03-0616_NEW CASTLE BUILDERS_Surety Agreement0
0
SURETY AGREEMENT
THIS AGREEMENT is made by and between the CITY OF SAN JUAN CAPISTRANO, a
municipal corporation, hereinafter referred to as the "City" and New Castle Builders, a Sole
Proprietor, referred to as "Developer".
WITNESSETH
WHEREAS, Citywill issue Grading Permit No. 46930 to Developerto construct certain
designated improvements, more particularly described in Exhibit "A" attached and
incorporated herein by reference, which said improvements constitute a portion of that real
property atthe location of Tract 5962 Lot 5, APN 650-031-06, commonly referred to as 29312
Spotted Bull Way.
WHEREAS, San Juan Capistrano Municipal Codes Section 8-2.08 requires the
posting of financial security to secure the faithful performance and laborand materials forthe
grading and installation of improvements connected with issuance of grading permits
including the construction of drainage and protection devices and any other corrective work
to remove and eliminate engineering and geological hazards.
WHEREAS, San Juan Capistrano Municipal Code Section 8-2.09 authorizes the
Building Official to require additional bonding as security to ensure against adverse aesthetic
impacts arising from incomplete grading and/or improvements from development projects
which have not been completed.
WHEREAS, the Building Official finds that the proposed project site is highly prominent
and visible to the community, has unique topographic features or involves substantial grading
of slope areas.
NOW, THEREFORE, in consideration of the premises and promises hereinafter
contained, City and Developer agree as follows:
1. Developer's Improvements Obligations. Developer shall, at its sole cost and
expense, provide and furnish all labor, materials and equipment for the installation of
improvements set forth in Exhibit "A". The grading permit and plans, which further defines the
9 0
improvements in Exhibit "A", are on file in the office of the City's Building Official, and all
documents referenced in Exhibit "A" are incorporated herein by reference.
2. Developer's Security. Developer shall provide a check, #1116, drawn on Wells
Fargo Bank Account #2012460259 subject to the approval of the City Attorney, to secure
Developer's improvement obligations required under this agreement.
The amount of the bond shall be $5,563.00 for that work described in Exhibit "A". This
security of $5,563.00 shall also serve as security for restoration of the site. A copy of the
surety instrument, as approved by the City Attorney, is attached as Exhibit "D".
3. Completion of Improvements. To ensure the protection of the public safety,
health and welfare, Developer shall constructthe improvements described in Exhibit "A" in
accordance with the schedule as set forth in Exhibit "B", and the conditions as set forth in
Exhibit "C".
4. Developer Default. In the event Developer does not complete the required
improvements, including erosion and silt control measures within the time required, using Best
Management Practices (BMP) in implementing a Water Quality Management Plan in full
compliance with Orange County National Pollutant Discharge Elimination System (NPDES)
Storm Water Implementation Agreement and San Juan Capistrano Municipal Code Section
8-14, or abandons the project site, or suspends work for more than twenty working days other
than previously prescribed, City shall have the rightto immediately declare a default and to
make demand on the surety for performance.
Restoration of Site. San Juan Capistrano Municipal Code Section 8-2.09
allows the City to require bonding as security to ensure against adverse aesthetic impacts
arising from uncompleted grading, drainage and/or improvements which includes illicit non -
storm drain water discharge. The purpose of this bonding shall be to restore the property to
its original condition if the Developer defaults. This restoration shall include but not be limited
to the following:
A. Dismantle and/or demolish improvements;
B. Grade property to its original contours as shown on the grading plan
referred to in Exhibit "A";
C. Remove all debris and construction materials from the site; and
9 0
D. Install erosion and silt control devices, including hydroseeding, to insure
a uniform vegetative cover, or equivalent stabilization measures which
include the use of such Best Management Practices as blankets, fiber
matrices, catch basin filters, or other erosion resistant soil coverings or
treatments to satisfaction of the Director of Engineering and Building.
