1995-0905_BOB WETZEL CONCRETE_D5_Agenda ReportLl E AGENDA ITEM September 5, 1995 TO: George Scarborough, City Manager FROM: William M. Huber, Director of Engineering & Building SUBJECT: Award of Contract for Installation of Drainage Improvements on Calle Delgado (Bob Wetzel Concrete, Inc.) RECOMMENDATION By motion, award the construction contract for the installation of drainage improvements on Calle Delgado to the low responsible bidder, Bob Wetzel Concrete, Inc., in the amount of $9,624 and reject all other bids. Authorize the Mayor and City Clerk to execute the contract documents on behalf of the City. SITUATION A. Summary and Recommendation Bids were opened on June 25, 1995, for the installation of drainage improvements on Calle Delgado. Bob Wetzel Concrete, Inc., was the low bidder at $9,624. Staff is recommending award of the bid to the low responsible bidder, Bob Wetzel Concrete, Inc. B. Background In August, 1994, the City Council authorized staff to proceed with geotechnical testing and preparation of construction plans to correct a problem with ponding water in the street adjacent to 27171 Calle Delgado. The geotechnical report concluded that ponding was at the center of a very deep subsurface consolidation. This conclusion is bome out by the observance of settlement of the adjacent homes and concrete slabs which lie between the street and the slope at the rear of the homes. The geotechnical report did not address recommendations for solving the settlement problem on private property. It may be advisable for the private property owners to pursue recommendations to mitigate their settlement problem also in view of the geotechnical report conclusion that settlement is likely to continue to occur indefinitely. The City contracted with Elmer Christiansen & Associates to prepare plans to solve the ponding problem. Originally, Calle Delgado was constructed to drain in a westerly direction, however, the street has gradually settled to form a low spot in front of 27171 Calle Delgado. Rather than reconstruct the curb, gutter and sidewalk to regain the original grade, it has been decided to place a catch basin and a storm drain lateral at the created low point. This solution will minimize the costs of correction of the ponding problem and will be effective in carrying FOR CITY COUNCIL AGENT �� 0 0 AGENDA ITEM -2- September 5, 1995 off water, even if the settlement continues to occur. The design will not create any adverse conditions with respect to the adjacent properties, nor will it preclude additional remediation to the adjacent properties. Adjacent property owners and the homeowners association have been notified of the proposed City project and have received copies of the geotechnical report. On June 6, 1995, the City Council approved the plans and specifications for installation of the drainage improvements on Calle Delgado and authorized staff to receive bids. Bids were received on June 25, 1995, as follows: 1. Bob Wetzel Concrete, Inc . ............................ $ 9,624.00 2. Steve Capello Construction ........................... 10,388.00 3. Brongo Construction ................................ 12,387.70 The engineer's estimate was $8,500. The 13% difference in the low bid and the engineer's estimate can be explained by the difficulty in estimating very small jobs. The smaller the project, the more likely contractor costs, such as office overhead, bonding, mobilization and other items which are difficult to estimate will drive up costs. COMMISSION/BOARD REVIEW AND RECOMMENDATIONS Environmental Administrator reviewed the proposed project on January 24, 1995 and approved the release of the project for preparation of bid documents/specifications pursuant to City Council Policy 418. FINANCIAL CONSIDERATIONS $20,250 is included in the 1994-95, Calle DelgadoNia De Agua Rehab Budget, Account No. 12- 65300-4710-134. PUBLIC NOTIFICATION All bidders Mr. William M. Ballinger, 27171 Calle Delgado, San Juan Capistrano, CA 92675 Mr. William A. Anderson, 405 S. Beverly Drive, Suite 400, Beverly Hills, CA 90210 Meredith Canyon Homeowners Association, c/o Tom Webb and Associates ALTERNATE ACTION 1. By motion, approve the plans and specifications for the installation of drainage improvements and authorize staff to receive bids. 2. Do not approve the plans and specifications. 3. Refer to staff for additional information. AGENDA ITEM -3- September 5, 1995 RECOMMENDATION By motion, award the construction contract for the installation of drainage improvements on Calle Delgado to the low responsible bidder, Bob Wetzel Concrete, Inc., in the amount of $9,624 and reject all other bids. Authorize the Mayor and City Clerk to execute the contract documents on behalf of the City. Respectfully submitted, William M. Huber Director of Engineering & Building WMH:ch Attachments: I. Location Map 2. Contract Prepared by, U.J7 Les Evans Project Manager Nl NINYV^MIIJ � / Nl MOOMVYB xi xo�oxuo�Y _ /� Nl NOMMVMS C/J///� Ml 3tl'IO]`x Nl MOxNO]SfOtl �/-// Nl VYOxYJTOv ^ I J� ♦ O�/JY 'l • NVnf ' orae. _ w3 {/_ 14 J rJhK �� _ EISj' _ tl r''3aor � J )3ryNbNJ i/`l/ Nvnr + NV —1 oi