Loading...
1987-0217_INDUSTRIAL ASPHAT_Contract 577095992 ' EXEMPT C8 RECORDED AT THE REQUEST OF RECORDING FEES EXEMPT DUE TO AND RETURN TO: GOVERNMENT CODE SECTION 6103 City of San Juan Capistrano City Clerk's Department 32400 Paseo Adelanto Mary Ann H ver, Citq Clerk San Juan Capistrano, CA 92675 City of San uan Capistrano, CA NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN that a contract was heretofore awarded by the City Council of the City of San Juan Capistrano, California, to Industrial Asphalt, P.O. Box 2263, Irwindale, California 91706, for the performance of the following work: CONSTRUCTION OF THE A.C. OVERLAY OF SAN JUAN CREEK ROAD That said work was completed by said company according to plans and specifications and to the satisfaction of the City Engineer of the City of San Juan Capistrano, and that said work was accepted by the City Council of the City of San Juan Capistrano, at a re ular meeting thereof held on the 17th day of February 1987, by Resolution No. 87-2- 7-1 That upon said Contract, the United Pacific Insurance Co. was surety for the bonds given by the said company as required by law. Dated at San Juan Capistrano, California, this 18th day of February , 1987. Mary Ann Woveir, City Cferk City of SaK Juan Capistrano STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS. CITY OF SAN JUAN CAPISTRANO ) I, MARY ANN HANOVER, the duly appointed and qualified City Clerk of the City Council of the City of San Juan Capistrano, California, do hereby certify under penalty of perjury that the foregoing Notice of Completion is true and correct, and that said Notice of Completion was duly and regularly ordered to be recorded in the Office of the Orange County Recorder by said City Council. Dated at San Juan Capistrano this 18th day of February ,1987. RECORDED IN OFFICIAL RECORDS OF ORANGE COUNTY CALIFORNIA Mary Ann Hap6vef, City Clerk -222 PM FEB 23 '87 City of San OJuan Capistrano couNrr RECd1DER CONTRACT = J a n This contract is made and entered into by and between the CITY OF SAN JUSAN.:, CAPISTRANO, hereinafter referred to as City and - INDUSTRIAL ASPHALT hereinafter referred to as CONTRACTOR. IT IS HEREBY AGREED BETWEEN THE PARTIES AS FOLLOWS: FIRST. CONTRACT DOCUMENTS. The contract documents shall be considered to include the Notice Inviting Bids, the Instructions to Bidders, the Proposal, the Bid Bond, the Non-Collusion Affidavit, the Designation of Sub-Contractors, the Contract which is prepared for execution by the City and the Contractor, Plans, Specifications and Special Provisions, the Standard Specifications for Public Works Construction, 1985 Edition, including all Supplements, Contract Bonds, Resolutions adopted by the City Council' pertaining to the work, insurance policies and certificates, and any supplemental written agreements amending or extending the scope of the work originally contemplated that may be required to complete the work in a substantial and acceptable manner. SECOND. THE WORK. CONTRACTOR agrees to furnish all tools, labor, material, equipment, transportation, and supplies necessary to perform and complete in good and workmanlike manner the construction of A.C. Overlay of San Juan Creek Road in strict conformity with the Plans, Specifications and all other contract documents, which documents are on file at the Office of the City Clerk, City Hall, 32400 Paseo Adelanto, San Juan Capistrano, California. THIRD. PAYMENT. City agrees to pay, and CONTRACTOR agrees to accept, the lump sum adjusted for variations of quantities, at the prices designated in bid proposal at the time and in the manner set forth in the Specifications. FOURTH. COMMENCEMENT AND COMPLETION OF THE WORK. CONTRACTOR agrees to begin and complete the work within the time specified in the Notice Inviting -14- Bids. It is agreed that it would be impracticable and extremely difficult to fix the actual amount of damages, and loss sustained by City, should CONTRACTOR fail to complete the work in the specified time; therefore, CONTRACTOR shall pay City, as liquidated damages, not in the nature of a penalty, one hundred dollars ($100) per calendar day for each day delayed; provided that extensions of time with waiver of liquidated damages, may be granted as provided in the Specifications. FIFTH. PERFORMANCE BOND AND LABOR AND MATERIAL BOND. CONTRACTOR agrees to furnish bonds guaranteeing the performance of this contract and guaranteeing payment of all labor and material used under this contract, as required by the laws of the State of California, on forms approved by City. The Performance Bond shall be for an amount of one hundred percent (100%) of the amount of this contract and shall be conditioned on full and complete performance of the contract, guaranteeing the work against faulty workmanship and materials for a period of one (1) year after completion and acceptance. The Labor and Material Bond shall be for an amount of one hundred percent (100%) of the amount of this contract and shall be conditioned upon full payment of all Labor and Material entering into or incidental to the work covered by this contract. CONTRACTOR agrees to furnish the bonds on the forms found within the Specifications. CONTRACTOR agrees to pay City such sum as the Court may judge as reasonable for the legal services of any attorney representing the City in any action brought to enforce or interpret the obligations of this agreement, and such sums shall be made a part of any judgment in such action against CONTRACTOR if such action is determined in favor of said City. The required Performance, Labor and Materials Bonds, and Bid Bond shall provide that the surety shall pay attorney's fees incurred by City in enforcing this agreement. SIXTH. GENERAL PREVAILING RATE OF PER DIEM WAGES. Pursuant to the Labor Code of the State of California, copies of the prevailing rate of per diem wages, as determined by the Director of the State Department of Industrial Relations, are on file in the offices of the City Clerk, 32400 Paseo Adelanto, San Juan Capistrano, California, and are hereby incorporated and made a part hereof. CONTRACTOR agrees that he, or -15- any SUB-CONTRACTOR under him, shall pay not less than the foreqoing specified prevailing rates of wages to all workmen employed in the execution of the contract. SEVENTH. INSURANCE. CONTRACTOR shall maintain at all times during this contract liability and property damage insurance naming the City and its elected and appointed officials as a named insured, which such policies shall be of an amount not less than One Million Dollars combined single limit. The insurance policies shall bear an endorsement or shall have an attached rider providing that in the event of expiration or proposed cancellation of such policies for any reason whatsoever, the City shall be notified by registered mail, return receipt requested, giving a sufficient time before the date thereof to comply with the applicable law or statute but in no event less than 30 days before expiration or cancellation is effective. CONTRACTOR shall provide to City the policy certificate establishing that the required level of insurance has been satisfied. CONTRACTOR shall indemnify and save harmless the City, its officers, agents, and employees from and against any and all claims, demands, loss or liability of any kind or nature which Lessor, its officers, agents and employees may sustain or incur or which may be imposed upon them or any of them for injury to or death of persons, damage to property as a result of, or arising out of, or in any manner connected with the performance of the obligations under this construction agreement. EIGHTH. COMPLIANCE WITH OTHER PROVISIONS OF LAW RELATIVE TO PUBLIC CONTRACTS. City is subject to the provisions of the Government Code and the Labor Code of the State of California. It is stipulated and agreed that all provisions of law applicable to public contracts are a part of this contract to the same extent as though set forth herein and shall be complied with by CONTRACTOR. These include, but are not limited to, the stipulation that eight (8) hours labor constitute a legal day's work and CONTRACTOR shall, as a penalty to City, forfeit twenty-five dollars ($25) for each workman employed in the execution of the Contract by CONTRACTOR, or by any SUB- CONTRACTOR, for each calendar day during which such workman is required or -16- permitted to work more than eight (8) hours in violation of the provisions of Article Three, Chapter One, Part Seven, Division 2, of the California Labor Code, except as permitted by law. IN WITNESS WHEREOF, this contract is executed by the duly authorized agent(s) of City, pursuant to Council action, and by CONTRACTOR on the date set before the name of each. CITY OF SAN JUAN CAPISTRANO DATED: October 21, 1486 BY: MAYOR Kenneth E. Friess, Mayor Industrial Asphalt, a partnership BY: Bv: Huntmix, Inc. , General Partner CONTRA O ert .Hunt, V ce President Dongiao Fausen, Assist-a-nt--7e—cretary ATTEST: Mary AnnH v r, Cit lerk APPROVED AS TFORM: �r John w, ity Attorney -17- a 4. REPORT OF CULTURAL ARTS AND HERITAGE CO SSION ACTIONS (920.60) The Report dated February 17, 1987, from t!i*'Secretary of the Cultural Arts and Heritage Commission, regarding actions talon at the meeting of January 27, 1987, was ordered received and filed. i 5. REPORT OF EQUESTRIAN COMWSS1ON ACTIONS (930.40) The Report dated February 17, 1987, from the Secretary of the Equestrian Commission, regarding actions taken at the meetings of February 2 and 9, 1987, was ordered received and filed. 6. REPORT OF PLANNING COMMISSION ACTIONS (440.40) i The Repopt�dated February 17, 1987, from the Secretary of the Planning Commis on, regarding actions taken at the meeting of February 10, 1987, was order received and filed. 7. R.,6PORT OF TRAFFIC AND TRANSPORTATION COMMISSION ACTIONS (590.20) The Report dated February 17, 1987, from the Secretary of the Traffic and Transportation Commission, regarding actions taken at the meetings of January 14 and 28, 1987, was ordered received and filed. / 8. COMPLETION OF ASPHALT CONCRETE OVERLAY OF SAN JUAN CREEK ROAD 600.30 As set forth in the report dated February 17, 1987, from the Director of Public Works, the asphalt concrete overlay of San Juan Creek Road was completed. Acceptance of Work: The following Resolution was adopted: RESOLUTION NO. 87-2-17-1, COMPLETION OF ASPHALT CONCRETE OVERLAY OF SAN JUAN CREEK ROAD INDUSTRIAL ASPHALT - A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, DECLARING WORK TO BE COMPLETED AS TO PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF THE ASPHALT CONCRETE OVERLAY OF SAN JUAN CREEK ROAD (INDUSTRIAL ASPHALT) The Resolution accepted the work as complete in the amount of $81,639.89, and directed the City Clerk to forward a Notice of Completion to the County Recorder. Payment status was as follows: Total Project'Cost $81,639.89 Less 10% Retention 8,163.99 Less Previous Payment 73,475.90 Amount Due -0- -3- 2/17/87 Staff was authorized to release the 10% retention 35 days after recording the Notice of Completion. 9. APPR L OF PLANS AND SPECIFICATIONS - CITY HALL PARKI AREA PAVING 600.30 As set fo\rth in the report dated February 17, 1987, from the Director of Public Works, the pans and specifications for the paving of the City Hall parking area were approved, Inc ding the waiver of Municipal Code Section 9-3.602 to allow the use of white hairpin �ir gn parking spaces. Staff was authorized to solicit bids for the project. The Eneer's Estimate for the project was $30,000; $20,000 was budgeted in Account No. -6900-4701-111. Upon award of the contract, a transfer of funds will be requested. 10. APPROVAL OF FINAL;.MAP 86-108 AND IMPROVEMENT AGREEMENT 31741 AGUACATE ROAD PATTERSON (420.70/600.30) As set forth in the report dated February 17,1987, from the Director of Public Works, I lnal Map 86-108 was approved with the finding that the Final Map was technically correct and in conformance with the provisions of the Subdivision Map Act. The City Engineer and City Clerk were authorized to execute the Final Map for recordation. The Improvement Agreement for Final Map 86-108 was approved and the Mayor and City Clerk were authorized to execute the Agreement on behalf of the City for forwarding to the Orange County Recorder's Office. 11. TRANSFER AND ASSIGNMENT OF DEVELOPMENT AGREEMENT FROM CAPISTRANO GROUP TO SHERATON INTERCONTINENTAL DEVELOPMENT HUNT CLUB PHASE II 600.30 As set forth in the report dated February 17, 1987, from the Director of Community Planning and Development, the following Resolution was adopted: RESOLUTION NO. 87-2-17-2, APPROVING ASSIGNMENT OF DEVELOPMENT AGREEMENT TO SHERATON INTERCONTINENTAL DEVELOPMENT, INC. TRACT 1 L753T- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, APPROVING ASSIGNMENT OF DEVELOPMENT AGREEMENT FROM CAPISTRANO GROUP, INC., TO SHERATON INTERCONTINENTAL DEVELOPMENT, INC. (TENTATIVE TRACT 11753) Councilman Hausdorfer stated that the background of the companies receiving the assignment of rights should be checked to provide assurance of their capabilities. PUBLIC HEARINGS 1. REQUEST TO CONSOLIDATE LOTS LOCATED AT 27351 AND 2371 SILVER CREEK DRIVE - TENTATIVE PARCEL MAP 86-427 TRACT 6381 LLOYD (CONTINUED) 420.70 �— Proposal: Consolidation of Lots 50 and 51 of Tract 6381 into one lot. The projec is located in the ES (Small Estate) District. -4- 2/17/87 AGENDA ITEM February 17, 1986 TO: Stephen B. Julian, City Manager FROM: W. D. Murphy, Director of Public Works SUBJECT: Resolution, Notice of Completion and Final Report - Asphalt Concrete Overlay of San Juan Creek Road (Industrial Asphalt) SITUATION The construction of the A.C. Overlay of San Juan Creek Road in the City has been completed to the satisfaction of the City Engineer and is ready for acceptance by the City Council and recordation of a Notice of Completion with the County Recorder. NOTIFICATION Industrial Asphalt COMMISSION/BOARD REVIEW, RECOMMENDATIONS N/A FINANCIAL CONSIDERATIONS The original contract price was for $76,507.98 and the final construction cost is $81,639.89, an increase of $5,131.91. The additional cost is due to the increase of estimated project quantities, particularly asphalt concrete to provide a good riding surface where the existing surface was misshaped. The City budgeted $205,000 in account #12-6900-4710-118 for this project and sufficient funds are still available. The current payment status is as follows: Original Contract Price $ 76,507.98 Total Project Cost 810639.89 Less 10% Retention 8,163.99 Total Due to Date $ 73,475.90 Previous Payment 73,475.90 Amount Due $ -0- ALTERNATE ACTIONS 1. Accept the improvements. 2. Do not accept the improvements. 3. Refer to Staff for additional information. oR CITY COUNCIL AGENDA .