03-1118_ORANGE, COUNTY OF_Memorandum of Understanding (2)MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF SAN JUAN CAPISTRANO, THE CITY OF SAN CLEMENTE AND THE COUTY OF ORANGE REGARDING THE PRELIMINARY DESIGN OF AVENIDA LA PATA This Memorandum of Understanding is made and entered into this 18`n day of November, 2003, by and between the County of Orange, the ("County"), the City of San Clemente ("San Clemente") and the City of San Juan Capistrano ("San Juan Capistrano') and collectively the "Parties". RECITALS Avenida La Pata, hereinafter referred to as "La Pata", is a highway of high importance in the southern part of Orange County and the extension of La Pata may traverse parts of the Cities of San Clemente, San Juan Capistrano and unincorporated territory. San Clemente and the County have, on March 18, 2003, entered into Agreement No. D02-035, and amended by an amendment to the Agreement executed by the County and San Clemente concurrently herewith (collectively the "Agreement") by which the County and San Clemente achieved an understanding by which the total cost for the preparation of an Environmental Impact Report (EIR) and Project Report for La Para between Avenida Pico and Ortega Highway, was to be shared under a contract to be let and administered by the County. A copy of this Agreement is attached as Exhibit A. The City of San Juan Capistrano has no financial obligation to the cost of preparing the EIR or the Project Report. San Juan Capistrano shall also have no financial obligation for construction and right of way for any alignment of La Pata within the City of San Juan Capistrano. The Parties are supportive of construction of the La Pata Extension between its current terminus at Ortega Highway to Calle Saluda as a Primary Arterial Highway (4 lane divided roadway), hereinafter referred to as the "Project". Significant geologic, topographic, environmental, habitat and utility considerations/constrains will be encountered in constructing the Project. The Project, as proposed, will consider two alignment options and two alternatives to each of the alignment options. The first alignment, "A", proposes an approximate 4.1 mile length extension of La Pata between Ortega Highway and Calle Saluda. For this alignment approximately 16,600 linear feet lie within the County of Orange from Ortega Highway, through the Prima Deshecha Landfill, to the City of San Clemente corporate boundary. The remaining 5,255 linear feet lie within the City of San Clemente, from the corporate boundary to Calle Saluda. The second alignment, `B", proposes an approximate 3.7 mile length extension of La Para between Ortega Highway and Calle Saluda. For this alignment, approximately 10,680 linear feet lies within the County of Orange from Ortega Highway to the City of San Juan Capistrano corporate boundary. The segment of this alignment through the City of San Juan Capistrano is approximately 4,596 linear feet. The remaining 4,619 linear feet lies within the City of San Clemente, from the corporate boundary to Calle Saluda. NOW, THEREFORE, IT IS MUTUALLY UNDERSTOOD AND AGREED AS FOLLOWS: The County shall be the Lead Agency in preparing the EIR and Project Report for the Project. San Clemente and San Juan Capistrano shall be Responsible Agencies for the EIR and Project Report. Given the physical constraints, there are two potential alignments and associated alternatives that will be considered in the EIR. These alignments are generally depicted on Exhibit I, attached hereto and hereafter referred to as Alignment `A' and Alignment `B'. That Alignment `A' traverses areas within the County and San Clemente jurisdictions. That Alignment `B' traverses areas within the County and San Juan Capistrano and San Clemente jurisdictions. 6. That the Parties are supportive of both alignments and alternatives being considered in the EIR. 7. That the Parties understand that only one alignment will be recommended in the EIR and analyzed in the Project Report, and that this determination will be made by the County and will be based on which alignment is the most economically and environmentally viable. That the recommended alignment in the EIR and Project report are developed consistent with the General Plan guidelines of the County and affected cities. That the Parties will cooperate with the County in preparation of the EIR and Project Report. 10. That in the event that the alignment chosen is Alignment "B," San Juan Capistrano agrees to enter into an Amendment to the Agreement with respect to its duties as a Responsible Agency for the EIR and Project Report and with respect to the need for assistance with permitting and any other necessary activities for the Project. 11. Notices: Any notice required or permitted by this Memorandum of Understanding shall be given in writing and sufficiently given if delivered in person or sent by certified or registered mail, postage prepaid, to the notice address of the respective parties set forth in this Memorandum of Understanding. Changes in the respective addresses for such notice may be made from time to time by any party by written notice to the other parties. The present addresses of the parties are: County of Orange: 2 County of Orange Public Facilities and Resources Department 300 N. Flower Street P.O. Box 4048 Santa Ana, CA 92702-4048 Attention: Vicki L. Wilson, Director San Juan Capistrano: City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Attention: Pamela Gibson, Interim City Manager San Clemente: City of San Clemente 100 Avenida Presidio, San Clemente, CA 92672 Attention: George Scarborough, City Manager 12. Term. This Memorandum of Understanding shall remain in full force and effect for a period of 15 years after the effective date of noted herein above on the first page. 13. Amendments. This Memorandum of Understanding may not be changed, modified or waived except by written agreement duly authorized and accepted by the parties. K3 r IN WITNESS WHEREOF, the parties hereto have executed this Memorandum of Understanding on the dates opposite their respective signatures: SIGNED: Date: 3 Approved as toform: JohriShaw, City Attorney Attest: L. R. Monahan, City Clerk Dat 10,3 -()`-� Attest: Myrna Erway, City derk Date: � :Z6 a23 Approved as to form: Jeffrey M. Oderman, City Attorney 12 COUNTY OF ORANGE, a political Subdivision of the State of California By: .—' > x, -� Vic j . Wil n, DUctor PFRD CITY OF SAN JUAN CAPISTRANO By:6;D _a'� 2",, Pamela Gibson, Interim City Manager CITY SAN CityManager rc ORtGA - AN CLEMENTE F eLa Pata Alternatives 0 1.00 4.000 v� Orange County, California i 1 SAN JUAN CAPISTRANO 1 / 1 PRIMA ALIGNMENT A 15� DESHECHA LANDFILL / �g ------------------ .._..- `\ ALIGN\B \IMENT ... Gpall NO DEQ R/ p ` v AN CLEMENTE F eLa Pata Alternatives 0 1.00 4.000 v� Orange County, California