1996-1203_HOLLAND-LOWE CONSTRUCTION, INC._Specifications & Contract Documents CITY OF SAN JUAN CAPISTRANO COUNTY OF ORANGE STATE OF CALIFORNIA SPECIFICATIONS AND CONTRACT DOCUMENTS PREVENTATIVE STREET MAINTENANCE 1996-1997 1. VIA CALIFORNIAICAMINO LAS RAMBLAS 2. AVENIDA AEROPUERTO 3. MISSION HILLS AND 4. CAPISTRANO VILLAS SPEED BUMPS Members of the City Council WYATT HART, MAYOR GIL JONES CAROLYN NASH COLLENE CAMPBELL DAVID SWERDLIN CITY MANAGER GEORGE SCARBOROUGH DIRECTOR OF ENGINEERING AND BUILDING WILLIAM M. HUBER DECEMBER 1996 TABLE OF CONTENTS PREVENTATIVE STREET MAINTENANCE 1996-1997 1. VIA CALIFORNIA/CAMINO LAS RAMBLAS 2. AVENIDA AEROPUERTO 3. MISSION HILLS AND 4. CAPISTRANO VILLAS SPEED BUMPS TITLE PAGE CONTRACT DOCUMENTS Notice Inviting Bids 1 Bid Proposal 3 Schedule of Work Items 6 Non-Collusion Affidavit 7 Designation of Sub-Contractors 8 Instructions to Bidders 9 Bid Bond BB-1 Performance Bond PB-1 Labor& Material Bond LM-1 CONTRACT Contract 1-4 SPECIAL PROVISIONS Work to be Done SP-1 Section 1 Standard Specifications SP-1 Section 2 Terms Defined SP-2 Section 3 Flow and Acceptance of Water SP-2 Section 4 Water SP-3 Section 5 Insurance and Overhead Costs SP-3 Section 6 Protection of Existing Utilities SP-3 Section 7 Protection of Private Property SP-3 Section 8 Construction Zone SP-3 Section 9 Pre-Construction Coordination Meeting SP-4 Section 10 National Pollutant Discharge Elimination System SP-4 Section 11 Preservation of Survey Monuments SP-5 Section 12 Monumentation Identification SP-5 Section 13 Order of Work SP-6 Section 14 Notification SP-6 Project Schedule Form TABLE OF CONTENTS (CON'T) PREVENTATIVE STREET MAINTENANCE 1996-1997 1. VIA CALIFORNIA/CAMINO LAS RAMBLAS 2. AVENIDA AEROPUERTO 3. MISSION HILLS AND 4. CAPISTRANO VILLAS SPEED BUMPS DETAIL SPECIFICATIONS AND METHOD OF PAYMENT Bid Item 1 Project Survey DS-1 Bid Item 2 Reestablish Centerline Ties and Monuments DS-1 Bid Item 3 City Notification Signs DS-1 Bid Item 4 Remove Existing PCC Curb, Gutter, Spandrel, Valley Gutter & DS-1 Sidewalk Bid Item 5 PCC Curb Type A DS-2 Bid Item 6 PCC Spandrel and Curb DS-2 Bid Item 7 PCC Handicap Access Ramp DS-2 Bid Item 8 PCC Valley Gutter DS-2 Bid Item 9 PCC 4" Thick Sidewalk DS-3 Bid Item 10 Cold Plane and Existing Asphalt Concrete 0.12' Deep to Zero DS-3 Bid Item 11 Remove and Replace Existing Asphalt Concrete DS-3 Bid Item 12 Remove Structural Section DS-3 Bid Item 13 Pavement Reinforcing Fabric DS-4 Bid Item 14 Asphalt Concrete Deeplift DS-5 Bid Item 15,22&26 Asphalt Concrete Overlay DS-6 Bid Item 16&19 Adjustment of City Manhole Frames and Cover Sets to Grade DS-6 Bid Item 17,20&24 Adjustment of CVWD Valve Boxes to Grade DS-6 Bid Item 18,23&27 Project Striping DS-7 Bid Item 21,25,28&29 Traffic Control DS-7 Bid Item 30 Asphalt Bump DS-8 Bid Item 31 Speed Bump Sign/W6 (15) DS-8 Bid Item 32 Install Thermoplastic Legends DS-9 Bid Item 33 Install Twelve-Inch Wide Thermoplastic White Stripes DS-9 Bid Item 34 Stripe Legends DS-9 Bid Item 35 Stripe Twelve-Inch Wide White Stripes DS-10 APPENDIX City Notification Signs (3 sheets) A1-3 City of San Juan Capistrano Standard Plan No. 300 A4 OCEMA Standard Plan No. 207 A5 City of San Juan Capistrano Standard Plan No. 330 (2 sheets) A6-7 CVWD Standard Plan W13 (2 sheets) A8-9 Speed Bump Location Description (No. 13, 14, 15 & 16) Al0 Speed Bump Location Plan (No 13, 14, 15 & 16) Al 1 Speed Bump Detail Sheet Al2 Sign Installation (3 sheets) A13-15 PREVENTATIVE STREET MAINTENANCE 1996-1997 1. VIA CALIFORNIA/CANIINO LAS RAMBLAS 2. AVENIDA AEROPUERTO 3. MISSION HILLS AND 4. CAPISTRANO VILLAS SPEED BUMPS NOTICE INVITING BIDS Public notice is hereby given that the City of San Juan Capistrano will, up to 2:00 p.m., on the 3rd day of February 1997, receive sealed proposals or bids for the Preventative Street Maintenance 1996- 1997 Rehabilitation of 1. Via California/Camino Las Ramblas, 2. Avenida Aeropuerto 3. Mission Hills, and 4. Capistrano Villas Speed Bumps,in accordance with the approved Plans, Specifications, Special Provisions, and the Standard Specification for Public Works Construction, 1994 Edition, including all supplements therefore, on file in the office of the City Clerk of the City of San Juan Capistrano, California. Bids will be received until the time hereinbefore stated at the City Clerk's Office, San Juan Capistrano City Hall, 32400 Paseo Adelanto, San Juan Capistrano, California. No bid will be received unless it is made on a proposal provided within these specifications. Each proposal or bid must be accompanied by a certified check, cash, cashier's check, or bidder's bond payable to the City of San Juan Capistrano in the sum of not less than ten percent of the total bid amount. The bid check, cashier's check or bidder's bond of the successful bidder will be forfeited to the City of San Juan Capistrano