�04'*O" AGENDA ITEM • February 17, 1986 Page Two RECOMMENDATION By motion, determine that the work for the A.C. Overlay of San Juan Creek Road has been completed and declare the work to be accepted. Direct the City Clerk to forward a Notice of Completion to the County Recorder for recording. Authorize Staff to release the 10% retention thirty-five (35) days after the recordation of the Notice of Completion. Respectfully submitted, W.r. W. D. Murphy/ WDM/BP:nb RESOLUTION NO. 87-2-17-1 COMPLETION OF ASPHALT CONCRETE OVERLAY OF SAN JUAN CREEK ROAD (INDUSTRIAL ASPHALT) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA, DECLARING WORK TO BE COMPLETED AS TO PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF THE ASPHALT CONCRETE OVERLAY OF SAN JUAN CREEK ROAD (INDUSTRIAL ASPHALT) WHEREAS, on the 21st day of October, 1986, the City of San Juan Capistrano entered into a contract with Industrial Asphalt, for the construction of the Asphalt Concrete Overlay of San Juan Creek Road; and, WHEREAS, the Director of Public Works has evaluated the final quantities and cost figures and recommends approval. NOW, THEREFORE, that the City Council of the City of San Juan Capistrano, does resolve as follows. SECTION I. That the work required to be performed by said contractor has been completed. SECTION 2. That the total cost of said work is in the amount of $81,639.89. SECTION 3. That the work is hereby accepted and approved. SECTION 4. The City Clerk is directed to forthwith forward a "Notice of Completion" to the County Recorder of the County of Orange for recording. PASSED, APPROVED, AND ADOPTED this 17th day of February 1987. KENNETH E. FRIESS, MAYOR ATTEST: Zz CITY CLERK -1- 0 f STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss CITY OF SAN JUAN CAPISTRANO ) 1, MARY ANN HANOVER, City Clerk of the City of San Juan Capistrano, California, DO HEREBY CERTIFY that the foregoing is a true and correct copy of Resolution No. 87_2_17-1 adopted by the City Council of the City of San Juan Capistrano, California, at a regular meeting thereof held on the 17th day Of February , 1987, by the following vote: I AYES: Councilmen Schwartze, Bland, Buchheim, I Hausdorfer, and Mayor Friess Nom: None ABSENT: None i I (SEAL) MAK Y ANN ANOVE , CITY CLERK `i I I I { I -2- 'Juan MEMBERS OF THE CITY COUNCIL ANTHONY L. BLAND 100IIINT. LAWRENCE F. IM KENNETH E. FRIRIESSESS �xxluxt0 IB6I GARY L. HAUS DO RFER 1776 PHILLIP R. SCHWARTZE CITY MANAGER STEPHEN B JULIAN ""NUTiCE 10'PROCEED TO: Industrial Asphalt P.O. Box 7607 Van Nuys, California 91406 Project: Asphalt Concrete Overlay of San Juan Creek Road Amount of Contract: $76,507.98 You are hereby notified to commence work on the referenced contract on or before November 25, 1986, and shall fully complete all of the work of said contract within 45 consecutive calendar days thereafter. Your completion date is therefore January 9, 1987. The contract provides for an assessment of the sum of $100.00 as liquidated damages for each consecutive calendar day after the above established contract completion date that the work remains incomplete. Dated this 24th day of November, 1986. G� Ir MARY ANN OVER, CMC City Clerk ACCEPTANCE OF NOTICE Receipt f e fo egoing Notice to Proceed is hereby acknowledged by �/ e this 5T day of U6G . , 1986. n_ C c: LSI --------------------- 32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 0 (714) 493.1171 0 �FcrrtP 1 f�—✓ MEMBERS OF THE CITY COUNCIL ANTHONY L. BLAND V LAWRENCE F. IM i110.v0[lwllo KENNETH E. FIESS If le Plilxt9 196 GARY L. HAUSOORFDORFER 1776 PHILLIP R. SCMWARTZ£ • CITY MANAGER STEPHEN B JULIAN October 24, 1986 Industrial Asphalt P. O. Box 2263 Irwindale, California 91706-2263 Re: Award of Contract - San Juan Creek Road Asphalt Concrete Overlay (Industrial , s halt Gentlemen: The City Council of the City of San Juan Capistrano at their regular meeting held October 21, 1986, awarded the contract for the San Juan Creek Road Asphalt Concrete Overlay to your company at $76,507.98. Enclosed is a fully executed copy of the Agreement for your records. Also enclosed are copies of bond forms to be used. These forms must be used in order for them to be accepted by the City. I am returning your previously submitted bond forms for this reason. Please provide all required bonds and insurance within 15 days. If you fail to furnish said bonds and certificates of insurance within 15 days from the date of this Notice, the City will be entitled to consider all your rights arising out of the City's acceptance of your bid to be abandoned and as a forfeiture of your Bid Bond. The City will be entitled to such other rights as may be granted by law. You are required to return an acknowledged copy of this Notice of Award. Please take note of pages 15 and 16 of the Agreement regarding bond and insurance amounts. The City is also to be named as an additional insured pursuant to the Standard Specifications for Public Works Construction. These requirements must be met as stated before the contract is effective. Thank you for your cooperation. If I can be of any help to you, please do not hesitate to call. Very truly yours, MARY ANN H OVER, CMC City Clerk MAH/mac UC 1' ti 1986 Enclosures cc: Director of Public Works Director of Administrative Services --------------- ------ Receipt q e f regoing Notice of Award is hereby acknowledged: By �a�i1v6 � his 3 ( day of 6- 7f' 1986. 32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 0 (714) 493.1171 6. AWARD OF CONTRACT - SAN JUAN CREEK ROAD ASPHALT CONCRETE OVERLAY INDUSTRIAL ASPHALT 600.30 As set forth in the report dated October 21, 1986, from the Director of Public Works, the contract for the asphalt concrete overlay of San Juan Creek Road from Calle Caballero to La Novia Avenue was awarded to the low responsible bidder, Industrial Asphalt, of Irwindale, in the amount of $76,507.98. All other bids were rejected. The Mayor and City Clerk were authorized to execute the contract on behalf of the City. 7. COMPLETION OF TRACT 10318 AND RELEASE OF SURETY - LOMAS VERDE GLENDALE FEDERAL L600.30/420.20) s set forth in the report dated October 21, 1986, from the Director o Public W ks, the public improvements for Tract 10318 were completed. Acce nce of Work The follo 'ng Resolution was adopted: RESOL ON NO. 86-10-21-1 COMPLETION OF P BLIC IMPROVE NTS - TRACT 10318 LOMAS VERD - A RESOLUTIO OF THE CITY COUNCIL OF THE CIT OF SAN JUAN CAPISTR NO, CALIFORNIA, DECLARING WORK TO BE COMPLETED AS O PLANS AND SPECIFICATI S FOR THE CONSTRUCTION O PUBLIC IMPROVEMENTS - TRACT 10318 (LOMAS VERDE) The Resolution accepted the w k as comple , and directed the City Clerk to forward a Notice of Completion to e County ecorder. Staff was authorized to exonerate tllowing sureties upon the expiration of thirty-five days from recording of the e of Completion: PURPOSE AMOUNT Labor and Materials 286,000 Monumentation 4,500 Staff was authorized to rel se the following surety up completion of a one-year maintenance period: Faithful P formance $286,000 The letter of cre i in the amount of $25,000, for installation of a traffic signal at La Novia and S Juan Creek Road, held by Glendale Federal Saving & Loan, shall remain in for until installation of said signal. PUBLIC HEA GS 1. STRE NAME CHANGE (PASEO CHRISTINA) (CONTINUED) (820.80) Pr osal: onsideration of two requests from homeowners in the Hidden Valley residential area to change the name of the private street known as "Paseo Christina," to -4- 10/21/86 AGENDA ITEM October 21, 1986 TO: Stephen B. Julian, City Manager FROM: W. D. Murphy, Director of Public Works SUBJECT: Award of Contract - San Juan Creek Road Asphalt Concrete Overlay (Industrial Asphalt) SITUATION Bids have been received for the asphalt concrete overlay of San Juan Creek Road from Calle Caballero to La Novia Avenue. The project will extend the area of San Juan Creek Road which was overlaid earlier this year from Forster Canyon Road to Calle Caballero during the Chiquita Land Outfall Project by the Santa Margarita Water District. The project is timed to follow the closure of San Juan Creek Road for the Camino Capistrano Bridge Project. Bids were received as follows: Industrial Asphalt $76,507.98 Vernon Paving Company $79,333.00 Sulley - Miller $85,812.70 Anderson Asphalt $88,206.95 Griffith Company $90,701.00 Hardy and Harper Inc. $94,942.00 R. J. Noble Company $98,864.50 Staff is recommending award of contract for the project to the low responsible bidder, Industrial Asphalt. NOTIFICATION Adjacent Homeowners Associations Industrial Asphalt COMMISSION/BOARD REVIEW, RECOMMENDATIONS Not applicable. FINANCIAL CONSIDERATIONS Two hundred and five thousand dollars has been budgeted in account #12-6900-4710-118 for the asphalt concrete overlay of San Juan Creek Road this fiscal year. The Engineer's estimate for this project is $135,000 and sufficient funds are available in the account for this work. Agenda Item • • October 21, 1986 Page Two ALTERNATE ACTIONS 1. Award the contract for the asphalt concrete overlay of San Juan Creek Road. 2. Do not award the contract. 3. Request further information from staff. RECOMMENDATION By motion, award the contract for the asphalt concrete overlay of San Juan Creek Road to the low responsible bidder, Industrial Asphalt in the amount of $76,507.98 and reject all other bids. Authorize the Mayor and City Clerk to execute the documents on behalf of the City. Respectfully submitted, IJ. f"`- W. D. Murphy WDM/BP:kjs Attachment 4►.C. OVERLAY 00 : SAN JUAN- .' CREEK ROAD sZ _ O r AVEN101 LL MAM01 CALLE C�tE caNrsoEMA t T p �� Y` �w s s w s s o e 4P } 7 O v SCALE : I "= 120.0 ' VICINITY MAP PERFORMANCE BOND Bond No.U-509250 KNOW ALL MEN BY THESE PRESENTS: Premium $344.00 That INDUSTRIAL ASPHALT as Principal, hereinafter called CONTRACTOR, and UNITED PACIFIC INSURANCE COMPANY as Surety, hereinafter called SURETY, are held and firmly bound unto the City of San Juan Capistrano, as Obligee, hereinafter called CITY, in the amount of seventy-six Thousand ,Five Hundred Seven and 98/1000--- Dollars for payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally, fairly by these presents. WHEREAS, Contractor has by written agreement dated October 21,1986 , entered into a (describe agreement): A.C. Overlay of San Juan Creek Road which contract is by reference made a part hereof; NOW, THEREFORE, the condition of this obligation is such that, if Principal shall promptly and faithfully perform said agreement, then this obligation shall be null and void; otherwise it shall remain in full force and effect. Surety waives whatever legal right it may have to require that a demand be made first against the principal in the event of default. BE IT FURTHER RESOLVED, that: 1. As a part of the obligation secured hereby, and in addition to the face amount specified, there shall be included costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered. -20- UNITED PACIFIC INSURANCE COMPANY WD OFFICE,FEDERAL WAY,WASHINGTON • POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS,The, the UNITED PACIFIC BiSURANCE COMPANY,a corporation duh organized undo, the laws of the Sate of Washington,does flweby make,corultltur and materials R. G. PARK of LOS ANGELES, CALIFORNIA--- on true and lawful Attorrry-in-Fact,to make,execute,mal and deliver f«and on no behalf,and a its act and dead ANY AND ALL BONDS AND UNDERTAKINGS OF SURETYSHIP--- and to bind the UNITED PACIFIC INSURANCE COMPANY thereby as Iulfy and to the wore extent a if such bonds and undertakings and other rn,nngs obligatory on the Mture thereof were signed by an Executive Off.= of the UNITED PACIFIC INSURANCE COMPANY and smled and attnled by one other of such officers,and hereby raifras and confirms all that its Laid Attorney(&I+n Fact may do in pursuance hereof This Power of Attorney is granted under and by authority of Article VII of the By laws of UNITED PACIFIC INSURANCE COMPANY which became effective September 7,1978.which provisions are now in full floor and effect,resiting as follows. ARTICLE VII - EXECUTION OF BONDS AND UNDERTAKINGS 1. The Board o1 Dnectors,the Nea 1,the Chairman of the Board,any Senior Vice Presdml,any Vim President as, Assistant Via President « other officer designated by the Bond of Directors shall have power and authority to(a)appoml AnorneysaniFM and to authorize them to execute on behalf of the Company,ponds and undertakings,recogniLnM, carnratts of indemnity and other writings obligatory, in the culture thereof,and 1bl to ismove env such Attornev•in-Fae at any time and revoke the power and wthority given to Mm. 2. Attorneys in-Fan yell haw power and authority.wbtM to the terms end limitations of the power of atorrtey Issued 10 them,to execute anddolwe,on behalf of the Company.bonds and undwtakmgs,rcogmsatces,contracts of indemnity and other writing,obl,galory on the culture thereof. The corporate toll is not rlocetury for the validity of any bonds and u,dertakinge,recognitanon.contracts of indemnity and other wnibngs obligatory an the"I we thereof. 3. Attotnevs-m-Fact shall have power and authonly to execute affidavits requnad to be attached to bonds,recognisances,contracts of indent. mtv or other conditional or obligatory undertakings and they shall also have Power and authority to mirtlfy the fipemal statement of the Company and 10 copies of the Br Laws of the Company Or any article or section thereof This power of attorney n signed and waled by facsimile untlai and by authority of the following Resolution adopted by the Board of Directors of UNITED PACIFIC INSURANCE COMPANY at a missing hold con the 511%day of June,1979,at which a quorum sues pmwhl,and and Resolution has not been amended or repealed -Resolved.that the signatures of such directors and officers and the sol of the Company may be affixed r any such Power,of attorney or any camili i to totaling thereto by facsimile,aro any such power of attorney o,pontificate besting such facsimile "natural cc facsimile wl yell be valid and binding upon the Company and any such power so exacuted and certified by facsimile sig,etura and facsimile sol shall be valid and binding upon the Company In the future with respect to any bond or undertaking to which It Is attached.- IN WITNESS WHEREOF,the UgIT D PACIFIC INSURANCE COMPANY Ns muted these presenn to be signed by in Vice President,and cot corporate Mal to be hereto affixed,mit At� day of October ig 85 1"A UNITED P IFIC INSURANCE COMPANY Via President STATE OF Washington la. COUNTY OF Hilton f On this 8th day of October .1985.Perac olh appeared Charles Be Schmalz to me known to be the VlceAresident of the UNITED PACIFIC INSURANCE COMPANY,and cknowledped that he executed and arrested the fore ping maruntent and affixed the zeal of sod corporation thwato,and that Article VII,Section 1,2,and 3 of the Illy-Laws of sod Companr.and the Recitation.eelform therein,ate dill in lull Iwte rnmes / Mr Coaion E.pras' July 20 e19 E6 �:_,^.:'t, yPdlcnandf«Beret Washington III is at Hilton 1, Lawrence W. Carlstrom "Mont Secretary M the UNITED PACIFIC INSURANCE COMPANY,do hereby ssrufy that the above and foregoing m a true and cones copy of a Forager of Attorney associated by and UNITED PACIFIC INSURANCE COMPANY,which m atrm m full torp and eHan. IN WITNESS WHEREOF,I have heratnto at my hand and affixed the==of mid Com v thle 5 day of November 1986 aDU 1431 Ed. 4780 t10ALHassan{Saoer.