Loading...
1980-1015_GRIFFITH COMPANY_Contract14-.80Po X957 5;3 RECORDED AT THE REQUEST OF RECORDING FEES EXEMPT DUE TO AND RETURN TO: GOVERNMENT CODE SECTION 6103 City of San Juan Capistrano p Office of the City Clerk 32400 Paseo Adelanto Mary An anover, City Clerk San Juan Capistrano, CA 92675 C13 City ofSan Juan Capistrano, CA NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN that the contract heretofore awarded by the City Council of the City of San Juan Capistrano, California, to Griffith Company, P. 0. Box BT, Irvine, California, 92716, who was the company thereon for doing the following work, to wit: CAMINO DEL AVION IMPROVEMENTS That said work was completed by said company according to plans and specifications and to the satisfaction of the City Engineer of the City of San Juan Capistrano, and that said work was accepted by the City Council of the City of San Juan Capistrano, at a regular meeting thereof held on the 19th day of May 1981 , by Resolution No. 81-5-19-3 That upon said contract the United Pacific Insurance Company was surety for the bonds given by the said company as required by law. Dated at San Juan Capistrano, California, this 19th day of May , 19 81 . r Mary Ann H ver, City Clerk of the City df San Juan Capistrano STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss CITY OF SAN JUAN CAPISTRANO ) I, MARY ANN HANOVER, the duly appointed and qualified City Clerk of the City Council of the City of San Juan Capistrano, California, do hereby certify under penalty of perjury that the foregoing NOTICE OF COMPLETION is true and correct, and that said NOTICE OF COMPLETION was duly and regularly ordered to be recorded in the Office of the Orange County Recorder by said City Council. Dated at San Juan Capistrano this 19th day of May 1981 . (SEAL) NECONOEOINOF IAl ROS Mary Ann nover, City Clerk of O100 OIGN017!! OE OfUNP(, CIILIf0AM1A San Juan apistrano .1135 PM JUN 1 '81 ' CITY COPY ' CONTRACT 1 I L This contract is made and entered into by and between the CITY OF SAN JUAN CAPISTRANO, hereinafter referred to as City and GRIFFITH COMPANY hereinafter referred to as CONTRACTOR. IT IS HEREBY AGREED BETWEEN THE PARTIES AS FOLLOWS: FIRST. CONTRACT DOCUMENTS. The contract documents shall be considered to include the Notice Inviting Bids, the Instructions to Bidders, the Proposal, the Bid Bond, the Non -Collusion Affi- davit, the Designation of Sub -Contractors, the Contract which is 'prepared for execution by the City and the Contractor, plans, specifications and special provisions, contract bonds, resolu- tions adopted by the City Council pertaining to the work, in- surance policies and certificates, and any supplemental written agreements amending or extending the scope of the work originally contemplated that may be required to complete the work in a substantial and acceptable manner. SECOND. THE WORK. CONTRACTOR agrees to furnish all tools, labor, material, equipment, transportation, and supplies neces- sary to perform and complete in good and workmanlike manner the ' construction of Camino Del Avion Improvements - Alioaz to 400' east of Descanso in strict confor- mity with the Plans, Specifications and all other contract docu- ments, which documents are on file at the Office of the City Clerk, City Tial]., 32400 Paseo Adelanto, San Juan Capistrano, California. ' THIRD. PAYMENT. City agrees to pay, and CONTRACTOR agrees to accept, the lump sum adjusted for variations of quantities, at ' the prices designated in bid proposal at the time and in the manner set forth in the Specifications. 1 -16- FOURTH. COMMENCEMENT AND COMPLETION OF THE WORK. CONTRACTOR ' agrees to begin and complete the work within the time specified in the Notice Inviting Bids. It is agreed that it would be im- practicable and extremely difficult to fix the actual amount of ' damages, and loss sustained by City, should CONTRACTOR fail to complete the work in the specified time; therefore, CONTRACTOR ' shall pay City, as liquidated damages, not in the nature of a penalty, one hundred dollars ($100) a day for each day delayed; provided that extensions of time with waiver of liquidated damages, may be granted as provided in the Specifications. ' FIFTH. PERFORMANCE BOND AND LABOR. AND MATERIAL BOND. Contractor agrees to furnish bonds guaranteeing the performance of this con- tract and guaranteeing payment of all labor and material used .under this contract, as required by the laws of the State of Cali- fornia, on forms approved by City. The Performance Bond shall be for an amount of one hundred percent (100%) of the amount of ' this contract and shall be conditioned on full and complete per- formance of the contract,.guaranteeing the work against faulty ' workmanship and materials for , period of one (1) year after com- pletion and acceptance. The.Labor and Material Bond shall be for an amount of one hundred percent (100%) of the amount of this ' contract and shall be conditioned upon full payment of all Labor and Material entering into or incidential to the work covered by ' this contract.' CONTRACTOR agrees to furnish the bonds on the forms found within the Specifications. ' SIXTH. GENERAL PREVAILING RATE OF PER DIEM WAGES. Pursuant to the Labor Code of the State of California, copies of the pre- vailing rate of per diem wages, as determined by the Director of the State Department of Industrial Relations, are on file ' in the office of the City Clerk, 32400 Paseo Adelanto, San Juan Capistrano, California, and are hereby incorporated and made a 1 -17- r ' part hereof. CONTRACTOR agrees that he, or any SUB -CONTRACTOR under him, shall pay not less than the foregoing specified pre- vailing rates of wages to all workmen employed in the execution of the contract. ' SEVENTH. INSURANCE. CONTRACTOR agrees to carry Public Liability, ' Property Damage, and Workmen's Compensation Insurance in amounts as required by the Specifications. ' EIGHTH. COMPLIANCE WITH OTHER PROVISIONS OF LAW RELATIVE TO PUBLIC CONTRACTS. City is subject to the provisions of the ' Government Code and the Labor Code of the State of California. It is stipulated and agreed that all provisions of law applicable ' to public contracts are a part of this contract to the same ex- tent as though set forth herein and shall be complied with by ' CONTRACTOR. These include, but are not limited to, the stipula- tion that eight (8) hours labor constitute a legal day's work ' and CONTRACTOR shall, as a penalty to City, forfeit twenty-five dollars ($25) for each workman employed in the execution of the Contract by CONTRACTOR, or by, any SUB -CONTRACTOR, for each calen- dar day during which such workman is required or permitted to work more than eight (8) hours in violation of the provisions ' of Article Three, Chapter One, Part Seven, Division 2, of the California Labor Code, except as permitted by law. '. INWITNESS WHEREOF, this contract is executed by the duly authorized agent(s) of City, pursuant to.Council action, and by CONTRACTOR on the date set before t name of each. Y OF SA CAP ISTRANO 1 DATED: October 15, 1980 BY ARY L HAUSDORFER, MA OR ' APPROVED AS TO FORM: C11x t� i�eXTY CLERK CITY ATTORNEY ' GRIFFITH COMPANY CONTRAC O DATED: ' BY JAMES D. WALTZE VICE PRESIDENT -18- E 0 RESOLUTION, NOTICE OF COMPLETION AND FINAL REPORT - CAMINO DEL AVION IMPROVEMENTS (GRIFFITH COMPANY) (38) Written Communications: V'(83) Report dated May 19, 1981, from the Director of Public Works advising that the storm drain and street improvements for Camino del Avion have been completed to the satisfaction of the City Engineer. Acceptance of Work: It was moved by Councilman Buchheim, seconded by Councilman Hausdorfer that the following Resolution be adopted: RESOLUTION NO. 81-5-19-3, COMPLETION OF CAMINO DEL AVION IMPROVEMENTS - A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, DECLARING WORK TO BE COMPLETED AS TO PLANS AND SPECIFICATIONS FOR IMPROVEMENTS TO CAMINO DEL AVION The motion carried by the following vote: AYES: Councilmen Friess, Buchheim, Bland, Hausdorfer and Mayor Schwartze NOES: None ABSENT: None The Resolution accepts the project as complete and directs The City Clerk to forward the Notice of Completion to the County Recorder within 10 days, all subject to the approval of the City Engineer. Payment status is as follows: Total Project cost: $506,236.02 Less 108 retention: 50,623,60 Total due to date: 455,612,42 Previous payments: 438,625.43 Amount due 16,986.99 The 108 retention is payable 35 days after recordation of the Notice of Completion; staff is authorized to make the payments as indicated. t' AGENDA ITEM • May 19, 1981 TO: James S. Mocalis, City Manager FROM: W. D. Murphy, Director of Public Works SUBJECT: Resolution, Notice of Completion and Final Report-AHFP 1022 Camino del Avion (Griffith Company) SITUATION The storm drain and street improvements for Camino del Avion have been judged completely by the City Engineer and are ready for acceptance by the City Council and recordation with the County Recorder. FINANCIAL CONSIDERATIONS The current payment status is as follows: Total project cost $506,236.02 Less 10% retention 50,623.60 Total due to date 455,612.42 Previous payments 438,625.43 Amount due $16,986.99 There is $360,000 in the system development fund to pay for $224,997.64 of street work and $600,000 in the drainage fund for $278,172.38 of the Del Avion Storm Drain. Toreal Investment (Tract 11086) has contributed $83,783.60 toward their portion of the project and the county AHFP fund has $165,000 available. City Council awarded this project October 15, 1980 for $479,088.57. ALTERNATE ACTIONS 1. Accept the project as complete. 2. Do not accept the project as complete. 3. Request further information from staff. RECOMMENDATION By resolution, determine that the work has been completed and declare the work to be accepted. Direct that within ten days from the date of acceptance a Notice of Completion be filed with the County Recorder. The total amount of work performed under this contract is $503,170.02. Direct staff to release the 10% retention thirty five days after the recordation of the Notice of Completion. Respectfully submitted, tW. I..Muu .