in the event such successful bidder fails to enter into the required contract within 15 days after the written notice that said contract has been awarded to him for the work. A pre-bid conference is scheduled at 10:00 a.m. on the 27th day of January 1997, in the City Council Chambers. The contractor shall have the opportunity for clarification or interpretation of any point or points of question within the plans and contract documents or specifications. It is the contractor's responsibility to be in attendance at this conference to receive any information disclosed during the proceedings, for the City of San Juan Capistrano shall not disseminate any records of the conference. Exclusive of written addenda and this pre-bid conference, the City of San Juan Capistrano shall not be responsible for any instructions, explanations, or interpretation of the plans, specifications, and contract documents presented to the bidders in any manner. The successful bidder, simultaneously with the execution of the contract, will be required to furnish a Faithful Performance Bond equal in the amount of one-hundred percent (100%) of the contract price. The surety bond company must be selected from among the surety companies set forth in the Standard Specifications. The City Council reserves the right to reject any and all bids received and to compare the relative merits of the respective bids and to choose that, which in the opinion of the City of San Juan Capistrano, will best serve the interests or needs of the City of San Juan Capistrano. 1 A time limit of Sixty (60) calendar days has been set for the completion of the work, from the date of the Notice to Proceed. BIDDERS ARE HEREBY NOTIFIED THAT, pursuant to the Labor Code of the State of California, copies of the prevailing rate of per diem wages, as determined by the Director of the State Department of Industrial Relations, are on file in the office of the City Clerk and shall be made available to any interested party on request. Copies of plans and specifications are on file in the office of the City Clerk of San Juan Capistrano, 32400 Paseo Adelanto, San Juan Capistrano, California. Copies of the plans and specifications for use in preparing bids may be obtained at the Office of the City Clerk, San Juan Capistrano, at the address shown above. One set of plans and specifications is available for each general contractor proposing to submit a bid for said work. A charge in the amount of$30, non-refundable, is required for obtaining each set of plans and specifications. There will be a $5 charge for postage and handling on all plans and specifications mailed. Each bidder shall state the California Contractor's License Number and Classification of such bidder so bidding, as no bid will be accepted from a Contractor who has not been licensed in accordance with the provisions of the laws of the State of California relating to the licensing of Contractors. This Notice is hereby given and published by order of the Council members of/the City of San Juan Capistrano and is dated this //" day of atr_IA141-/t- ./ 99(v CITY CLE' CITY OF SAN JUAN CAPISTRANO ORANGE COUNTY, CALIFORNIA 2 BID PROPOSAL For the: PREVENTATIVE STREET MAINTENANCE 1996-1997 L VIA CALIFORNIA/CAMIINO LAS RAMBLAS, 2. AVENIDA AEROPUERTO 3. MISSION HILLS AND 4. CAPISTRANO VILLAS SPEED BUMPS From: Contractor, License No. & Classification To the Members of the City Council City of San Juan Capistrano Gentlemen: The undersigned, as bidder, declares that he has carefully examined the location of the proposed work as described, examined the Plans, Specifications, Special Provisions, and the Standard Specifications for Public Works Construction, 1994 Edition, including all supplements therefore, read the Instructions to Bidders, and is familiar with all proposal requirements, and hereby proposed and agrees, if the proposal is accepted, to complete the said construction in accordance with the Contract Documents, as defined in Section 1-2 of the Standard Specifications, in the time stated herein, for the unit price or lump sum given on the following pages of this proposal, amounting to a total of: Words Figures Said amount to include and cover all taxes, the furnishing of all materials, the performing of all the labor requisite or proper and the providing of all necessary machinery, tools, apparatus, and other means of construction; also, the performance and completion of all the work in the manner set forth, described and shown in the Specifications or the drawings for the work. If the contract is awarded, the undersigned agrees to enter into a contract with the City of San Juan Capistrano and to commence work within fifteen (15) calendar days from the date of execution thereof, and to diligently prosecute the work to completion before the expiration of Sixty (60) calendar