Loading...
1988-0523_BLAIR PAVING, INC_Bid Opening ReportThe above bid amounts have not been checked. The bid totals are subject to correction after the bids have been completely reviewed. C i B I D O P E N I N G R E P O R T Bids opened May 23, 1988 at 2:30 gwpm Asphalt Concrete Overlay - Camino Capistrano I-5 Ramps Project Title at San Juan Creek Road to 1700 Feet South Project Engineer Brian Perry Pre -Bid Estimate $75,000.00 Bid Bid Bidder: Amount Bond 1, Blair Paving, Inc. X5a g'L pp 2, Madison Paving, Inc. goq.pO 3, Sully -Miller Contracting Co. SSS (o`io.5rl 4. Vernon Paving Co. ��� X35. -q5 5. 6. 7. 8. 9. 10. cc: City Clerk's Staff (3) Signed 2Xg&i/ q Public Works (3) City Manager (1) Dated The above bid amounts have not been checked. The bid totals are subject to correction after the bids have been completely reviewed.