6. Attorney's Fees. Developer agrees to pay City such sum as the courtmayjudge
as reasonable forthe legal services of an attorney representing the City in an action brought
to enforce or interpret the obligations of this agreement, and such sum shall be made a part
of anyjudgment in such action against Developer if such action is determined in favorof said
City.
7. Developer's Work in Safe Condition. Developer shall perform all work in a safe
workmanlike manner and shall take such precautions as may be necessary to warn and
protect the public from any dangerous condition caused by the construction of said
improvements.
8. Liabili . Developer shall hold City, its officers, and employees harmless from
any and all claims, demands, causes of action, liability or loss of any sort because of, or
arising out of, the acts or omissions of Developer, his contractor, subcontractors, agents or
employees in the performance of this agreement.
� /// In witness whereof, the parties have executed this agreement as of
j6ik - 14a , 2003 at San Juan Capistrano, California.
D elope City of San Juan Capistrano
B Saeed Asadi (Sonny) By: Daniel W. Mc arland
New Castle Builders, Principal Building Official
Approved as to Form:
v4ajv�
By: John haw
City Attorney
0 0
EXHIBIT "A"
Tract 5962 Lot 5
29312 Spotted Bull Way
Item 1: Construction of all on-site grading (cut, fill and slope stabilization) operations in
accordance with Grading Permit No. 46930 and the Developer's plans and
supporting documents as listed below:
(A) Grading Plan for McGiffin Residence, dated April 11, 2003, prepared by H.K.
And Associates, Michael H. Khoylou, RCE No. 36700.
(B) No Geotechnical Report for McGiffin Residence required.
Item 2: Construction of all on-site improvements in accordance with Grading Permit
No. 46930 and Developer's grading plans referenced in Item 1 above, including, but
not limited to: driveways, parking areas, retaining walls, erosion and silt control,
terrace drains, down drains, sub -drains, area drainage systems, and private storm
drain systems not a part of Developer's Improvement Plans filed with the City
Engineer.
0 0
EXHIBIT "B"
SCHEDULE FOR COMPLETION OF IMPROVEMENTS
Completion Date
September 2003
December 2004
Task
Rough Grade Certification
Landscape Irrigation
December 2004 Landscape Planting
0
EXHIBIT "C"
0
CONDITIONS FOR COMPLETION OF IMPROVEMENTS
A. The grading forthis project shall be in strict conformance with the grading plans and
related documents as described in Exhibit "A" and Grading Permit No. 46930.
B. Grading operations shall commence within fourteen (14)calendar days after issuance
of Grading Permit No. 46930.
Winter grading will be conducted in strict accordance with the dynamic erosion and silt
control plan submitted by the Developer, and approved bythe City. This erosion and
silt control plan reflects erosion and silt mitigation measures for expected grading
conditions as the work progresses through the winter season and shall not be
amended except with the permission of the City.
In the event Developerdoes notwish to implement winter grading, or permission for
winter grading is rescinded, static erosion and silt control plans reflecting current
conditions of grading shall be submitted within ten (10) days of cessation of work.
These plans shall:
1. Identify all pollutant sources including sources of sediment that may affect the
quality of storm water discharges associated with the construction activity.
2. Include the erosion and sediment control planting and hydroseeding to insure
a uniform vegetative cover or equivalent stabilization measures which include
the use of such Best Management Practices as blankets, fiber matrices, catch
basin filters or other erosion resistant soil covering or treatments to the
satisfaction of the City Engineer.
C. A sequence plan of grading operations shall be approved by the City prior to the
issuance of any grading permit for this project. Any variation or deviation in the
sequence of operations must be recommended, in writing, by the supervising civil and
soils engineers and approved by the Building Official prior to performing any work
related to the variation or deviation.
D. The supervising civil engineerand soils engineershall file biweekly progress reports
of all grading operations with the Building Official. An interim compaction report, for
thatwork completed atthetimework is suspended forthe rainyseason, shall befiled
0 0
with the Building Official. This interim report shall conform to the grading code
requirements for final compaction reports.