days. All bids are to be computed on the basis of the given Estimated Quantities of Work, as indicated in this proposal, times the unit prices as submitted by the bidders. In case of discrepancy between words and figures, the words shall prevail. In case of discrepancy between unit prices and the extension thereof, the unit price shall prevail and bids will be computed as indicated above and compared on the basis of corrected totals, given solely as a basis for comparison of bids. It is understood that the 3 City does not expressly, nor by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any item or portion of the work or to omit portions of the work as may be deemed expedient by the Engineer. It is also understood by Bidder that the City of San Juan Capistrano has the right to reject this proposal or to award a contract to the undersigned at the prices stipulated. If the proposal is rejected, then any check or cashier's check shall be returned to the undersigned within thirty (30) days. No bid bonds will be returned. If the proposal is accepted and the undersigned fails to enter into a contract within fifteen (15) days after the agreement is delivered to him for signature, or within such further time as may be granted by the Members of the City Council, then said check shall be cashed or said bond declared forfeit and an amount equal to the difference between the lowest bid and the next lowest bid who will execute a contract shall be paid into the treasury of the City of San Juan Capistrano as liquidated damages for the failure of the undersigned to comply with the terms of this proposal. Accompanying this proposal is (Insert "$ cash," cashier's check, certified check or bidder's bond on the forms from pages BB-1 and BB-2 of these Contract Documents, as the case may be), in an amount equal to at least ten percent (10%) of the total bid. The following is the name and place of business of the surety company which will furnish the required bonds as surety if the work is awarded to the undersigned: Licensed in accordance with an act providing for the registration of contractors -- License No. and Classification Signature of Bidder: 4 (If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm: President, Secretary, Treasurer, and Manager thereof) Dated: Business Address Dated: Telephone Number Further, the undersigned bidder certifies that he has thoroughly checked the figures set forth in this proposal, that they are correct to the best of his knowledge and that they constitute his proposal for the work called out herein. Dated: Signature of Bidder Dated: Telephone Number 5 SCHEDULE OF WORK ITEMS PREVENTATIVE STREET MAINTENANCE 1996-1997 1. VIA CALIFORNIA/CAMINO LAS RAMBLAS 2. AVENIDA AEROPUERTO 3. MISSION HILLS AND 4. CAPISTRANO VILLAS SPEED BUMPS Item Approximate Work Items With Unit Price Unit Price Total Amount Quantity (Written in Words) (In Figures) 1 L.S. Project survey for the lump sum price of dollars. $ 2 L.S. Reestablish centerline ties and monuments for the lump sum price of dollars. $ 3 6 Ea. Provide City notification signs for the unit price of dollars per each. $ $ 4 2630 S.F. Remove existing P.C.C. curb, gutter, spandrel, valley gutter and sidewalk for the unit price of dollars per square foot. $ $ 5 32 L.F. Construct P.C.C. curb Type "A" for the unit price of dollars per lineal foot. $ $ 6 1384 S.F. Construct P.C.C. spandrel and curb for the unit price of dollars per square foot. $ $_ 7 936 S.F. Construct P.C.C. handicap access ramp and retaining curb for the unit price of dollars per square foot. $ $ 8 64 S.F. Construct 6" thick P.C.C. valley gutter for the unit price of dollars per square foot. $ $ 9 230 S.F. Construct 4" thick P.C.C. sidewalk for the unit price of _dollars per square foot. $ $ 10 49,715 S.F. Cold plane 0.12' to zero for the unit price of dollars per square foot. $ $ 11 328 Ton Remove and replace existing asphalt for the unit price of dollars per ton. $ $ 6 SCHEDULE OF WORK ITEMS PREVENTATIVE STREET MAINTENANCE 1996-1997 1. VIA CALIFORNIA/CAMINO LAS RAMBLAS 2. AVENIDA AEROPUERTO 3. MISSION HILLS AND 4. CAPISTRANO VILLAS SPEED BUMPS(Con't) 12 8,725 S.F. Remove structural section (Mission Hills) for the unit price of dollars per square foot. $ $ 13 64,810 S.F. Provide and install pavement reinforcing fabric for the unit price of dollars per square foot. $ $ 14 325 Tons Provide and place asphalt concrete deeplift for the unit price of dollars per ton. $ $ 15 735 Tons Provide and install asphalt concrete overlay (Mission Hills) for the unit price of dollars per ton. $ $ 16 7 EA Adjust City manhole covers and frames to grade (Mission Hills) for the unit price of dollars each. $ $ 17 5 EA Adjust CVWD valve boxes to grade (Mission Hills) for the unit price of dollars per each. $ $ 18 L.S. Mission Hills striping for the lump sum of dollars. $ 