� W. D. rp y WDM:MG/dll 111 Attach. FOR CITY COUNCIL AGENDA . �- - • '1 I O y RESOLUTTN NO. 81-5-19-3 COMPLETION OF CAMINO DEL AVION IMPROVEMENTS A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, DECLARING WORK TO BE COMPLETED AS TO PLANS AND SPECIFICATIONS FOR IMPROVEMENTS TO CAMINO DEL AVION WHEREAS, on the 15th day of October, 1980, the City of San Juan Capistrano entered into a contract with Griffith Company for improvements to Camino del Avion; and, WHEREAS, the Director of Public Works has evaluated the final quantities and cost figures and recommends approval. NOW, THEREFORE, the City Council of the City of San Juan Capistrano does resolve as follows: SECTION 1. That the work required to be performed by said contractor has been completed. SECTION 2. That the total cost of said work is in the amount of 506,236.02. SECTION 3. That the work is hereby accepted and approved. SECTION 4. It is further ordered that a "Notice of Completion" be recorded, on behalf of the City, in the office of the County Recorder of the County of Orange within ten (10) days of the date of this Resolution. PASSED, APPROVED AND ADOPTED this 19th day of May 1981 , by the following vote, to wit: AYES: Councilmen Friess, Buchheim, Bland, Hausdorfer and Mayor Schwartze NOES: None ABSENT: None PHILLIP R. SCHWARTZE, MAY ATTEST: CITY1 -1- r • CARLOS BEA RICHARD J. ]DELL CARLOS BEA A LAW CORPORATION fill FRONT STREET SAN FRANCISCO. CALIFORNIA 94111 (415) 788-5700 City of San Juan Capistrano City Clerk's Office 32400 Paseo Adelanto San Juan Capistrano, CA E April 30, 1981 t`3 r RECEIVED t`V1or, ' slJ Ll$'f, AXE5 TELEX: 278627 C1rtY GF SAN C,4 RE: Stop Notice filed by American Pacific Concrete Pipe Company Dear Sir or Madame: This is to advise you that the Stop Notice filed by my client AMPAC, Inc., a copy of which is attached, is hereby rescinded. Very trul CARLOS OFjJA 14W, CORPORATION LM J. I RJI:lma Attachment cc: Ms. Elizabeth Cox, AMPAC, Inc. • 0 10. APPROVAL, OF CHANGE' ORDER NO. 3 - A.H.F.P. 1022, CAMINO DEh AV108 (38) Channe Order No. 3 was approved at $29,840.68 for extra work (83) performed due to unstable soil conditions as set forth in the report dated Aeril 21, 1981, from the Director of Public Works. q/a i /$ n U AGENDA ITEM April 21, 1981 TO: James S. Mocalis, City Manager FROM: W. D. Murphy, Director of Public Works SUBJECT: Approval of Contract Change Order #3, AHFP 1022 Camino Del Avion Improvements (Griffith Company) SITUATION While trenching for the 81 inch diameter pipe on Camino Del Avion unsuitable soil conditions were discovered. Overexcavating an additional two feet and backfilling with a more suitable material was necessary to provide a proper foundation and avoid buckling and settling of the pipe. FINANCIAL CONSIDERATIONS The cost of this change order for exporting the unsuitable material and importing backfill is $29,840.88. Since the price bid for the project was $479,088.57, this represents an increase of 6.2%. There is $600,000 budgeted in the 1980-81 budget for the Del Avion Storm Drain. 25% of the cost of this phase of the storm drain is being borne by the County AHFP Fund. ALTERNATE ACTIONS 1. Approve the contract change order. 2. Do not approve the contract change order. 3. Refer to staff for additional information. RECOMMENDATION By motion, approve Contract Change Order #3 for AHFP 1022, Camino Del Avion Improvements in the amount of $29,840.88. Respectfully submitted, ///a'v/"k� W. D. Murphy [� WDM:MG/rem Encl. FoR -'ITY COUNCIL AGENDA•..• CONTRACT CHANGE ORDER REQUEST FOR APPROVAL CITY SAN JUAN CAPISTRANO AHFP `:n. 1022 PROJECT Camino Del Avion CCO No. 3 CONTRACTOR Griffith Company DESCRIPTION Remove and haul away unsuitable material. Import backfill for mainline storm drain. QUANTITY SUICIARY - TRIS CCO ITEM 110. DESCRIPTION INCREASE (DECREASE) 0 AMOUNT TOTAL $ EXTRA WORK, DESCRIPTION Tickets 1261, 1262, 1263, & 1264 Remove unsuitable materials and 12621 TOTAL CHANGE COST SUTL`fARY Increase (decrease) of Contract items Extra Work TOTAL Percent Change THIS CCO * AHFP NON ** AHFP (2358.) (7074.50) 7460.22 22380.66 7460.22 22380.66 0.2) ' (0.3) PREV. CCO's * AHFP NON ** IfflFP (2358.) (7074.50) 7460.22 22380.66 (2358.00 (7074.5 0.2) ' (0.3) 01 ContractorG ITH1 Y Date *Costs eligible for Approved _T ¢ 8/ AFIF'P funding: $121,570 City Engineer, George M. Lohnes, Jr. Date ** City only costs, or Concurred other non-AHFP Orange County MIT Field Representative Date eligible costs: $234,870 Approved _ Orange County EVA -Development Date $ 29,840.88 $ 29,840.88 TOTAL TO DATE AHFP AH1'P (2358.00) (7074.50) 7460.22 22380.66 F5102.22 15306.16 4.90 9.2% RECEIVED AmpaC MAR 26 i2 5�` °I' AMERICAN PACIFIC CONCRETE PIPE COMPANY, INC. P.O. BOX 1409 • UPLAND, CALIFORNIA 91786 �' �. Telephone 714-985-1839 March 17, 1981 City of San Juan Capistrano 32400 Paseo Addlanto San Juan Capistrano, CA 92675 RE: Camino Del Avion Street Improvement A.H.S.P. 1022 Gentlemen: Enclosed please find our Stop Notice. Please file the original and return a file -marked copy to us in the envelope provided. Also enclosed is our check for $2.00, covering the fee to comply with our request that you give us notice of the expiration of the Stop Notice period, by any of the following methods, within 10 days after completion of that period: Filing a notice of completion, acceptance by your entity, or cessation of labor for long enough to constitute completion on public projects where cessation can serve that role. Sections 3086, 3210, 3185 of the Civil Code. We would appreciate your sending such notice to our attorney, Carlos Bea, Esq., 611 Front Street, San Fran- cisco, California 94111. Very truly yours, AMERICAN PACIFIC CONCRETE PIPE COMPANY, INC. (;6- Elizabeth Cox Asst. Corporate Secretary 0 Stop Notice 0 NOTICE T6 City of San Juan Capistrano Name 32400 Paseo Adelanto San Juan Capistrano (Public Body or Lender) (If Public Job — file with office of controller, auditor, or other public disbursing officer whose duty it is to make payments under provisions of the contract.) (If Private Job —file with responsible officer or person at office or branch of construction lender administering the construction funds.) Prime Contractor: Griffith Company Sub Contractor (If Any) Wayne Holland Owner or Public Body: an Juan Capistrano, City o Improvement known as Camino del Avion Street Alioaz - 4001 Fast of Tlosranen (name and address of project or work of improvement) in the City of San Juan Capistrano County of Orange State of California. American Pacific Concrete Pipe Co., Inc. ,claimant, a Corpon (Claimant) (Corporation partnership)Sole Propritetorshlp) furnished certain labor, service, equipment or materials used in the above described work of improvement. The name of the person or company by whom claimant was employed or to whom claimant furnished labor, service, equipment or materials is Wayne Holland (Name of Subcontmctor/Contmctor/Owner-But7der) The kind of labor, service, equipment or materials furnished or agreed to be furnished by claimant was reinforced concrete pipe (Describe in detail) Total value of labor, service, equipment or materials agreed to be furnished .......... $ 77,062.00 Total value of labor, service, equipment or materials actually furnished is . .. .. ...... $ 82.608.75 Credit for materials returned, if any ......................... ... $ Amount paid on account, if any .. . . .. .. .. . ... .. .. . .. . .. .... .. $76,208.75 C� 7. APPROVAL OF CHANGE ORDER NO. 2, EXTENSION OF TIME, CAMINO DEL AVION IMPROVEMENTS (GRIFFITH) (38) A 40 -day time extension for completion of the Camino Del (83) Avion Improvements to May 9, 1991, was approved due to rainy weather. 3/,7/gj AGENDA ITEM March 17, 1981 TO: James S. Mocalis, City Manager FROM: W. D. Murphy, Director of Public Works SUBJECT: Approval of Time Extension - Camino Del Avion AHFP 1022 (Griffith Company) SITUATION Staff is requesting a 40 -day time extension to complete the Camino Del Avion project. The time extension is due to the rainy days in February and March; the new completion date is May 9, 1981. FINANCIAL CONSIDERATION There are no financial impacts by this action. ALTERNATE ACTIONS 1. Approve the time extension of forty days. 2. Do not approve the time extension. 3. Request further information from staff. RECOMMENDATION By motion, approve the time extension of 40 days for Camino Del Avion, AHFP 1022 to a new completion date of May 9, 1981. Respectfully submitted, W. D. Murph� WDM:GA/rem Encl. FOR GMCOUNCIL- AGENDA .nae °a® CITY PROJECT CONTRACTOR DESCRIPTION CONTRACT CHANGE ORDER REQUEST FOR APPROVAL SAN JUAN CAPISTRANO Del Avion 1022 Griffith Company 0 AHFP No. CCO No. QUANTITY SUMI4ARY - THIS CCO ITER INCREASE NO. DESCRIPTION (DECREASE) 1 Time extension of 40 days; none completion_ date, Play 9, 1981 EXTRA WORK COST SUPlPlARY Increase (decrease) of Contract items Extra Work TOTAL Percent Change THIS CCO AHFP NON A11FP -0- -0- -0- -0- -0- -0- -0- -0- DESCRIPTION TOTAL TOTAL CHANGE PREV. CCO's AHFP NON AHFP -0- -0- -0- -0- -0- -0- ---I- - -0- 2 1022 AMOUNT $ -0- TOTAL TO DATE AHFP NON AHFP -0- -0- -0- -0- -0- -0- -0- -0- �!_�-_,�%:G2.L-(iii Contractor GRIFFITH COMPANY Date Approved City Engineer Date Concurred Orange County AHFP Field Representative Date Approved Orange County EMA-Development Date 4. UNITED PACIFIC INSURANCE COMPANY HOME OFFICE. TACOMA. WASHINGTON PERFORMANCE BOND CALIFORNIA -PUBLIC CONTRACT Bond No. U34 35 42 Premium: $3,593.00 Executed in 3 Counterparts KNOW ALL MEN BY THESE PRESENTS: That GRIFFITH COMPANY P. 0. Box B -T, Irvine, California 92716 ---------------------- as Principal, and the UNITED PACIFIC INSURANCE COMPANY, a Washington corporation author- ized to execute bonds in the State of California, as Surety, are held and firmly bound unto the CITY OF SAN JUAN CAPISTRANO------------------------------------- as Obligee, in the sum of Four Hundred Seventy -Nine Thousand, Eighty -Eight and 57/100 ---------------------------------------------------------------------- Dollars($479,088.57----- ) for which sum we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally by these presents. THE CONDITION of the above obligation is such that, Whereas the Principal has entered into a contract, dated , 19 , with the Obligee to do and perform the following work to -wit: Construction of Camino Del Avion Improvements - Alipaz to 400' East of Descanso Now, THEREFORE, if the said Principal shall well and truly perform the work contracted to be performed under said contract, then this obligation shall be void; otherwise to remain in full force and effect. Signed and sealed this 27th day of October 19 80 GRIFFITH CO ANY JAMES D. WALTZE __,,. •„ . - Y1QE_ PRESIDENT (Seal) U TED A INSURANCE COMPANY B........................................................ Douglas son Attomeyin•Fact BDU-2801 CAL. - CONTRACT - PUBLIC - PERFORMANCE B-2035 0 z 0 m W U z Q Ir Ir 0 w M 5 } Z z O a� G �a m a z 0- < a z 3 ¢ d x � h O Z U -a O U H F �w U U aLL LL 00 U,LU zo � x This Notice is hereby given and published by order of the City Council of the City of San Juan Capistrano, and is dated this 12th day of September, 1980 �Z CITY CLER1 CITY OF SAN JUAN CAPISTRANO ORANGE COUNTY, CALIFORNIA 0 -3- The successful bidder, simultaneously with the ekecution of the contract, will be required to furnish a Faithful Perfor- mance Bond equal in the amount of one -hundred percent (100%) of the contract price. The City Council reserves the right to reject any and all bids received and to compare the relative merits of the respective bids and to choose that which in the opinion of said City will best serve the interests or needs of said City. A time limit of one hundred and fifty days has been set for the completion of the work, from the date of execution of the contract. BIDDERS ARE HEREBY NOTIFIED THAT, pursuant to the Labor Code of the State of California, copies of the prevailing rate of per diem wages, as determined by the Director of the State Department of Industrial Relations, are on file in the office of the City Clerk and shall be made available to any interested party on request. Copies of Plans and Specifications one on file in the office of the City Clerk of San Juan'Capistrano, 32400 Paseo Adelanto, San Juan Capistrano, California. Copies of the plans and speci- fications for use in preparing bids may be obtained at the office of the City Clerk, San Juan Capistrano, at the address shown _ above. One set of plans and specifications is available for each general contractor proposing to submit a bid for said work. A charge in the amount of $10, nonrefundable, is required for obtaining each set of plans and specifications. There will be a $5 charge for postage and handling on all plans and specifications mailed. Each bidder shall state the California Contractor's License - number of such bidder so bidding, as no bid will be accepted from a Contractor who has not been licensed in accordance with