�1�/TLi��/ t-"'1� ' State of California, County of Los Angeles SS: On this 5th , day of November in the year 1986 before me Notary of Public personally appeared R-G-Park personally known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to this instrument as the Attorney-In-Fact of UNITED PACIFIC INSURANCE COMPANY, and acknowledged to me that UNITED PACIFIC INSURANCE COMPANY executed the instrument. SYLICIAL SEAL V1 o NOTARY PUBtIC CAuFOBNIA PINNCIPAL OFFICE IN LOS ANGELES COUNTY Comm. Ego.Jan.28. 1 89 l� My Commission expires , fg_ �.� ` BDU-1818 ED.6/83 (CALIF.) 4VMftry Public iff and for mid County STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) On this 4th day of November in the year 1986, before me, the undersigned, a Notary Public in and for said State, personally appeared Wallace E. Hunt, Jr. , and Douglas Hansen, personally known to me (or proved to me on the basis of satisfactory evidence) to be the persons who executed the within instrument as Vice President and Assistant Secretary on behalf of Huntmix, Inc. , therein named and acknowledged to me that the corporation, as General Partner, executed it on behalf of the partnership, Industrial Asphalt. ainnnimmininnninnnmunmmnOFFICI1AL SEAL TRUDY M. KROHN = Notary P is in and for said State. ._ffi NOTARY PUBLIC-CALIFORNIA PRINCIPAL OFFICE IN • LOS ANGELES COUNTY My Commission Expires Aug. 16, 1989 annmm�nuwnnnunnnnmnnnnnmm�nninnninunninnnainuniunnA • • 2. Said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or modification of the contract documents or of the work to be performed thereunder, shall in any way affect its obligations or this bond, and it does hereby waive notice of any such change, extension of time, alterations, or modifications of the contract documents or of work to be performed thereunder. Executed this 5th day of November 19 86 , at Glendale , California. Industrial Asphalt, a partnership PRINC y: fiu mix, Inc. , General Partner By: 1 WallacE. n , Sr, /V�i�c/e��P�ressident � ' a w Douglas Ha en, Assistant Secretary APPROVED AS TO FORM (NOTARIZATION AND SEAL) J NR. HAW, CITY ATTORNEY SURETY UNITED PACIFiq INSURANCE COMPANY Park, Attorney in Fact (NOTARIZATION AND SEAL) -21- F,F.CEINE Premium Included N0 1 t ?7 P4 51 Bond No.U-509250 LABOR AND MATERIAL BOND KNOW,ALL MEN BY THESE PRESENTS: That WHEREAS, the City of San Juan Capistrano, a municipal corporation of Orange County, California, has awarded to INDUSTRIAL ASPHALT , License No. , hereinafter designated as "Principal", a contract for A.C. Oveilay of San Juan Creek Road ; and WHEREAS, said Principal is required to furnish a bond in connection with the said contract providing that if said Principal, or any of his or its sub-contractors, shall fail to pay for any materials, provisions, provender or other supplies or teams used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, the surety or this bond will pay the same. NOW, THEREFORE, we INDUSTRIAL ASPHALT Principal, and UNITED PACIFIC INSURANCE COMPANY , as surety, are held firmly bound unto the City of San Juan Capistrano, a municipal corporation, in the penal sum of Seventy-Six Thousand Five Hundred Seven and 98/100-------- DOLLARS ($76,507.98 ,, lawful money of the United States of America, for payment of which sum well and truly to be made we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION is such that, if said Principal, his or its heirs, executors, administrators, successors or assigns, or sub-contractors, shall fail to pay for any materials, provisions, provender, or teams, or other supplies or equipment used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor as required by the provisions of Title 1, Division 5, Chapter 3 of the Government Code of California as amended, that the surety will pay for the same in an amount not exceeding the sum specified in this bond and also in case suit is brought upon the bond, a reasonable attorney's fee to be fixed by the court. This bond shall inure to the benefit of any and all persons, companies and corporations entitled to file claims under said act, so as to give a right of action to them or their assigns in any suit brought upon this bond. FURTHER, the said surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or modification of the contract documents or of the work to be performed thereunder shall in any way affect its obligation on this bond and it does hereby waive notice of any such change, extension of time, alteration or modification of the contract documents or of work to be performed thereunder. As a part of the obligation secured hereby, and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered. _22_ UNITED F4PF-IC INSURANCE WMPAN-Y HEAD OFFICE,FEDERAL WAY,WASHINGTON POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS.The, it, UNITED PACIFIC INSURANCE COMPANY,a WOWstiorn duty oriniad under the kws of the State of Washington,dolga hweby make.owenitute and appoint R. G. PARK of LOS ANGELES, CALIFORNIA--- Its true and lawful Attorney-in-Fact,to make,aaacute.Irl and daliar to and an N behalf,and r its an and`ed ANY AND ALL BONDS AND UNDERTAKINGS OF SURETYSHIP--- Mid to bond the UNITED PACIFIC INSURANCE COMPANY literally as billy and to the rine event a if Such bonds and msritkrtakrngs and other on,rings obligatory on the nature thereof wwe sigreed by an Eaawtrw Offi= of vee UNITED PACIFIC INSURANCE COMPANY and sealed and interstate by one other of such of film I.and hereby ratifies and confirms all that its rid Attwnaylsl:n-Frl may,do in pursiana hereof, This Power of Attorney is Anted under and by authority of Anlck VII of the By Lows of UNITED PACIFIC INSURANCE COMPANY which became effrtrw S*Plemther 7,1978,which provisions we now,in lull fah and effect,reading as follows. ARTICLE VII- EXECUTION OF BONDS AND UNDERTAKINGS 1. The Board of Directors,the hrndeni,the Chairmen of the Board.any Sensor Via Indent,any Vice Proudem Or Assistant Via President a other ofliar designated by the amid of Gilmore shell have power and authority to(al appoint Attorneys on-Fact and to authaae them to eaacule on behalf of the Company,bonds and undertakings.recognimorms, aonracts of indemnity and othm writings mblrPiory on the nature thereof,and Ibl to remove any Such Attornat-in-Face at any time and revoke the power and authority Sian so Mm. 2 Atlorneys-m-Fact dell hew power and authority,subjM to the terms and Ihmnforons of the power of attorney yawed to them,to execute Mid delver on behalf of the Company.bonds and undertakings,rrogniarras,contracts of indemnity and other writing obligatory on the nature thereof. The corporate Sul is not n ormosery for the validity of any bonds and urnderaking.,recogriianas,contracts of Indemnity and oihw writings obligatory on the nature thereof 2. Altmlnayl-Oh-Fact shall haw power and wlhwny to eseCdf aflndawls reaWred to be attached t0 bmndl,leoogniances.contracts of midwh may 0. 01her conditional on obligatory undertakings and they shalt also rot Power and Outstations,to amity she fina l matanant of the Conpany and to copies of the BY Laws of the Company or any*nick or ration thereof This power of attorney n agoed and paled by facsimile undw and by wthorisy of the following Resolution adopted by the Board of Directors of UNITED PACI FIC INSURANCE COMPAN Y at a maetino haltl on the 5111 day of June.1979,at which a tliorum was Prerrnt,end rad Resolution has not been amended or repealed -Rewlwd.that the signatures of such directors and officers and the not of the Company try be affixed to any such power of actor nen or any, anifioa rekling thereto by facsimile.and any such power of rtornar Or certificate baring such facsimile Ypnalwas Or fa imle Mal shall be alta and bonding upon the Company and any such power oto eacured and artihed by facsimile signatures and facsimile sal shall be"lid and billing upon the Company M ties future with Impact to any blind or Undertaking to which it is attached.- IN WITNESS WHEREOF,theIT D PACIFIC INSURANCE COMPANY has sra surd them p,~Isbe SW"by in Via h *n rideot. il Its corporate Mal to be hereto afhxw,the L3t� d*y of October t9 85 UNITED► IFICINS RANCECOMPANY "A Via President STATE OF Washington COUNTY OF Hilton )! On INS 8th may of October .1985.emotionally appeared Charles B. Schmalz to most known to Ie the Vra-President of the UNITED PACIFIC INSURANCE COMPANY,and skrowledPd that he earuad and attested the lore Doing mmrumant and offisrd the Mal of rid corporation thafro,std seat Attack Vol.Section 1,2,and 7 of the By-law of rid Company.and the Resolution,at lain therein,we will in full lora. / n ' ^' �My CA ExprM July 20 .19 86 CLs%1j1!!zM%01) nri6lamMdtaBMMN Washington Ramdm at Milton I. Lawrence W. Carlstrom ,Assistant Sewr*ry M tea UNITED PACIFIC INSURANCE COMPANY,do heabr cartdir that the @bow and lwoofama s a true and correct spy of a Paver of Attorney samned be Mid UNITED PACIFIC INSURANCE COMPANY,which a will m full Lora and Meet. 1N WITNESS WHEREOF,I Iry heaunto an my hid and afl sad the lots of rid Com wmy @M 5 dev of November 19 86 BOU 1431 ga. 4190 Aatwrt Joon 1 w eh.ri� iM hemlum to 006 Md TTNITED PA%j1:ErIC INI3U1:;?_ANC3E . COMPANY was +. md�ded m mr Mnta e+a Bontl cMt6r. HEAD OFFICE, FEDERAL WAY,WASHINGTON Bond No. U-365337 BID BOND APPROVED BY THE AMERICAN INSTITUTE OF ARCHITECTS A.I.A.DOCUMENT NO.A-310(FEB. 1970 ED.) KNOW ALL MEN BY THESE PRESENTS, that we Industrial Asphalt as Principal,hereinafter called the Principal, and the UNITED PACIFIC INSURANCE COMPANY of Federal Way, Washington, a corporation duly organized under the laws of the State of Washington, as Surety, hereinafter called the Surety, are held and firmly bound unto City of San Juan Capistrano as Obligee, hereinafter called the Obligee, in the sum of Ten percent (10%)of total amount bid Dollars 1$ 1, for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves,our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Asphalt Concrete overlay of San Juan Creek Rd. Bid Opening 9/15/86 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material fur- nished in the prosecution thereof,or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 9 day of September A.D. 19 86 Industrial Asphalt (Principal (Seal) (witness) x ( +tial Vice Presiden grunnnnnnnnnimunmm�nuonnnnnu:nnnunurmmnnnnimnunnu£ z OFFICIAL SEAL = UNITED PACIFI INSURANCE COMPANY B[RTNA R. MUKIE NOTARYFUNLIC CNU PRINCIPAL OFFICE E IN y� LOS ANGELES COUNTY m My Commission Expires May 31, 1981 anus,uuuunnnnunrnura:::nuunrunuunn:nu:uu..... nrnnumm Attorney in Fact BDU 2305 Ed. 5/81 State of California, County of Los Angeles SS: On this 9 da of September 1986 Y in the year , before me Notary of Public personally appeared R.G.Park , personally known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to this instrument as the Attorney-In-Fact of UNITED PACIFIC INSURANCE COMPANY,and acknowledged to me that UNITED PACIFIC INSURANCE COMPANY executed the instrument. OFF ML SEAL SYLM T RIVAS e N0411Y POM1C CMJFOONYI i PNINCft OF1Ni 1N LOS ANOELES COONIY CM1a1.Eq.1NL ZS,1 My Commission expires , 19 BDU-1818 ED.6/83 (CALIF.) otary Public in and for said County UNITED %MPIC INS7JFLANCIE COMPANY HOME OFFICE, FEDERAL WAY, WASHINGTON POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, That the UNITED PACIFIC INSURANCE COMPANY,a corporation duly organized under the laws of the State of Washington,does hereby make,constitute and appoint WILLIAM W. JELKS of LOS ANGELES, CALIFORNIA--------- its true and lawful Attorney-in-Fact,to make,execute,art and deliver for and on its behalf,and as its act and deed ANY AND ALL BONDS AND UNDERTAKINGS OF SURETYSHIP--- and to bind the UNITED PACIFIC INSURANCE COMPANY thereby as fully and to the same extent as if such bonds and undertakings and other writings obligatory in the nature thereof were signed by an Executive Officer of the UNITED PACIFIC INSURANCE COMPANY and tested and attested by one other of such officers,and hereby ratifies and confirms all that its rid Attorney(sl-in-Fact may do in pursuance hereof. This Power of Attorney is granted under and by authority of Article VII of the By-Laws of UNITED PACIFIC INSURANCE COMPANY which became effective September 7,1978,which provisions are now in full form and effect,reading as follows: ARTICLE VII—EXECUTION OF BONDS AND UNDERTAKINGS 1. The Board of Directors,the President,the Chairman of the Board,any Senior Vice President,any Vice President or Assistant Vice President or other officer designated by the Board of Directors shall have power and authority to(al appoint Attorneys-in-Fact and to authorize them to execute on behalf of the Company, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof,and (b) to ramose any such Attorney-in-Fact at any time and revoke the power and authority given to him. 2. Attorneys-in-Fact shall have power and authority,subject to the terms and limitations of the power of attorney issued to them, to execute and deliver on behalf of the Company.bonds and undertakings,recognizanms,contracts of indemnity and other writings obligatory in the nature thereof. The corporate seal is not necessary for the validity of any bonds and undertaking.,recognizanms,contracts of indemnity and other writings obligatory in the nature thereof. 