Loading...
1995-1017_BRONGO CONSTRUCTION_D5_Agenda Report AGENDA ITEM October 17, 1995 TO: George Scarborough, City Manager FROM: William M. Huber, Director of Engineering&Building SUBJECT: Award of Contract -River Street Drainage Improvements, CIP No. 145 (Brongo) RECOMMENDATION By motion, award the contract for River Street Drainage Improvements to the low responsible bidder, Brongo Construction, in the amount of$14,221.59, and reject all other bids. Authorize the Mayor and City Clerk to execute the documents on behalf of the City. SITUATION A. Summary and Recommendation Bids were opened September 18, 1995, for the River Street Drainage Improvements. The bids are valid until November 2, 1995, a period of 45 days from the opening date. Staff is recommending that City Council award the contract to the low responsible bidder, Brongo Construction, in the amount of $14,221.59, which is 21% above the Engineer's estimate of$10,750. The 21% difference in the second lowest bid and the engineer's estimate can be explained by the difficulty in estimating very small jobs. The smaller the project, the more likely contractor costs, such as office overhead, bonding, mobilization and other items which are difficult to estimate will drive up costs. B. Background The following bids were received: Brongo Construction $14,221.59 Southpaw Construction $24,173.00 Atlas Allied, Inc. $24,223.50 Excel Paving Co. $36,516.00 No subcontractors were listed with the bid from Brongo Construction. River Street was abandoned as a public street by the County of Orange in 1948 and reverted to the adjacent properties, Lots 55 and 56 of Tract 103. As part of the public construction requirements of the Franciscan Plaza project, a storm drain was constructed from the Franciscan Plaza and Verdugo Street down River Street to Trabuco Creek in a public easement obtained from the owners of Lots 55 (Jones) and 56 (Ito) of Tract 103. FOR CITY COUNCIL AGEN135#::- / AGENDA ITEM -2- October 17, 1995 An inlet to this storm drain was provided on River Street approximately 20 feet west of Los Rios Street. During light rains, the inlet collects street run-off adequately. During moderate to heavy rains, street run-off bypasses the inlet. This project will mitigate this situation in part by providing drainage inlet capacity on Los Rios Street by means of a slotted drain. Also, the cross fall on River Street will be increased locally from approximately 2% to 4% by a combination of overlaying or reconstructing River Street in the area adjacent to the existing inlet. The City has obtained construction license agreements with the owners of Lots 55 and 56 for minor work on their properties within the limits of River Street. COMMISSIONBOARD REVIEW, RECOMMENDATIONS N/A FINANCIAL CONSIDERATIONS River Street Drainage is budgeted at $16,000 for design and construction in Account No. 12-63500- 4705-145. The Engineer's estimate for construction is $11,750. NOTIFICATION Brongo Construction Southpaw Construction Atlas Allied, Inc. Excel Paving Co. Mr. and Mrs. Gil Jones Douglas & Braven Ito ALTERNATE ACTIONS 1. Award the contract for River Street Drainage Improvements to the low responsible bidder, Brongo Construction. 2. Do not award the contract. 3. Refer to Staff for additional information. 0 AGENDA ITEM -3- October 17, 1995 RECOMMENDATION By motion, award the contract for River Street Drainage Improvements to the low responsible bidder, Brongo Construction, in the amount of$14,221.59, and reject all other bids. Authorize the Mayor and City Clerk to execute the documents on behalf of the City. Res/pe�ctf�ully submitted,�j I, / Prepared by, William M. Huber, P.E. Brian Perry, P.E. Director of Engineering& Building Project Manager WMHMP:ssg Attachment: Contract a.\agendas\10-17riv.bp