Loading...
1996-0530_PACIFIC POINT PARTNERS_Staff Memo • MEMORANDUM May 30, 1996 TO: iiimiimarty Clerk FROM: Daniel W. McFarland, Building Official Department of Engineering & Building �w SUBJECT: Pacific Point Partners Grading Bond Reduction Please cause a reduction of the $54,750.00 cash bond posted by Pacific Point Partners on February 23, 1996 to an amount of$5,000.00 . This bond was posted for on-site grading of the property located at the southerly terminus of Valle Road, commonly referred to as Pacific Point, North R & D Site. The $5,000.00 retention bond is to insure establishment of slope planting and installation and maintenance of erosion control devices and shall remain in place until released by the Building Official. If you have any questions or need to discuss this with me, please contact me. DWM/st i -, �o� 5/30% ..6eeA aA/gun iA-621 • City of San Juan Capistrano CHECK REQUEST &O.:50 Administrative Services Department G ✓ = ' Address Check To: Name: Pacific Point Partners, L.P. Address: 2535 Tech Drive, Suite 111 Bettendorf, IA 52722 Check Amount Requested: $49,750.00 Account Number: 19-2302 Invoice Number: n/a Invoice Date: n/a Check stub to contain: Reduction of$54,750.00 cash bond for grading at Pacific Point, North R& D Site, to $5,000.00 retention bond for slope maintenance/erosion control. Check Requested By: Employee: Daniel . McFarland, Building Official Department: Engineering & Building Date: May 31, 1996 Department Approval: Daniel W. McFarland, Building Official Transmittal Instructions: Return Check To: Mail With Attached: Other (Specify): /st For Administrative Services Use Only Vendor Number: Warrant Number: Date: Approved: