1995-0606_BOB WETZEL CONCRETE_D3_Agenda ReportAGENDA ITEM • • June 6, 1995 TO: George Scarborough, City Manager FROM: William M. Huber, Director of Engineering & Building SUBJECT: Plans and Specifications and Authorization to Receive Bids - Drainage Improvements on Calle Delgado RECOMMENDATION By motion, approve the plans and specifications for the installation of Drainage Improvements on Calle Delgado and authorize Staff to receive bids. SITUATION A. Summaa and Recommendation Plans have been prepared for the installation of drainage improvements on Calle Delgado. Staff is requesting approval of plans and specifications and authorization to receive bids for this project. A copy of the plans and specifications are available for review in the City Clerk's Office and a copy has been placed in the City Council office. B. Background At the City Council meeting of August 16, 1994, a design contract with Christiansen and Associates was approved for geotechnical testing and preparation of construction plans to correct a problem with ponding water in front of 27171 Calle Delgado. The geotechnical investigation has been completed, as well as plans and specifications for the installation of a storm drain inlet in the curb and gutter at the low point of Calle Delgado. The geotechnical report concluded that ponding was at the center of a very deep subsurface consolidation. This conclusion is home out by the observance of settlement of the adjacent homes and concrete slabs which lie between the street and the slope at the rear of the homes. The geotechnical report did not address recommendations for solving the settlement problem on private property. It may be advisable for the private property owners to pursue recommendations to mitigate their settlement problem also, in view of the geotechnical report conclusion that settlement is likely to continue to occur indefinitely. FOR CITY COUNCIL AGEN D�3 AGENDA ITEM • -2- June 6, 1995 The Engineer has prepared plans to solve the ponding problem. Originally, Calle Delgado was constructed to drain in a westerly direction, however, the street has gradually settled to form a low spot in front of 27171 Calle Delgado. Rather than reconstruct the curb, gutter and sidewalk to regain the original grade, it has been decided to place a catch basin and a storm drain lateral at the created low point. This solution will minimize the costs of correction of the ponding problem and will be effective in carrying off water, even if the settlement continues to occur. The design will not create any adverse conditions with respect to the adjacent properties, nor will it preclude additional remediation to the adjacent properties. Adjacent property owners and the Homeowner's Association have been notified of the proposed City project and have received copies of the geotechnical report. 0 XIMAIII�I few I-. Environmental Administrator reviewed the proposed project on January 24, 1995 and approved the release of the project for preparation of bid documents/specifications pursuant to City Council Policy 418. $25,000 is included in the 1994-95, Calle DelgadoNia De Agua Rehab budget, account number 12- 65300-4710-134. The design fee for the Calle Delgado project was $11,190. The Engineer's estimate for construction of the project is $8,500. NOTIFICATION Mr. William M. Ballinger, 27171 Calle Delgado, San Juan Capistrano, CA 92675 Mr. William A. Anderson, 405 S. Beverly Dr., Ste 400, Beverly Hills, CA 90210 Meridith Canyon Homeowner's Association, C/O Tom Webb and Associates 1. By motion, approve the plans and specifications for the installation of drainage improvements and authorize Staff to receive bids. 2. Do not approve the plans and specifications. 3. Refer to Staff for additional information. RECOMMENDATION By motion, approve the plans and specifications for the installation of drainage improvements on Calle Delgado and authorize Staff to receive bids. Respect ly submitted, ��%� William M. Huber, P.E. Director, Engineering & Building W 4WTGS/LE:ssg 7L4w G S1, Theodore G. Simon