07-1001_HANSON, RONALD_Grading Surety Agreement• f V ORIGINAL
GRADING SURETY AGREEMENT
THIS AGREEMENT is made by and between the CITY OF SAN JUAN CAPISTRANO, a
municipal corporation, hereinafter referred to as the "City" and Ronald Hanson the owner
referred to as "Developer".
WITNESSETH
WHEREAS, City will issue Grading Permit No B07-0819 to Developer to construct
certain designated improvements which constitute a portion of that real property at the
location of Tract 6427 Lot 25, commonly referred to as 30191 Silver Spur Drive.
WHEREAS, San Juan Capistrano Municipal Codes Section 8-2.08 requires the
posting of financial security to secure the faithful performance and labor and materials for
the grading and installation of improvements connected with issuance of grading permits
including the construction of drainage and protection devices and any other corrective work
to remove and eliminate engineering and geological hazards.
WHEREAS, San Juan Capistrano Municipal Code Section 8-2.09 authorizes the
Building Official to require additional bonding as security to ensure against adverse
aesthetic impacts arising from incomplete grading and/or improvements from development
projects which have not been completed.
WHEREAS, the Building Official finds that the proposed project site is highly
prominent and visible to the community, has unique topographic features or involves
substantial grading of slope areas.
NOW, THEREFORE, in consideration of the premises and promises hereinafter
contained, City and Developer agree as follows:
1. Developer's Improvements Obligations. Developer shall, at its sole cost and
expense, provide and furnish all labor, materials and equipment for the construction of
grading improvements as approved by the City Engineer. The grading permit and plans,
which describe all the work to be constructed per this agreement are on file in the office of
the City's Building Official.
0 0
2. Developer's Security. Developer shall provide a cash deposit, Certificate of
Deposit or a bond by a duly authorized corporate surety subject to the approval of the City
Attorney, or as approved by the City Engineer, to secure Developer's improvement
obligations required under this agreement.
The amount of the bond shall be $11,856.25 for all onsite grading improvements as
approved by the City Engineer. This security shall also serve as security for restoration of
the site. A copy of the surety instrument, as approved by the City Attorney, is attached as
Exhibit "A".
3. Completion of Improvements. To ensure the protection of the public safety,
health and welfare, Developer shall construct all said improvements in accordance with the
schedule as set forth in Exhibit "B", and the conditions as set forth in Exhibit "C'.
4. Developer Default. In the event Developer does not complete the required
improvements, including erosion and silt control measures within the time required, using
Best Management Practices (BMP) in implementing a Water Quality Management Plan in
full compliance with Orange County National Pollutant Discharge Elimination System
(NPDES) Storm Water Implementation Agreement and San Juan Capistrano Municipal
Code Section 8-14, or abandons the project site, or suspends work for more than twenty
working days other than previously prescribed, City shall have the right to immediately
declare a default and to make demand on the surety for performance.
5. Restoration of Site. San Juan Capistrano Municipal Code Section 8-2.09
allows the City to require bonding as security to ensure against adverse aesthetic impacts
arising from uncompleted grading, drainage and/or improvements which includes illicit non -
storm drain water discharge. The purpose of this bonding shall be to restore the propertyto
a safe and acceptable condition if the Developer defaults. This restoration shall include but
not be limited to the following:
A. Dismantle and/or demolish improvements;
B. Grade property to its original contours as shown on the approved
grading plans.
C. Remove all debris and construction materials from the site; and
D. Install erosion and silt control devices, including hydroseeding, to
insure a uniform vegetative cover, or equivalent stabilization
measures which include the use of such Best Management Practices
0
as blankets, fiber matrices, catch basin filters, or other erosion
resistant soil coverings or treatments to satisfaction of the Director of
Engineering and Building.
6. Attorney's Fees. Developer agrees to pay City such sum as the court may
judge as reasonable for the legal services of an attorney representing the City in an action
brought to enforce or interpret the obligations of this agreement, and such sum shall be
made a part of any judgment in such action against Developer if such action is determined
in favor of said City.
7. Developer's Work in Safe Condition. Developer shall perform all work in a
safe workmanlike manner and shall take such precautions as may be necessary to warn
and protect the public from any dangerous condition caused by the construction of said
improvements.
8. Liability. Developer shall hold City, its officers, and employees harmless from
any and all claims, demands, causes of action, liability or loss of any sort because of, or
arising out of, the acts or omissions of Developer, his contractor, subcontractors, agents or
employees in the performance of this agreement.
In witness whereof, the parties have executed this agreement as of
I C�) / \ i C)-1 200"1 at San Juan Capistrano, California.
Developer r
n
By: (Signee) �Z-r)i "aa 5c k
(Title) nc4)�,atc
Approved as
By: John Shaw
City/Attorney
City of San Juan Capistran
-By: L r Nasser Abbaszadeh
Engineering and Building Director
California Notorial
Loose Certificate
attached
EXHIBIT "B"
SCHEDULE FOR COMPLETION OF IMPROVEMENTS
Completion Date Task
04/01/2008 Rough Grade Certification
10/01/2008 Landscape Irrigation
10/01/2008 Landscape Planting
0 0
EXHIBIT "C"
CONDITIONS FOR COMPLETION OF IMPROVEMENTS
1. The grading for this project shall be in strict conformance with the grading plans as
well as the San Juan Capistrano Municipal Code.
2. Grading operations shall commence within fourteen (14) calendar days after
issuance of Grading Permit.
