Loading...
1997-0815_PETAR ARTUKOVICH CONSTRUCTION_Response to Project Claims boa3 4311414 r • I. r ���' MEMBERS OF THE CITY COUNCIL COLLENE CAMPBELL , ifi 1 JOHN GREINER ISIR[R RPRRR1fR WYATT HART • (SIRIIISXfR 1961 GIL JONES 1776 i IDAVID M.SWERDLIN • l • CITY MANAGER GEORGE SCARBOROUGH August 15, 1997 e44444#0121. Petar Artukovich Construction Co., Inc. Attn: Petar Artukovich 8243 Seranata Drive Whittier, CA 90603 Re: Marbella Gravity Sewer Dear Mr. Artukovich: I have reviewed your letters of August 11 and 14, 1997, regarding project claims. Claims which have not been paid are under review. I have, however, the following comments: It is simply not true that all claims are outstanding since June 23, 1997, nor can the City provide a commitment that claims will be paid. It is completely unacceptable to the City for you to refuse to continue to work on this contract. Failure to prosecute the work may necessitate the Director of Engineering and Building to terminate the contract. The City will certainly not entertain payment of$3,087.12 per day stand-by charges. There is no construction direction outstanding. The project completion date is September 13, 1997. The contract provides for liquidated damages of$250/day after this date. Very truly yours avz.4,...... Brian Perry Senior Civil Engine BP:ssg cc: William M. Huber (w/Artukovich letters of August 11 and 14, 1997) 11.1rtukovich letters of August 11 and 14, 1997) brian\8-15marb.let 32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 • (714) 493-1171 • • PETAR ARTUKOVICH (562) PHONE pas 947-4081 Contractor's License No. 295300 Class A CONSTRUCTION CO., INC. FAX4 943-3260 8243 SERANATA DRIVE (562) WHITTIER, CALIFORNIA 90603-1050 August 11, 1997 Mr. Brian Perry Senior Civil Engineer City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 RE: Marbella Gravity Sewer Dear Mr. Perry: We are requesting immediate payment for our claims submitted to the City for the extra work and additional costs on the above referenced project. We have already paid the labor costs and some of the material costs of these claims, but we are unable to absorb any more costs unless we are reimbursed by the City. To date, this project is almost complete, and we have received payment for less than 20% of the contract amount. It is not economically feasible for a contractor to have to finance almost 100% of a construction contract. If we do not receive payment for our claims or a commitment from the City that it intends to pay our claims, we may not be able to continue the work on this project. Very truly yours, Aat,42/-rtZ Petar Artukovich i a, President 'ETAR ARTUKOVICH (562) Contractor's License PHONEPCD S 947-4081 No. 295300 Class A CONSTRUCTION CO., INC. FAX j 943-3260 8243 SERANATA DRIVE (562) WHITTIER,CALIFORNIA 90603-1050 August 14, 1997 Mr. Brian Perry Senior Civil Engineer City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 RE: Marbella Gravity Sewer SUBJECT: Paving Phasing Dear Mr. Perry: This letter is in reply to your August 12, 1997, letter regarding the paving phasing for the Marbella Gravity Sewer project. The paving reconstruction work on Forster & El Camino Real south of Ortega Highway will begin after midnight on the first night of paving and cold planing work. By midnight, the businesses on Forster & El Camino Real will be closed, and our work will not cause any interference. We will also have flagmen available if needed. Also, any work not completed the first night on Forster and El Camino Real will be completed the second night of paving work. We will schedule the work to allow access in and out of the driveways for the businesses at this location. The paving and cold planing work on El Camino Real from Acjachema Street to La Zanja will be performed during the day. Currently, we have postponed the paving work on this project due to the fact that we have not been reimbursed by the City for our claims submitted since June 23, 1997. We can no longer continue to perform work on this project without being paid for these claims or receive a written commitment from the City that these claims will be paid. A summary of our claims which remain unpaid are listed on the attached pages and total $127 ,483.62. We will also be obliged to charge the City $3,087.12 per day stand-by time for our equipment until this matter is resolved. We are requesting a speedy resolution to this matter. Very truly yours, Petar Artukovich President cc: Dan Peterson, Claims Consultant August 14, 1997 City of San Juan Capistrano Page 2 RE: Marbella Gravity Sewer LIST OF UNPAID CLAIMS Claim No. Description of Claim Amount Due 1. Saw cut concrete with rebars $ 11 ,155.37 2. Concrete with rebar removal 3,932.58 3. Wet material replaced with CMB 46,576.97 and slowing of operations 5. Uncompacted backfill in storm drain 18,622.33 adjacent to trench 8. Saw cut concrete pavement not 1 ,530.86 indicated on drawings 9. Removal of concrete paving 238.57 10. Cut & repair existing 10" sewer in 522.97 conflict with new sewer 11 . Locating mismarked utilities 2,954.24 60-01 Additional surveying services 1,033.23 12. Broke an unmarked water service at 2,360.24 Station 53+50 13. Equipment stand-by time while awaiting 2,412.85 alignment change due to utilities interference from Sta. 60+00 to 64+35 14. Broke unmarked street light conduit on 4,527 .24 Camino Capistrano and repairs to conduit 15. Broke 8" AC water main mismarked 7 feet 8,373.20 from actual location at Sta. 59+63 16. Extra work due to alignment change because 16,566.08 of closeness of existing potable water lines 17. Loading & hauling charges for increased 2,441 .00 amount of asphalt & concrete pavement removal due to increased trench widths 18. Extra work to extend sewer laterals due to 1,614.65 alignment change of 10" sewer August 14, 1997 City of San Juan Capistrano Page 3 RE: Marbella Gravity Sewer List of Unpaid Claims Continued: Claim No. Description of Claim Amount Due 19. Extra work to install a 6" sewer $ 2,621.24 lateral at Sta. 60+87 TOTAL DUE = $127,483.62