E. Contractor shall control dust to the satisfaction of the Building Official or his deputy.
During grading, Contractor shall keep water truck on site and dampen work area,
grounds, and loaded trucks.
F. Grading operations suspended during the rainy season shall be resumed no laterthan
15 days from date of suspension termination.
G. Installation of interim erosion and sediment control devices and systems shall
commence within seven (7) days after rough grade certification has been approved by
the Building Official and must be completed within fifteen (15) days of rough grade
certification. Final erosion and sediment control devices, planting, landscaping and
irrigation systems shall be installed prior to final inspection of the grading permit.
H. All work shall be performed in strict observation of the Hours of Operation in
accordance with San Juan Capistrano Municipal Code Section 8-1.03.
I. Contractor shall adhere to conditions of haul route permit and encroachment permit
issued by the City Engineer.
J. Parking for construction crew is to be on-site.
PAY TO THE
ORDER OF—
0
NEW CASTLE BUILDERS
301 ALIENTO 949-888-5898
RANCHO SANTA MARGARITA, CA 92688
Wells Fargo Bank N.A.
California
www.wellsfargoxom
is 12 2000 24 4': 20 121,
25
11220 4753 1116
201x46025/9/� /
DATE ___1 0J
0 $5x63
1 ' n
i6
Plan Check Application No.
Permit No. lf09%a
CITY OF
SAN JUAN CAPISTRANO
MISCELLANEOUS RECEIPT
Project Name _
Project Address
Applicant A
Address 106
Building Plan Check ...........................
Grading Plan Check ............................
On -Site Plan Check ............................
Special Inspection/Re-Inspection ....... :..........
OCFA Plan Check .............................
Geotechnical/Soils Plan Review ..................
( ) Copies @ 20¢/each ..................
Other � -?,#- f ..:.....
TOTAL ....................
Phone
$ (01-4411)
$ (01-4413)
$ (01-4413)
$ (01-4412)
$ (19-2334)
$ (01-4419)
$ (01-4521)
$ 55K�3 <lQ,;z:�4p�
;1
r
NOTE: APPLICATIONS FOR WHICH NO PERMIT IS ISSUED WITHIN 180 DAYS
FOLLOWING THE DATE OF APPLICATION/DEPOSIT SHALL EXPIRE BY
LIMITATION AND BECOME NULL AND VOID. UNIFORM BUILDING CODE
SECTION 304 (d)
Prepared By -&4 &
Department of Engineeri4 & Building Date
4-PAJ 60�7fq- d �J/ftp
7 /L �g6a Z. LoT s
I
m n
D
Z
c
D O
Z m 71
Dnay
Fon
➢ Z
D rMC
C
Z
>a
D Z
'S
O n
r n
�Z
D 8 9
ZDy
D
N y
Z
0
m
I
a
�
m
I
�
Dy0
C
m
•
Helen C. McGiffm
29312 Spotted Bull Way
San Juan Capistrano, CA 92675
949-813-8443
June 15, 2003
To: City of San Juan Capistrano
I, Helen C. McGiffin, am the sole owner of the property located at 29312 Spotted Bull
Way in San Juan Capistrano, CA. I hereby give full authorization to Saeed Asadi to pull
any and all permits required by the city of San Juan Capistrano as it pertains to this
property.
Sincerely,
C
Helen C. McGiffin
I- c �Al
�-
�to�F
5 — �fc, l 1; '2-e� -7�o
C ^YNgt f o' Ad ,l �'if"
A/e,j ego-ge �o � d P,--,
HL o y °c
b11)C) 0
S6ta !"
q7t
L+4k%
l D'rs`
0 0
MEMORANDUM March 2, 2005
TO: Accounts Payable, Admin Services
FROM: Paul Melby, Interim Building Services Manager
SUBJECT: Grading Bond Release, 29312 Spotted Bull Lane, McGiffin Residence
--------------------------------------------------------------------
--------------------------------------------------------------------
This memorandum is authorization to release the grading bond posted for the above
reference address. The grading for the project has been completed sufficiently to warrant
the release of the bond.
