September 5, 1996
I-5 SOUNDWALLS ADJACENT TO
SAN JUAN ELEMENTARY SCHOOL AND
CASITAS CAPISTRANO
ADDENDUM NO. 1
The following changes to the plans and specifications are promulgated through this Addendum.
1. Pile Spacing
i) Sheet C-1, Typical Wall Section
Delete reference to spacing 16' - 0" o.c.
ii) Sheet S-1, Detail 12
Pile spacing at 10' - 0" o.c. is required for walls up to 10' - 0" height
iii) Sheet S-1, Detail 19
Pile spacing at 5' - 6" o.c. is required for walls over 10' - 0" to 16' - 4" height.
2. Bid Item 3. City Notification Signs
This item will not be required. Bidders should enter $0 for this item.
3. Casitas Capistrano Wall
Top of wall elevation shall be 209.00 throughout.
32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 • (714) 493-1171
w
p
Addendum No. 1 (Soundwalls)
September 5, 1996
Page 2
4. Time for Completion
The time for completion shall be Eighty (80) calendar days if the contract includes the
additive alternate.
5. Insurance
Project insurance shall include and name the following additional insureds:
City of San Juan Capistrano
Transportation Corridor Agency
California Corridor Constructors
Caltrans
Capistrano Unified School District
Casitas Capistrano HOA.
A signed copy of this addendum shall accompany the bid.
Contractor Brian Perry
Senior Civil Engineer
brian\misc\snwladen.1