Loading...
01-0730_CHALAYAN, ELGIN_Grading Surety Agreement SURETY AGREEMENT THIS AGREEMENT is made by and between the CITY OF SAN JUAN CAPISTRANO, a municipal corporation, hereinafter referred to as the "City" and Mr. Elgin Chalayan, a Homeowner referred to as "Developer". WITNESSETH WHEREAS, City will issue Grading Permit No. 44220 to Developer to construct certain designated improvements, more particularly described in Exhibit"A" attached and incorporated herein by reference,which said improvements constitute a portion of that real property at the location of Tract 9184 Lot 9, commonly referred to as 30342 Malaspina Road. WHEREAS, San Juan Capistrano Municipal Codes Section 8-2.08 requires the posting of financial security to secure the faithful performance and labor and materials for the grading and installation of improvements connected with issuance of grading permits including the construction of drainage and protection devices and any other corrective work to remove and eliminate engineering and geological hazards. WHEREAS, San Juan Capistrano Municipal Code Section 8-2.09 authorizes the Building Official to require additional bonding as security to ensure against adverse aesthetic impacts arising from incomplete grading and/or improvements from development projects which have not been completed. WHEREAS, the Building Official finds that the proposed project site is highly prominent and visible to the community, has unique topographic features or involves substantial grading of slope areas. NOW, THEREFORE, in consideration of the premises and promises hereinafter contained, City and Developer agree as follows: 1. Developer's Improvements Obliqations. Developer shall, at its sole cost and expense, provide and furnish all labor, materials and equipment for the installation of improvements set forth in Exhibit"A". The grading permit and plans,which further defines the improvements in Exhibit "A", are on file in the office of the City's Building Official, and all documents referenced in Exhibit "A" are incorporated herein by reference. 2. Developer's Security. Developer shall provide a passbook savings account, Account Number 2202-132805 subject to the approval of the City's City Attorney, to secure Developer's improvement obligations required under this agreement. The amount of the bond shall be $31,550 for that work described in Exhibit "A". This security of $31,550 shall also serve as security for restoration of the site. A copy of the surety instrument, as approved by the City Attorney, is attached as Exhibit "D". 3. Completion of Improvements. To ensure the protection of the public safety, health and welfare, Developer shall construct the improvements described in Exhibit "A" in accordance with the schedule as set forth in Exhibit"B", and the conditions as set forth in Exhibit "C". 4. Developer Default. In the event Developer does not complete the required improvements, including erosion and silt control measures within the time required, using Best Management Practices (BMP) in implementing a Water Quality Management Plan in full compliance with Orange County National Pollutant Discharge Elimination System (NPDES) Storm Water Implementation Agreement and San Juan Capistrano Municipal Code Section 8-14, or abandons the project site, or suspends work for more than twenty working days other than previously prescribed, City shall have the right to immediately declare a default and to make demand on the surety for performance. 5. Restoration of Site. San Juan Capistrano Municipal Code Section 8-2.09 allows the City to require bonding as security to ensure against adverse aesthetic impacts arising from uncompleted grading,drainage and/or improvements which includes illicit non- storm drain water discharge. The purpose of this bonding shall be to restore the property to its original condition if the Developer defaults. This restoration shall include but not be limited to the following: A. Dismantle and/or demolish improvements; B. Grade property to its original contours as shown on the grading plan referred to in Exhibit "A"; C. Remove all debris and construction materials from the site; and D. Install erosion and silt control devices, including hydroseeding, to insure a uniform vegetative cover,or equivalent stabilization measures which include the use of such Best Management Practices as blankets,fiber matrices, catch basin filters, or other erosion resistant soil coverings or treatments to satisfaction of the Director of Engineering and Building. 6. Attorney's Fees. Developer agrees to pay City such sum as the court may adjudge as reasonable for the legal services of an attorney representing the City in an action brought to enforce or interpret the obligations of this agreement, and such sum shall be made a part of any judgment in such action against Developer if such action is determined in favor of said City. 7. Developer's Work in Safe Condition. Developer shall perform all work in a safe workmanlike manner and shall take such precautions as may be necessary to warn and protect the public from any dangerous condition caused by the construction of said improvements. 