3. Attorneys-in-Fan shall have power and authority to execute affidavits required to be attached to bonds,recognizances,contracts of indem- nity or other conditional or obligatory undertakings and they shall also have power and authority to certify the financial statement of the Company and to copies of the By-Laws of the Company or any article or section thereof. This power of attorney is signed and sealed by facsimile under and by authority of the following Resolution adopted by the Board of Directors of UNITED PACIFIC INSURANCE COMPANY at a meeting held on the 5th day of June,1979,at which a quorum was present,and said Resolution has not been amended or repealed: "Resolved,that the signatures of such directors and officers and the seal of the Company may be affixed to any such power of attorney or any mrtificate relating thereto by facsimile,and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached." - IN WITNESS WHEREOF,the UNITED PACIFIC INSURANCE COMPANY has mused these presents to be signed by its Vice President,and its corporate seal to be hereto affixed.this 19th day of September 19 80. UNITED PACIFIC INSU ANCE OMPANY t: SEAL/' SLl✓�•(/4�j I � w's Vim President STATE OF Washington COUNTY OF King las. On this 19th day of September 19 80 personally appeared Charles B. Schmalz to me known to be the Vice-President of the UNITED PACIFIC INSURANCE COMPANY,and acknowledged that he executed and attested the fore. going instrument and affixed the seal of said corporation thereto, and that Article VII,Section 1, 2, and 3 of the By-Laws of said Company, and the Resolution,set form therein,are still in lull force. , �S My Commission Expires: .c��%. / zM QZ) ligtyJ; June 12 1982 Notary Public in and for Stile of Washington Residing at Tacoma Charles J. Falskow Assistant Secretary of the UNITED PACIFIC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney executed by aid UNITED PACIFIC INSURANCE COMPANY,which is still in full force and effect. IN WITNESS WHEREOF,I have hereunto at my hand and affixed the ctrl of aid Company this 9 day oof September ig 86 0--i YAssistantSecretar eDU-14J1 Etl. 4/80 State of California, County of Los Angeles SS: On this day of Sentemher in the year 1986 before me Notary of Public personally appeared William W- .Telks , personally known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to this instrument as the Attorney-In-Fact of UNITED PACIFIC INSURANCE COMPANY,and acknowledged to me that UNITED PACIFIC INSURANCE COMPANY executed the instrument. OFFICIAL SD SYLVIA T .gyp 1 NOTARY PUBIIC PRINCIPAL OFLOS ANGELES M Comm Up. la �T� My Commission expires ' 19— _ ��'y`'r'r--' / BDU-1818 ED.6/83 (CALIF.) NoWry Public in and for mid County IN WITNESS WHEREOF, the above-bounden parties have executed this instrument under their several seals this 9th day of 9--- 19_26., the name and corporate seal of each corporate party being affixed hereto and these presents duly signed by its undersigned representative pursuant to authority of its governing body. Two Witnesses (If Individual) INDUSTRIAL ASPHALT PRINCIPAL BY: ♦*�s Title: Vice President ATTEST ( C;C OFFIOIALSEAL WANDA DOWNY NOTARY PUBLIC-CALIFORNIA LOS ANGELES COUNTY. - MY COMM. EXP. NAY 1, 1990 UNITED PACIFIC INSURANCE COMAPNY Corporate Seal Syt= ATTESTBY: / Title: William W. Jelks,Attorney in Fact Title APPROV AS TO FORM: l� John Shaw, City Attorney -19- Th. bmlum 1-1 thl,610 Dana la Includetl In the Muter BidBond chary,, Bond No.U-365337 BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, Industrial Asphalt , as PRINCIPAL, and TTNTTFn PACTFTC TNRTTRANCF COMPANY , as SURETY, hereinafter called Surety, are held and firmly bound unto the CITY OF SAN JUAN CAPISTRANO, Obligee, hereinafter called City, in the sum of $ 10% of bid , for payment whereof Principal and Surety bind themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally, fairly by these presents. THE CONDITION OF THIS OBLIGATION is such that whereas the Principal has submitted the accompanying bid dated September 15 , 19 86 , for the construction of Asphalt Concrete overlay of San Juan Creek Rd. .for the City of San Juan Capistrano, Orange County, California. NOW, THEREFORE, if the Principal shall not withdraw said bid within thirty (30) days after the opening of same, and shall, within fifteen (15) days after the agreement has been presented to him for execution, enter into a written contract with the City in accordance with the bid as accepted, and if the Principal shall give the required bond with good and sufficient sureties, or sureties for the faithful performance and proper fulfillment of such contract and for the protection of laborers and materialmen, or in the event of the withdrawal of said bid within the periods specified, or the failure to enter into said contract and give said bond within the time specified, if the Principal shall within sixty (60) days after request by the City, pay the City the difference between the amount specified in said bid and the amount for which the City may procure the required work and/or supplies if the latter amount be in excess of the former, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue. Further, as a part of the obligation secured hereby, and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered. _18_ DESIGNATION OF SUB-CONTRACTORS Submit with Proposal, In compliance with the Provisions of Section 4100-4107 of the Government Code of the State of California as amended, the undersigned certifies that he has used the sub-bids of the following listed sub-contractors in making up his bid, and that the. . sub-contractors listed will be used for the work for which they bid, subject to the approval of the Engineer, and in accordance with the applicable provisions of the Specifications. It is understood and agreed that all those portions of the work called for in the contract documents for which a sub-contractor is not listed will be performed by the undersigned through his forces. If no sub-contractors are listed, all bonds and insurance will be written in the name of the general contractor only. Item of Work Sub-Contractor Address Phone No. 1 . /Ti: aIR1�R RAV7Nl. �bS.SB;LA/-OLMA SOMA AVAWEinn U.42fr" 7/4-G309a7b 230V GRa EW L-&00 A v3 2 • 172W4 N1Aw4Jor,6 Aglaaws mwronee� MIA G4,k775f 213 -72Z 97 3 . 4 . 5 . 6 . 7 . a . T�VDa5 ilei,+c {spfsA�i BIDDER'S NAME AUTHORIZED SIGNATURE -8- NON-COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER .AND SUBMITTED WITH BID STATE OF CALIFORNIA ) SS. County of 62A.✓G c ) /9RiAto ARM57Ryr4c+ , being first duly sworn deposes and says that he is Vrac 1 R<5/dCN7 of i.iDus rR 1A�_ .s 5,00/9 A. 7- the the party making the foregoing bid; that such bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization, or corporation; that such bid is genuine and not collusive or sham; that said bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or, indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that any one shall refrain from bidding; that said bidder has not in any manner, directly or.indirectly, sought by agreement, communication or conference with any one to fix the bid price of said bidder or of any other bidder, or to fix the bid price of or cost element of such bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of any one interested in the proposed contract; that all statements contained in such bid are true; and further, that said bidder has not directly or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid and will not pay any fee in connection therewith, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, or to any other individual except to any person or persons as have a partnership or other financial interest with said bidder in this general business. DATED: SE,oTc-row e i.s. SIGNATURE On this the is day of ScOTE/n4ic/Z 19 BG before me, the undersigned, a Notary Public in and for said State, personnally appeared Be,A A2.n.^,r2o vG VlE P'eeswc.vT personally known to me/proved to me on the basis of satisfactory evidence, to be the person(s) whose name(s) is subscribed to the within instrument, and acknowledged that ,yam executed it. JIIIIi1111111111111111111111111111111111111111111111111iII101111111111111111p1111111pIIIII11111L OFFICIAL SEAL BERTHA R. MUNCIE _ NOTARY PUBLIC-CALIFORNIA e PRINCIPAL OFFICE IN WITNESS m hand and official seal. y Cem' LOSANGELES May 3GUNTY '. y , My Cwnmisslan Expires May 31, W88 5 mniowmwemnwnnieunlnn,...n.....nuumnuoninuweanu...moG _4ZL Notary Public in and for said State -7- SCHEDULE OF WORK ITEMS A.C. OVERLAY OF SAN JUAN CREEK ROAD Approximate Work Items With Unit Price Unit Price Item Quantity (Written in Words) (In Figures) Total Amount 1 18,930 S.F. Cold Plane A.C. for the unit price of Ssy_lNTetiw c4-&r -. dollars. $ •/7 $ 32(80 2 1770320 S.F. Furnish and install pavement reinforcing fabric for the unit price of E/BHT d- F 6ki6 {ivuDR��dollars per sq. foot. a 3 2,000 Ton Furnish and install asphalt concrete for the unit price of 1wBe.i1V saVaN 1740 s +-- ' EllW—r')TTpNa cels dollars. $ Z7. 8I $ SS620,oa 4 13 Ea. Adjust frame and cover to rade for the unit price of ONffRao � yeNTN fiwr dollars. $ 175.00 5 L.S. Traffic control for the lump sum price of t7,1e 14 ut,,Za a;o dollars. $ ,0v $ sbaon Total Bid Price (enter here and on Page 3) S ,E. sem rAousaP,O,PO l+vNoa� �Bvc�N oousHt s Nilo= E agT $ �l0 507,9 8 Words Figures The following information regarding pavement reinforcing fabric shall be provided with each bid. Fabric Trade Name 4?kmo MA e. Physical Property Requirement Proposed Weight, Ounces Per Square Yard - ASTM 3.0 to 8.0 Designation: D 1910 Grab Tensile Strength (1-Inch Grip), 90 Min. Pounds - ASTM Designation: D 1117 Elongation at Break, Percent - ASTM 40 Min. Designation: D 1117 Fabric Thickness, Mils - ASTM 12 to 100 Designation: D 461 -6- (If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm: President, Secretary, Treasurer, 1"006TIR/A/. ASPw.gLT-- A A.f JNL'.CS/f/lJ — CowmSJ/NG and Manager thereof.) pF; _ Cogcr sra n/AaT/No• { IfVNJM/X 'NC;— Dated: NCS—Dated: SE OT_/S, /986 Ao. l3o zzc3 /Qw/nloacE cn. 9/JoL Business Address ' Dated: d/P- a/y- /./zo Telephone Number Further, the undersigned bidder certifies that he has thoroughly checked the figures set forth in this proposal, that they are correct to the best of his knowledge and that they constitute his proposal for the work called out herein. // .PU5T,2/A p45P HALT Dated: se-'Or. /s /286 Signature of Bidder v, AkaS,D az r) Dated: B/8- 8/y-/V Z. Telephone Number -5- given solely as a basis for comparison of bids. It is understood that the City does not expressly, nor by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any item or portion of the work or to omit portions of the work as may be deemed expedient by the Engineer. It is also understood by Bidder that the City of San Juan Capistrano has the right to reject this proposal or to award a contract to the undersigned at the prices stipulated. If .the proposal is rejected, then any check or cashier's check shall be returned to the undersigned within thirty (30) days. No bid bonds will be returned. If the proposal is accepted and the undersigned fails to enter into a contract within fifteen (15) days after the agreement is delivered to him for signature, or within such further time as may be granted by the City Council, then said check shall be cashed or said bond declared forfeit and an amount equal to the difference between the lowest bid and the next lowest bidder who will execute a contract shall be paid into the treasury of the City of San Juan Capistrano as liquidated damages for the failure of the undersigned to comply with the terms of this proposal. Accompanying this proposal is /Biontas /jo n (Insert "$ cash", cashier's check, certified check or bidder's bond, as the case may be), in an amount equal to at least ten percent (10%) of the total bid. The following is the name and place of business of the surety company which will furnish the required bonds as surety if the work is awarded to the undersigned: UN/7,rp Aqc /c_ 1/ oyRANC6 Cb- 0.13VX Z9oo8. GLENO.Q�E/ CA, i'/Le 9 C8/9-24u-696 o) Licensed in accordance with an act providing for the registration of contractors -- License No. Al.-V3-177- ,q Signature of Bidder: N U 7 IAL 5 v/CC PRsa/o ENT -4- BID PROPOSAL For the: A.C. OVERLAY OF SAN JUAN CREEK ROAD .From: 2:a-4usre:v� As0eefaf rr Contractor To the Honorable City Council City of San Juan Capistrano Gentlemen: The undersigned, as bidder, declares that he has carefully examined the location of the proposed work as described, examined the Plans, Specifications, Special Provisions, and the Standard Specifications for Public Works Construction, 1985 Edition, including all supplements therefor, read the Instructions to Bidders, and is familiar with all proposal requirements, and hereby proposes and agrees, if the proposal is accepted, to complete the said construction in accordance with the Contract Documents, as defined in Section 1-2 of the Standard Specifications, in the time stated herein, for the unit price or lump sum given on the following Rages of this proposal, amounting to a total of: 5�L'hrl�I Sn� '7tkOv5A�.n0 Fl✓d/ v&IOP D Sc'Vor/ Vou4a-¢ $ 70507.-fg Words Figures Said amount to include and cover all taxes, the furnishing of all materials, the performing of all the labor requisite or proper and the providing of all necessary machinery, tools, apparatus, and other means of construction; also, the performance and completion of all the work in the manner set forth, described and shown in the Specifica- tions or the drawings for the work. If the contract is awarded, the undersigned agrees to enter into a contract with the City and to commence work within fifteen (15) calendar days from the date of execution thereof, and to diligently prosecute the work to completion before the expiration of forty-five (45) calendar days. All bids are to be computed on the basis of the given Estimated Quantities of Work, as indicated in this proposal, times the unit prices as submitted by the bidders. In case of discrepancy between words and figures, the words shall prevail. In case of discrepancy between unit prices and the extension thereof, the unit price shall prevail and bids will be computed as indicated above and compared on the basis of corrected totals. The estimated quantities of work indicated in the proposal are approximate only being -3- B I D O P E N I N G R E P O R T Bids opened SEPTEMBER 15, 1986 at 2;00 am/pm Project Title A.C. OVERLAY OF SAN JUAN CREEK ROAD Project Engineer Brian Perry Pre-Bid Estimate $135,000 Bid Bid Bidder: Amount Bond 1 R.J. Noble Company q_0 2. Sully-Miller Vernon Paving Co. 4. /�� Sem , r/'�i ,7— 2 6 C�9 r 5. L)Jtch Y U 6. 7. 8. 9. 10. cc: City Clerk' s Staff (3) Signed Public Works (3) City Manager (1) Dated The above bid amounts have not been checked. The bid totals are subject to correction after the bids have been completely reviewed. State of California, Countyof Los Angeles SS: On this 5th day of November in the year 1986 before me Notary of Public personally appeared R-C-Park , personally known to me (or proved to me on the basis of satisfactory evidence) to be the person whose name is subscribed to this instrument as the Attorney-In-Fact of UNITED PACIFIC INSURANCE COMPANY,and acknowledged to me that UNITED PACIFIC INSURANCE COMPANY executed the instrument. OFFICIAL SEAL SYLVIA T RIVAS c NOTARY PUBLIC CALIFORNIA PRINCIPAL OFFICE IN LOS ANGELES COUNTY Comm.Exp. )an.28, 1989 My Commission expires ' 19 �— BDU-1818 EO.6/83 (CALIF.) — Il, Notary Pubfic in and for aid County STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) On this 4th day of November in the year 1986, before me, the undersigned, a Notary Public in and for said State, personally appeared Wallace E. Hunt, Jr. , and Douglas Hansen, personally known to me (or proved to me on the basis of satisfactory evidence) to be the persons who executed the within instrument as Vice President and Assistant Secretary on behalf of Huntmix, Inc. , therein named and acknowledged to me that the corporation, as General Partner, executed it on behalf of the partnership, Industrial Asphalt. •_.inmm�mm�innwnmmMill nOFFICI'AL SEALlnnnnim / TRUDY M. KROHN NOT:YI PRIPUBNCIPAL O FILEAL IN a Notary PuVic in and for said State. = pNINCI PAL OFFICE IN LOS ANGELES COUNTY'_ My Commission Expires Aug- 16, 1999 =_ �nwnnwnnipunnnnnnnnnunnnnUs .......... nnnnnnn....I . IN WITNESS WHEREOF three (3) identical counterparts of this instrument, each of which shall for all purposes be deemed an original thereof, have been duly executed by the Principal and surety herein named on the 5th day of November , 19 86 . The name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representatives pursuant to authority of its governing body. Industrial Asphalt, a partnership By: Huntmix Inc General Partner PRINCIP By � Q -� _q— — Wallice E. cant, J . , Vice President By Doug as 4 nsen, ssistanteco retary UNITED PACIFIC INSURANCE COMPANY SURETY 7 By R. G. Park, Attorney in Fact APPROVED AS TO FORM R. SHAW, CITY ATTORNEY -23- �J7�T�D P�L;IF'�C �i'3;SU.RA L�7C�a C�r3P_r��7'i' �AD OFFICE, FEDERAL WAY, WASHINGTON • POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS.That the UNITED PACIFIC INSURANCE COMPANY,a corporation dcJy orpsnized under the laws of the State of