01-1002_ESTATES OF SAN JUAN HOA_B3_Agenda Reportv
AGENDA ITEM October 2, 2001
TO: George Scarborough, General Manager
FROM: Amy Amirani, Public Works Director
SUBJECT: Consideration of Plans and Specifications and Call for Bids - SC04
Terminal Pipeline Project (CIP No. 794)
By motion, 1) approve the SC04 Terminal Pipeline Project plans and specifications; 2)
release the project for bidding; 3) authorize the General Manager to enter into a right -
of -entry agreement with the County of Orange for the Prima Desecha Landfill; and 4)
adopt a resolution accepting easements from the Estates of San Juan Homeowners
Association and the San Juan Hills Estates Homeowners Association.
SITUATION
On February 15, 2000, the Board approved entering into a Personal Services
agreement with Malcolm Pirnie, for civil engineering design services for the SC04
Terminal Pipeline Project. The Environmental Administrator reviewed the project
pursuant to Section 15061 of the California Environmental Quality Act (CEQA) and
issued a Mitigated Negative Declaration, on July 26, 2000. No objections were noted to
the selected route. On September 5, 2000, the Board selected the La Pate alignment
for this project; and, directed staff to develop the final construction plans for this project.
On April 3, 2001, the Board adopted the Certified Mitigated Negative Declaration by
Resolution No. CVWD 014-34. Also on April 3, 2001, the Board approved the plans
and specifications, and called for Bids. Since that time, bidding has been delayed
pending funding of this project. Concurrent with the October 2, 2001 Board meeting,
the Board will be considering an increase in the water operating rate. This action is the
final step in the FY 2001-02 budget process and will allow the District to move forward
with issuance of debt to fund this project. Also, the original bid package offered two bid
alternatives for pipeline material in the upper reaches of the pipeline: steel or polyvinyl
chloride (PVC). Since that time, a more refined economic analysis of the costs did not
show PVC to be substantially less expensive, and PVC has been removed as an
alternative construction material to facilitate the bid process.
Malcolm Pirnie has completed the design work, and has obtained all necessary permits,
and environmental clearances. The alignment described below is depicted on the
attached Exhibit 1. The water system improvements known as the SC -04 South
Connectors I and II (the SC04 Terminal Pipeline Project) are identified in the Capistrano
(2v \VD
FOR CITY COUNCIL AGENDAS rif)
Agenda Item October 2, 2001
SC04 Terminal Pipeline Project
Valley Water District (CVWD) Domestic Water Master Plan dated May 1999. This
project will enhance overall water service reliability and increase capacity on the
southeast side of the District. The project includes approximately 22,000 lineal feet of
24 -inch diameter pipeline, 5,400 lineal feet of 12 inch diameter pipeline, 3 pressure
regulating stations, and modifications to existing system interconnections.
Connections to two existing tracts require easements from the homeowners
associations. Easement documents are being executed by The Estates of San Juan
HOA and the San Juan Hills Estates HOA.
The County of Orange has prepared a right -of -entry agreement for the Prima Deshecha
Landfill. This agreement allows construction to begin, and provides for conveyance of
the permanent easement to the District upon completion of the SC04 pipeline
construction. Pending CVWD Board's acceptance, this agreement will go to the
Orange County Board of Supervisors for their approval, at which point the agreement
will be executed.
PROJECT DESCRIPTION
The SC04 Terminal Pipeline Project starts at the intersection of Ortega Highway and
Antonio Parkway, and crosses Ortega Highway, continues south; adjacent to, and in
the right-of-way (RAN) of La Pata up to the Prima Desecha Landfill boundary. This
alignment then heads west along the northerly boundary of the landfill. The alignment
then continues south along the westerly edge' of the Landfill and meanders
southwesterly to the proposed location of the SC04 Terminal Reservoir.
PROJECT SCHEDULE
Pending Board approval of this construction project, the schedule will be as follows:
11/13/01 — Construction Bids due
12/04/01— Bids brought to the Board for Acceptance
01/03/02 — Start of Construction
12/04/02 — Construction Completed
COMMISSION RECOMMENDATION
None.
Page 2
'Agenda Item
SC04 Terminal Pipeline Project
FINANCIAL CONSIDERATION
�.) October 2, 2001
There is $5,200,000 in the FY2001-2002 Budget CIP No. 794 for this project.
The Engineer's estimate for this project is:
Pipeline construction
$4,672,000
Easement Acquisition
$20,000
Permits
$88,500
Construction Management
A4n =nn
Total Construction Cost
$5,200,000
NOTIFICATION
None
ALTERNATE ACTIONS
1. By motion, 1) approve the SC04 Terminal Pipeline Project plans and
specifications; 2) release the project for bidding; 3) authorize the General
Manager to enter into a right -of -entry agreement with the County of Orange for
the Prima Desecha Landfill; and 4) adopt a resolution accepting easements from
the Estates of San Juan Homeowners Association and the San Juan Hills
Estates Homeowners Association.