Winter grading will be conducted in strict accordance with the dynamic erosion and
silt control plan submitted by the Developer, and approved by the City. This erosion
and silt control plan reflects erosion and silt mitigation measures for expected
grading conditions as the work progresses through the winter season and shall not
be amended except with the permission of the City.
In the event Developer does not wish to implement winter grading, or permission for
winter grading is rescinded, static erosion and silt control plans reflecting current
conditions of grading shall be submitted within ten (10) days of cessation of work.
These plans shall:
1. Identify all pollutant sources including sources of sediment that may affect
the quality of storm water discharges associated with the construction
activity.
2. Include the erosion and sediment control planting and hydroseeding to
insure a uniform vegetative cover or equivalent stabilization measures which
include the use of such Best Management Practices as blankets, fiber
matrices, catch basin filters or other erosion resistant soil covering or
treatments to the satisfaction of the City Engineer.
3. Suspension in excess of twenty (20) working days of work authorized by approved
grading plans and grading permit for subject property, including erosion and
sediment control measures and landscaping and irrigation, shall constitute default of
this agreement.
4. The supervising civil engineer and soils engineer shall file biweekly progress reports
of all grading operations with the Building Official. An interim compaction report, for
that work completed at the time work is suspended for the rainy season, shall be
0 0
filed with the Building Official. This interim report shall conform to the grading code
requirements for final compaction reports.
5. Contractor shall control dust to the satisfaction of the Building Official or his deputy.
During grading, Contractor shall keep water truck on site and dampen work area,
grounds, and loaded trucks.
6. Grading operations suspended during the rainy season shall be resumed no later
than 15 days from date of suspension termination.
7. Installation of interim erosion and sediment control devices and systems shall
commence within seven (7) days after rough grade certification has been approved
by the Building Official and must be completed within fifteen (15) days of rough grad
certification. Final erosion and sediment controls devices, planting, landscaping and
irrigation systems shall be installed prior to final inspection of the grading permit.
8. All work shall be performed in strict observation of the Hours of Operation in
accordance with San Juan Capistrano Municipal Code Section 8-1.03.
9. Contractor shall adhere to conditions of haul route permit and encroachment permit
issued by the City Engineer.
10. Parking for construction crew is to be on-site.
California All -Purpose Acknowledgment
State of California
County of Orange
On /0 - / -
0
200 7 , before me B. Beisel, Notary Public, personally
appeared Q7I,-)31 j 3' ,
proved to me on the basis of satisfactory
evidence
to be the person(61) whose name(s) is/*Fe-
subscribed to the within instrument and
acknowledged to me that he/sha#*hey
executed the same in his/herr
authorized capacity(4s), and that by
his/her/+ signature(g) on the
instrument the person(), or the entity
upon behalf of which the person(p) acted,
executed the instrument.
Witness my hand and official seal.
B. Beisel
Notary Seal Signature of Notary Public
Description of Attached Document
Title or Type of Document✓�'1% �� CQ� / ��
Document Date: Number of Pages:
Signer(s) Other Than Above:
Capacity(ies) Claimed by Signer
Signer's Name:
Individual
Corporate Officer- Title (s):
Partner - Limited or General
Attorney in Fact
Trustee
Guardian or Parent(s)
Other:
B. BEISEL
Gomm... 1643580 m
n1
(J
NOTARY PUBLIC -CALIFORNIA
m
ORANGE COUNTY W
d
I'llTerm Exp. Feb 6, 2010 6
proved to me on the basis of satisfactory
evidence
to be the person(61) whose name(s) is/*Fe-
subscribed to the within instrument and
acknowledged to me that he/sha#*hey
executed the same in his/herr
authorized capacity(4s), and that by
his/her/+ signature(g) on the
instrument the person(), or the entity
upon behalf of which the person(p) acted,
executed the instrument.
Witness my hand and official seal.
B. Beisel
Notary Seal Signature of Notary Public
Description of Attached Document
Title or Type of Document✓�'1% �� CQ� / ��
Document Date: Number of Pages:
Signer(s) Other Than Above:
Capacity(ies) Claimed by Signer
Signer's Name:
Individual
Corporate Officer- Title (s):
Partner - Limited or General
Attorney in Fact
Trustee
Guardian or Parent(s)
Other:
nw-
CIO OF SAN JUAN CAPISTROO
32400 Paseo Adelanto
SAN JUAN CAPISTRANO, CA 92675
(949)493-1171
Paid By HANSON, RONALD B
Permit Number B07-0819
r
9
Paid Date 10/2/2007
Check No 1368
Payment Method Check
ADMINISTRATIVE FEE
GRADING GEOTECHNICAL REVI
GRADING PERMIT FEE
GRADING REFUNDABLE DEPOS
ON SITE IMPROVEMENT PERMIT
PERMIT ISSUANCE FEES
Contractor
Site Address
30191 SILVER SPUR RD
Description
Grading & OS Improvements
Fees
01-4414
01-4413
19-2302
01-4414
FEE TOTAL $13,314.61
$356.75
$62.50
$488.52
$11,856.25
$525.99
$24.60
0
MEMORANDUM
TO: Meg Monahan, City Clerk
0
October 3, 2007
FROM: Deena Berens, Senior Permit Technician j ---I
SUBJECT: Cash Bond, Hanson residence - Tract 6427 Lot 25 Precise Grade 30191
Silver Spur Drive.
Please find attached for your records, the original Grading Surety Agreement and a copy of
receipt # 1362 showing the deposit amount of $11856.25 for the placement of bond for the
purpose of precise grading for Tract 6427, Lot 25.
Attachment