the _ provisions of the laws of the State of California relating to the licensing of Contractors. -2- 0 NOTICE INV IT IN G B I D S Public notice is hereby given that the City of San Juan Capistrano will up to 2:00 p.m. on the 8th day of Oct. 1980, receive sealed proposals or bids for the Camino Del Avion Improvements - Alipaz to 400' east of Descanso , in accordance with the approved plans and specifications on file in the office of the City Clerk of the City of San Juan Capistrano, California. Bids will be received until the time hereinbefore stated at the San Juan Capistrano City Hall, 32400 Paseo Adelanto, San Juan Capistrano, California. No bid will be'received unless it is made on a proposal provided within these specifications. Each proposal. or bid mist be accompanied by a certified check, cash, cashier's check or .bidder's bond payable to the City of San Juan Capistrano in the sum of not less than ten percent of the amount. The bid check, cashier's check or bidder's bond of the successful bidder will be forfeited to said City in the event such successful bidder fails to enter into the required contract within 15 days after the written notice that said contract has been awarded to him for the work. A pre-bid conference is scheduled at 10:00 a.m. on the 1st day of Oct. , 1980, at the City offices. The con- tractor shall have the opportunity for clarification or interpre- tation of any point or points of question within the plans and contract documents or specifications. It is the contractor's responsibility to be in attendance at this conference to receive any information disclosed during the proceedings, for the City shall not disseminate any records of the conference. Exclusive of• written addendums and this pre-bid conference, the City shall not be responsible for any instructions, explanations, or inter- pretation of the plans, specifications, and contract documents presented to the bidders in any manner. - 1 - NOTICE INVITING BIDS CAMINO DEL AVION IMPROVEMENTS - ALIPAZ STREET TO 400 FZET EAST OF DESCANSO Notice is hereby given that the City of San Juan Capistrano will receive sealed proposals or bids for the improvement of Camino del Avion from AlioaZ Street to 400 £eg_t_eaB�L_of nPScanso until 2:00 p.m. on the 8th day of October , 1980 A pre-bid conference is scheduled at 10:00 a.m. on the 1st day of October 1980 , at the City offices to assist contractors. Copies of Plans and Specifications are on file in the Office of the City Clerk of San Juan Capistrano,, 32400 Paseo Adelanto, San Juan Capistrano, California, and may be obtained at a non-refundable charge of $10.00 , plus a $5.00 charge for postage and handling on all plans and specifications mailed. Dated:September 12, 1980 o CITY CLEW CITY OF AN JUAN CAPISTRANO, . ORANGE COUNTY, CALIFORNIA NOTICE OF TRANSMITTAI LEGAL PUBLICATIONS TO: DAILY SUN -POST Helen Nielsen, Legal FOR PUBLICATION ON: MONDAY, SEPTEMBER 22, 1980 and MONDAY, SEPTEMBER 29, 1980 DOCUMENT(S) TO BE PUBLISHED: NOTICE INVITING BIDS - CAMINO DEL AVION IMPROVEMENTS - ALIPAZ STREET TO 400 FEET EAST OF DESCANSO 'r'' PROOF OF PUBLICATION: Please send to: • Office of the City Clerk City Hall 32400 Paueo Adelanto San Juan Capistrano, CA 92675 AUTHORIZED BY: DATE: September 16, 1980 0 pate of Bid Opening 10/8/80 Date(s) notice published 9/22/80 and 9/29/80 Date affidavit received Date notice posted in designated posting places (3) 9/22/80 Date notice(s) posted on property n/a Date of mailing notices to property owners n/a PROOF OF PUBLI( ION (2015.5 C.C.P.) STATE OF CALIFORNIA, County of Orange City of San Clemente I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a party to or interested in the above -entitled matter. 1 am the principal clerk of the printer of the San Clemente Sun -Post a newspaper of general circulation printed and DAILY published.............. I ..................................... .................. in the City of San Clemente County of Orange, and which newspaper has been adjudged a newspaper of general circulation by the Superior Court of the County of Orange, State of California under the date of March 11, 1360, F Case Number A9140; that the notice, of which the annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to -wit: _......................._.... September_22- ............ ........................ all in the year 19.80 I certify (or declare) under penalty of perjury that the foregoing Is true and correct. Dated at San Clemente, California, this 29th day of September 80 �.... . 19........... Signature SAN CLEMENTE PUBLISHING CORP. 1542 North El Camino Real - P.O. Box 367 San Clemente, Calif. 92672 - Phone 714-192-5121 This spacev the County Clerk's inning Sump RLrCE!'✓f p CIT''K OF s44N �, d ' S Proof of Publication 10 P 7 � �G' NOTICE INVITING BIDS ............................................................................._.. „.... UNITED CCD,2PANY HOME OFFICE, TACOMA, WASHINGTON POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, That the UNITED PACIFIC INSURANCE COMPANY, a corporation duly organized under the lawsof the Stateof Washington, does hereby make, constitute and appoint FRANCIS G. JARVIS, JR. of NESJPORT BEACH, CALIFOR?iIA---------- its true and lawful Attorney:n-fact, to make execute, seal and deliver for and on its behalf• and as its act and deed ANY AND ALL BONDS AND UNDERTAKINGS OF SURETYSHIP ----------------- and to bind the UNITED PACIFIC INSURANCE COMPANY thereby as fully and to the same extent as if such bonds and undertakings and other writings obligatory in the nature thereof were signed by an Executive Officer of the UNITED PACIFIC INSURANCE COMPANY and sealed and attested by one other of such officers, and hereby ratifies and confirms all that its said Attorneys) -in -fact may do in pursuance hereof, This Powei of Attorney is granted t der and by authority of Section 37A of the By -Laws of UNITED PACIFIC INSURANCE COMPANY which provisions are now in full force and effect, reading as follows: SECTION 37A — ATTORNEYS -IN -FACT SECTION 1. The Board of Directors, the President, or any Vice -President or Assistant Vice -President shall have power and authority to: (a) appoint Attorneys -in -fact and to authorize them to execute on behalf of the Company, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof, and Ib) to remove any such Attorney-in-fact at any time and revoke the power and authority given to him. SECTION 2. Attorneys.intact shall have power and authority, subject to the terms and limitations of the power of attorney issued to them, to execute and deliver on behalf of the Company. bonds and undertakings; recognizances, contracts of indemnity and other writings obligatory in the nature thereof, The corporate seal is not necessary for the validity of any bonds and undertakings, recognizances• contracts of indemnity and other writings obligatory in the nature thereof. This tower of attorney is signed and sealed by facsimile under and by authority of the following Resolution adopted by the Board of Directors of UNITED PACIFIC INSURANCE COMPANY at a meting held on the 26th day of October, 1971, at which a quorum was present,and said Resolution has not been amended or repealed:' "Resolved, that the signatures of such directors and officers and the seal of the Company may be affixed to any such power of attorney or any certificate relating thereto by facsimile, and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by .. facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond of undertaking to which it is attached! - - IN WITNESS WHEREOF. the UNITED PACIFIC INSURANCE COMPANY has caused these presents to be signed by its Vice -President. and its corporate seal to be hereto affixed. this 2nd day of February 1978 STATE OF Washington COUNTY OF Pierce On this 2nd day of - February , 1978, personally appe; UNITED PACIFIC INSURANCE COMPANY - Vice—President W.M. J. COTTER , to me known to be the Vice -President of the UNITED PACIFIC INSURANCE COMPANY, and acknowledged that he executed and attested the foregoing instrument and affixed the seat of said corporation thereto, and that Section 37A.Zection 1 and 2 of the By -Laws of said Company and the Resolution• set forth therein, are still in full force. My Commission Expires: January 15 82 3 ':R Washingt� • 19 -- ?;la"^ Notary Pubiie in and for Slate of. '. iuioc le . Residing at Tacoma 1, Gerald C. Lyon . Assistant Secreiary of the UNITED PACIFIC INSURANCE COMPANY.• do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney executed by said UNITE PACIFIC INSURANCE COMPANY.which is stilt in full . force and of tett. IN WITNESS WHEREOF. I have hereunto set my hand and affixed the seat of said COmpaCy119 O LU day or BDU-1431 ED.2.72 BID BOND Bond No. 95-33-78 KNOW ALL MEN BY THESE PRESENTS, �.7 ItTh�;ant pwpei GRIFFITH COMPANY , as Principal, and YKSff NCE'CC61t,�ANY existing under the laws of the State of Washington , and whose principal office is located in the City of Tacoma , as surety are jointly and severally bound unto the CITY OF SAN JUAN CAPISTRANO of Orange County, California, in the sum of TEN PERCENT (1011 OF THE DOLLARS y TOTAL AMOUNT BID IN---------- ($ ----------------- ), lawful money of the United States of America to be paid to the said CITY OF SAN JUAN CAPISTRANO, for which payment well and truly to be made, we bind ourselves, our heirs, successors, executors, administrators and assigns, jointly and severally, by these presents. THE CONDITION OF THIS OBLIGATION is such that whereas the Principal has submitted the accomp ap,y��n�a ,,bid dated October 8 , 19 80 , for construction of caW11opaaeJo X6TnEa-s'�royeaent`Rnso for the CITY OF SAN JUAN CAPISTRANO, Orange County, California. NO11, THEREFORE, if the Principal shall not withdraw said bid within thirty- (30; day: the opening of same, and shall within fif- teen (15) days after the agreement has been presented to him for execu- tion enter into a written contract with the City in accordance with the bid as accepted, and if the Principal shall give the required bond with good and sufficient sureties, or sureties for the faithful performance and proper fulfillment of such contract and for the protection of laborers and materialmen, or in the event of the wZthdrawl of said bid within the per- iods specified, or the failure to enter into said contract and give said bond within the time specified, if the Principal shall within sixty (60) days after request by the City, pay the City the difference between the amount specified in said bid and the amount for which the City may procure the required work and/or supplies if the latter amount be in ex- cess of the former, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue, IN WITNESS WHEREOF the above -bounded parties have executed this instrument under their several seals this 6th day of October , 1980 , the name and corporate seal of each corporate party being affixed hereto and these presents duiy signed by its undersigned representative pursuant to authority of its governing body. Two Witnesses (if individual) ATTEST (if corporation GRIFFITH COMPANY PRINCIPAL ES D. WALTZE Title��2 ICE PRESIDENT Title UNITED P RA_RMUle Corporat— _S _6 ATTEST By Francis G. Jarv9341jr. Title Attorney -in -F Title Corporate Seal State of California ss: Countyof Orange I On October 6th , 19 80 , before me, the undersigned, a Notary Public in and for said County, personally appeared Francis G. Jarvis, Jr. known to me to be the person whose name is subscribed to the within instrument as Attorney -in -Fact of UNITED PACIFIC INSURANCE COMPANY, and acknowledged to me that _he subscribed the name of UNITED PACIFIC INSURANCE COMPANY, as Surety, and hi S own name as Attorney -in -Fact. OFFICIAL SEAL MARY A. JENNY NOTARY PUBUC- CALIFORNIA PRINCIPAL OFFICE IN ORANGE COUNTY MY COMMISSION EXPIRES AUG. 12, 1981 My Commission expires BDU,1818 ED. 3/72 (CALIF.) otarPubln and for s ount DESIGNATION OF SUB -CONTRACTORS Submit with Proposal. In compliance with the Provisions of Section 4100-4107 of the Government Code of the State of California as amended, the undersigned certifies that he has used the sub -bids of the fol- lowing listed sub -contractors in making up his bid, and that the sub -contractors listed will be used for the work for which they - bid, subject to the approval of the Engineer, and in accordance with the applicable provisions of the Specifications. It is understood and agreed that all those portions of the work called for in the contract documents for which a sub -contractor is not listed will be performed by the undersigned through his forces. If no sub -contractors are listed, all bonds and insurance will be written in the name of the general contractor only. ITEM OF WORK SUB -CONTRACTOR ADDRESS PHONE NO. 1. E�EEr3�c STe�� �o. / �_ 77� 2- 3c,/ 2.cu/6&�6�/%�ZcwsrEi Lc CJY�Q 9'7F-2_122- 3.SiXucii+-Ps41P.pe ` w�y^�e 705S _iAJ 7j/— 06 e / 4. �oikc�_ C�Ou.