19 5 EA Adjust City manhole covers and frames to grade (Avenida Aeropuerto) for the unit price of dollars per each. $ $ 20 3 EA Adjust CVWD valve boxes to grade (Avenida Aeropuerto) for the unit price of dollars per each. $ $ 21 L.S. Traffic control (Avenida Aeropuerto) for the lump sum price of dollars. $ 22 652 Ton Provide and install asphalt concrete overlay (Avenida Aeropuerto) for the unit price of dollars per ton. $ $ 23 L.S. Avenida Aeropuerto striping for the lump sum price of dollars. $ 7 SCHEDULE OF WORK ITEMS PREVENTATIVE STREET MAINTENANCE 1996-1997 1. VIA CALIFORNIA/CAMINO LAS RAMBLAS 2. AVENIDA AEROPUERTO 3. MISSION HILLS AND 4. CAPISTRANO VILLAS SPEED BUMPS(Con't) 24 9 EA Adjust CVWD valve boxes to grade (Via California/Camino Las Ramblas) for the unit price of dollars per each. $ $ 25 L.S. Traffic control (Via California/Camino Las Ramblas) for the lump sum price of dollars. $ 26 447 Ton Provide and install asphalt concrete overlay (Via California/Camino Las Ramblas) for the unit price of dollars per ton. $ $ 27 L.S. Via California/Camino Las Ramblas striping for the lump sum of dollars. $ 28 L.S. Traffic Control (Mission Hills) for the lump sum price of dollars. $ 29 L.S. Traffic Control (Capistrano Villas) for the lump sum price of dollars. $ 30 4 EA Asphalt Bump, complete, in place for the unit price of dollars per each. $ $ 31 8 EA Speed Bump sign, complete, in place for the unit price of dollars per each. $ $ 32 4 EA Bump thermoplastic legend, complete, in place for the unit price of dollars per each. $ $ 33 L.F. 144 Twelve-inch wide thermoplastic white stripes, complete, in place for the unit price of dollars per lineal foot. $ $ 34 4 EA Stripe bump legend complete, in place for the unit price of dollars per each. $ $ 35 144 L.F. Stripe twelve-inch wide white stripes, complete in place for the unit price of dollars per lineal foot. $ $ Total Bid Price (Enter here and on Page 3) Words Figures 8 NON-COLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID STATE OF CALIFORNIA ) ) SS. County of ) , being first duly sworn deposes and says that he is of , the party making the foregoing bid; that such bid is not made in the interest of or on behalf of any undisclosed person, partnership, company, association, organization or corporation; that such bid is genuine and not collusive or sham; that said bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that said bidder has not in any manner, directly or indirectly, sought by agreement, communication or conference with anyone to fix the bid price of said bidder or of any other bidder, or to fix the bid price of or cost element of such bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in such bid are true; and further, that said bidder has not directly or indirectly, submitted his bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid and will not pay any fee in connection therewith, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, or to any other individual except to any person or persons as have a partnership or other financial interest with said bidder in this general business. DATED: SIGNATURE On this the day of , 19 , before me, the undersigned, a Notary Public in and for said State, personally appeared , personally known to me/proved to me on the basis of satisfactory evidence, to be the person(s) whose name(s) subscribed to the within instrument, and acknowledge that executed it. WITNESS my hand and official seal. Notary Public in and for said State 9 DESIGNATION OF SUB-CONTRACTORS Submit with Proposal. In compliance with the Provisions of Section 4100-4107 of the Government Code of the State of California as amended, the undersigned certifies that he has used the sub-bids of the following listed sub-contractors in making up his bid, and that the sub-contractors listed will be used for the work for which they bid, subject to the approval of the Engineer, and in accordance with the applicable provisions of the Specifications. It is understood and agreed that all those portions of the work called for in the contract documents for which a sub-contractor is not listed will be performed by the undersigned through his forces. If no sub-contractors are listed, all bonds and insurance will be written in the name of the general contractor only. Item of Work Sub-contractor License No. Address Phone & Classification 1. 2. 3. 4. 5. 6. 7. 8. BIDDER'S NAME AUTHORIZED SIGNATURE 10 INSTRUCTION TO BIDDERS Securing Documents Plans, Specifications and other contract documents will be available for examination without charge and copies may be secured in accordance with the "Notice Inviting Bids." Examination of Plans. Specifications and Site of Work The bidder is required to examine the site of work, the Proposal, the Plans and the Specifications, Special Provisions, and the Standard Specifications for Public Works Construction. 