Washington,clow hereby maks,constitute and appoint R. G. PARK of LOS ANGELES , CALIFORNIA--- rte true and lawfuf Atiornery-ut•Fan,to make.execute,col and deliver fa and on ib behalf,and w its act and dead ANY AND ALL BONDS AND UNDERTAKINGS OF SURETYSHIP--- and to bind the UNITED PACIFIC INSURANCE COMPANY thereby as hilly and to The game imam w,f such bonds and undertakings and other writings obligatory in the mune theredf ware signed by an Exewtive Offissr of Thee UNITED PACIFIC INSURANCE COMPANY and sailed and allesle i by one other of subh off,cwt,and hereby readies and confirnss all that its mid Arlpney(s)4n-Fac1 may Win pursuance hereof This Power of Attorney it panted under and by authority of Article VII of the Br Laws of UNITED PACIFIC INSURANCE COMPANY which became effective Se Ptember 7, 1978,which povruons we row In full ford and effect,reading as follows. ARTICLE VII - EXECUTION OF BONDS AND UNDERTAKINGS 1. The Board of Directors,the Pnedenl,the Chairman of the Board,any Senior Via Presdenl,any V-c*PreWem or, Awnunt Vere President Or other oflicer des,gmled by The Board of Dvemors she❑have power and authority to (al appoint Attorneys in-Fan and to authorize them to execute on behalf of The Contoany,bonds and underuk,ngs, recogn,zancn, comrans of indemnity and other writups obligatory in the rsature thereof,and (bl to remove any such Atiorrey-in-Fan at any lime and rewke the povyer and authority given to Nm. 2. Attorneys-m-Fan still have power and authority,s iblect to the iwm e;and limitations at the power of attorney issued to them, to execute and deli",on behalf of The Company,bonds and undwl+kmgs,recogmur,crs,contrails of indemnity and other wf,Ongs obbgalory in the nalure tnerecf. The corporate seal is ncl tecetmry for the validity of any bonds and undef takirq.,rocogn,zanas,contracts of indemnity and oihw writings obligatory in the"I we thereof, 3. Anorneys-m-Fan "it haw power and authority to execute ah davits re twared to be attached to bo rods,recognizances.eontrans of meem- nmY or oth6r, condmo"I or obligatory under UkiNs and they still alio taut power, and authpnty to Qnify the fiNnOal nalwMnl pf the Company and •To copies of the ByLam of the Company w any article Or mm,on thereof This power of attorney n agned and nailed by facsimile urdw and by authority of the folfowutq Resolution adopted by the Solid of Dvemors of UNITED PACIFIC INSURANCE COMPANY at a investing held on the 5th day of Jura, 1979,at which a quorum was presont,and gad Resotylion has not been amended or repealed 'Rewlwd,that the signatures of such directors and officers and the mal of the Company Rey be affixed n any such power of attorney or any certificate fel+lmq threlo by facsimile,and any such power of aticeney a afTd.e+te bearing such faa,mde signatures on facsimile goal still be valid and binding upon The Company and any aucn power w executed and anifted by facsimile signatures and facumde sail shall be valid and boding upon The enmtpany in the future with rasped to any bond or undensking to which it is attached•• IN WITNESS WHEREOF,ehe UWTAO PACIFIC INSURANCE COMPANY has caused these presents to be spiced by les Vice Nin.denl,sed is co,porate fail to be hereto all..".this tll day of October 19 85 0+�\ UNITED P4PFIC INSURANCE COMPANY Vice hesdfatt STATE OF Washington COUNTY OF Milton On in,, 8th They of October .1985,pww,,wfy appeared Charles B. Schmalz Io me knov+n to Ie The Vice-President of the UNITED PACIFIC INSURANCE COMPANY,wed acknowledged that hex Kuled and Guested Ili tine' going Instrument and affuad the mal of mid corporation thweso,arid that Artpfa VII,Section 1,2,and 3 of the By-Law, of gad Company.and the oluTlpn,col therein,be mill In full force. hayy r*t Corrtaeton E E xpipre' �6/s-/. July 20 .19 E6 yPblcncodfalgafaot Washin ton F Amdng+t Hilton i, Lawrence W. Carlstrom Awinanl Savuaty W the UNITED PACIFIC INSURANCE CC '&ANY, do hereby comfy shat rte above and foregoing is a true sed eorract copy of a POww of Attorney etaosin d by wed UNITED PACIFIC INSURANCE COMPANY•which not it'll in full fps and then. IN WITNESS WHEREOF,I Aim hereunto eat my hand and Mixed the®I of said Company thi, 9 day of September 19 86 RDV 1431 Ed. 4/30 � gV•t A wiarti e awn r / ' s� eta AFFIDAVIT OF PUBLICATION This space is for the County Clerk's Filing Stamp RECFI\{ED SEP ° "' n ")IJ STATE OF CALIFORNIA Proof of Publication of County of Orange I am a citizen of the United States and a resident of the County aforesaid:I am over the age of twenty one years, NOT-ICS •INVIT•ING-BIDS• . . . • • . • and not a party to or interested in the above-entitled matter. I am the principal clerk of the Capistrano Val- ley News,a newspaper of general circulation in the City of San Juan Capistrano, County of Orange, and which newspaper has been adjudicated to be a newspaper of general circulation by the Superior Court of the County of Orange, State of California, June 5, 1984, Case No. A-122949 in and for the City of San Juan Capistrano, County of Orange and the South Orange CountyJudicial �± District; that the notice,of which the annexed is a true ._r i4rll. alr printed copy, has been published in each regular and SAN JUAN CILAD entire issue of said newspaper and not in any supple- ubmaw mu, �p MCo0{ onowin c ment thereof on the following dates, to wit: W ah .rorty, tneei tut9.ajainc Jum It SCIq'4iv ot8eptpngar.IMC ;.a -ewCe CM MoeLNulod of lC:MAY.oo Ne Ctl#MW d 'ot{`eva and fPcoo boa4t coo4a;�auWai August 21, 28, 1986 iu�.� "eSPft Off IWNO '�w'kestas8r_ I,IOW mO�bo AU4210 N go a[tQY�14r eh�het MPJwW dad SpocMcWow NWa 14,SCM - ,IDkRY ANN. f I declare under penalty of perjury that the foregoing is 4 ture and correct. IRTWWR Executed at Mission Viejo, Orange County California,this ....2$.. dayof August 19 ,86 ... .. . �v.. ... .. ..... .. .. ... .. . Signature Capistrano Valley News 23811 Via Fabricante P.O. Box 3629 Mission Viejo, Calif, 92690 NOTICE OF TRANSMITTAL - LEGAL PUBLICATIONS TO: CAPISTRANO VALLEY NEWS Jody Kolar, Legal FOR PUBLICATION ON: THURSDAY, AUGUST 21, 1986 THURSDAY, AUGUST 28, 1986 DOCUMENT TO BE PUBLISHED: NOTICE INVITING BIDS - A.C. OVERLAY OF SAN JUAN CREEK PROOF OF PUBLICATION: Please send to: City Clerk's Department City Hall 32400 Paseo Adelanto San Juan Capistrano, CA 92675 (714) 493-1171 AUTHORIZED BY: � t DATE: August 14, 1986 Date of Bid Opening - September 15, 1986 Date (s) notice published - August 21, 1986 August 28, 1986 Date affidavit received - Date notice posted in designated posting places (3) - August 21, 1986 ✓ NOTICE INVITING BIDS A.C. OVERLAY OF SAN JUAN CREEK ROAD Notice is hereby given that the City of San Juan Capistrano will receive sealed proposals or bids for the A.C. Overlay of San Juan Creek Road until 2:00 P.M. on the 15th day of September, 1986. A pre-bid conference is scheduled at 10:00 A.M. on the 8th day of September, 1986, at the City offices to assist contractors. Copies of Plans and Specifications are on file in the Office of the City Clerk of San Juan Capistrano, 32400 Paseo Adelanto, San Juan Capistrano, California, and may be obtained at the non-refundable charge of $10.00, plus a charge of $5.00 for each set of Plans and Specifications mailed. Dated: August 14, 1986 TY CLERK// CITY OF SAX JUAN CAPISTRANO ORANGE COUNTY, CALIFORNIA • C�� � , 3v PLANS, SPECIFICATIONS AND CALL FOR BIDS - ASPHALT AND CONCRETE OVERLAY OF SAN JUAN CREEK ROAD FROM CALLE CABALLERO TO LA NOVIA ROAD (425. 146 600.30/912. 44) The plans and specifications for the asphalt concrete overlay of San Juan Creek Road from Calle Caballero to La Novia Avenue were approved, and a call for bids authorized. As set forth in the report dated August 5 , 1986 , from the DIrector of Public Works,. $205 ,000 was budgeted in Account 12-6900-4710-118 for the asphalt concrete overlay of San Juan Creek Road; the Engineer' s estimate for this project was $135 ,000. 8 s-�6 A.C. OVERLAY OF SAN JUAN CREEK ROAD NOTICE INVITING BIDS Public notice is hereby given that the City of San Juan Capistrano will, up to 2:00 p.m., on the 15th day of September 1986, receive sealed proposals or bids for the A.C. OVERLAY OF SAN JUAN CREEK ROAD in accordance with the approved Plans, Specifications, Special Provisions, and the Standard Specification for Public Works Construction, 1985 Edition, including all supplements therefor, on file in the office of the City Clerk of the City of San Juan Capistrano, California. Bids will be received until the time hereinbefore stated at the San Juan Capistrano City Hall, 32400 Paseo Adelanto, San Juan Capistrano, California. No bid will be received unless it is made on a proposal provided within these specifi- cations. Each proposal or bid must be accompanied by a certified check, cash, cashier's check, or bidder's bond payable to the City of San Juan Capistrano in the sum of not less than ten percent of the total bid amount. The bid check, cashier's check or bidder's bond of the successful bidder will be forfeited to said City in the event such successful bidder fails to enter into the required contract within 15 days after the written notice that said contract has been awarded to him for the work. A pre-bid conference is scheduled at 10:00 a.m. on the 8th day of September 1986, at the City offices. The contractor shall have the opportunity for clarification or interpre- tation of any point or points of question within the plans and contract documents or specifications. It is the contractor's responsibility to be in attendance at this conference to receive any information disclosed during the proceedings, for the City shall not dis- seminate any records of the conference. Exclusive of written addendums and this pre-bid conference, the City shall not be responsible for any instructions, explanations, or inter- pretation of the plans, specifications, and contract documents presented to the bidders in any manner. The successful bidder, simultaneously with the execution of the contract, will be required to furnish a Faithful Performance Bond equal in the amount of one-hundred percent (100%) of the contract price. The surety bond company must be selected from among the surety companies set forth in the surety list provided herein. _1_ The City Council reserves the right to reject any and all bids received and to compare the relative merits of the respective bids and to choose that which in the opinion of said City will best serve the interests or needs of said City. A time limit of forty-five (45) calendar days has been set for the completion of the work, from the date of execution of the contract. BIDDERS ARE HEREBY NOTIFIED THAT, pursuant to the Labor Code of the State of California, copies of the prevailing rate of per diem wages, as determined by the Director of the State Department of Industrial Relations, are on file in the office of the City Clerk and shall be made available to any interested party on request. Copies of plans and specifications are on file in the office of the City Clerk of San Juan Capistrano, 32400 Paseo Adelanto, San Juan Capistrano, California. Copies of the plans and specifications for use in preparing bids may be obtained at the Office of the City Clerk, San Juan Capistrano, at the address shown above. One set of plans and specifications is available for each general contractor proposing to submit a bid for said work. A charge in the amount of $10, nonrefundable, is required for obtaining each set of plans and specifications. There will be a $5 charge for postage and handling on all plans and specifications mailed. Each bidder shall state the California Contractor's License number of such bidder so bidding, as no bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the laws of the State of California relating to the licensing of Contractors. This Notice is hereby given and published by order of the City Council of the City of San Juan Capistrano, and is dated this day of I�YyCL F Ijl CITY OF N JUAN CAPISTRANO ORANGE COUNTY, CALIFORNIA -2- AGENDA ITEM August 5, 1986 TO: Stephen B. Julian, City Manager FROM: W. D. Murphy, Director of Public Works SUBJECT: Plans, Specifications and Call for Bids - Asphalt and Concrete Overlay of San Juan Creek Road SITUATION Staff is requesting approval of plans and specifications and authorization to receive bids for the asphalt concrete overlay of San Juan Creek Road from Calle Caballero to La Novia Avenue. This project will extend the area of San Juan Creek Road which was overlaid earlier this year from Forster Canyon Road to Calle Caballero during the Chiquita Land Outfall Project by the Santa Margarita Water District. NOTIFICATION Adjacent Homeowner Associations; San Juan Hills Country Club; Glendale Federal COMMISSION/BOARD REVIEW, RECOMMENDATIONS N/A FINANCIAL CONSIDERATIONS $205,000 has been budgeted in account #12-6900-4710-118 for the asphalt concrete overlay of San Juan Creek Road this fiscal Year. The Engineer's estimate for this project is $135,000 and sufficient funds are available in the account for this work. ALTERNATE ACTIONS 1. Approve the plans and specifications and authorize Staff to receive bids for the asphalt concrete overlay of San Juan Creek Road. 2. Don not approve the plans and specifications. 