CALIFORNIA 92675 0 (714) 493-1171 r Rancho Sierra Vista Equestrian Center January 6 1995 Page 2 Construction work is now underway and I hope to meet with you soon with the contractor to coordinate his work with the Equestrian Center operations. If you have any questions, please feel free to call me at (714) 443-6353. truly yours, . Zee. Brian Perry Senior Civil Engineer BP:ssg / cc: Cheryl Johnson 6ele bean\1-6eques.let i MINIM 1961 1776 June 23, 1994 Patricia Harris Rancho Sierra Vista Equestrian Center 31441 Avenida de la Vista San Juan Capistrano, California 92675 Re: License Agreement for Tempos Pumping Stations and Pipelines Dear Mrs. Harris: MEMBERS OF THE CITY COUNCIL COLLENE CAMPBELL GARY L. HAUSOORFER GIL JONES CAROLYN NASH JEFF VASQUEZ CITY MANAGER GEORGE SCARBOROUGH At their meeting of June 21, 1994, the City Council of the City of San Juan Capistrano approved the License Agreement with you to allow the City improved access during construction of a temporary sewer pipeline and a buried pumping station for the sewer which crosses Trabuco Creek. The temporary license granted to the City will expire on either December 31, 1994, or at the filing of a Notice of Completion for the construction, whichever occurs first. A fully -executed copy of the License Agreement is enclosed for your files. If you need any additional information, please let us know. Thank you for your cooperation in this matter. Very truly yours, Cheryl Johnson City Clerk Enclosure cc: Director of Engineering and Building (with copy of Agreement) Brian Perry, Project Manager (with copy of Agreement) 32400 PASEO ADELANTO, SAN JUAN CAPISTRANO. CALIFORNIA 92675 • (714) 493-1171