1994 Edition including all supplements, very carefully. He shall satisfy himself as to the character, quality and quantities of the work to be performed, the materials to be furnished and the requirements of the Contract Documents. The plans for the work show conditions as they are believed to exist, but it is not to be inferred that all the conditions as shown thereon are actually existent, nor shall the City of San Juan Capistrano or any of its officers or agents be liable for any loss sustained by the contractor as a result of any variance between conditions shown on the plans and actual conditions revealed during examination or progress of the work. The submission of a proposal shall be prima facie evidence that the bidder has made such an examination. Interpretation of Drawings and Documents If any bidder should find discrepancies in, or omissions from the drawings, specifications or other proposed contract documents, or if he should be in doubt as to the true meaning of any part thereof, he shall at once make a written request to the Engineer for correction, clarification or interpretation of the point or points in question. The person submitting such a request shall be responsible for its prompt delivery. In the event that the Engineer receives such a request and it should be found that certain essential information is not clearly and fully set forth, or if the Engineer discovers errors, omissions, or points requiring clarification in the drawings or documents, a written addendum will be mailed to each person to whom a set of contract documents has been delivered. The City of San Juan Capistrano will not be responsible for any instructions, explanations or interpretations of the documents presented to bidders in any manner other than written addendum. Addenda or Bulletins The effect of all addenda to the contract documents shall be considered in the bid and said addenda shall be made a part of the contract documents and shall be returned with them. Before submitting his bid, each bidder shall inform himself as to whether or not any such addenda have been issued, and failure to cover in his bid any such addenda issued may render his bid invalid and result in its rejection. 11 Disqualification of Bidders No person, firm or corporation shall be allowed to make, file or be interested in more than one bid for the same work unless alternate bids are called for. A person, firm or corporation who has submitted a sub-proposal to a bidder, or who has quoted prices on materials to a bidder, is not hereby disqualified from submitting a bid in his own behalf. Proposals Bids to receive consideration shall be in accordance with the following instructions: A. Bids shall be made only upon the forms provided within these specifications; all bid items shall be properly filled out; bid prices shall be stated both in words and in figures; and the signatures of all persons signing shall be in longhand. Where there is a conflict in the words and the figures, the words shall govern. B. All prices and notations must be in ink or typewritten. No erasures will be permitted. Mistakes may be crossed out and corrections typed or written in ink adjacent thereto and must be initialed in ink by the person or persons signing the bid. C. Bids shall not contain any recapitulation of the work to be done. Alternate proposals will not be considered except as required hereinabove. No oral, telegraphic or telephonic proposals or modifications will be considered. D. The City of San Juan Capistrano may require any bidder to furnish a statement of his experience, financial responsibility, technical ability, equipment and references properly and fully filled out. E. Each bidder shall list his proposed sub-contractors on the form accompanying the proposal in accordance with the provisions of the specifications. F. Each bidder must accompany his bid with either a cashier's check upon some responsible bank, or a properly certified check upon such bank, or an approved corporate surety bond payable to the City of San Juan Capistrano for such a sum of not less than ten percent (10%) of the aggregate sum of the bid, which check or bond and the monies represented thereby shall be held by the City of San Juan Capistrano as a guarantee that the bidder, if awarded the contract, will in good faith enter into such contract and furnish the required bonds. The bidder agrees that, in case of his refusal or failure to execute said contract and give bonds within the time required by these documents, such check or bond, and the money represented thereby, shall remain the property of the City of San Juan Capistrano and, if the bidder shall fail to execute said contract, said surety will pay to the City of San Juan Capistrano the damages which the City of San Juan Capistrano may suffer by reason of such failure not exceeding the sum of ten percent (10%) of the amount of the bid. A bid received and not accompanied by such cashier's check, certified check or approved bond shall be rejected. 