3. Request additional information from Staff. AGENDA ITEM • August 5, 1986 Page Two RECOMMENDATION By motion, approve the plans and specifications for the asphalt concrete overlay of San Juan Creek Road and authorize Staff to receive bids. Respectfully submitted, W. D. Murphy WDM/BP:nb • W.C. OVERLAY Ott SAN JUAN CREEK ROAD a � - OQ � NNS- 3P ®� L.a wANCM -s swtN, 1JPP PSE CARTAGENA A e n 9 a JPS V w 2 j O s CPy T eP o � = is s r 0 �o I SCALE '. I "= 120.0 VICINITY MAP 20315 - Ventura B1 . Suite 200 Woodland Hills, Ca. 91364 ( 818) 887-4155 November 20 , 1986 MARY ANN HANOVER Cty/San Juan Captrno 32400 Paseo Adelanto S J C CA 92615 FOR YOUR ATTENTION [ _] Enclosed is your policy. ( _] Enclosed is Endorsement. Please attach to your policy. [ _] fill in [ _] Please ( _] sign and return enclosed form. [ _] Recent Claim [ _] Enclosed is check for ( _] Premium Adjustment [ _] Enclosed is Premium Statement. Please remit in envelope provided ( _] I have been unable to contact you. Please contact our office. [ _] Enclosed please find copy of certificate of Insurance for: ( X] Other: ENCLOSED PLEASE FIND CERTIFICATE OF INSURANCE FOR INDUSTRIAL ASPHALT. Sincerely yours, 7J JAN(ICONRAD J C/pe C COf ,SUE DATE(M 100,Y V) ® , � 1 11/20/86 PRI IDUCER THIS CERTIFICATE IS ISSUED AS A NATTER OF INFORMATION ONLY AND CONFERS 40 RIGHTS UPON'I HE CERTIFICATI4 HOLDER.THIS C ERTIFICAI:_DOES NOT AMEND, EXTEND OR ALTEI- THE COVEFtl10P.AFFORDED BY-rHE POLICIES BELOW. Christensen 6 Whitmer Ius. Bkrs. COI1IPANIE$ AFFORDING COVERAGE 20315 Ventura Blvd. , Suite 200 _ Woodland Hills, CA 9136 - CC APANY LE TER A Industrial Indemnity LE TER s INS IRED Industrial Indemnity CC'APANY f-..f Industrial Asphalt LE TER C Industrial Indemnity P.Q. BOX 7607CC'APANY p Van Nuys, CA 91409 LE TER Industrial Indemnity _ F CC'APANY rst tate— - un :'1 LE'TER E Ins Co of Pennsylvania y • 40-1141 - 1 iIS IS TO CERTIFY THAT POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PEF=INDICATED. F DTWITHSTANDING ANY REGUIREMEN TERM OR CONDITION OF ANY C:)NTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY E=ISSUED OR MAY PERTAIN,THE INSL RANCE AFFORDED BY THE POUC ES DESCRIBED HE REIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS,AND CONDI. I ONS OF SUCH POLICIES. CO POLICY EFF-:TIVE POCK` EXPIRATION LIABILITY LIMITS IN THOUSANDS LTR TYPE OF INSURANCE POLICY NUMBER DATE(MMn`.)NY) DATE iMIAMN') EACH _ OCCURRENCE AGGREGATE 1ENERAL LIABILITY BODILY A ); COMPREHENSIVE FORM SG876-7364 7/1/86 7/1/87 INJURY $ $ J� PREMISES/OPERATIONS PROPERTY F EXPLOSIONUND B COLLAPSE HAZARD DAMAGE $ $ X PRODUCTS/COMPLETED OPERATIONS }; CONTRACTUAL Big PO COMBINED $ $ y, INDEPENDENT CONTRACTORS 11,000, 1,000, X BROAD FORM PROPERTY DAMAGE X PERSONAL INJURY PERSONAL m1JURY $1,000, AUTOMOBILE LIABILITY MDu B ANY AUTO SG876-7364 7/1/86 7/1/87 IIPEKa RSONI $ rt�' ALL OWNED AUTOS(PRN. PASS.) BWLv ALL OWNED AUTOS(OTHER THAN I(PER A PRIV PASS IHN occnENp $ r HIRED AUTOS PROPERTY NON-OWNED AUTOS DAMAGE $ "F ; GARAGE LIABILITY SI a PD COMBINED $1,000, EXCESS LIABILITY 01.000537 7/1/86 7/1 87 2,500, 2,500, B UMBRELLA FORM 42867159 7/1/86 7/1/87 81Co,',eINED $ 3,000, $3,000, OTHER THAN UMBRELLA FORM WORKERS'COMPENSATION STATUTORY CAND CZ 876-7440 I/l/86 1/1/87 �; $ EACH ACCIDENT) EMPLOYERS'LIABILITY $ DISEASE-POLICY LIMIT) �g $ (DISEASE-EACH EMPLOYEE) OTHER renewal of D SM847-4624 1/1/86 L 1/1/87 p 71PT ON O O RATION LOC I NW I SP 1 IT A it�on nsure�: y o �d �� Ea istrano, but only as respects to the \\ Z insured's operations. Project: San Juan Creek Road Overlay IV SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EX- City of San Juan Capistrano PIRATION DA EOF, THE ISSUING COMPANY WILL ENDEAVOR TO 32400 Paseo Adelanto MAIL 30 SWR NOTICE TO THE CERTIFIC TE HOLD MED TO THE LEFT,BUT F URE TO SUCH NOTICE LL 1 O OB OR LIABILITY San Juan Capistrano CA 92675 OF ANY KIN PON TN PANY, ITS A NT R IVES. ATTN: Mary Ann Hanover AO an Y: CALIFORNIA PRELIMINARY NO E YOUR ATTENTION IS DIRECTED TO SECTION 38 AND 3111,CALIFORNIA CIVIL CODE WHICH RE US TO NOTIFY YOU "THAT IF BILLS ARE NOT PAID IN FULL FOR LABOR,SERVICES, EQUIPMEN ATERIALS FURNISHED, OR TO BE FURNISHED,THE lit PROPERTY(WHICH IS DESCRIBED HEREON) MAY BE SUBJECT TO MECHANICS' LIENS". (THIS ATEMENT IS APPLICABLE TO PRIVATE WORK ONLY.) f O O THIS IS NOT A LIEN. THIS IS NOT A REFLECTION ON THE INTEGRITY OF ANY CONTRACTOR OR SUBCONTRACTOR. (v� � ' YOU ARE HEREBY NOTIFIED: DATE December 18 , 1986 THAT THE UNDERSIGNED HAS FURNISHED OR WILL FURNISH LABOR, SERVICES, EQUIPMENT OR MATERIAL OF THE FOLLOWING DESCRIPTION: PHILLIPS FIBERS CORPORATION PETROMAT (R) NONWOVEN FABRIC (NAME) (DESCRIPTION OF MATERIALS,LABOR,SERVICES OR EQUIPMENT FURNISHED.) P 0 BOX 66 BOND No. U509250 (ADDRESS) INDIVIDUAL OR GREENVILLE SC 29602 ASPHALT CONCRETE OVERLAY FIRM (CITY) !� (STATE) (ZIP) BY: JACKIE EDDY ChC - f. i OF SAN JUAN CREED ROAD (SIGNATURE) (ADDRESS OF BUILDING.STRUCTURE,WORK OF IMPROVEMENT) FINANCIAL SERVICES REP . 12/18/ ORANGE COUNTY (TITLE) (DATE) (CITY) (STATE) (ZIP) THE NAME AND ADDRESS OF THE PERSON WHO CONTRACTED FOR THE PURCHASE OF SUCH LABOR, SERVICE, EQUIPMENT OR MATERIAL S Bob Escudero, Robert Escudero, Inc. P 0 Box 12328, La CRescenta CA 91214-5328 TRUST FUNDS TO WHICH SUPPLEMENTAL FRINGE BENEFITS ARE PAYABLE ( TO: XXXXXn CITY OF SAN JUAN CAPISTRANO NAME OWNER, REPuTEDOWNER,32 OO PPASEO ADOLEANTO ADDRESS oR BLIC AGENCY SAN JUAN CAPISTRANO CA 92675 NAME 100 ADDRESS CORIGINAL NDUSTRIAL ASPHALT T NAME 13130 EAST LOS ANGELES STREET ADDRESS seiIRWINDALE CA 91706 (MATERIAL MEN NOT REQUIRED TO Jp URNISH THE ABOVE) NOTICE [REPUTO: TO CONSTRUCTION LENDER ONLY TED TRUCTION ENDER ESTIMATED TOTAL PRICE OF THE LABOR, SERVICES, OR EQUIPMENT OR MATERIALS DESCRIBED HEREON. ERUCTION DERENDER .10 PROOF OF SERVICE AFFIDAVIT (SECTION 3097 1,CALIFORNIA CIVIL CODE) J. L. Eddy I, , declare that I served copies of The above PRELIMINARY NOTICE (check appropriate box). (a) ❑ By personally delivering copies to at (nam and❑tle(s)of person served) (address) on 19 at _.m. (date) (time) (b) By First Class Certified or Registered Mail service, postage prepaid, addressed to each of the parties at the addresses shown above on December 18. , 1986 I declare under penalty of perjury that the foregoing is true and correct. S C Signed EPHTT.T.TPS FTRFRS r.ORpnRATTnN , Cakifa[Ricxon December 18, 11986 . [ATTACH RECEIPTS OF CERTIFIED OR REGISTERED MAIL WHEN RETURNED] `- l ' SIGNATURE OF EPSON MAKING SERVICE NOTICE TO OWNER Umber IM CalNamle Restarts.new law any romire[la,,[ob[enlrv[le.,sadism, vPPll.r or other per...who MIp[to IF,...Yeor prail,bol I[ at told lar M1I[/he,work o..opPllv[.be[a[IBM1I to.Mor[,a dorm arydam mse p-m- anY,rblemenelhe,aNma Imn.p;ymr, yenl[o,ld Smith!by a ,r ,ilowmal the perm deal11-me east ra aidelM1e lnde6letlne e.TM1b[nM1we.p rn• nil Yo M1vv .tidy or In W1111 Me e,rMenlren [kbenas eoppll,r[rmmaln unpehd.Le pre,mrvm—mmi pbt o IIIc a[helm er Il,n epaln[I:vu, ,openy,[,Halo a'ItlmanN eu[M1 oe mb[onl,e[I re oe molerlel..Pilar en, Irmd to.root!,pu wI1M1 de[umenl[mrNled!'Peraw'.11 I.OnBinal(o se p,lmef[onin[Itn end lvhormrt for wage[de rel M1at.le provide this roll[,. Ii so ess,N ti[,b ml a 11en epalnu your trop.nY.ll[Porpeee b tr r,*By You of parse",who may Mv,r rIBM le Mea lien...I......r prerynY H they.- pdtl.(4en,relly,IM1",maalmom Ila,ellewed for IIIIas o dvlm ar Ilan palnsl year p,epmny Ie nIn,1Y(Po)dvYs vNmr[omplmllan el Your p,olmn.)TO INSURE EXTRA PROTECTION FOR YOUR AND YOUR PROPERTY,YOU IMY WISH TO TAKE ONE 09 MORE OR THE FO I LOWING STEPs.(1)R ,(-IFN Paor ro.tnner supply ytv waFap,ii and pada anon[.bend(,at t 11—Station whoa.p-sli he,lM bondl.t—mpial-111.1flarmmplem IM1eprvlkl or pv14em-B,eo Me mar—I the Sand.This mynnm and pe,b,mmre bond as wall vs t ropy a11F,[aml,v[Hon[outran sM1euld be III1-I11IM1....MY rmrordmr lo.pu.lunM1mr prelenlen.lE)Rmvlre H,at..'marls Mmast",dl,eeHyte evb[e•rrxlon CIM",alert! y ii IM1reoBM1 t taint[o lml,A.,IRM romrol ap„emanl,INw1d 1,,Ird,th,eddmnd„m opp,e..d by Ibe ReBlstnr W Cenlw[bn.(1)1.—I.Im[M1.sbs lar payment,mad,ooh to both I—...t..norand svManlrxbn nr mWe,lal supplier Im wlrmd In the p,a,n.This will M1,Ip 101",ur.that all persons due PeYmmnt are en,rallY paid.(1)AH't mvLln9 PaYmmnl an anY[ompl,l.d ph...M Ibe prol,[I.and brier.melds..any.,m.r m,menl[,r,yul,m year eenl,teI-tt pro id.Pa.wish n[eMulwwl llmoleea,[[IB..I by.ws,-spi rvpplbr..vb[o Ima endleban,I...Lmd 1.:h." Into.el the work Far wblth par--,we,made On preens lnvolvinBlmPror,m.ens loednyb 1am11y nOd,n[e eralupLa ownelh1 dlndoals,the.,nuns19aii,th-w—war ,FareIM1- ibs,to III.a.alm..ain't Yeur papers'.In orM1—1,...of....H—H U.Prol,nlon meYmIl be I mldmT bN meY to bem[,.1.i0 PROTECT YOURSELF UNDER THIS OPTION JOU ��,MEUST BE CERTAIN THAT ALL MATERIAL SUPPLIERS,SUBCONTRACTORS AND LABORERS HAVE SIGNEEDI 7 E�WFgi 45449 POLY PAK(50 SETS)4P449 / Brian ��r r`1 Iw•11,84 �J(\l ��, Oo n o JJ carbon/era LENDER COPY JK6623 CALLE EVA MIRANDA, AZUSA, CALIFORNIA 91702 - Phone: (818) 969-7951 INDUSTRIAL ASPHALT_ PRELIMINARY NOTICE ON PRIVATE OR PUBLIC WORK Date of Notice ORIGINAL CONTRACTOR r 'i i.', f!l dll, ,I lrati t'A1.� 4P1..tri tai! . riC. OR REPUTED CONTRACTOR . .111 ih,iil Pi l..H f?1 :dI1 ,•)1.. t�k� r :.. Gentlemen: You are hereby notified that the customer Identified herein has Con- Certified tracted with Industrial Asphalt for the purchase of labor, services, Mail No. (For Private Work Only) equipment rental,aggregate and/or asphaltic paving materials used,or to be used in the work of Improvement at the jobsite described herein. NOTICE TO PROPERTY OWNER This notice is not Intended to reflect In any way on the credit reputation of our customer. However,In compliance with Section 3097 a 3088 of the California Civil Code,we advise you that,IF BILLS ARE NOT PAID IN OWNER FULL FOR THE LABOR,SERVICES,EQUIPMENT OR MATERIALS FUR- OR i, (-1' ( "'y f t i)a(I C,'M f',) W�.P'.i[: i NiSHED OR TO BE FURNISHED,A MECHANIC'S LIEN LEADING TO THE REPUTED y ;.t{ ;,i C ry y. A-1�,t rt I,l ,� LOSS,THROUGH COURT FORECLOSURE PROCEEDINGS,OF ALL OR OWNER PART OF YOUR PROPERTY BEING SO IMPROVED,MAY BE PLACED brY 2, =.t t 7 9[i .�i}] A;+t�('i11 tC� , "A i t AGAINST THE PROPERTY EVEN THOUGH YOU HAVE PAID YOUR CON- OR TRACTOR IN FULL.YOU MAY WISH TO PROTECT YOURSELF AGAINST PUBLIC THIS CONSEQUENCE BY 0) REQUIRING YOUR CONTRACTOR TO AGENCY FURNISH A SIGNED RELEASE BY THE PERSON OR FIRM GIVING YOU THIS NOTICE BEFORE MAKING PAYMENT TO YOUR CONTRACTOR OR Certified r, u , �„F_ (Z)ANY OTHER METHOD OR DEVICE WHICH IS APPROPRIATE UNDER Mail No. r 1t - (For Private Work Only) THE CIRCUMSTANCES. We thank you for the privilege of supplying asphaltic paving materials to this project and look forward to serving you in the near future. y Yours very truly CONSTRUCTION r INDUSTRIAL ASPHALT LENDER OR REPUTED CONSTRUCTION LENDER Certified Mail No. (For Private Work Only) CUSTOMER rltir r. JOBSITE DESCRIPTION Fay�or; (,e (.rf r'7l;?. 1, t`.y 11 1 San allot, C'.11, si.l-aft„ �rICA- r,\ -perm' 1-7-57 FORM C209A-Rev. 5-85 OWNER COPY ' CITY OF SAN JUAN CAPISTRANO' tCOUNTY OF ORANGE STATE OF CALIFORNIA ' SPECIFICATIONS AND CONTRACT DOCUMENTS ' A.C. OVERLAY OF SAN JUAN CREEK ROAD CITY COUNCIL KENNETH E. FRIESS, MAYOR ' PHILLIP R. SCHWARTZE ANTHONY L. BLAND LAWRENCE F. BUCHHEIM GARY L. HAUSDORFER CITY MANAGER ' S. B. JULIAN DIRECTOR OF PUBLIC WORKS W. D. MURPHY JULY 1986 ' TABLE OF CONTENTS ' CONTRACT DOCUMENTS TITLE PAGE ' Notice Inviting Bids. . . . . . . . . . . .. . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 Bid Proposal . .3 Schedule of Work Items . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Non-Collusion Affidavit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7 ' Designation of Sub-Contractors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 Instruction to Bidders . .9 Contract . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14 ' Bid Bond . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..18 Performancece Bond. . .nd . .20 Laborand Material Bond . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22 Listingof Surety Companies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .24 SPECIAL PROVISIONS ' Work To Be Done . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .SP-1 Standard Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . .SP-l fined ' Terms d Acceptance : . . . . . . . . . . . . . . .. . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .SP-2 Flow and Acceptance of lX ater .SP-2 Water . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .SP-2 Insurance and Overhead Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .SP-2 Protection of Existing Utilities . . . . . . . . . . . . . . . . . .. .. . . .. . . . . . . . . . . . . . . . . . . . . . .SP-2 Protection of Private Property . .SP-2 Construction Zone . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .SP-3 ' Pre-Construction Coordination Meeting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .SP-3 Southern California Gas Company .SP-3 ' DETAIL SPECIFICATIONS AND METHOD OF PAYMENT ColdPlane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DS-1 ' Pavement Reinforcing Fabric . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DS-1 Asphalt Concrete . DS-3 Adjust Frame and Cover to Grade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DS-3 ' Traffic Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . DS-4 1 N • INSTRUCTION TO BIDDERS t Securing Documents Plans, Specifications and other contract documents will be available for examination ' without charge and copies may be secured in accordance with the "Notice Inviting Bids". ' Examination of Plans, Specifications and Site of Work The bidder is required to examine the site of work, the Proposal, the Plans and the Specifications, Special Provisions, and the Standard Specifications for Public Works ' Construction, 1985 Edition including all supplements, very carefully. He shall satisfy himself as to the character, quality and quantities of the work to be performed, the ' materials to be furnished and the requirements of the Contract Documents. The plans for the work show conditions as they are believed to exist, but it is not to be inferred that all the conditions as shown thereon are actually existent, nor shall the City or any of its officers or agents be liable for any loss sustained by the Contractor as a result of any variance between conditions shown on the plans and actual conditions revealed during examination or progress of the work. The submission of a proposal shall be prima facie evidence that the bidder has made such an examination. ' Interpretation of Drawings and Documents If any bidder should find discrepancies in, or omissions from the drawings, specifications or other proposed contract documents, or if he should be in doubt as to the true meaning ' of any part thereof, he shall at once make a written request to the Engineer for correction, clarification or interpretation of the point or points in question. The person submitting such a request shall be responsible for its prompt delivery. In the event that the Engineer receives such a request and it should be found that certain ' essential information is not clearly and fully set forth, or if the Engineer discovers errors, omissions, or points requiring clarification in the drawings or documents, a written addendum will be mailed to each person to whom a set of contract documents has been delivered. The City will not be responsible for any instructions, explanations or ' interpretations of the documents presented to bidders in any manner other than written addendum. ' 9 ' Addenda or Bulletins The effect of all addenda to the contract documents shall be considered in the bid and ' said addenda shall be made a part of the contract documents and shall be returned with them. Before submitting his bid, each bidder shall inform himself as to whether or not ' any such addenda have-been issued, and failure to cover in his bid any such addenda issued may render his bid invalid and result in its rejection. ' Disqualification of Bidders No person, firm or corporation shall be allowed to make, file or be interested in more ' than one bid for the same work unless alternate bids are called for. A person, firm or corporation who has submitted a sub-proposal to a bidder, or who has quoted prices on ' materials to a bidder, is not hereby disqualified from submitting a bid in his own behalf. Proposals Bids to receive consideration shall be in accordance with the following instructions: A. Bids shall be made only upon the forms provided within these specifications; all bid items shall be properly filled out; bid prices shall be stated both in words and in figures; and the signatures of all persons signing shall be in longhand. Where there is a conflict in the words and the figures, the words shall govern. B. All prices and notations must be in ink or typewritten. No erasures will be ' permitted. Mistakes may be crossed out and corrections typed or written in ink adjacent thereto and must be initialed in ink by the person or persons signing the bid. C. Bids shall not contain any recapitulation of the work to be done. Alternate proposals