8. Liability. Developer shall hold City, its officers,and employees harmless from any and all claims, demands, causes of action, liability or loss of any sort because of, or arising out of, the acts or omissions of Developer, his contractor, subcontractors, agents or employees in the performance of this agreement. In witness whereof, the parties have executed this agreement as of July 30, 2001 at San Juan Capistrano, California. Developer 7 City of San Juan Capistrano By: Elgin Chalaya B : Daniel W. M arland Homeown Building Official Approved as to Form: By: John haw City Attorney EXHIBIT "A" 30342 Malaspina Road Elgin Chalayan Residence Item 1: Construction of all on-site grading (cut, fill and slope stabilization) operations in accordance with Grading Permit No. 44220 and the Developer's plans and supporting documents as listed below: (A) Grading Plan for (Project Name) 30342 Malaspina Road, dated July 5, 2001, prepared by(Firm) Saxon Engineering Services, (Engineer) Kurt M. Saxon, RCE No. 44180. (B) Geotechnical Report for (Project Name) 30342 Malaspina Road, dated August 24,2000, prepared by(Firm), Professional Engineering, (Engineer) Frederick A. Schilling No. EG 2046. EXHIBIT "B" SCHEDULE FOR COMPLETION OF IMPROVEMENTS Completion Date Task September 8, 2001 Rough Grade Certification N/A Landscape Irrigation N/A Landscape Planting EXHIBIT "C" CONDITIONS FOR COMPLETION OF IMPROVEMENTS A. The grading forthis project shall be in strict conformance with the grading plans and related documents as described in Exhibit "A" and Grading Permit No. 44220. B. Grading operations shall commence within fourteen (14) calendar days after issuance of Grading Permit No. 44220. W inter grading will be conducted in strict accordance with the dynamic erosion and silt control plan submitted by the Developer, and approved by the City. This erosion and silt control plan reflects erosion and silt mitigation measures for expected grading conditions as the work progresses through the winter season and shall not be amended except with the permission of the City. In the event Developer does notwish to implementwinter grading,or permission for winter grading is rescinded, static erosion and silt control plans reflecting current conditions of grading shall be submitted within ten (10) days of cessation of work. These plans shall: 1. Identify all pollutant sources including sources of sedimentthat may affect the quality of storm water discharges associated with the construction activity. 2. Include the erosion and sediment control planting and hydroseeding to insure a uniform vegetative cover or equivalent stabilization measures which include the use of such Best Management Practices as blankets, fiber matrices, catch basin filters or other erosion resistant soil covering or treatments to the satisfaction of the City Engineer. C. A sequence plan of grading operations shall be approved by the City prior to the issuance of any grading permit for this project. Any variation or deviation in the sequence of operations must be recommended, in writing, by the supervising civil and soils engineers and approved by the Building Official prior to performing any work related to the variation or deviation. D. The supervising civil engineerand soils engineershall file biweekly progress reports of all grading operations with the Building Official. An interim compaction report,for that work completed at the time work is suspended for the rainy season, shall be filed with the Building Official. This interim report shall conform to the grading code requirements for final compaction reports. E. Contractor shall control dust to the satisfaction of the Building Official or his deputy. During grading, Contractor shall keep water truck on site and dampen work area, grounds, and loaded trucks. F. Grading operations suspended during the rainy season shall be resumed no later than 15 days from date of suspension termination. G. Installation of interim erosion and sediment control devices and systems shall commence within seven (7)days after rough grade certification has been approved by the Building Official and must be completed within fifteen (15) days of rough grade certification. Final erosion and sediment control devices, planting, landscaping and irrigation systems shall be installed prior to final inspection of the grading permit. H. All work shall be performed in strict observation of the Hours of Operation in accordance with San Juan Capistrano Municipal Code Section 8-1.03. I. Contractor shall adhere to conditions of haul route permit and encroachment permit issued by the City Engineer. J. Parking for construction crew is to be on-site. Page: 1 Document Name: untit i RSPO 2 FSS RST PLEDGE INQ/MAINT 01/07/30 12 . 14 . 02 RSMU CO 114 OP MS ACTION SUCCESSFUL ACTION INQ COID ACCT COND PROD CODE DDA ACCT — C2202132805 SHORT NAME CHALAYAN ELGIN CLASS 2 (1, 2, 3) TYPE 1 SE—0-- CURRENCY ORIGINAL PLEDGE AMT. . . . 31550. 00 DATE PLACED. . . . . . . . . . . . . 101/07/3�, CURRENT PLEDGE AMT. . . . . 31550. 00 DATE EXPIRES. . . . . . . . . . . 999/99/99% STATUS CODE. . . . . . . . . . . . 1 PLEDGED TO PRODUCT. . . . . REVIEW FREQUENCY. . . . . . . PLEDGED TO ACCT NO. . . . . 000000000000000 LAST REVIEW DATE. . . . . . . SPECIAL COMMENTS LINE 1 TAMMI BANKS 949 661-0898 0990 LINE 2 SPECIAL PURPOSE ACCOUNT FOR RESTRAINT REASON LINE 1 CITY OF S. J. C. 9494931171 LINE 2 NEED LETTER DO NOT RELEASE STATUS CODE VALUES 1 = ACTIVE 2 = DELETE A = ACTIVE PAID B DELETE PAID PF: 2-CONT 4-CHG 5-FAD 6-INQ 9-NXT . . -DEL . . -ADD Tammi Banks San Juan Capistrano Customer Service Representative 32222 Camino Capistrano Mon.Tue.&Fri. San Juan Capistrano,CA 92675 949661-0898 ' 949496-0195 Fax 800 869-3557 24Hr.Cust.Service Date: 7/30/01 Time : 10 : 14 : 55 AM �i WELLS EARGO �f c NAME ACCOUNT NO.. �n -t 3 a ftO S ADDRESS iM TRANSACTION BALANCE CHECK NO DATE TRANSACTIONS i I DEPOSIT CR@ AMOUNT V AMOUNT I i Savings New Account Kit