Loading...
19-0530_C.S. LEGACY CONSTRUCTION, INC._Affidavit of Publishing Capistrano Valley News PROOF OF PUBLICATION 2190 S.Towne Centre Place Suite 100 Anaheim, CA 92806 Legal No. 0011274113 714-796-2209 PUBLIC NOTICE CITY OF SAN JUAN CAPISTRANO NOTICE OF INTENT TO ADOPT AN INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION FOR THE VERDUGO STREET BEAUTIFICATION PROJECT The City of San Juan Capistrano.(City) is the Lead Agency and proj- ect proponent for the proposed Verdugo Street Beautification Project (Proposed Protect).The City has directed the preparation of an Ini- 5190473 tial Study and Mitigated Negative Declaration (IS/MND) in compli- • once with the California,Environmental, Quality Act (CEQA). The purpose of an IS/MND is to provide decision makers,public agencies, and the general public with an objective and informative document SAN JUAN CAP CITY CLERK that facilitates a basic understanding of the Proposed Project and 32400 PASEO ADELANTO fully discloses,the potential environmental effects associated with the Proposed Project,including direct,indirect,and cumulative environ- CITY CLERK mental effects.The Proposed Project will require the following agen- cy permits and approvals: City Council approval of Capital Improve- SAN JUAN CAPISTRANO, CA 92675-3603 ment Project(CIP)14106. Project Location: The Proposed Project is located in the city of San Juan Capistrano near the San Juan Capistrano Metrolink/Amtrak train depot and includes the entire length (approximately 300 lineal feet)of Verdugo Street from the intersection at Camino Capistrano to FILE NO. CIP 14106 Republish the cul-de-sac. . Project Description: The Proposed Project would beautify the cor- ridor and provide a more pedestrian-friendly street experience for AFFIDAVIT OF PUBLICATION visitors.The proposed improvements will include the following: • Reducing the overall width of the roadway; • Widening the sidewalks and adding rolled curbs; STATE OF CALIFORNIA, • Adding bulb-outs at intersection with Camino Capistrano; • Providing colored concrete and decorative pavers; SS, • Modifications to existing storm drain catch basins; • Landscaping and irrigation; County of Orange • Enhanced lighting and seating;and • Installing ADA ramps and improvements. Phasing of Project improvements will be coordinated to minimize construction impacts to the adjacent businesses and to maintain traf- fic flow and avoid to the extent practical conflicts with holidays and special events in the downtown area. I am a citizen of the United States and a resident of the Potentially Significant Environmental Impacts: Potentially sig- County aforesaid; I am over the age of eighteen years,and nificant impacts to biological resources, cultural resources, geology and soils,and tribal cultural resources were identified in the Initial not a party to or interested in the above entitled matter. I Study.All impactswould be reduced to a less-than-significant level am the principal clerk of the Capistrano Valley News, a with the incorporation of mitigation measures. newspaper that has been adjudged to be a newspaper of tablished a 20 day local.publicorevliew per period begiinningeMay 23,2019 general circulation by the Superior Court of the County of to solicit comments and input on the Draft IS/MND. Orange, State of California, on June 7, 1984, Case No. To ensure that all environmental issues are fully identified and ade- quately addressed,written comments are invited from all interested A-122949 in and for the City of San Juan Capistrano, parties. Written comments on the Draft IS/MND should be sub- County of Orange, State of California; that the notice, of mated no later than 5:00 pm on June 11,2019 to: Jwhich the annexed is a trueprinted copy, has been CoePfSanCity Capistrano City of San Juan Capistrano published in each regular and entire issue of said SanJJ0 uanCapstrano,CA92675 newspaper and not in any supplement thereof on the Email:iparco@sanivancapistrano.org following dates, to wit: Written comments regarding the scope-and content of information in the Draft IS/MND may also be submitted electronically no later than June 11,2019 to the City Engineer. 