2. Request additional information from the staff.
Page 3
THE CITY OF
SAN JUAN CAPISTRANO
N
A
SC04
Pipeline Route
SC04 Pipeline Extension
La Pata Alignment
3000 6000 9000
Agenda Item October 2, 2001
SC04 Terminal Pipeline Project
RECOMMENDATION
By motion, 1) approve the SC04 Terminal Pipeline Project plans and specifications; 2)
release the project for bidding; 3) authorize the General Manager to enter into a right -
of -entry agreement with the County of Orange for the Prima Desecha Landfill; and 4)
adopt a resolution accepting easements from the Estates of San Juan Homeowners
Association and the San Juan Hills Estates Homeowners Association.
Respectfully ..submitted,
�n
Amy A nirani
Public Works Director
Prepared by,
Eric Bauman
Senor Engineer
Attachments:
1) Location Map
2) Resolution accepting easements from the Estates of San Juan HOA and the San
Juan Hills Estates HOA.
Notes:
1) A copy of the plans and specifications is available for Board review in the Board
Chambers.
2) A copy of the plans and specifications is available for public review at the City
Clerk's office.
Page 4
RESOLUTION NO. CVWD 01-10-02-01
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CAPISTRANO
VALLEY WATER DISTRICT, ACCEPTING PUBLIC WATER FACILITIES
EASEMENTS SAN JUAN HILLS ESTATES HOA AND ESTATES OF SAN
JUAN HOA
WHEREAS, the original developers have constructed the existing
improvements, and provided the required easements; and,
WHEREAS, the CVWD Board of Directors approved the existing
improvements and accepted the required easements; and,
WHEREAS, in conjunction with the construction of the SC04 Pipeline project,
easements are to be dedicated to the Capistrano Valley Water District; and,
WHEREAS, the owners of said real property have, upon request by the
Capistrano Valley Water District, granted the necessary easements to the District for
valuable consideration; and,
NOW, THEREFORE, BE IT RESOLVED, by the Board of Directors of the
Capistrano Valley Water District as follows:
SECTION 1.
The required easements are hereby accepted from San Juan Hills Estates HOA and
the Estates of San Juan HOA.
SECTION 2.
The Clerk of the Board is hereby authorized to forward the Easement Documents to
the Orange County Recorder's Office for recordation.
PASSED, APPROVED, AND ADOPTED this 2nd day of October 2001.
ATTEST:
- Y. &, 7ff� , 6t,-�
b M6RgARET R. MONAHAN, CLERK OF THE BOARD
d
STATE OF CALIFORNIA
COUNTY OF ORANGE ) ss.
CITY OF SAN JUAN CAPISTRANO )
I, MARGARET R. MONAHAN, appointed Clerk of the Board of the Capistrano Valley
Water District, do hereby certify that the foregoing Resolution No. CVWD 01-10-02-01
was duly adopted by the Board of Directors of the Capistrano Valley Water District at a
regular meeting thereof, held the 2nd day of October 2001, by the following vote:
AYES: DIRECTORS: Campbell, Hart, Swerdlin, Gelff
NOES DIRECTORS: None
ABSENT: DIRECTORS: None
ABSTAIN: DIRECTORS: Chairman Bathgate
R. MONAHAN, Clerk of the
Im
32400 PAseo ADELANTO
SAN JUAN CAPISTRANO, GA 92675
(949) 493-1 171
(949) 493-1053 (FAX)
www.sanjuancapistrano.org
May 13, 2002
Cleric -Recorder's Office
County of Orange
P.O. Box 238
Santa Ana, California 92701
MEMBERS OF THE CITY COUNCIL
DIANE L. BATHGATE
COLLENE CAMPBELL
JOHN S. GELFF
WYATT HART
DAVID M. SWERDLIN
CITY MANAGER
GEORGE SCARBOROUGH
Re: a) CIP #794 — SC04 Pipeline/Calle Pinon Connection/Estates of San_ Juan HOA:
Easement Deed; and
b) CIP #794 —SC04 Pipeline/Calle Pinon Connection/Estates of San Juan HOA:
Temporary Easement Deed
The two noted document are enclosed for recordation:
When placed of record, please return the documents to this office.
Thank you for youy assistance,
R. Monahan, CMC
(949) 443-6308
cc: Eric Bauman, Senior Engineer
San Juan Capistrano: Preserving the Past to Enhance the Future
M11SE