Loading...
06-0731_RBF CONSULTING, INC_Personal Services Agreement AmdAMENDMENT TO PERSONAL SERVICES AGREEMENT t THIS AMENDMENT is made and entered into this .5—day day of t�6 by and between the City of San Juan Capistrano (hereinafter referred s t "City") and RBF Consulting, Inc., (hereinafter referred to as "Consultant"). RECITALS: WHEREAS, City and Consultant have entered into a Personal Services Agreement dated August 24, 2005, for a total of $233,780 for engineering services for the Avenida Placida Landslide — Krum Reservoir Pipeline Stabilization; and, WHEREAS, City and Consultant agree that additional services outlined in the cost proposal as set forth in Exhibit "A", attached and incorporated herein by reference, are required for which extra compensation will become due. City and Consultant mutually agree as follows: Section 1. Additional Work The additional scope of work to be performed by Consultant shall consist of additional design services as set forth in Exhibit "A". Consultant warrants that all of its services shall be performed in a competent, professional and satisfactory manner and in accordance with the prevalent standards of its profession. Section 2. Additional Compensation City hereby agrees to pay the additional sum of Four Thousand Six Hundred ($4,600) for a revised total contract price of $238,380 to Consultant for those services performed as set forth in Exhibit "A". These additional services to the Agreement shall commence on the effective date of this Amendment. Section 3. Relationship to Agreement Except as to Sections 1 and 2 herein, all other terms and conditions of the Agreement shall remain unchanged. Section 4. Entire Agreement This entire Agreement between City and Consultant with respect to those extra services described herein, and any other understandings, oral or in writing, are hereby superseded. IN WITNESS WHEREOF, the parties hereto have executed this Agreement. APPROVED AS TO FORM: 44'�� — John I Shaw, City Attorney CITY OF SAN JUAN CAPISTRANO By: Dave Adams, City Manager M RBF Consulting, 2 CON5ULTING July 14, 2006 JN 10-104476 Mr. Peter Salgado City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Subject: Krum Reservoir Project Proposal for Addendum No. 1 Dear Mr. Salgado: RBF Consulting is contracted with the City of San Juan Capistrano to provide engineering services for the Krum reservoir project, In order to complete the project RBF Consulting has performed the following tasks that are beyond the original scope of work: A. Materials Testing Services, Ninyo & Moore Our geotechnical sub -consultant on this project has performed extra deputy inspection and materials testing services for concrete and field welding associated with the pipeline rehabilitation portion of the project. Final invoice was received from Ninyo & Moore on June 29, 2006; our cost includes an additional 10% for coordination and processing. Cost for additional inspection and material testing is $3,500. B. Construction management and inspection RBF provided additional construction management and inspection services in the month of June, for the final phase of construction of the pipeline rehabilitation project. Cost for additional construction management and inspection is $1,100. The total cost for extra work performed under this addendum is $4,600. RBF is pleased to provide these additional services for the Krum Reservoir Project. If you have any questions, feel free to call me at (949) 855-3638. Thank you. US=rely, Michael Ma quis, P \ Project Manager U EXHIBIT A PLANNING ■ DESIGN ■ CONSTRUCTION 14725 Alton Parkway, Irvine, CA 82618-2027 a P.O. Boz 57057, Irvine, CA 92619-7057 • 949.472.3505 a FAX 949.472.8373 Offices located throughout California, Arizona & Nevada a wwwABF.com