05/30/2019 A copy of the Draft IS/MND is available for public review at the fol- lowing locations: San Juan Capistrano Library City of San Juan Capistrano City Hall 31495 El Camino Real Development Services Department San Juan Capistrano,CA 92675 32400 Paseo Adelanto San Juan Capistrano,CA 92675 I certify(or declare) under the penalty of perjury under the City of San Juan Capistrano laws of the State of California that the foregoing is true Community Services Department and correct: San JCamino an Capistra Avian 92675 The Draft IS/MND is available for public review online at the follow- Executed at Anaheim, Orange County, California, on ingwebsite: Date: May30, 2019. http://sanivanistrano.org/Departments/Development-Services/ http://sanivancipistrano.org/Departments/Development-Services/ PubiTisfied:The Capistrano Valley NewsAAav 30,2019 11274113 • 49-"?/71.1441 Vo'&12/1/ Signature GA 1\-.1-4113 NOTICE OF TRANSMITTAL CAPISTRANO VALLEY NEWS Legal Publications CHARGE TO ACCOUNT NO. 0041125000 FOR PUBLICATION ON: THURSDAY, MAY 30, 2019 DOCUMENT TO BE PUBLISHED: PUBLIC NOTICE - NOTICE OF INTENT FOR CIP 14106 (VERDUGO STREET PROJECT) PROOF OF PUBLICATION Please send to: City Clerk's Division, City Hall 32400 Paseo Adelanto San Juan Capistrano, CA 92675 (949) 493-1171 • AUTHORIZED BY: /s/Maria Morris Maria Morris,City Clerk DATE: May 21, 2019 Date notice published - 05/30/2019 Date affidavit received - Date notice posted in Designated posting places (3) 05/23/2019 AV PUBLIC NOTICE CITY OF SAN JUAN CAPISTRANO NOTICE OF INTENT TO ADOPT AN INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION FOR THE VERDUGO STREET BEAUTIFICATION PROJECT The City of San Juan Capistrano (City) is the Lead Agency and project proponent for the proposed Verdugo Street Beautification Project (Proposed Project). The City has directed the preparation of an Initial Study and Mitigated Negative Declaration(IS/MND) in compliance with the California Environmental Quality Act (CEQA). The purpose of an IS/MND is to provide decision makers, public agencies, and the general public with an objective and informative document that facilitates a basic understanding of the Proposed Project, and fully discloses the potential.environmental effects associated with the Proposed Project, including,direct, indirect, and cumulative environmental effects. The Proposed Project will require the following agency permits and approvals: City Council approval of Capital Improvement Project(CIP) 14106. Project Location: The Proposed Project is located in the city of San Juan Capistrano near the San Juan Capistrano Metrolink/Amtrak train depot and includes the entire length (approximately 300 lineal feet) of Verdugo Street from the intersection at Camino Capistrano to the cul-de-sac. Project Description: The Proposed Project would beautify the corridor and provide a more pedestrian-friendly street experience for visitors. The proposed improvements will include the following: • Reducing the overall width of the roadway; • Widening the sidewalks and adding rolled curbs; • Adding bulb-outs at intersection with Camino Capistrano; • Providing colored concrete and decorative.pavers; • . Modifications to existing storm drain catch basins; • Landscaping and irrigation; • Enhanced lighting and seating; and • Installing ADA ramps and improvements. Phasing of Project improvements will be coordinated to minimize construction impacts to the adjacent businesses'and to maintain traffic flow and avoid to the extent practical conflicts with holidays and special events in the downtown area. Potentially Significant Environmental Impacts: Potentially significant impacts to biological resources, cultural resources, geology and soils, and tribal cultural resources were identified in the Initial Study. All impacts would be reduced to a less-than-significant level with the incorporation of mitigation measures. Public Review Period: In compliance with CEQA, the City has established a 20-day local public review period beginning May 23, 2019 to solicit comments and input on the Draft IS/MND. To ensure that all environmental issues are fully identified and adequately addressed, written comments are invited from all interested parties. Written comments on the Draft IS/MND should be submitted no later than 5:00 pm on June 11,2019 to: Joe Parco, City Engineer City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Email:jparco@sanjuancapistrano.org Written comments regarding the,scope and content of information in the Draft IS/MND may