�/�a rt ��SIP�es �2�3�74S�S 5. 6. 7. 8. GRiFFITH COMPANY I BIDDER'S NAME JAMES D. WAITZE VICE PRESIDENT A ZHORIZED SIGNAT E ON October 6 , 1980 before me, the undersigned, a Notary Public in and for said State, personally appeared Donald L. McGrew to be the person whose name is subscribed to the within Instrument, and acknowledged to me that he executed the same. WITNESS my hand and official seal. Public in and for said State. FICIAL SEAL' N. PITTMAN WO:GEORGE PUBLIC • CALIFORNIA Ne�cOUNTy PiE s CMAY 24, 1982 C,ONIPANY ME NON -COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID STATE OF CALIFORNIA ) County of Los Angeles ) ss. Eonald L. McGrew , being first duly sworn deposes and says that he is. Executive Vice President of GN&FITH COMPANY the party making the foregoing bid; that such bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation; that such bid is genuine and not collusive or sham; that said bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or any- one else to put in a sham bid, or that any one shall refrain from bidding; that said bidder has not in any manner, directly or indirEctly, sought by agreement, communication or conference with any one to fix the bid price of said bidder or of any other bid- der, or to fix the bid price of or cost element of such bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of any one inter- ested in the proposed contract; that all statements contained in such bid are true; and further, that said bidder has not directly or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid and will not pay any fee in connection there- with, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, or to any other individual except to any person or persons as have a partnership or other financial interest with said bidder in this general business. -7- SCHEDULE OF WORK ITEMS -'PEM APPROX. WORK ITEM WITH UNITS UNIT PRICE TOTAL VO. QUANTITY (PRICE WRITTEN IN WORDS) (IN FIGURES) AMOUNT 7. 32 L.F. Furnish and install 36" reinforced concrete pipe (2000D) for the unit price ofS Fives. ✓'o// Slx7y 47n c�7s G3 i6 dollarg per lineal foot. "8. 1 EA. Furnish and install catch basin Inlet Type II (L=211) for the unit price of Foul iia usNair� -. ! efy %'ipee, ocr "o dollars each.�3- 29. 1645 L.F. Furnish and install 5' chainlink fence as specified for the unit price of L2o//CL-S c�d� dollars per lineal foot. s0. 40 L.F. Furnish and install sliding gate W=20' as specified for the unit price of Elf — dollars per lineal foot. 1. 3 EA. Furnish and install parkway cul- verts for the unit price of - O—e Titovsg.vo a ��%� ✓ae /ll'a'rs reee-a dolla ach. '2. 245 L.F. Furnish and install 2.25' x 3' reinforced concrete box for the unit/ price of /3/- 3�, C) dollar per lineal foot. CPiFFITH COMPANY -6d- SCHEDULE OF WORK ITEMS �'EM APPROX. 10. QUANTITY WORK ITEM WITH UNITS (PRICE WRITTEN IN WORDS) UNIT PRICE (IN FIGURES) TOTAL AMOUNT 106 L.F. Furnish and install W x 8' structure Type III -Transition reinforced concrete box for for the unit price of Foci the unit price of y� j`'65e- �drej 7WA.&B av ¢LaCi- �4dD `a 22. dollars per lineal foot. Furnish and install junction 78 L.F. Furnish and install 36" corru- structure Type II for the unit gated metal pipe for the unit price of Two 7Zind�.9nJlJ Srn 7 y Sr price of 5e-ce r dollars per lineal foot. 66 Sx. - . 22. 2 EACH Furnish and install junction structure Type III -Transition for the unit price of Foci 7�c.SrM/,o %7�/C, IVCI.d e t dollars each. av ¢LaCi- �4dD `a 22. 2 EACH Furnish and install junction - structure Type II for the unit price of Two 7Zind�.9nJlJ Srn �[UNlJQc'o e 7V Fi// dollars each. _ z6zJ' SZS� ea -3. L.S. Remove and relocate chainlink fence as specified for the lump sum of dollars. VCZ S �G� o0 114. 1 EACH Furnish and install Inlet Type V and A.C. Channel for the unit price ofjG �jlu�vo26� a �T dollars 'each. 25. 2 EACH Furnish and install catch basin Inlet Type II (Ir7') for the unit price of7Iiru 0�ipG'Sr/NP 6r�rfi /tiOer� %Ty dollar each. C,CIeO 7p- 16. 2 EACH Furnish and install catch basin Inlet Type II (L=3.5') for the unit price of 7%/ 7%0o r4,_,o GitJE r✓o ff FiF7Y 7relc� dollars each. ' GRiFFITH COMPANY, -6c- SCHEDULE OF WORK ITEMS ITEM APPROX. WORK ITEM WITH UNITS UNIT PRICES TOTAL NO. QUANTITY (PRICE WRITTEN IN WORDS) (IN FIGURES) AMOUNT 10, 3 EACH Adjust water valve cover to grade for the unit price of dollars each. 11. LS Clear and grub for the lump sum of -7-111RZ!r 1"lIRg- - �hJs�t(i dollarl0s., 12. 80 Tons Furnish and install Asphaltic Concrete pavement overlay for the unit price of Time, 7�y Se�� . Oa "A ' �i FTS Com, 7 s dollars per ton. 13. LS Provide traffic control for the lump sum price of S dollars. 14. 350 SF Furnish and install P.C.C. drive approach for the unit price of LC/U DOI�Lts �C� i%aG dollars per square foot. -15. 267 Tons Furnish and install Asphaltic Concrete pavement bikeway for the unit price of 7Z,, 7kdt/< dollars pe9/ton. 16. 182 L.F. Furnish and install 81" R.C.P. - ( 1350 D) for the unit price of pti/� �{ii�✓D�2co FiF7x dollars per lineal oot. 17. 700 L.F. Furnish and install 78" R.C.P. ( 1350 D) for the unit price of Twd A1.111� vs r4i F�u� dollars per lineal foot. 18, 242 L.F. Furnish and install 18" R.C.P. ( 2000 D) for the unit - prig'—�i�TY Twi/�rS r� f7Y x,13 dollar per per lineal foot. GRIFFITH COMPANY -6b- es- O, -5S.r c, 00 pp DOO 3.5 000 2-7 4�? 2- Z GrJ =`� 62 7L—`a 62- 2� /.7% 4ZJ SCHEDULE OF WORK ITEMS ITEM APPROX. NO. QUANTITY 'WORK ITEM WITH UNITS (PRICE WRITTEN IN WORDS) UNIT PRICES (IN FIGURES) TOTAL AMOUNT 1. 2460 Tons Furnish and install Asphaltic Concrete pavement for the unit price of _LY%a Do//sur dollars 'per ton.2}- 2. 8610 Tons Furnish and install aggregate base for the unit price of S-� 4✓cLt¢if��%Wo ��.%�S S72— 6 — 2e 516137— dollars p r ton. 3. 2520 LF Furnish and install P.C.C. curb and gutter Type A-2 for the unit price of • �2Ty Stn CPQ-. �x dollars lineal foot. 4�6 2-0 %62 %9 - per 4. 1 EACH 4. Furnish and install P.C.C. cross gutter for the unit price of %epee ?lpe-e r✓o 7Aiv ,c dollars each. 3 3.g 334 �v 5. 3 EACH Furnish and install street lights for the unit price of TY %LUO doll l 2 5 621- p 0 7 �6• "- rs each. 6. 200 SF Furnish and install P.C.C. side- walk for the unit price of ,0,9& -s %Z✓e, �K f-o,/,e ce�h foot. Z — dollars per square 7. 24,000 SF Remove Asphaltic Concrete for the unit price of dollars per square foot. O , 312 S. 3 EACH Furnish and install stop signs and traffic control signs for the unit price of Nir/�y 22 dollars c� / each. 9. 3 EACH Adjust manhole cover to grade for the unit rice of %vv drwnli5<� �-. ollars each. «� Z1O�-- CIC/ GRIFF11H COMPANY -6a- United Pacific Insurance Company, 443 Shatto Place, Los Angeles; Ca 90020 Licensed in accordance with an act providing for the registration of contractors -- License No. 32168 - Signature of Bidder: CR&FITH COMPANY JAMES A WALTZE VICE PRESIDENT (If an individual, so state. If a firm or co -partnership., state the firm name and give the names of all individual co- partners composing the firm: president, secretary, treasurer and manager thereof.) DATED: October 8, 1980 P. O. Box B-', Irvine, California 92716 Business Address (714) 549-2291 Phone Number Further, the undersigned bidder certifies that he has thoroughly checked the figures set forth in this proposal, that they are correct to the best of his knowledge and that they constitute s proposal for the work called out herein. JAMES D. WALTZE October 8, 1980 VICE PRESIDMI - Signature of Bidder Date (714) 549-2291 Phone Number Q -C All bids are to be computed on the basis of the given Estimated Quantities of Work, as indicated in this proposal, times the unit prices as submitted by the bidders. In case of discrepancy between words and figures, the words shall prevail. In case of discrepancy between unit prices and the extension thereof, the unit price shall prevail and bids will be computed as indicated above and compared on the basis of corrected totals. The estimated quantities of work indicated in this proposal are approximate only, being given'solely as a basis for comparison of bids. It is understood that the City does not expressly nor by implication agree that the actual amount of work will corres- pond therewith, but reserves the right to increase or decrease the amount of any item or portion of the work or to omit portions of the work as may be deemed expedient by the Engineer. It is also understood by Bidder that the City of San Juan Capistrano has the right to reject this proposal or to award a contract to the undersigned at the prices stipulated. If the proposal is rejected, then any check or cashier's check shall be returr,ad to the undersigned within thirty (30) days. No bid bonds will be returned. If the proposal is accepted and the undersigned fails to enter into a contract within fifteen (15) days after the agreement is delivered to him for signature, or within such further time as may be granted by the City Council, then said check shall be cashed or said bond declared forfeit and an amount equal to the difference between the lowest bid and the next lowest bidder who will execute a contract shall be paid into the treasury of the City of San Juan Capistrano as liquidated damages for the failure of the undersigned to comply with the terms of this proposal. Accompanying this proposal is 10e Bidder's Bond (insert "$ cash", cashier's check, certified check or bidder's bond, as the case may be) in an amount equal to at least ten percent (10%) of the total bid. The following is the name and place of business of the surety company which will furnish the required bonds as surety if the work is awarded to the undersigned: GRiFFITH COMPANY, -5- BI D PROPOSAL For the: Camino Del Avion Improvements - Alipaz to 400' east of Descanso To the Honorable City Council City of San Juan Capistrano Gentlemen: From: GRIFFITH COMPANY Contractor The undersigned, as bidder, declares that he has carefully examined the location of the proposed work as described, examined the Plans and Specifications and General Conditions therefor, read the Instructions to Bidders, and is familiar with all pro- posal requirements, and hereby proposes and agrees, if the pro- posal is accepted, to complete the said construction in accordance with the Contract Documents, as defined in Section 1-2 of the Standard Specifications, in the time stated herein, for the unit price jr lump sum given on the following pages of this proposal, amounti g to a to al o < Words bigures Said amount to include and cover all taxes, the furnishing of all materials, the performing of all the labor requisite or proper and the providing of all necessary machinery, tools, ap- paratus, and other means of construction; also, the performance and completion of all the work in the manner set forth, described and shown in the Specifications or the drawings for the work. If the contract .is awarded, the undersigned agrees to enter into a contract with the City and to commence work within fifteen (15) calendar days from the date of execution thereof, and to diligently prosecute the work to completion before the expiration of 150 days. -4- B 10 0 P 1 N C4, 780 x,:00 �'.Mm L i Pay 5� To 4W' S of "DEScAf-3150 B10(yER AMOUNT < I v 4 4- 114.50) o�L _ r CLI .. r G I ' (• . 