Loading...
19-0716_C.S. LEGACY CONSTRUCTION, INC._F2a_PowerPointVerdugo Street Beautification Project (CIP 14106)Item F2aJuly 16, 20191 Agenda Item Purpose•Approve Environmental Document for the Project (MND)•Approve Plans and Specifications for the Project•Authorize Staff to advertise and receive bids for the Project•Provide direction regarding potential Rotary donation for a four‐faced clock2 Previous Project Review & Outreach•Nov 13, 2017 ‐ Workshop to review concept design plan•Feb 8, 2018  ‐ Presentation to the DRC•Mar 27, 2018  ‐ Presentation to the CHC and PC•Jun 19, 2018  ‐ Council approval of final concept design•Nov 5, 2018   ‐ Council approval of agreement for design and environmental •Feb 28, 2019    ‐ Project’s final design review by DRC  •Jun 25, 2019      ‐ PC recommended City Council approval of the environmental document and project •Jul 9, 2019           ‐ Additional stakeholders’ workshop3 4 5 6 7 8 Proposed Hardscape Improvements9 Proposed Hardscape Improvements10 Proposed Hardscape Improvements116’   and   8’ 36” & 42” Proposed Overhead String Lighting12Looking down the streetLooking towards adjacent buildingsStreetSidewalkSidewalk Proposed Landscape Improvements13 Proposed Landscape Improvements14 Potential Donation of Four‐Faced Clock15 Potential Donation of Four‐Faced Clock•Howard Replica/Seth Thomas clock •16’ tall clock placed in the Plaza Area•Would include Rotary logo and Possible Plaque•Bid Alternate•Seeking Council direction regarding acceptance of the donation16 Environmental & Budget•Environmental Documentation‐ Mitigated Negative Declaration•Engineers Estimate/Budget17 Schedule & Phasing•Contract Award: September 2019  •Construction Start Fall 2019•Phased approach‐Sidewalk/Pavers‐Verdugo Street Improvements‐Camino Capistrano Improvements•End Construction Spring 202018 Recommendations1.Approve resolution adopting the Environmental Document for the Project (MND)2.Approve Plans and Specifications for the Project3.Provide direction regarding potential Rotary donation for a four‐faced clock4.Authorize Staff to advertise and receive bids for the Project19 Thank youQUESTIONS?20