also be submitted electronically no later than June.11, 2019 to the City Engineer. A copy of the Draft IS/MND is available for public review at the following locations: San Juan Capistrano Library City of San Juan Capistrano City Hall 31495 El Camino Real Development Services Department San Juan Capistrano, CA 92675 32400 Paseo Adelanto San Juan Capistrano, CA 92675 City of San Juan Capistrano Community Services Department 25925 Camino del Avion San Juan Capistrano, CA 92675 The Draft IS/MND is available for public review online at the following website: http://sanj uancapistrano.org/Departments/Development-Services/Planning- Zoning/Environmental-Documents • • VI1 CITY COUNCIL PUBLIC MEETING NOTICE city of san juan capistrano A PUBLIC MEETING WILL BE HELD BY THE CITY COUNCIL OF THE CITY OF SAN JUAN CAPISTRANO ON TUESDAY, THE 16TH DAY OF JULY, 2019 AT 5:00 P.M. IN THE CITY COUNCIL CHAMBERS AT 32400 PASEO ADELANTO, SAN JUAN CAPISTRANO TO CONSIDER THE FOLLOWING PROJECT: Verdugo Street Beautification Project - CIP 14106 The proposed project would beautify the Verdugo Street corridor between the train station platform and Camino Capistrano to provide a more pedestrian-friendly street experience for visitors. The proposed improvements will include the following: • Reduction of the overall roadway width • Widening of sidewalks and the addition of rolled curbs • New bulb-outs at the intersection of Verdugo Street/Carnino Capistrano Installation of colored concrete and decorative pavers • Modifications to existing storm drain catch basins • New landscaping and irrigation • Enhanced lighting and public seating • Installation of ADA ramps Under the California Environmental Quality Act (CEQA), the City prepared an Initial Study of ' the proposed project to determine if the proposed project would have a significant effect on the environment. The Initial Study(IS) determined that all impacts of the proposed project can be mitigated to a less than significant level and that a Mitigated Negative Declaration (MND) is the appropriate documentation to obtain CEQA clearance for the proposed project. The City circulated the IS/MND for a 20-day public review period from May 23, 2019 to June 11, 2019. Staff received three comment letters submitted by the Orange County Transportation Authority, the Southern California Regional Rail Authority and'the Orange County Fire Authority. The Planning Commission considered the item at their June 25, 2019 meeting and recommended to the City Council approval of the project and adopting the project's MND and the associated Mitigation Monitoring Reporting Program (MMRP). You are invited to attend the public meeting to provide testimony or find out more about the project. If you can't attend the meeting and have questions about the project, please contact the project manager, Paul Meshkin, Senior Civil Engineer at (949) 443-6350 or by e-mail at pmeshkin(c�sanjuancapistrano.orq. Comments which you want to become part of the public record must be presented verbally at the meeting or in writing. This project may be one of several to be considered and may be heard after the beginning of the meeting. If you challenge action onthis project in court, you may be limited to raising only those issues which you or someone else raised at the public meeting described in this notice, or in written correspondence delivered to the City Council at, or prior to the meeting. Should you have special needs to be accommodated in order to provide testimony at the meeting, please contact Lindsey Stigall, Senior Management Analyst at (949) 443-6317 at least 48 hours in advance to enable the City to make reasonable arrangements to ensure accessibility. STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss AFFIDAVIT OF POSTING CITY.OF SAN JUAN CAPISTRANO ) I, MARIA MORRIS, declare that I am the duly appointed and qualified City Clerk of the City of San Juan Capistrano; that on July 3, 2019, I caused the above Notice to be d posted in three (3) public places in the City of San Juan Capistrano, to wit: City Hall; Community Center Reception Area; Orange County P •lic Library AND, that on July 3, 2019, the above o ice . posted on the City's website. I II I declare under penalty o •erg hat the foregoing is true and correct. MARIA7rrif"RS, CITY L. RK City of San Juan Capist :no, California