1 V F r o r I ���... J 9 G COO, 0 0 4 1 L' '5 8 AGENDA ITEM October 15, 1980 TO: James S. Mocalis, City Manager FROM: W. D. Murphy, Director of Public Works SUBJECT: Award of Contract - Camino Del Avion Improvements, AHFP 1022 STTTTATTON Bids for the Camino Del Avion improvements were opened on October 8, 1980. The results of the bid opening are as follows: Contractor Bid Griffith Company $479,088.57 McGrew Company 480,825.00 Clarke Contracting Corporation 484,134.50 Sully -Miller Contracting Company 553,328.79 Escudero Company 561,121.70 Frost Company 594,000.00 Crosby Company 667,641.75 Staff has reviewed the qualifications of Griffith Company and find them acceptable. FINANCIAL CONSIDERATION The County of Orange will participate in the funding in the amount of $165,000. City Gas Tax and Drainage Funds will provide the local matching funds. Cadillac Fairview will contribute $150,000 for this improvement as a condition of development. ALTERNATE ACTIONS 1. Award the contract to Griffith Company in the amount of $479,088.57. 2. Award the contract to one of the other bidders. 3. Reject all bids and readvertise. RECOMMENDATION By motion, award the contract to Griffith Company in the amount of $479,088.57; and authorize the Mayor and City Clerk to execute the agreement on behalf of the City for the improvement of Camino del Avion from Alipaz to 410 feet east of Avenida Descanso, AHFP 1022. Respectfully s mitted, W. D. Murp �.�P W. y WDM:GA/pjs FOR CITY COUNCIL AGENDA V � ?j State of California 1 1 ss: County of Los Angeles 1 On October 27 , 19 80 , before me, the undersigned, a Notary Public in and for said County, personally appeared DOUGLAS H. JUDSON known to me to be the person whose name is subscribed to the within instrument as Attorney -in -Fact of UNITED PACIFIC INSURANCE COMPANY, and acknowledged to me that he subscribed the name of UNITED PACIF IC INSURANCE COMPANY, as Surety, and h is own name as OFFICIAL SEAL - _ _ •e ,?1 MARTHA J. CHASE 2^ mca. ) ❑OTARY PU8UC-CALIrORN1A PRID:CIPAL Or"CE IN LOS ANGELES COUNTY My Commission Expires April 3, 1981 s ►ee,f f isc oA�e wiEas.....___ _ _ - -' .19 BDU-1818 ED. 3/72 (CALIF.) 9 joe-st\de1 C) a r 0 0 z z a m r n z z .i z a n H Z 0 UNITED PACIFIC INSURANCE COMPANY HOME OFFICE, TACOMA, WASHINGTON ;awn aZ, ;; „ _ ,_ a Bond No. U34 35 42 Executed in 3 Counterparts LABOR AND MATERIAL BOND CALIFORNIA -PUBLIC CONTRACT KNOW ALL MEN BY THESE PRESENTS, that GRIFFITH COMPANY P. 0. Box B,T, Irvine, California 92716 ----------------------- as Principal, and the UNITED PACIFIC INSURANCE COMPANY, a Washington corporation author- ized to execute bonds in the State of California, as Surety, are held and firmly bound unto the CITY OF SAN JUAN CAPISTRANO--------------------------------------- as Obligee, in the sum of Four Hundred Seventy -Nine Thousand, Eighty -Eight and 57/100 ----------------------------------------------------------------------- Dollars ($ 479,088,57----- ) for which sum we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally by these presents. The Condition of the above obligation is such that, Whereas the Principal on the day of 19 , entered into a contract with the Obligee for the construction of Camino Del Avion Improvements - Alipaz to 400' East of Descanso NOW, THEREFORE, if the above -bounden Principal or his subcontractors fail to pay any of the persons named in Section 3181 of the Civil Code of the State of California, or amounts due under the Unemployment Insurance Code with respect to work or labor performed by any such claimant, the Surety will pay for the same, in an amount not exceeding the sum specified in this bond, and also, in case suit is brought upon this bond, a reasonable attorney's fee, to be fixed by the court. This bond shall inure to the benefit of any and all persons entitled to file claims under Section 3181 of the Code of Civil Procedure, so as to give a right of action to them or their assigns in any suit brought upon this bond. Signed and sealed this 27th day of October 19 80 GRTFFITH COM Y ............ ....................... �`1 JAMES D. WALTZE VICE. PRESIDENT ITED ACYFIl INSURANCE COMPANY ......... I.......... >n Attorney -in -Fact BDU-2804 ED. 3n2 (CALIF.) State of California 1 I ss: County of Los Angeles ) On October 27 , 19 80 , before me, the undersigned, a Notary Public in and for said County, personally appeared DOUGLAS H. JUDSON known to me to be the person whose name is subscribed to the within instrument as Attorney -in -Fact of UNITED PACIFIC INSURANCE COMPANY, and acknowledged to me that he subscribed the name of UNITED PACIFIC INSURANCE COMPANY, as Surety, and h is own name as OFFICIAL SEAL MARTHA J. CHASE D Y NOTARY PUSLIC-CALIFORNIA PRWOWAL OFFICE IN LOS ANGELES COUNTY My Commission Expires April 3, 1981 19 BDU,1818 ED. 3/721CALIF.) )v0b1e_-SJe4 r, 0 7 32400 PASEO AOELANTO SAN JUAN CAPISTRANO. CALIFORNIA 92675 PHONE 493 1171 June 4, 1981 Griffith Company P. O. Box B -T Irvine, California 92716 Re: Completion of Street Improvements 1022 Camino del Avion Gentlemen: Enclosed is a copy of Resolution No. 81-5-19-3 which was adopted by the City Council at their meeting of May 19, 1981. The Resolution accepts the work completed for street improvements at 1022 Camino del Avion in the amount of $506,236.02. Council directed that the balance due in the amount of $16,986.99 be payable immediately. The 10% retention will be payable upon 35 days from recording of the Notice of Completion. The Notice was recorded on June lst;.therefore, the final payment in the amount of $50,623.60 may be released on July 6, 1981. If you have any questions, please do not hesitate to give me a call. Very truly yours, MARY ANN HFINOVER, CMC City Clerk MAH:ol Enclosure cc: Director of Public Works Administrative Services j 32400 PAsEO AOELANTO SAN JUAN CAPISTRANO, CALIFORNIA 92675 ^i PHONE 493-1171-�1 I March 24, 1981 Griffith Company P. O. Box BT Irvine, CA 92716 Re: Change Order No. 2 - Camino Del Avion Improvements Gentlemen: At their meeting of March 17, 1981, the City Council took action to approve the time extension of 40 days for Camino Del Avion, to a new completion date of May 9, 1981. If you need additional information, please do not hesitate to call. Very truly yours, MARY ANN H NOVER, CMC City Clerk MAH:ol cc: Director of Public Works I;Z 14 tj +% CERTIFICATE OF INSURANCE �• 3600 Wilshire Blvd. _ 1. WARN EMPLOYERS INSURANCE _company Los Angeles,Ca.900t0 _ 2• CENTRAL NATIONAL INSURANCE COMPANY company (213)386-2360 company company THIS IS TO CERTIFY TO CITY OF SAN JUAN CAPISTRANO 32400 PASEO ADELANTO SAN JUAN, C.APISTRANO, CALIFORNIA 92675 THAT ON THE DATE NOTED BELOW, THE FOLLOWING DESCRIBED INSURANCE POLICIES, ISSUED BY THIS COMPANY (OR COMPANIES) ARE IN FULL FORCE AND EFFECT. DESCRIPTIVE SCHEDULE NAME OF INSURED GRIFFITH COMPANY _ DESCRIPTION OF C VEHICLES ❑ PREMISES 91 OPERATIONS COVERED _ SCHEDULE OF INSURANCE DESCRIPTION OF COVERAGE INSURINOCO.NO. POLICY NUMSEII INCEPTION DATE EXPIRATION DATE LIMITS OF LIA&LnY WORKER'S COMPENSATION 1 16272 7/1/80 7/1/81 STATUTORY General Liability 1. GL 42-0780- 7/1/80 7/1/81 $ * ea. occur. Bodily Injury 17084 $ * aggregate General Liability $ * ea. occur. Property Damage 1 • $ * aggregate Automobile Liability Bodily Injury 1 BA 42-0780- 7/1/80 7/1/81 $ * ea. person 17084 $ * ea. occurr. Automobile Liability 1. Property Damage $ * ea. occurr. $500,000. COMBINED SINGLE LI41T BODILY RY UMBRELLA LIABILITY 2 CNU 7/1/80 7/1/81 ** $1,500,000. COME II GGS�EE NED SPRIMAR IMIMI�RIDILY INJURY AND/ GR PROPERTY AMAGE LIABILITY PLEASE SEE VERSE SIDE) ry THIS CERTIFICATE OR VERIFICATION OF INSURANCE IS NOT AN INSURANCE POLICY AND DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES LISTED HEREIN, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE OR VERIFICATION OF INSURANCE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. IT IS UNDERSTOOD AND AGREED THAT, IN THE EVENT OF CANCELLATION, THE INSURING COMPANY (OR COMPANIES) WILL MAIL THIRTY ( 30 1 DAY WRITTEN NOTICE THEREOF TO THE CERTIFICATE HOLDER. z �- EFFECTIVEOCTOBER 27, 1980 INSURING COMPANY (OR COMPANIES) BY� ,z�� Authorized Representativeee-«� CORROON & BLACK -MILLER & AMES 113MOd atnva •aw sa;ea(;T;ia� asaq; u1 sa8uego Niue annbai noAj! ;oopP sn ;oe;uoo oseald -pamsuc mo ;o ;sonboi oq; ;e;uas eupq aie oouemsul;o sa;eoUpioD poso(oug 09EZ-98£ (£ B) 01006 e!w0Jgej 'sa109utl s01 '•P"!8 aal4sl!M 009£ s3 my l8 I' HI00}I}I0) 0861 `LZ HOMO '032ism 03WVN Ni d0 SN0IMJ3d0 SI03dS3d SV AINO 1(18 GRnSNI IVNOIlI00V NH SV 03anIONI ARP SI ONVUSIdVO wvn e NVS d0 AIIO 3HI IVHI 033d9V QNV 000ISN3QNn SI II :SN0IIIQN03 1VI03dS • 0 SU®V i I 2 I _' '� I LICENSE NO. 32166 P.O. BOX B -T, IRVINE, CALIF. 92716 17191 349-2291 � 1 October 29, 1980 City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, California 92675 Re: Camino Del Avion Improvements Alipaz to 400' E/of Descanso Attention: Mary Ann Hanover City Clerk Dear Mg. Hanover: Enclosed is the executed copy of the contract for the above referenced project along with Performance Bond, Labor & Material Bond and Certi- ficate of Insurance. Thank you for awarding us this contract and we look forward to working with you. Very truly yours, MIFFITH COMPANY James D. Waltze Vice President/District Manager JDW-ld Encl 0 0 2. CAMINO DEL AVION STREET IMPROVEMENT (KINOSHITA) (83) Shigeru Kinoshita, property owner of farmland at the inter- section of Camino Del Avion and Alipaz, addressed the Council to request installation of protective fencing due to the incompleted status of the Camino Del Avion street improve- ments and trespassing problems. Approval of Protective Fencing: It was moved by Councilman Priess, seconded by Councilman Schwartze and unanimously carried that staff be authorized to take the necessary measures to install protective fencing along Camino Del Avion as soon as possible. John Loynd, construction contractor for the development in progress on the opposite side of Camino Del Avion, also addressed the Council and offered some suggestions to resolve the problems with trespassing on farmland. 3/3/3 0 U CAMINO DEL AVION STREET IMPROVEMENTS/AGRICULTURE PRESERVATION (68) Shigeru Kinoshita addressed the Council regarding the ,A83) completion date for the street and storm drain improvements and protective fencing adjacent to the agricultural property on Camino del Avion. With Council concurrence, Mayor pro tem Schwartze requested that the Director of Public Works provide a written report on the project status to Mr. Kinoshita and the City Council. 