12 G. Bids shall be delivered to the City of San Juan Capistrano at the location stipulated on or before the day and hour set for the opening of bids, as hereinbefore specified in the "Notice Inviting Bids." Bids shall be enclosed in a sealed envelope bearing the title of the work, the name of the bidder, bid opening date and time of bid opening. Licensing of Contractor All persons, firms,partnerships or corporations shall be licensed in accordance with the Business and Professions Code of the State of California and the applicable ordinances of the City and County before doing any work of any kind. Withdrawal of Bids Any bidder may withdraw his bid in person or by written request at any time prior to the scheduled closing time for receipt of bids. Opening of Bid Proposals The City of San Juan Capistrano will, in open session, publicly open, examine and declare the bids at the time set forth in the "Notice Inviting Bids." Bidders or their authorized representatives are invited to be present. Award of Contract or Rejection of Bids No bidder may withdraw his bid for a period of ninety(90) days after the date set for the opening of bids. The contract for the work will either be awarded or the bids rejected within the ninety (90) days from the date set for the opening of bids. The contract for the work will be awarded to the lowest responsible bidder complying with these instructions and with the "Notice Inviting Bids." The City of San Juan Capistrano, however, reserves the right to reject any or all bids and to waive mere informalities, minor technical errors or irregularities, obvious clerical errors or erasures. The bidder to whom the award is made shall execute two copies of the written contract with the City of San Juan Capistrano and furnish the stipulated bonds, insurance and bid breakdown within fifteen (15) days after the bid opening date. The contract shall be made in the form adopted by the City of San Juan Capistrano. The release of the successful bidder's surety deposit, as previously stipulated (page 5), shall be made upon the City of San Juan Capistrano's acceptance of the Labor and Materials Bond and the Faithful Performance Bond. 13 If the bidder to whom the award is made fails to enter the contract as herein provided, the award may be annulled and an award may be made to the next lowest responsible bidder; and such bidder shall fulfill every stipulation embraced herein, as if he were the party to whom the first award was made. A corporation to which an award is made shall furnish evidence of its corporate existence and evidence that the officer signing the contract and bonds for the corporation is duly authorized to do so. Bonds The successful bidder, simultaneously with the execution of the Agreement, will be required to furnish a Labor and Material Bond in a sum not less than one hundred percent (100%) of the total amount payable by the terms of the contract and a Faithful Performance Bond in a sum not less than one hundred percent (100%) of the amount of the contract, Said bonds shall be secured from a surety company selected from the surety companies set forth in the standard specifications. Bonds must be submitted on the forms contained in these specifications. Time Performance The work shall be commenced within fifteen (15) calendar days from the date of issuance of the Notice to Proceed and shall be diligently prosecuted until completion. A time limit of Sixty (60) calendar days from the date specified in the Notice to Proceed has been set for completion of the work. The bidder's attention is directed to the specifications as to provisions for extension of time of completion and/or assessment of liquidated damages. Assignment of Contract No assignment by the Contractor of any contract to be entered into hereunder or any part thereof, or of funds to be received thereunder by the Contractor, will be recognized by the awarding authority unless such assignment has had prior approval of the awarding authority and the surety has been given notice of such assignment in writing and has consented thereto in writing. Workmen and Wages Attention is specifically directed to all provisions of the Labor Code of the State of California with regard to workmen and wages. Wages shall not be less than prevailing wage rates determined by the City of San Juan Capistrano pursuant to said Code and as listed in the "Notice Inviting Bids." Construction Permits It shall be the Contractor's responsibility to obtain all necessary permits, bonds and insurance, as required, for the completion of the project. No extra compensation shall be made therefore. 