A Company Check #1116 drawn on Wells Fargo Bank Account #2012460259, in the
amount of $5,563.00 was posted as security for the bond. A copy of the Surety
Agreement, grading permit and check is attached for your information. If you have any
questions, please contact me.
Attachment
cc: file
Meg Monahan, City Clerk
&V9 �17
J
City of San Juan Capistrano
CHECK REQUEST
Administrative Services Department
Address Check to: Name: New Castle Builders
Address: 401 Poplar St.
Laguna Beach, CA 92651
Check Amount Requested
Invoice No. Invoice Date Amount Account No.:
Permit 46930 6/16/03 5,563.00 19-2302
CHECK TOTAL: $ $5,563.00
Grading Bond Refund for 29312 Spotted Bull Lane.
For completion of grading, reference Building permit
Check stub to contain the following: 46930.
Check Requested By: Employee:
Department
Department Approval: Nasser Abbaszadeh
Transmittal Instructions: ❑ Return Check To:
❑ Mail With Attached:
❑ Other (Specify):
For Administrative Services Use Only
Vendor Number:
Warrant Number:
Approved:
Date: 3/2/05
Date:
E
0
SURETY AGREEMENT
THIS AGREEMENT is made by and between the CITY OF SAN JUAN CAPISTRANO, a
municipal corporation, hereinafter referred to as the "City' and New Castle Builders, a Sole
Proprietor, referred to as "Developer".
WITNESSETH
WHEREAS, Citywill issue Grading Permit No. 46930 to Developerto construct certain
designated improvements, more particularly described in Exhibit "A" attached and
incorporated herein by reference, which said improvements constitute a portion of that real
property atthe location of Tract 5962 Lot 5, APN 650-031-06, commonly referred to as 29312
Spotted Bull Way.
WHEREAS, San Juan Capistrano Municipal Codes Section 8-2.08 requires the
posting of financial security to secure the faithful performance and labor and materials for the
grading and installation of improvements connected with issuance of grading permits
including the construction of drainage and protection devices and any other corrective work
to remove and eliminate engineering and geological hazards.
WHEREAS, San Juan Capistrano Municipal Code Section 8-2.09 authorizes the
Building Official to require additional bonding as securityto ensure against adverse aesthetic
impacts arising from incomplete grading and/or improvements from development projects
which have not been completed.
WHEREAS, the Building Official finds that the proposed project site is highly prominent
and visible to the community, has unique topographic features or involves substantial grading
of slope areas.
NOW, THEREFORE, in consideration of the premises and promises hereinafter
contained, City and Developer agree as follows:
1. Developer's Improvements Obligations. Developer shall, at its sole cost and
expense, provide and furnish all labor, materials and equipment for the installation of
improvements set forth in Exhibit"A". The grading permit and plans, which further defines the
1-1
0
improvements in Exhibit "A", are on file in the office of the City's Building OfficialC
0d
aa
documents referenced in Exhibit "A" are incorporated herein by reference. DDY
2. Developer'sSecurity. Developer shall provide a check, #1116, drawn on Wells
Fargo Bank Account #2012460259 subject to the approval of the City Attorney, to secure
Developer's improvement obligations required under this agreement.
The amount of the bond shall be $5,563.00 for that work described in Exhibit"A". This
security of $5,563.00 shall also serve as security for restoration of the site. A copy of the
surety instrument, as approved by the City Attorney, is attached as Exhibit "D".
3. Comoletion of Improvements. To ensure the protection of the public safety,
health and welfare, Developer shall construct the improvements described in Exhibit "A" in
accordance with the schedule as set forth in Exhibit "B", and the conditions as set forth in
Exhibit "C".
4. Developer Default. In the event Developer does not complete the required
improvements, including erosion and silt control measures within the time required, using Best
Management Practices (BMP) in implementing a Water Quality Management Plan in full
compliancewith Orange County National Pollutant Discharge Elimination System (NPDES)
Storm Water Implementation Agreement and San Juan Capistrano Municipal Code Section
8-14, or abandons the project site, or suspends work for more than twenty working days other
than previously prescribed, City shall have the right to immediately declare a default and to
make demand on the surety for performance.