2 //7/F/ �l� ��,�rir , �rrrrJr `"f�rJfi�rrr� ' 32400 PASEO ADELANTO SAN JUAN CAPISTRANO. CALIFORNIA 92675 ' PHONE 493-1171 October 22, 1980 Griffith Company P. O. Box B -T Irvine, California 92716 Re: Award of Contract - Camino Del Avion Improvements Gentlemen: At their meeting of October 15, 1980, the City Council awarded the contract for the Camino del Avion Improvements - Alipaz to 400 Feet East of Descanso, to your company at $479,088.57. Enclosed are two copies of the contract. Please sign and date both contracts and return the "City Copy" to this office along with all required bonds and insurance. The remaining contract is for your files. The contract documents are to be executed by your company within 15 days of this notice. I am enclosing pages 24 and 25 of the bid documents which cite the City's requirements for bond and insurance amounts. These requirements must be met as stated before the contract is effective. If I can be of any help to you, please do not hesitate to call. Thank you for your cooperation. Very truly yours, / (MRS) MARY ANN HANOVER, CMC/ City Clerk MAH/cj Enclosures cc: Director of Public Works 41x.00.l�i�i � - �^'� 4 5 ha�l0/ 06ciftrF;i9NSt DRAW irJ65 0 to/1 @ lUaw. A_VWN I MPP4V€ MENMS - ENTATIVE CONTRACT AWARD D"'E. iorr�" L1ST "W00' S of U4 DESuS _T Es � PHONE C F!E RAE AD S Csuv Lk)I I lc. �. V-yLpsk� �rti 111401 -os Alp rmi os Q?ve D-13 o 9 -7x0 13Ls A V^( *- I a 22 - Po� ra61 ag-o 6 f DzcJrJD_t� _CSP_ _.98-- Z 11-7 N 'L- G- /U � "'ej -j / _ 9a8o� - �Ca t 3) -7 -7-3— 3$ l _ lba.��►1es-t Inrq'�1 (,213) 9a-7- 148 Ly NYORO CONOU/T COROORAT/ON POST OFFICE BOX 939 • CORONA, CALIFORNIA 91720 • PHONE 714/735-2420 October 3, 1980 City of San Juan Capistrano City Clerk Office 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Sir: X Please forward plans and specifications for: We are returning Camino Del Avion Improvements - San Juan Capistrano Bid Time and Date: 2:00 P.M., Oct. 8, 1980 Deposit X Payment JLD:dra cc: Accounting of $10.00 Plans and specifications enclosed. enclosed Plans and specifications returned under separate cover. Please return our deposit of Yours truly, HYDRO CONDUIT CORPORATION �Alt.4. J. L. Denton, Sales Coordinator Authorized Signature F UNITED STATES PIPE AND FOUNDRY COMPANY CONCRETE PIPE DIVISION P.O. Box 429 Telephone (213) 337-1211 Baldwin Park, California 91706 October 2, 1980 City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 SUBJECT Camino Del Avion Improvement BID DATE: Oct 8, 1980 @ 2:00 P.M. We would appreciate you mailing to the following a total of 1 sets of Plans and Specifications of the above subject job. r Deposit Enclosed No Deposit Required U.S. Pipe and Foundry Company P.O. Box 429 14041 East Live Oak Avenue Baldwin Park, CA 91706 ATTN: FRANK H. RING U.S. Pipe and Foundry Company P.O. Box 3033 6501 Clay Street Riverside, CA 92509 Check No. $15.00 Payment Check No. We have enclosed a self-addressed stamped envelope and would appreciate your sending us a list of the Plan Holders for the above job, seven (7) days prior to the bid date. Your expedience in this matter will be greatly appreciated. Very truly yours, Prank H. King Customer Service Administrator FHK'gg Enclosure a -am Walter eonmasny 4M " •' CITY OF SAN JUAN CAPISTRANO ORANGE COUNTY STATE OF CALIFORNIA ),U PLANS, SPECIFICATIONS, SPECIAL PROVISIONS AND CONTRACT DOCUMENTS FOR THE CAMINO DEL AVION IMPROVEMENTS - ALIPAZ TO 400' EAST OF DESCANSO CITY COUNCIL GARY L. HAUSDORFER, MAYOR KENNETH E. FRIESS PHILLIP R. SCHWARTZE LAWRENCE F. BUCHHEIM W. D. MURPHY DIRECTOR - PUBLIC WORKS SEPTEMBER, 1980 V PLANS, SPECIFICATIONS, SPECIAL PROVISIONS AND CONTRACT DOCUMENTS FOR THE CAMINO DEL AVION IMPROVEMENTS - ALIPAZ TO 400' EAST OF DESCANSO CITY COUNCIL GARY L. HAUSDORFER, MAYOR KENNETH E. FRIESS PHILLIP R. SCHWARTZE LAWRENCE F. BUCHHEIM W. D. MURPHY DIRECTOR - PUBLIC WORKS SEPTEMBER, 1980 TABLE OF CONTENTS Title Page CONTRACT DOCUMENTS NOTICE INVITING BIDS . . . . . . . . . . . . . . 1 BID PROPOSAL . . . . . . . . . . . . . . . . . . 4 SCHEDULE OF WORK ITEMS . . . . . . . . . . . . . 6a NON -COLLUSION AFFIDAVIT . . . . . . . . . . . . 7 DESIGNATION OF SUB -CONTRACTORS . . . . . . . . . 9 INSTRUCTION TO BIDDERS . . . . . . . . . . . . . 10 CONTRACT . . . . . . . . . . . . . . . . . . . . 16 BID BOND . . . . . . . . . . . . . . . . . . . . 19 FAITHFUL PERFORMANCE BOND . . . . . . . . . . . 20 LABOR AND MATERIAL BOND . . . . . . . . . . . . 21 SPECIAL PROVISIONS INDEX . . . . . . . . . . . . . 23 WORK TO BE DONE . . . . . . . . 24 STANDARD SPECIFICATIONS . . . . . . . . . . . 24 TERMS DEFINED . . . .. . . . . . 25 SPECIAL PROVISIONS OF ITEMS OF WORK . . . . . . 25 INSURANCE AND OVERHEAD COSTS . . . . . . . . . . 31 UTILITIES . . . . . . . . . . . . . . . . . . . 31 ' INSTRUCTION TO BIDDERS ' Securing Documents Plans, specifications and other contract documents will be available for examination without charge and copies may be secured ' in accordance with the "Notice Inviting Bids". ' Examination of Plans, Specifications and Site of Work The bidder is required to examine the site of work, the ' proposal, the plans and the specifications very carefully. He shall satisfy himself as to the character, quality and quantities ' of the work to be performed, the materials to be furnished and. the requirements of the Contract Documents. The plans for the ' work show conditions as they are believed to exist, but it is not to be inferred that all the conditions as shown thereon are actually existent, nor shall the City or any of its officers or ' agents be liable for any loss sustained by the Contractor as a result of any variance between conditions shown on the plans and ' actual conditions revealed during examination or progress of the work. The submission of a proposal shall be prima facie evidence ' that the bidder has made such an examination. ' Interpretation of Drawings and Documents If any bidder should find discrepancies in, or omission from, the drawings, specifications or other proposed contract ' documents, or if he should be in doubt as to the true meaning of any part thereof, he shall at once make a written request to the ' Engineer for correction, clarification or interpretation of the point or points in question. The person submitting such a re- quest shall be responsible for its prompt delivery. In the event that the Engineer receives such a request and ' it should be found that certain essential information is not clearly and fully set forth, or if the Engineer discovers errors, ' -10- ' omissions, or points requiring clarification in the drawings or ' documents, a written addendum will be mailed to each person to whom a set of contract documents has been delivered. The City will not be responsible for any instructions, explanations or ' interpretations of the documents presented to bidders in any manner other than written addendum. ' Addenda or Bulletins ' The effect of all addenda to the contract documents shall be considered in the bid and said addenda shall be made a part of the contract documents and shall be returned with them. Be- fore submitting his bid, each bidder shall inform himself as to ' whether or not any such addenda have been issued, and failure to cover in his bid any such addenda issued may render his bid invalid and result in its rejection. Disqualification of Bidders ' No person, firm or corporation shall be allowed to make, file or be interested in more than one bid for the same work ' unless alternate bids are called for. A person, firm or cor- poration who has submitted a sub -proposal to a bidder, or who has ' quoted prices on materials to a bidder, is not hereby disqualified from submitting a bid in his own behalf. ' Proposals Bids to receive consideration shall be in accordance with ' the following instructions: A. Bids shall be made only upon the forms provided within these ' specifications; all bid items shall be properly filled out; bid prices shall be stated both in words and in figures; and ' the signatures of all persons signing shall be in longhand. Where there is a conflict in the words and the figures, the words shall govern. I ' B. All prices and notations must be in ink or typewritten. No ' erasures will be permitted. Mistakes may be crossed out and corrections typed or written in ink adjacent thereto and must be initialed in ink by the person or persons signing the bid. ' C. Bids shall not contain any recapitulation of the work to be done. Alternate proposals will not be considered except as ' required hereinabove. No oral, telegraphic or telephonic proposals or modifications will be considered. ' D. The City may require any bidder to furnish a statement of his experience, financial responsibility, technical ability, equip- ment and references properly and fully filled out. E. Each bidder shall list his proposed sub -contractors on the ' form accompanying the proposal in accordance with the pro- visions of the specifications. ' F. Each bidder must accompany his bid with either a cashier's check upon some responsible bank, or a properly certified check upon such bank, or an approved corporate surety bond payable to the City for such a sum of not less than ten (10) percent of the aggregate'sum of the bid, which check or bond and the monies represented thereby shall be held by the City ' as a guarantee that the bidder, if awarded the contract, will in good faith enter into such contract and furnish the required ' bonds. The bidder agrees that, in case of his refusal or failure to ' execute said contract and give bonds within the time required by these documents, such check or bond, and the money re- presented thereby, shall remain the property of the City and, ' if the bidder shall fail to execute said contract, said surety will pay to the City the damages which the City may ' suffer by reason of such failure, not exceeding the sum of ten (10) percent of the amount of the bid. A bid received and not accompanied by such cashier's check, certified check or approved bond shall be rejected. -12- G. Bids shall be delivered to the City at the location stipulated, on or before the day and hour set for the opening of bids, as hereinbefore specified in the "Notice Inviting Bids". Bids shall be enclosed in a sealed envelope bearing the title of the work, the name of the bidder, bid opening date and time of bid opening. Licensing of Contractor All persons, firms, partnerships or corporations shall be licensed in accordance with the Business and Professions Code of the State of California and the applicable ordinances of the City and County before doing any work of any kind. ' Withdrawl of Bids Any bidder may withdraw his bid in person or by written ' request at any time prior to the scheduled closing time for re- ceipt of bids. ' Opening of Bid Proposals The City will, in open session, publicly open, examine and ' declare the bids at the time set forth in the "Notice Inviting Bids". Bidders or their authorized representatives are.invited ' to be present. . ' Award of Contract or Rejection of Bids No bidder may withdraw his bid for a period of forty-five (45) days after the date set for the opening of bids. The con- tract for the work will either be awarded or the bids rejected within the forty-five (45) days from the date set for the opening ' of bids. ' The contract for the work will be awarded to the lowest responsible bidder complying with these instructions and with the "Notice Inviting Bids". The City, however, reserves the ' right to reject any or all bids and to waive any nonconformity in the bids received. 