14 CONTRACT This contract is made and entered into by and between the CITY OF SAN JUAN CAPISTRANO, hereinafter referred to as "CITY" and - hereinafter referred to as "CONTRACTOR." IT IS HEREBY AGREED BETWEEN THE PARTIES AS FOLLOWS: FIRST. CONTRACT DOCUMENTS. The contract documents shall be considered to include the Notice Inviting Bids, the Instructions to Bidders, the Proposal, the Bid Bond, the Non-Collusion Affidavit, the Designation of Sub-Contractors, the Contract which is prepared for execution by the CITY and the CONTRACTOR. Plans, Specifications and Special Provisions, the Standard Specifications for Public Works Construction, 1994 Edition, including all Supplements, Contract Bonds, Resolutions adopted by the CITY pertaining to the work, insurance policies and certificates, and any supplemental written agreements amending or extending the scope of the work originally contemplated that may be required to complete the work in a substantial and acceptable manner. SECOND. THE WORK. CONTRACTOR agrees to furnish all tools, labor, material, equipment, transportation, and supplies necessary to perform and complete in good and workmanlike manner the construction of PREVENTATIVE STREET MAINTENANCE 1996-1997, 1. VIA CALIFORNIA/CAMINO LAS RAMBLAS, 2. AVENIDA AEROPUERTO, 3. MISSION HILLS AND 4. CAPISTRANO VILLAS SPEED BUMPS, in strict conformity with the Plans, Specifications and all other contract documents, which documents are on file at the Office of the City Clerk, City Hall, 32400 Paseo Adelanto, San Juan Capistrano, California. THIRD. PAYMENT. CITY agrees to pay, and CONTRACTOR agrees to accept, the lump sum adjusted for variations of quantities, at the prices designated in bid proposal at the time and in the manner set forth in the Specifications. FOURTH. COMMENCEMENT AND COMPLETION OF THE WORK. CONTRACTOR agrees to begin and complete the work within the time specified in the Notice Inviting Bids. It is agreed that it would be impracticable and extremely difficult to fix the actual amount of damages, and loss sustained by CITY, should CONTRACTOR fail to complete the work in the specified time; therefore, 1 CON TRACTOR shall pay CITY, as liquidated damages, not in the nature of a penalty, Two Hundred Fifty Dollars ($250) per calendar day for each day delayed; provided that extensions of time with waiver of liquidated damages, may be granted as provided in the Specifications. FIFTH. PERFORMANCE BOND AND LABOR AND MATERIAL BOND. CONTRACTOR agrees to furnish bonds guaranteeing the performance of this contract and guaranteeing payment of all labor and material used under this contract, as required by the laws of the State of California, on forms approved by the CITY. The Performance Bond shall be for an amount of one hundred percent (100%) of the amount of this contract and shall be conditioned on full and complete performance of the contract, guaranteeing the work against faulty workmanship and materials for a period of one (1) year after completion and acceptance. The Labor and Material Bond shall be for an amount of one hundred percent (100%) of the amount of this contract and shall be conditioned upon full payment of all Labor and Material entering into or incidental to the work covered by this contract. CONTRACTOR agrees to furnish the bonds on the forms found within the Specifications. CONTRACTOR agrees to pay CITY such sum as the Court may judge as reasonable for the legal services of any attorney representing the CITY in any action brought to enforce or interpret the obligations of this agreement, and such sums shall be made a part of any judgment in such action against CONTRACTOR if such action is determined in favor of said CITY. The required Performance, Labor and Materials Bonds, and Bid Bond shall provide that the surety shall pay attorney's fees incurred by CITY in enforcing this agreement. SIXTH. GENERAL PREVAILING RATE OF PER DIEM WAGES. Pursuant to the Labor Code of the State of California, copies of the prevailing rate of per diem wages, as determined by the Director of the State Department of Industrial Relations, are on file in the Office of the City Clerk, 32400 Paseo Adelanto, San Juan Capistrano, California, and are hereby incorporated and made a part hereof CONTRACTOR agrees that he, or any SUB-CONTRACTOR under him, shall pay not less than the foregoing specified prevailing rates of wages to all workmen employed in the execution of the contract. 