will not be considered except as required hereinabove. No oral, telegraphic or telephonic proposals or modifications will be considered. D. The City may require any bidder to furnish a statement of his experience, financial responsibility, technical ability, equipment and references properly and fully filled out. E. Each bidder shall list his proposed sub-contractors on the form accompanying the ' proposal in accordance with the provisions of the specifications. F. Each bidder must accompany his bid with either a cashier's check upon some ' responsible bank, or a properly certified check upon such bank, or an approved corporate surety bond payable to the City for such a sum of not less than ten (10) percent of the aggregate sum of the bid, which check or bond and the monies represented thereby shall be held by the City as a guarantee that the bidder, if awarded the contract, will in good faith enter into such contract and furnish the ' required bonds. ` ' -l0- i • ' The bidder agrees that, in case of his refusal or failure to execute said contract and give bonds within the time required by these documents, such check or bond, and the ' money represented thereby, shall remain the property of the City and, if the bidder shall fail to execute said contract, said surdty will pay to the City the damages ' which the City may suffer by reason of such failure, not exceeding the sum of ten (10) percent of the amount of the bid. A bid received and not accompanied by such ' cashier's check, certified check or approved bond shall be rejected. G. Bids shall be delivered to the City at the location stipulated, on or before the day and hour set for the opening of bids, as hereinbefore specified in the "Notice Inviting ' Bids". Bids shall be enclosed in a sealed envelope bearing the title of the work, the . name of the bidder, bid opening date and time of bid opening. ' Licensing of Contractor ' All persons, firms, partnerships or corporations shall be licensed in accordance with the Business and Professions Code of the State of California and the applicable ordinances of the City and County before doing any work of any kind. Withdrawl of Bids ' Any bidder may withdraw his bid in person or by written request at any time prior to the scheduled closing time for receipt of bids. ' Opening of Bid Proposals ' The City will, in open session, publicly open, examine and declare the bids at the time set forth in the "Notice Inviting Bids". Bidders or their authorized representatives are invited to be present. Award of Contract or Rejection of Bids ' No bidder may withdraw his bid for a period of forty-five (45) days after the date set for the opening of bids. The contract for the work will either be awarded or the bids ' rejected within the forty-five (45) days from the date set for the opening of bids. ' The contract for the work will be awarded to the lowest responsible bidder complying with these instructions and with the "Notice Inviting Bids". The City, however, reserves the right to reject any or all bids and to waive mere informalities, minor technical errors ' or irregularities, obvious clerical errors or erasures. ' -11- ' The bidder to whom the award is made shall execute a written contract with the City and furnish the stipulated bonds, insurance and bid breakdown within fifteen (15) days after ' the notice of award of contract. The contract shall be made in the form adopted by the City. The release of the successful bidder's surety deposit, as previously stipulated (page 5), shall be made upon the City's acceptance of the Labor and Materials Bond and the Faithful Performance Bond. If the bidder to whom the award is made fails to enter the contract as herein provided, the award may be annulled and an award may be made to the next lowest responsible bidder; and such bidder shall fulfill every stipulation embraced herein, as if he were the party to whom the first award was made. A corporation to which an award is made shall furnish evidence of its corporate existence and evidence that the officer signing the con- tract and bonds for the corporation is duly authorized to do so. ' Bonds The successful bidder, simultaneously with the execution of the Agreement, will be ' required to furnish a Labor and Material Bond in a sum not less than one hundred percent (100%) of the total amount payable by the terms of the contract and a Faithful ' Performance Bond in a sum not less than one hundred percent (100%) of the amount of the contract. Said bonds shall be secured from a surety company listed as acceptable on the list included in these specifications. Bonds must be submitted on the forms contained in these specifications. ' Time of Performance The work shall be commenced within fifteen (15) calendar days from the date of issuance ' of the Notice to Proceed and shall be diligently prosecuted until completion. A time limit of forty-five (45) calendar days from the date specified in the Notice to Proceed has been set for completion of the work. The bidder's attention is directed to the specifications as to provisions for extension of time of completion and/or assessment of ' liquidated damages. ' Assignment of Contract No assignment by the Contractor of any contract to be entered into hereunder or any part thereof, or of funds to be received thereunder by the Contractor, will be recognized 1 by the awarding authority unless such assignment has had prior approval of the awarding authority and the surety has been given notice of such assignment in writing and has ' consented thereto in writing. ' -12- Workmen and Wages Attention is specifically directed to all provisions of the Labor Code of the State of ' California with regard to workmen and wages. Wages shall not be less than prevailing wage rates determined by the City pursuant to said Code and as listed in the "Notice ' Inviting Bids". Building Permits ' It shall be the Contractor's responsibility to obtain all necessary permits, bonds and insurance, as required, for the completion of the project. No extra compensation shall be ' made therefore. 1 t ' -13 Prepared By: Office of City Attorney San Juan Capistrano 7(29/85 LISTING OF SURETY COMPANIES QUALIFYING UNDER SURETY BOND COMPANY RATING CRITERIA The following surety bond companies are qualified to submit surety bonds to the City of ' San Juan Capistrano. The criteria utilized in rating surety bond companies are: A.M. Best Company Rating of "A"; U.S. Treasury Underwriting Limitation of $1,000,000.00 or more. Use of any other surety company may only be allowed with approval of the City ' Attorney. AID Insurance Company ' Aetna Casualty and Surety Company of Illinois Aetna Reinsurance Company Affiliated FM Insurance Company Alaska Pacific Assurance Company ' Allendale Mutual Insurance Company Allstate Insurance Company ' American Automobile Insurance Company American Casualty Company of Reading, Pennsylvania American Centennial Insurance Company ' American Credit Indemnity Company American Economy Insurance Company ' American Indemnity Company The American Insurance Company ' American Manufacturer's Mutual Insurance Company American Motorists Insurance Company ' American Mutual Liability Insurance Company American Re-Insurance Company American States Insurance Company Argonaut Insurance Company Arkwright-Boston Manufacturers Mutual Insurance Company Associated Indemnity Corporation Atlantic Mutual Insurance Company ' -24- Listing of Surety Companies, Continued Page Two Auto-Owners Insurance Company ' Balboa Insurance Company Bankers Multiple Line Insurance Company ' Boston Old Colony Insurance Company The Camden Fire Insurance Association Centennial Insurance Company Central Mutual Insurance Company ' The Central National Insurance Company of Omaha The Charter Oak Fire Insurance Company Cigna Insurance Company Commercial Insurance Company of Newark, New Jersey The Connecticut Indemnity Company Continental Casualty Company The Continental Insurance Company Continental Reinsurance Corporation Dependable Insurance Company, Inc. Employers Mutual Casualty Company ' Employers Reinsurance Corporation Fairmont Insurance Company Farmers Alliance Mutual Insurance Company Federal Insurance Company, ' Federated Mutual Insurance Company The Fidelity and Casualty Company of New York Fidelity and Deposit Company of Maryland Fireman's Fund Insurance Company Firemen's Insurance Company of Newark, New Jersey ' First National Insurance Company of America Foremost Insurance Company Fremont Indemnity Company General Accident Insurance Company of America ' General Insurance Company of America General Reinsurance Corporation ' -25- ' Listing of Surety Companies, Continued Page Three The Glens Falls Insurance Company ' Global Surety & Insurance Co. Globe Indemnity Company ' Grain Dealers Mutual Insurance Company Great American Insurance Company ' Greater New York Mutual Insurance Company Gulf Insurance Company ' The Hanover Insurance Company Harco National Insurance Company Harleysville Mutual Insurance Company Hartford Accident and Indemnity Company Hartford Casualty Insurance Company ' Hartford Fire Insurance Company The Hawaiian insurance & Guaranty Company ' Highlands Insurance Company Highlands Underwriters Insurance Company The Home Indemnity Company The Home Insurance Company Houston General Insurance Company INA Reinsurance Company ITT Lyndon Property Insurance Company ' Imperial Casualty and Indemnity Company Indemnity Insurance Company of America ' Industrial Indemnity Company Insurance Company of North America ' Insurance Company of the West Integrity Insurance Company International insurance Company ' Iowa National Mutual Insurance Company John Deere Insurance Company Liberty Mutual Insurance Company Lumbermens Mutual Casualty Company ' -26- Listing of Surety Companies, Continued Page Four Maryland Casualty Company Mead Reinsurance Corporation The Mercantile and General Reinsurance Company of America Michigan Millers Mutual Insurance Company Michigan Mutual Insurance Company ' Mid-Century Insurance Company The Millers Mutual Fire Insurance Company of Texas ' Munich American Reinsurance Company National Fire Insurance Company of Hartford National Indemnity Company The National Reinsurance Corporation National Surety Corporation ' Nationwide Mutual Insurance Company New Hampshire Insurance Company ' New York Underwriters Insurance Company Newark Insurance Company ' North American Reinsurance Corporation The North River Insurance Company North Star Reinsurance Corporation ' Northbrook Property and Casualty Insurance Company Northwestern Pacific Indemnity Company ' The Ohio Casualty Insurance Company Ohio Farmers Insurance Company ' Old Republic Insurance Company Pacific Employers Insurance Company ' Pacific Indemnity Company Peerless Insurance Company Pennsylvania Manufacturers' Association Insurance Company Phoenix Assurance Company of New York The Phoenix Insurance Company Progressive Casualty Insurance Company Protective Insurance Company -27- ' Listing of Surety Companies, Continued Page Five Prudential Reinsurance Company Ranger Insurance Company The Reinsurance Corporation of New York ' Reliance Insurance Company Republic Insurance Company ' Republic Western Insurance Company Royal Indemnity Company Royal Insurance Company of America SAFECO Insurance Company of America St. Paul Fire and Marine Insurance Company St. Paul Mercury Insurance Company Seaboard Surety Company ' Security Insurance Company Select Insurance Company Skandia America Reinsurance Corporation South Carolina Insurance Company ' The Standard Fire Insurance Company State Farm Fire and Casualty Company Transamerica Insurance Company ' Transamerica Premier Insurance Company Transcontinental Insurance Company ' Transportation Insurance Company The Travelers Indemnity Company The Travelers Indemnity Company of America The Travelers Indemnity Company ' Trinity Universal Insurance Company Twin City Fire Insurance Company Unigard Security Insurance Company ' United Fire & Casualty Company United Pacific Insurance Company ' United States Fidelity and Guaranty Company United States Fire Insurance Company 1 ' -28- • t Listing of Surety Companies, Continued Page Six Universal Underwriters Insurance Company ' Utica Mutual Insurance Company Valley Forge Insurance Company ' Vigilant Insurance Company West American Insurance Company Weschester Fire Insurance Company The Western Casualty and Surety Company ' The Western Fire Insurance Company Western Surety Company Westfield Insurance Policy ' -29- ' SPECIAL PROVISIONS WORK TO BE DONE The work to be done under this contract in general consists of the construction of a two inch thick asphalt concrete overlay to part of San Juan Creek Road in the City of San ' Juan Capistrano. The work will consist of cold planing approximately 19,000 square feet of existing asphalt concrete, laying approximately 177,000 square feet of pavement reinforcing fabric, laying approximately 2,000 tons of asphalt concrete overlay, adjusting ' cover to grade, traffic control and other miscellaneous items. 1. STANDARD SPECIFICATIONS ' The Contractor shall perform his work in accordance with the Standard Specifications for Public Works Construction, 1985 Edition, hereinafter referred to as the Standard Specifications. ' The Contractor shall maintain a copy of these books on the job-site at all times. Unless otherwise specified errata and supplements to the Standard Specifications shall be part of these specifications. The provisions of the Standard Specifications shall be modified as indicated below: Change 1: Contract Termination If at any time, in the opinion of the Public Works Director, Contractor fails to supply suitable equipment, an adequate working force, or material of proper quality, ' or shall fail in any respect to prosecute any work with'the diligence and force specified and intended in and by the terms of the contract, notice thereof in writing shall be served upon him, and should he neglect or refuse to provide means for ' satisfactory compliance with the contract, as directed by the Public Works Director, within the time specified in such notice, the City in any such case shall have the power to terminate all or any portion of the contract. ' Upon receiving notice of such termination, Contractor shall discontinue said work or such parts of it as the City may designate. Upon such termination, the Contractor's control shall terminate and thereupon the City Council, or its duly authorized ' representative, may take possession of all or any part of the Contractor's materials, tools, equipment, appliances, and plant and buy such additional materials and supplies at the Contractor's expense as may be necessary for the proper conduct of ' the work and for completion thereof; or may employ other parties to carry the contract to completion, employ the necessary workmen, substitute other machinery or materials and purchase the materials contracted for, in such manner as the City may deem proper; or the City Council may annul and cancel the contract and re-let ' the work or any part thereof. Any excess of cost arising therefrom over and above the contract price will be charged against the Contractor and his sureties, who will be liable therefor. ' In the event of such termination all money due the Contractor retained under the terms of this contract shall be forfeited to the City; but such forfeiture will not ' release the Contractor or the sureties from liability or failure to fulfill the contract. Contractor and sureties will be credited with the amount of monies so forfeited toward any excess of cost over and above the contract price, arising from the suspension of the operation of the contract and the completion of the work by ' SP-1 0 the City as provided above, and the contractor will be credited with any surplus remaining after all just claims for such completion have been paid. ' Change 2: "Section 8 - Facilities for .Agency Personnel Delete this section. i2. TERMS DEFINED Whenever in the said Standard Specifications the following terms are used, it is hereby provided that the following City Department or persons shall be intended: AGENCY shall mean City.of San Juan Capistrano whenever appropriate. ' BOARD shall mean the City Council of the City of San Juan Capistrano. 