1 -13- ' The bidder to whom the award is made shall execute a written ' If the bidder to whom the award is made fails to enter the contract as herein provided, the award may be annulled and an ' award may be made to the next lowest responsible bidder; and such bidder shall fulfill every stipulation embraced herein, as ' if he were the party to whom the first award was made. A corpora- tion to which an award is made shall furnish evidence of its cor- porate existence and evidence that the officer signing the con- tract and bonds for the corporation is duly authorized to do so. ' Bonds The successful bidder, simultaneously with the execution of ' the Agreement, will be required to furnish a Labor and Material Bond in a sum not less than one hundred percent (1008) of the total amount payable by the terms of the contract and a Faithful Performance Bond in a sum not less than one hundred percent (1008) of the amount of the contract. Said bonds shall be ' secured from a surety company satisfactory to the City. Surety companies, to be acceptable to the City, must be authorized to do business in the State of California and be on the accredited list of the United States Treasury. ' Time of Performance ' The work shall be commenced within fifteen (15) calendar days from the date of execution of the contract and shall be diligently prosecuted until completion. A time limit of one hundred and fifty _ 1 -14- contract with the City and furnish the stipulated bonds, insurance ' and bid breakdown within fifteen (15) days after the notice of award of contract. The contract shall be made in the form adopted ' by the City. The release of the successful bidder's surety deposit, as previously stipulated (page 5), shall be made upon the City's ' acceptance of the Labor and Materials Bond and the Faithful Per- formance Bond. ' If the bidder to whom the award is made fails to enter the contract as herein provided, the award may be annulled and an ' award may be made to the next lowest responsible bidder; and such bidder shall fulfill every stipulation embraced herein, as ' if he were the party to whom the first award was made. A corpora- tion to which an award is made shall furnish evidence of its cor- porate existence and evidence that the officer signing the con- tract and bonds for the corporation is duly authorized to do so. ' Bonds The successful bidder, simultaneously with the execution of ' the Agreement, will be required to furnish a Labor and Material Bond in a sum not less than one hundred percent (1008) of the total amount payable by the terms of the contract and a Faithful Performance Bond in a sum not less than one hundred percent (1008) of the amount of the contract. Said bonds shall be ' secured from a surety company satisfactory to the City. Surety companies, to be acceptable to the City, must be authorized to do business in the State of California and be on the accredited list of the United States Treasury. ' Time of Performance ' The work shall be commenced within fifteen (15) calendar days from the date of execution of the contract and shall be diligently prosecuted until completion. A time limit of one hundred and fifty _ 1 -14- ' ( 150) calendar days from the date of execution of the contract has been set for completion of the work. The bidder's attention is ' directed to the specifications as to provisions for extension of time of completion and/or assessment of liquidated damages. ' and Wages Attention is Assignment of Contract directed to all provisions of ' the Labor Code of the State of No assignment by the Contractor of any contract to be ' entered into hereunder or any part thereof, or of funds to be received thereunder by the Contractor, will be recognized by the awarding authority unless such assignment has had prior approval of the awarding authority and the surety has been given notice of such assignment in'writing and has consented thereto in writing. tWorkmen and Wages Attention is specifically directed to all provisions of ' the Labor Code of the State of California with regard to workmen and wages. Wages shall not be less than prevailing wage rates determined by the "Notice City pursuant to said Code and as listed in the Inviting Bids". ' Building Permits It shall be the Contractor's responsibility to obtain all ' necessary permits, bonds and insurance, as required, for the completion of the project. No extra compensation shall be made therefore. 1 I 1 -15- 1 - SPECIAL PROVISIONS INDEX Section Title Page(s) 1-1 WORK TO BE DONE . . . . . . . . . . 24 1-2 STANDARD SPECIFICATIONS . . . . . . 24-25 1-3 TERMS DEFINED . . . . . . . . . . . 25 1-4 SPECIAL PROVISIONS,OF ITEMS OF WORK 25-31 1-5 INSURANCE AND OVERHEAD COSTS. . . . 31 1-6 UTILITIES . . . . . . . . . . . . . 31 -23- ' SPECIAL PROVISIONS 1. Work to be Done The work to be done consists of the construction of storm drain, street improvements including asphalt paving, curb and gutter, ' sidewalks and street lights on Camino del Avion, and all other appurtenant work as shown on the plans or included in the speci- fications. ' 2. Standard Specifications The contractor shall perform his work in accordance with the ' Standard Specifications for Public works Construction, 1976 Edition, hereinafter referred to as the Standard Specifications. The contractor shall maintain a copy of this book on the job ' site at all times. The provisions of the Standard Specifications shall be modified as indicated below: I 1 1 1 1 Change 1: "Section 2-4 - Contract Bonds" The "Payment Bond" (Material and Labor Bond) shall be in the amount of 100 percent of contract price. The "Faithful Performance Bond" shall be held as assurance of guaranteed performance for a period of one year after acceptance of the improvements by the City Council. Change 2: "Liability Insurance" The amounts and provisions of insurance are modified to be: Bodily Injury $ . 500,000 each person Bodily Injury $ 1,000,000 each accident Bodily Injury $ 1,000,000 aggregate products Property Damage $ 500,000 each accident Property Damage $ 500,000 aggregate operations Property Damage $ 500,000 aggregate protection Property Damage $ 500,000 aggregate products Property Damage $ 500,000 aggregate contractual The contractor shall likewise obtain public liability and property damage insurance to cover vehicles used or main- tained by him, whether on or off the premises, with liability limits of not less than $500,000, for any one person, and $500,000, for any one accident, and property damage of $500,000. The insurance amounts set forth herein are the minimum amounts required by the City. Other agencies with which the contractor may be involved in the accomplishment of the work may require greater amounts. 1 -24- The City will not recognize any claim for additional com- pensation because of the requirement for greater amounts of insurance, as an element to be considered by the con- tractor in determining his bid. Change 3: "Section 8 - Facilities for Agency Personnel" Delete this section. ' 3. Terms Defined ' Whenever in the said Standard Specifications the following terms are used, it is hereby provided that the following City department or persons shall be intended: ' AGENCY shall mean City of San Juan Capistrano wherever appropriate. ' BOARD shall mean the City Council of the City of San Juan Capistrano. ' ENGINEER shall mean City Engineer or other person(s) designated by same. ' 4. Special Provisions of Items of Work and Method of Payment A. Bid Items BID ITEMS 1 & 15 - Furnish and Install A.C. Pavement Asphalt concrete shall meet the requirements of Section 400 ' and these special provisions. Coarse aggregate shall con- sist of material of which at least 75 percent by weight shall be crushed particles in lieu of the requirements of Subsection 400-4.2.3. The viscosity grade of paving asphalt shall be AR -4000 or AR -8000 as determined by the Engineer. The exact proportions of aggregate and the amount of asphalt binder for each type of mixture shall be regulated as directed by the Engineer. Normally the asphalt content shall be between 5.8 and 6.0 percent by dry weight of aggregate. Grading shall be III -B2, III -B3, III -C2, or III -C3 as deter- mined by the Engineer. The final or surface layer of asphalt concrete shall not be placed until all on-site im- provements have been completed, including all grading, and until all unacceptable concrete work has been removed and ' replaced unless approved otherwise by the Engineer. The sand equivalent and S -Value requirements of Subsection 400- 4.3 shall be the moving average requirements. Individual ' test requirements for sand equivalent and S -Value shall be as determined by the EMA-Materials Lab. The contractor shall install SS 1H Seal Coat after placement of asphalt. ' Payment The unit price bid per ton shall include all labor, materials, tools, and equipment, including the placement of Seal Coat ' for the placing of A.C. Pavement as specified on the plans and no additional compensation shall be made. 1 -25- ' BID ITEM 2 - Furnish and Install Aggregate Base 1 -26- Untreated base materials shall meet the requirements of Section ' 400 and these special provisions. In lieu of the second sen- tence of Section 200-2.4.1 at least 65 percent, by weight, of the material retained on the No. 4 sieve shall be a crushed particle as determined by Test Method No. California 205. ' Evaluation of gradation and sand equivalent test results shall conform to the provisions of Subsection 400-1.4. The gradation and sand equivalent requirements of Subsections 200-2.2, 200-2.3, 200-2.4, 200-2.5 and 200-2.6 shall be the moving average require- ments. Individual test requirements for gradation and sand equivalent shall be as determined by the EMA-Materials Lab. Payment The unit price bid per ton shall include all labor, materials, ' tools and equipment for the grading of earth and placement of aggregate base as specified on the plans and no additional com- pensation shall be made. BID ITEMS 3, 4, 6, and 14 - Furnish and Install P.C.C. Curb and Gutter, Cross Gutter, Sidewalk, Drive Approach ' Portland cement concrete shall meet the requirements of Section 400 and these special provisions. For 2500 class concrete, a prequalified mix design may be used in accordance with the pro- ' visions of ACI 318-71, Section 4.2.2.1, in which f' = 2500 psi. The sodium sulphate loss requirement and the gradaFion X -value submittal required of Section 400-1.3.1 may be waived by the ' Engineer. The cement type requirement, Section 201-1.2.1, shall be Type II or Type V as determined by the Engineer. Type II or Type V cement shall conform to ASTM C 150 and the low alkali re- quirements of Table lA therein. The Cleanness Value requirement of Section 200-1.4 shall be replaced with the following: Tests Test Method No. Requirements ' Cleanness Value Calif. 227 Individual Test 70 Min.* Moving Average 75 Min.* The Sand Equivalent requirement of Section 200-1.5.3 shall be replaced with the following: ' Tests Test Method No. Requirements Sand Equivalent Calif. 217 ' Individual Test 70 Min.* Moving Average 75 Min.* *For 2500 or less class concrete, except concrete pavement, ' a minimum 65 Individual Test Result and a minimum 70 Moving Average will be acceptable if 2500 psi 28 -day strength criteria of Section 201-1.1.4 are met, at a 6 - inch slump or greater. The testing and acceptance deter- mination will be made by the EMA Materials Laboratory. 