5. Restoration of Site. San Juan Capistrano Municipal Code Section 8-2.09
allows the City to require bonding as security to ensure against adverse aesthetic impacts
arising from uncompleted grading, drainage and/or improvements which includes illicit non -
storm drain water discharge. The purpose of this bonding shall be to restore the propertyto
its original condition if the Developer defaults. This restoration shall include but not be limited
to the following:
A. Dismantle and/or demolish improvements;
B. Grade property to its original contours as shown on the grading plan
referred to in Exhibit "A";
C. Remove all debris and construction materials from the site; and
D. Install erosion and silt control devices, including hydroseeding, to insure
a uniform vegetative cover, or equivalent stabilization measures which
include the use of such Best Management Practices as blankets, fiber
matrices, catch basin filters, orother erosion resistant soil coverings or
treatments to satisfaction of the Director of Engineering and Building.
6. Attomey's Fees. Developer agrees to pay City such sum as the court mayjudge
as reasonable for the legal services of an attorney representing the City in an action brought
to enforce or interpret the obligations of this agreement, and such sum shall be made apart
of anyjudgment in such action against Developer if such action is determined in favor of said
City.
7. Developer's Work in Safe Condition. Developer shall perform all work in a safe
workmanlike manner and shall take such precautions as may be necessary to warn and
protect the public from any dangerous condition caused by the construction of said
improvements.
8. Liability. Developer shall hold City, its officers, and employees harmless from
any and all claims, demands, causes of action, liability or loss of any sort because of, or
arising out of, the acts oromissions of Developer, his contractor, subcontractors, agents or
employees in the performance of this agreement.
In witness whereof, the parties have executed this agreement as of
aiik /CO , 2003 at San Juan Capistrano, California.
D elope City of San Juan Capistrano
Q . Saeed Asadi (Sonny) By: Darnel W. Mc ariand
New Castle Builders, Principal Building Official
Approved as to Form:
By: John haw
City Attorney
COPY
"---244753
NEW CASTLE BUILDERS 1220 1116
301 ALIENTO 949-888-5898 2012460259
RANCHO SANTA MARGARITA, CA 926882
DAI£ —0J i
PAY TO TIM $WJ7
1 i
M/elfWs Fargo Bank NA
California
www Ilsfargox m
r M
+I:i220002t, 71:20124 025911' i6
i
i
r
1]
Plan Check Application No.
Permit No. 499�q�
CITY OF
SAN JUAN CAPISTRANO
MISCELLANEOUS RECEIPT
Project Name _
Project Address
.Applicant A
_
Address 4&
Building Plan Check
Grading Plan Check ........................:...
On -Site Plan Check ............................
Special Inspection/Re-Inspection .......:.. ...... .
OCFA Plan Check .............................
Geotechnical/Soils Plan Review ..................
( ) Copies @ 20¢/each ..................
Other (Jf - --G�?�. ov ??- ..:.....
TOTAL ....................
C(DG°�Y
Phone
Nl s�ir� Y/woo _92-e09/
$
(01-4411)
$
(01-4413)
$
(01-4413)
$
(014412)
$
(19-2334)
$
(01-4419)
$
(01-4521)
$ ��,, Vv,
it
NOTE: APPLICATIONS FOR WHICH NO PERMIT IS ISSUED WITHIN 180 DAYS
FOLLOWING THE DATE OF APPLICATION/DEPOSIT SHALL EXPIRE BY
LIMITATION AND BECOME NULL AND VOID. UNIFORM BUILDING CODE
SECTION 304 (d)
Prepared By z5&461
Department of Engineerin & Building
.Pit/
Timms
Date
• r.
n
z
a o
Zw,n
0' w
v0>
y -0Z
D
>MC
-0°D
Z
00
T � n
o0v
Zoy
D �
N n
V Z
�J
E
ZF
D2D�mm
m
-2
Dye
ME
Om