1 ENGINEER shall mean City Engineer or other person(s) designated by same. 3. FLOW AND ACCEPTANCE OF WATER Surface or other waters may be encountered at various times during construction. The Contractor, by submitting a bid, acknowledges that he has investigated the risks arising from surface or other waters and has prepared his bid accordingly. It shall be the sole responsibility of the Contractor to protect his work from danger due to any waters encountered. Should any damage to the work due to surface or other water occur prior to acceptance of the work by the City, the Contractor shall repair such ' damage at his expense. 4. WATER ' Water will be available from the Capistrano Valley Water District. Arrangements for temporary construction water services permit and water service may be made by contacting the Capistrano Valley Water District at 714/493-1515 one week prior to ' need for service. All water facility construction shall conform to the "Standard Specifications," Capistrano Valley Water District, and 'The Uniform Plumbing Code," 1982 Edition. 5. INSURANCE AND OVERHEAD COSTS The Contractor shall receive no direct compensation for insurance and overhead ' (move-in costs for example costs. Accordingly, these costs should be pro-rated to the appropriate bid items. ' 6. PROTECTION OF EXISTING UTILITIES (UNDERGROUND SERVICE ALERT) The Engineer has endeavored to show all existing utilities. The Contractor must, however, take all due precautionary measures to protect all of the existing ' utilities. The Contractor must contact Underground Service Alert, prior to commencing work by calling 800/422-4133. ' 7. PROTECTION OF PRIVATE PROPERTY The Contractor must remain within the construction zone to the best of his ability. The Contractor must protect all existing private property. SP-2 • • 8. CONSTRUCTION ZONE Contractor shall protect property and facilities adjacent to the construction zone, ' and all property and facilities within the construction zone which are shown on the plans to be protected. After completion of project, the construction zone shall be clean and in a presentable condition All public or privately owned improvements and ' facilities shall be restored to their original condition and location. In the event improvement of facilities are damaged, they shall be replaced with new materials equal to the original. ' Nothing herein shall be construed to entitle the Contractor to the exclusive use of any public street, way or parking area during performance of the contract work, and Contractor shall conduct his operations so as not to interfere with the authorized ' work of utility companies or other agencies in such streets, ways or parking areas. The Contractor shall be responsible for investigating conditions of available public ' and private roads and of clearances, restrictions and other limitations affecting transportation and ingress and egress to the site of the work. 9. PRE-CONSTRUCTION COORDINATION MEETING Prior to the commencement of construction, arrangements will be made for a meeting between the Contractor, the Engineer and involved utility representatives. ' The purpose of this meeting is to coordinate the activities of the Contractor within the limits of this contract, review scheduling, discuss construction methods and clarify inspection procedures. The Contractor will be required to submit a complete ' schedule showing the number of working days required to complete each phase of the project. This schedule shall be approved by the City Engineer, prior to the start of . construction. 10. SOUTHERN CALIFORNIA GAS COMPANY The California Public Utilities Commission mandates that, in the interest of public ' safety, main line gas valves be maintained in a manner to be readily accessible and in good operating condition. It is a condition of this contract that the contractor shall notify the Southern California Gas Company Headquarters Planning Office at 714/634-3258 at least two working days prior to the start of construction. A Southern California Gas Company representative will be available on the job site to discuss the paving schedule and work that may be necessary to assure CPUC compliance. ' SP-3 • • ' CITY OF SAN JUAN CAPISTRANO A.C. OVERLAY OF SAN JUAN CREEK ROAD ' DETAIL SPECIFICATIONS AND METHOD OF PAYMENT BID ITEM 1 - COLD PLANE A.C. PAVEMENT ' The work will consist of cold-planing the pavement adjacent to the concrete gutter and join lines where shown on the plans and as directed by the Engineer. A strip of existing ' pavement five feet (S) minimum width along the gutter shall be planed by a continuous moving asphalt cold planer. This strip shall be tapered from two inches deep at the gutter lip or join line to zero. The cold plane strips shall provide a key for the construction of asphalt concrete resurfacing and to create a smooth transition at the ' gutter or at pavement join lines. The surface of the pavement after planing shall be uniformly rough grooved or ridged. The grade shall not deviate from a suitable straight edge more than 3/8-inch at any point. The machine used for cold planing shall have ' performed satisfactorily on similar work prior to this project and meet the following requirements: ' The planing machine shall be specially designed and built to perform cold planing of bituminous pavement with the ability to plane concrete patches; the cutting drum shall be a minimum 60" wide with carbide tip cutting teeth placed in variable lacing pattern to produce a grooved, but uniform finish. The machine shall be capable of ' operation at speeds from 0 to 40 RPM. It shall be self-propelled and have a water spray at the cutting drum to minimize dust; the machine shall be capable of removing the material adjacent to the concrete gutter. The planer shall be so ' designed that the operator thereof can at all times observe the planing operation without leaving the controls. The cutting drum shall be adjustable as to slope and depth, and shall deep cut in one pass a maximum of three inches (311) without producing fumes or smoke. The Contractor shall provide a small machine to trim areas inaccessible to the larger machine where necessary. The smaller machine shall be maneuverable and ' shall be equipped with a 12" wide cutting drum mounted on a 3 wheel chassis allowing it to be positioned without interrupting traffic or pedestrian flow. ' During and after the planing operation the Contractor shall sweep the street with mechanical equipment and remove all loosened material from planed area. The Contractor shall abate dust nuisance by cleaning, sweeping and sprinkling with water and other means as necessary. ' PAYMENT ' Payment for cold planing shall be at the contract unit price bid per square foot which shall be full compensation for furnishing all labor, materials, equipment, cleaning and incidentals necessary to cold plane the areas shown on the plan and as directed by the Engineer. BID ITEM 2 - PAVEMENT REINFORCING FABRIC ' Pavement Reinforcement Fabric shall conform to the State of California Department of Transportation Standard Specifications July 1984 Section 39-4.03 and Section 88 and these Special Provisions ' DS-1 • • ' Section 35-4.03 - Pavement Reinforcing Fabric - Pavement reinforcing fabric shall be placed on existing pavement to be surfaced or between layers of asphalt concrete when such work is shown on the plans, or specified in the special provisions, or ordered by the ' Engineer. Before placing the pavement reinforcing fabric, a binder of paving asphalt shall be ' applied to the surface to receive the pavement reinforcing fabric at an approximate rate of 0.25 gallon per square yard of surface covered. The exact rate will be determined by the Engineer. The binder shall be applied to a width equal to the width of the fabric mat plus 3 inches on each side. 1 Before applying binder, large cracks, spalls and chuckholes in existing pavement shall be repaired as directed by the Engineer, and such repair work will be paid for as extra work ' as provided in Section 4-1.03D. The fabric shall be stretched, aligned and placed with no wrinkles that lap. The test for lapping shall be made by gathering together the fabric or more, the fabric shall be cut to remove the wrinkle, then lapped in the direction of paving. Lap in excess of 2 inches shall be removed. ' Pavement reinforcing fabric shall not be places in areas of conform tapers where the thickness of overlying asphalt concrete is 0.08-foot or less. ' If manual laydown methods are used, the fabric shall be unrolled, stretched, aligned and placed in increments of approximately 30 feet. Adjacent borders of the fabric shall be lapped 2 to 4 inches. The preceding roll shall lap ' 2 to 4 inches over the following roll in the direction of paving at ends of roll or at any break. At fabric overlays, both the tack coat and the fabric shall overlap the previously . placed fabric by the same amount. ' Seating of the fabric with rolling equipment after placing will be permitted. Turning of the paving machine and other vehicles shall be gradual and kept to a minimum to avoid ' damage. A small quantity of asphalt concrete, to be determined by the Engineer, may be spread over the fabric immediately in advance of placing asphalt concrete surfacing in order to ' prevent fabric from being picked up by construction equipment. Public traffic shall not be allowed on the bare reinforcing fabric, except that public cross traffic shall be allowed to cross the fabric under traffic control, after the Contractor has placed a small quantity of asphalt concrete over the fabric. Care shall be take to avoid tracking.binder material onto the pavement reinforcing fabric or distorting the fabric during seating of the fabric with rolling equipment. If necessary, exposed binder material shall be covered lightly with sand. ' Section 88-1.01 Description - Engineering fabrics consisting of pavement reinforcing fabric and filter fabric shall conform to the requirements in this Section 88. Engineering Fabrics. ' Engineering fabrics shall be placed in accordance with the various sections of these specifications requiring the use of an engineering fabric or as specified in the special provisions. 1 ' DS-2 • • A Certificate of Compliance for each kind of engineering fabric used on the project shall be furnished to the Engineer in accordance with the provisions in Section 6-1.07, "Certificates of Compliance." Engineering fabrics shall be furnished to the Engineer in protective covers capable of protecting the fabric from ultraviolet rays, abrasion and water. ' Section 88-1.02 - Pavement Reinforcing Fabric - Pavement reinforcing fabric shall be manufactured from polyester, polypropylene, or polypropylene-nylon material. The fabric shall be nonwoven, and shall conform to the following: Weight, ounces per square yard ASTM Designation: D 1910 3.0 to 8.0 ' Grab tensile strength (1-inch grip), pounds, min. ASTM Designation: D 1117 90 ' Elongation at break, percent, min. ASTM Designation: D 1117 40 ' Fabric thickness, mils. ASTM Designation: D 461 12 to 100 ' PAYMENT Pavement Reinforcing fabric will be measured by the square foot b} dimensional limits shown on the plans or staked in the field. There shall be no allowance for overlaps in the ' measurement. Unless otherwise specified, payment shall be made by the unit price per square foot, which shall include full compensation for testing, furnishing, delivering, and placing pavement reinforcing fabric complete in place. The cost shall include all labor, ' equipment and tools required to complete the work. BID ITEM 3 - ASPHALT CONCRETE PAVING ' This bid item shall include the furnishing and placing of asphalt concrete as indicated on the plans and in the specifications. The workmanship and materials necessary to complete the work as required shall conform to Section 302-5 of the Standard ' Specifications and Orange County Standard Plan 805. PAYMENT ' The unit price bid per ton for asphalt concrete shall include all labor, material, tools, and equipment necessary to construct the asphalt concrete paving, and no additional compensation shall be made. ' BID ITEM 4 - ADJUSTMENT OF MANHOLE FRAMES AND COVER SETS TO GRADE ' The work for this bid item shall include setting all existing sewer, storm drain, and utility manhole frames and cover sets to grade within the area to be surfaced. ' PAYMENT The lump sum bid for adjusting manhole frames and cover sets to grade shall include all labor, materials, tools, and equipment, as well as traffic control and no additional ' compensation will be made. ' DS-3 BID ITEM 5 - TRAFFIC CONTROL ' The Contractor shall provide and maintain traffic control devices during the construction of the project and for seven (7) calendar days after completion or until striped by others whichever is the lesser period of time. ' In addition to those provisions of Section 7-10 of the Standard Specifications for Public Works Construction (Green Book) dealing with Public Convenience and Safety, the following requirements are included as contract specifications. ' All warning and regulatory signs, lights and devices used for the protection of the public on the project shall conform to those described in the current issue of the State of California Manual of Warning Signs, Lights and Devices for use in Performing Work Upon ' Highways as required by Section 21400 of the California Vehicle Code. Guidelines for the use and placement of these traffic control devices shall conform to ' applicable layouts described in the State Manual and in the latest edition of the Work Area Traffic Control Handbook (WATCH) published by building News Inc. All traffic control patterns shall be subject to approval of the engineer. ' PAYMENT The lump sum bid for traffic control shall include all work as specified for the duration ' of the project and for a period of seven (7) calendar days after completion and shall include all labor, materials, tools, and equipment and no additional compensation shall be made. 1 1 1 DS-4