1 -26- ' Evaluation of Sand Equivalent and Cleanness Value results shall conform to.the provisions of Subsection 400-1.4. ' Payment The unit price bid per lineal foot or square foot shall include all ' labor, materials, tools and equipment for the installation of the curb and gutter, cross gutter, sidewalk and drive approach as speci- fied on the plans and no additional compensation shall be made. ' BID ITEM 5 - Furnish and Install Street Lights The workmanship and materials included in the work prescribed for ' Bid Item 5 shall conform to Sections 209, 306 and 307 of the Standard Specifications. The work for this bid item shall include the installation of the street light and all electrical work ' necessary to energize the light. Payment ' The unit price bid per each shall include all labor, materials, tools and equipment for the installation of street lights as specified, dnd no additional compensation shall be made. ' BID ITEM 7 - Remove Existing Asphalt Concrete ' The workmanship and materials included in the work prescribed for Bid Item 7 shall conform to Section 300 of the Standard Specifica- tions. The work for this bid item shall include the removal and disposal as directed by the Engineer where it must be taken. Payment ' The unit price bid shall include all labor, materials, tools and equipment necessary to remove existing asphaltic concrete and no additional compensation shall be made. ' BID ITEM 8 - Furnish and Install Traffic Warning, Stop Signs The workmanship and materials included in the work prescribed for ' Bid Item 8 shall conform to Sections 206 and 304 of the Standard Specifications. The work for this bid item shall include the installation of traffic warning and stop signs as specified on the ' plans. Payment ' The unit price bid per each shall include all labor, materials, tools and equipment for the installation of traffic warning and stop signs, and no additional compensation shall be made. ' BID ITEMS 9 & 10 - Adjust Manhole Cover and Water Valve Cover to Grade The workmanship and materials included in the work prescribed for Bid Items 9 and 10 shall conform to Sections 201 and 303 of ' -27- the Standard Specifications. The work for these bid items shall include the adjustment of existing manholes and water valve covers up to proposed grade. Payment The unit price bid per each shall include all labor, materials, tools and equipment necessary to adjust existing manholes and water valve covers to proposed grade, and no additional compensa- tion shall be made. BID ITEM 11 - Clear and Grub The workmanship and materials included in the work prescribed for Bid Item 11 shall conform to Sections 300 and 301 of the Stan- dard Specifications. The work for this bid item shall include the clearing of all vegetable growth and all obstructions as noted on the plans. Payment The lump sum bid shall include all labor, materials, tools and equipment for the removal of all growth, and no additional com- pensation shall be made. BID ITEM 12 - Furnish and Install A.C. Over ' The workmanship and materials included in the work prescribed for Bid Item 12 shall meet the requirements of Sections 203, 300, 301, ?02 and 400 of the Standard Specifications. The work for ' this bid item shall include the placing of all asphaltic concrete with a tack and seal coat as.shown on the construction plans. Payment The unit price per ton shall include all labor, materials, tools and equipment for the placing of A.C. pavement as specified and Ino additional compensation shall be made. BID ITEM 13 - Provide Traffic Control ' The work for this bid item shall include the safe control of traffic in the construction zone to the satisfaction of the ' Engineer. Camino Del Avion shall be closed from Alipaz Street to Del Amo during construction. The contractor shall provide school pedestrian access with protective fencing at.all times during construction. ' Payment ' The lump sum bid shall include all labor, materials, tools and equipment for traffic control as specified, and no additional compensation shall be made. ' -28- BID ITEMS 16, 17 and 27 - Furnish and Install 81", 78" and 36" Reinforced Concrete Pipe The work for this bid item shall include excavation, bedding, laying of the pipe, backfill, a brick and mortar bulkhead at station 12+74.29 joining the 36" reinforced concrete pipe to the existing 36" reinforced concrete pipe, and joining the 36" line at the end of the project to the reinforced concrete box. Workmanship shall conform to Sections 306-1, 300-1.3 and 303-1 of the Standard Specifications. Bedding shall be crushed aggregate base per Section 200-2.2 of the Standard Specifications. Reinforced concrete pipe shall conform to Section 207-2 of the Standard Specifications. Brick and mortar shall be 8" x 8" x 16" unreinforced concrete block and mortar per Section 202-2 of the Standard Specifications. Backfill shall be select back- fill as approved by the engineer and conform to Section 306-1.3 of the Standard Specifications. Payment Full compensation for all labor, materials, tools and equipment for the above work and all other appurtenant work as shown on the plans or included in the specifications shall be included in the unit price bid per lineal foot and no additional compensation will be made. BID ITEM 18 - Furnish and Install 18" Reinforced Concrete Pipe The work for this bid item shall include excavation, bedding, laying of the pipes, backfill, joining of the 18" reinforced concrete pipe to the existing asbestos cement pipes, the removal of the 2' x 8' reinforced concrete box (to be abandoned) where necessary to extend the pipe, joining pipe into the mainline storm drain with a Type VI junction structure per Orange County Environmental Management Agency standard plan 315, and 3 concrete collars per Orange County Environmental Management Agency standard plan 317 as shown on the plans. Workmanship shall conform to Sections 300-1.3, 303-1 and 306-1 of the Standard Specifications. Bedding shall be crushed aggregate base per Section 200-2.2 of the Standard Specifications. Reinforced concrete pipe shall conform to Section 207-2. Concrete shall be class 560-C-3250 per Section 201-1. Backfill is to be select backfill as approved by the engineer and conforming to Section 306-1.3. Payment Full compensation for all labor, materials, tools and equipment for the above work and all other appurtenant work as shown on the plans 29- ' or included in the specifications shall be included in -the unit price bid per lineal foot and no additional compensation will be made. ' BID ITEMS 19, 32, 21, 22, 25, 26 & - Furnish and Install 4#' x 8', 2 25'x3' 28 Reinforced Concrete Box, Junction Structure Type III, Junction Structure ' Type Ii, Catch Basin L=7' and Catch Basin L=3.5', and Catch Basin L=21' ' The work for this bid item shall include excavation, bedding, steel fabrication and placement, formwork, placing of concrete and back- filling. Local depressions shall be included in the price bid for each catch basin. ' Workmanship shall conform to Section 303-1 of the Standard Specifications. Bedding shall be crushed aggregate base per Section 200-2.2 of the ' Standard Specifications. Reinforced concrete shall conform to Sections 201-1 and 201-2. Backfill shall be select backfill as approved by the engineer and conform to Section 306-1.3. ' Payment ' The work for this bid item shall include excavation, bedding, fabrica- tion of special fittings, laying of corrugated metal pipe, backfill and abandonment of 8' x 2' reinforced concrete box, and A.C. channel. ' Workmanship shall conform to Sections 300-1.3 and 306-1 of the Stan- dard Specifications. ' Bedding shall be crushed aggregate base per Section 200-2.2 of the Standard Specifications. Corrugated metal pipe shall conform to Section ' 207-11 and be 18 guage. Backfill shall be select backfill as approved by the engineer and conform to Section 306-1.3. The 2' x 8' reinforced concrete box in the public right-of-way shall be removed. The remainder shall be abandoned per Section 306-5. ' Payment ' Full compensation for all labor, materials, tools and equipment for the above work and all other appurtenant work as shown on the plans or included in the specifications shall be included in the unit price bid and no additional compensation will be made. 1 -30- Full compensation for all labor, materials, tools and equipment for the above work and all other appurtenant work as shown on the plans or included in the specifications shall be included in the unit price bid and no additional compensation will be made. ' BID ITEMS 20 and 24 - Furnish and Install 36" Corrugated Metal Pipe ' The work for this bid item shall include excavation, bedding, fabrica- tion of special fittings, laying of corrugated metal pipe, backfill and abandonment of 8' x 2' reinforced concrete box, and A.C. channel. ' Workmanship shall conform to Sections 300-1.3 and 306-1 of the Stan- dard Specifications. ' Bedding shall be crushed aggregate base per Section 200-2.2 of the Standard Specifications. Corrugated metal pipe shall conform to Section ' 207-11 and be 18 guage. Backfill shall be select backfill as approved by the engineer and conform to Section 306-1.3. The 2' x 8' reinforced concrete box in the public right-of-way shall be removed. The remainder shall be abandoned per Section 306-5. ' Payment ' Full compensation for all labor, materials, tools and equipment for the above work and all other appurtenant work as shown on the plans or included in the specifications shall be included in the unit price bid and no additional compensation will be made. 1 -30- ' BID ITEM 23 - Removal and Relocation of Chainlink Fence The workmanship and materials included in the work prescribed ' for Bid Item 23 shall conform to Section 206 of the Standard Specifications. The work for this bid item shall include removal and relocation to the satisfaction of the engineer. ' Payment ' The lump sum bid shall include all labor, materials, tools and equipment for the removal and relocation, and no additional compensation shall be made. ' BID ITEMS 29 and 30 - Chainlink Fence and Gate Chainlink fence and gate shall be furnished and installed in ' accordance with Section 206-6 of Specifications and the referenced Orange County Environmental Management Agency's Standard Plan. ' Payment The unit price bid per lineal foot shall include all labor, ' materials, tools and equipment for the installation of Chain- link fence and gate as specified and no additional compensation shall be made. ' BID ITEM 31 - Parkway Culverts The work for this bid item shall conform to Orange County ' Environmental Management Agency Standard Plan 309-A and Section 303-1 of the Standard Specifications. ' Reinforced concrete shall be Class 560-C-3250 and conform to Sections 201-1 and 201-2 of the Standard Specifications. ' Payment Full compensation for all labor, materials, tools and equipment for the above work and all other appurtenant work as shown on ' the plans or included in the specifications shall be included in the unit price bid and no additional compensation will be made. ' 5. Insurance and Overhead Costs The contractor will not receive any direct compensation for ' insurance and overhead (move in, clearing and grubbing, etc.) costs. Accordingly, all such costs shall be prorated to the appropriate bid items. ' 6. Utilities The engineer has endeavored to show all existing utilities. ' The contractor must, however, take all precautionary measures to protect all utilities. Also to be protected is a 4" PVC irrigation line at the beginning of the project. ' -31-