20-0218_CALPROMAX ENGINEERING, INC._AddendaADDENDUM NO. 1
SAN JUAN HILLS GREENS CORROSION PROTECTION SYSTEM PROJECT
CIP NO. 17801
NOVEMBER 19, 2019
The following clarifications, modifications, and revisions are hereby incorporated as part of the Construction
Project Bid Package for the San Juan Hills Greens Corrosion Protection Project, CIP 17801.
The general intent of the work for this project has remained the same. The revisions indicated contain further
details, notes, clarifications, and changes as a result of subsequent discovery, design refinements and design
input.
A. Technical Specifications
1. Section 16640 Cathodic Protection and Joint Bonding, Part 3 Section A Paragraph 4 shall be
removed in its entirety and replaced with the following paragraph.
Auger- may be done manually or- using air N-acuum iiiethed depends upon soil aew44eff'
.
Augering for the anodes from ground surface to a depth of 4 feet must be done utilizing the air
vacuum method, or by Air Knife/Water Knife. In no case will a drill of any sort be used to
excavate from ground surface to a depth of 4 foot. A drill may be used from a depth of 4 -foot
to the required 16.5 foot depth for the anodes. Protect the exposed service line in place.
Addendum No. 1
San Juan Hills Greens Corrosion Protection Project
CIP 17801
November 19, 2019
THIS ORIGINAL SIGNED ADDENDUM MUST BE RETURNED TO OWNER AS PART OF THE BID
SUBMITTAL.
Sincerely,
Vanessa Paneto
Utilities Engineer
AGREED AND ACCEPTED
CONTRACTOR: CALPROMAX ENGINEERING, INC. Date: � I 0/
By:
MA IAA MODE❑
Its: PRESIDENT
ADDENDUM NO.2
SAN JUAN HILLS GREENS CORROSION PROTECTION SYSTEM PROJECT
CIP NO. 17801
December 3, 2019
The following clarifications, modifications, and revisions are hereby incorporated as part of the Construction
Project Bid Package for the San Juan Hills Greens Corrosion Protection Project, CIP 17801.
The general intent of the work for this project has remained the same. The revisions indicated contain further
details, notes, clarifications, and changes as a result of subsequent discovery, design refinements and design
input.
A. Bidder's Question
1. On page 125 of bid document, it stated that the City will perform all notification to existing
customers regarding temporary loss of service. Will the City also notify the surrounding
residentials of the proposed construction/project prior to work start?
Response
City to provide all Notifications to Residents within project area including notification prior to work start.
Will San Juan Capistrano provide on-site or nearby staging area for contractor's equipment?
If so, would you please provide us the address of the staging location?
Response
Staging Area to be Tirador Well.Contractor to provide required fencing around equipment as necessary.
See Attached Map for location.
Addendum No. 2
San Juan Hills Greens Corrosion Protection Project
CIP 17801
December 3, 2019
THIS ORIGINAL SIGNED ADDENDUM MUST BE RETURNED TO OWNER AS PART OF THE BID
SUBMITTAL.
Sincerely,
Vanessa Paneto
Utilities Engineer
AGREED AND ACCEPTED
CONTRACTOR: CALPROMAX ENGINEERING, INC.
By: • v. —v i v
L.MAWA ARMOGMA
Its: PRESIDENT
Date: