Loading...
20-0102_LEGEND PUMP & WELL SERVICE INC_Staff Memo • 1/02/2020 ,Project Initiation Memo • TO: Ben Siegel, City Manager FROM: Eric Bauman, Assistant Utilities Director Prepared by: Mike Marquis, P.E., Associate Civil Engineer SUBJECT: Mission Well Rehabilitation • N Description: Mission Well has stopped working and requires rehabilitation before a new well pump and motor can be installed. The major tasks associated with the rehabilitation process include 'removal of the existing pump, motor and column piping, clean up and inspect the pump and motor and provide an assessment of their condition, clean up the existing column piping for re- use, chemically treat, swab and brush well screen to remove fouling, video the well (includes pre and post cleaning video and reports), airlift debris from well to holding tank to separate solids and liquids, haul off and dispose of solids, neutralize and pump liquid waste to sewer. Remove corroded 12 inch diameter well liner. The City has an approved on-call contract program with 3 vendors, of which Legend Pump&Well Service Inc. is available and qualified,to provide these services. Therefore staff recommends that the City Manager approve a task order in the amount not to exceed $33,500 (includes 10% contingency to account for unforeseen conditions) for the Mission Well rehabilitation work described above. Location: 26601 Mission Street Project Cost: $33,500 Funding Source: �-� — 7 44 9q — 67/of — Z062of— o®& Proposals: Competitive Proposals • Proposals: N/A. The City has an existing On-Call contract program in place with Legend Pump &Well Service Inc. Staff Analysis&Recommendation: Legend Pump&Well Service Inc. is available and qualified to, provide these services, and has performed well on past City projects. Therefore staff recommends that the City Manager approve a task.order in the amount not to exceed $33,500 for the Mission Well rehabilitation work described above.