1976-0920_BRAEGER, ART A._Stop Notice • BIPCO FORM 5
STOP NOTICE
R.E C E'V pKAL NOTICE TO WITHHOLD CONSTRUCTION FUNDS
(Public or Private Werk)
TO: City oPSJi Juan Capistrano PROJECT: El Camino Real Park
(Name of ownt7,Ipublih bunfir or construction fund holder) (Name)
32400 Paseo,Adelanto Camino Capistrano
(Address. If directed to a bank or-ssyings and loan assn., use address of branch holding fund) (Address)
San Juan Capistrano, California 92675 San Juan Capistrano, CA
(City, state and zip) (City. State And Tip)
TAKE NOTICE THAT CANTERBURY DESIGNS, INC.
(Name of the person or firm claiming the stop notice. Licensed contractor. mu-t use the name under which contractor's license is issued)
whose address is 3712 S. Robertson Blvd. , Culver City, California 90230
(Address of person or firm claiming atop notice)
has performed labor and furnished materials for a work of improvement described as follows: El Camino Real Park,
Camino Capistrano, San Juan Capistrano, California
(Name and location of the project wham work or materials were furnished)
The labor and materials furnished by claimant are of the following general kind: Twelve — 1890 Park Benches
(General description of work and materials furnished)
The labor and materials were furnished to or for the following party: A. Art Braeger, 1334 A North Benson Avenue,
Upland, California 91786
(Name of party who ordered the work or materials)
The value of the whole amount of labor and materials agreed to be furnished is $ 4,119.71
(Total of everything claimant agreed or contracted to furnish)
The value of the labor and materials furnished to date is $ 41119.71 _. Claimant has been paid
(Total value of everything actually furnished by claimant)
the sum of $ 1.240.00 and there is due, owing, and unpaid the sum of $ 2.879.71 together
(Total amount which has been paid to claimant) (Balance due to claimant pn the project)
with interest at the rate of --- —"--"—"" 7 %per annum from August 20th , 19 76
(Interest as specified in contract. If none, legal rate is 7%) (Date when unpaid balance became due)
You are required to set aside sufficient funds to satisfy this claim with interest. You are also notified that claimant claims an equitable lien
against any construction funds for this project which are in your hands.
FIRM NAME: _CANTERBURY DESIGNS, INC.
(Name of)due, notice claimant
— sea instructions for details)
(Owner or agent oJrAft notice claimant must sign here and verify below)
VERIFICATION
I. the undersigned, say: I am the _ 4ianager ofsident er-_ —of
the claimant of the foregoing
("PreoP', "Managof", "A Dartner of", "Owner of," etc.)
Stop Notice; I have read said Stop Notice and know the contents thereof; the same is true of my own knowledge.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on September 21, 1976 , at Culver City __ California.
(Date this document was signed) (Name of city where stop notice signed)
J
(Personal si aturea individual who is swearing
that the conte sof stop "mice are true)
SEE REVERSE SIDE FOR COMPLETE INSTRUCTIONS
This and other construction forms available from BUILDING INDUSTRY PUBLISHING CO., 1666 Corinth Avenue, Los Angeles, Calif. 90025
INFORMATION ABOUT STOP NOTICES
Time for Filing: The period for filing stop notices is the same as Mailing: The stop notice should be served by registered or certified
the period for recording mechanics' liens. This means that the stop mail.
iotice must be filed within 90 days after the completion of the entire Stop Notice Bond: A bond is required when the stop notice is served
pork of improvement, unless the owner records a notice of completion. on a construction lender or escrow or joint control holding construction
In that case, the stop notice must be filed within 30 days after record- funds. When the-notice is served on the owner or on a public body, no
ing of the notice of completion, bond is required.
Effect of Stop Notice: The owner or fund holder must withhold suf. Suit Must be Filed: A Stop notice expires unless suit is properly Filed.
ficient money to satisfy the stop notice claim. Suit may not be filed before the expiration of ten days after service of the
Stop Notice nor more than 90 days after the expiration of the mechanic's
Where to File: If the stop notice is on a public job, it should be lien period. This means that if a notice of completion has been recorded,
filed with the controller, auditor, or any public disbursing officer whose suit must be filed within 120 days thereafter; if no notice of completion
duty it is to make payments on the project, or with the body by whom has been recorded, suit must be filed within 180 days after the comple-
the overall contract was awarded. In the case of a California State con- tion of the work of improvement.
tract by or through the Department of Public Works, the notice must be Additional Requirements: Under special circumstances, there are sev-
filed with the Director of Public Works. In the case of other state work, eral additional technical rules about the time within which stop notices
it must be filed with the head of the State department, board, commission, and stop notice suits must be filed. For further information, see California
or officer who awarded the contract. In the case of private work, the Construction Law Manual (Building Industry Publishing Company, 1666
stop notice may be filed either with the owner of the project or with the Corinth Avenue, Los Angeles, California 90025. The stop notice law is
construction lender, joint control, or escrow holder holding construction frequently amended. If you have any question about proper procedure, see
funds. your attorney.
INSTRUCTIONS FOR SIGNING AND VERIFYING THIS FORM
Signature: If the claimant of the stop notice is a corporation, an officer or managing employee should sign. If the
claimant is a partnership, a partner or managing employee should sign. If the firm is a sole proprietorship, whether or not
doing business under a fictitious name, the owner of the business or a managing employee should sign. See exainple:
CORPORATION SOLE PROPRIETORSHIP (Fictitious Name)
JOHNSON ELECTRICAL CO, INC. SPEEDY ELECTRICAL CO.
Firm Name — _P—X/J—__—_� ,. I— —_. Firm NameBy By
-- c �v� / By
PARTNERSHIP SOLE PROPRIETORSHIP (Own Name)
JOHNSON ELECTRICAL CO. SID JOHNSON ELECTRIC CO.
Firm Name Firm Name _By — `" Csy�ry / �- _ " " _ By
Verification: This is a declaration under penalty of perjury. If it is signed in the State or California, it does not have
to be notarized. However, to be valid, the verification must contain the date, the city where signed, and the signature.
See above for example:
r
J_wjjjj g ° 11 � ff 4
t
i291 1
T
0 I W = w a
a t er 7 it T r R
• IF YOU HAVE ANY DOUBT AS TO PROPER PROCEDURE, CONSULT YOUR ATTORNEY