2 SEVENTH. INSURANCE. CONTRACTOR shall maintain at all times during this contract liability and property damage insurance naming the CITY and its elected and appointed officials as a named insured, which such policies shall be of an amount not less than One Million Dollars combined single limit. Insurance certificates shall be for a minimum period of one year. CONTRACTOR shall maintain in full force and effect comprehensive automobile liability coverage, including owned, hired, and non-owned vehicles in the following minimum amounts: $500,000 property damage; $500,000 injury to one person/any one occurrence/not limited to contractual period; $1,000,000 injury to more than one person/any one occurrence/not limited to contractual period. The insurance policies shall bear an endorsement or shall have an attached rider providing that in the event of expiration of proposed cancellation of such policies for any reason whatsoever, the CITY shall be notified by registered mail, return receipt requested, giving a sufficient time before the date thereof to comply with the applicable law or statute but in no event less than 30 days before expiration or cancellation is effective. CONTRACTOR shall provide to CITY the policy certificate establishing that the required level of insurance has been satisfied. CONTRACTOR shall indemnify, defend and save harmless the CITY, its officers, agents, and employees from and against any and all claims, demands, loss or liability of any kind or nature which CONTRACTOR, its officers, agents and employees may sustain or incur or which may be imposed upon them or any of them for injury to or death of persons, damage to property as a result of, or arising out of, or in any manner connected with the performance of the obligations under this contract. EIGHTH. COMPLIANCE WITH OTHER PROVISIONS OF LAW RELATIVE TO PUBLIC CONTRACTS. CITY is subject to the provisions of the Government Code and the Labor Code of the State of California. It is stipulated and agreed that all provisions of law applicable to public contracts are a part of this contract to the same extent as though set forth herein and shall be complied with by CONTRACTOR. These include, but are not limited to, the stipulation that eight (8)hours labor constitute a legal day's work and CONTRACTOR shall, as a penalty to CITY, forfeit Twenty-five Dollar ($25) for each workman employed in the execution of the Contract by 3 CONTRACTOR, or by any SUB-CONTRACTOR, for each calendar day during which such workman is required or permitted to work more than eight (8) hours in violation of the provisions of Article Three, Chapter One, Part Seven, Division 2, of the California Labor Code, except as permitted by law. IN WITNESS WHEREOF, this contract is executed by the duly authorized agent(s) of CITY, pursuant to City Council action, and by CONTRACTOR on the date set before the name of each. City of San Juan Capistrano DATED: BY: DAVID SWERDLIN, MAYOR BY: CONTRACTOR, LICENSE NO. AND CLASSIFICATION ATTEST: Cheryl Johnson, City Clerk APPROVED AS TO FORM: • Richard K. Denhalter, City Attorney 4 r • JOB Submitted in Accordance with the Legend: PROGRESS SCHEDULE LIMITS Requirements of the special provisions % Complete PRAT. NO. by: Actual Progress SPEC. NO. Contractor Date Scheduled Progress START DATE .Accepted by Date BID WORKING DAYS ITEM % OF 10 20 30 40 50 60 70 80 90 100 NO. DESCRIPTION _BID 1 1 a 1 V 1 - ' Ai 1 1 IBJ - A - r A CITY OF SAN JUAN CAPISTRANO PREVENTATIVE STREET MAINTENANCE 1996-1997 1. VIA CALIFORNIA/CAMINO LAS RAMBLAS 2. AVENIDA AEROPUERTO 3. MISSION HILLS AND 4. CAPISTRANO VILLAS SPEED BUMPS SPECIAL PROVISIONS WORK TO BE DONE The work in general to be constructed under this contract consists of removal and reconstruction of concrete, curb, gutter, spandrel and sidewalk at Avenida Aeropuerto and removal and replacing asphalt concrete cold planing, adjusting covers and frames to grade, asphalt concrete overlay at i) Via California/Camino Las Ramblas, ii) Avenida Aeropuerto and iii) Mission Hills, three separate locations within the City, as well as constructing four asphalt concrete Speed Bumps (No. 13 and 14 on Avenida De La Vista and one each on Calle San Francisco and Calle San Luis in the Capistrano Villas area of the City), furnishing and installing Speed Bump/W6 (15) advance warning signs, installation of Bump thermoplastic and painted stencil/legends and installation of twelve-inch thermoplastic and painted white stripes. SECTION 1 - STANDARD SPECIFICATIONS The contractor shall perform his work in accordance with the Standard Specifications for Public Works Construction, 1994 Edition, hereinafter referred to as the Standard Specifications. The Contractor shall maintain a copy of this book on the job-site at all times. Unless otherwise specified, errata and supplements to the Standard Specifications shall be part of these specifications. The provisions of the Standard Specifications shall be modified as indicated below: Change 1: Contract Termination "If at any time, in the opinion of the Director of Engineering and Building, Contractor fails to supply suitable equipment, an adequate working force, or material of proper quality, or shall fail in any respect to prosecute any work with the diligence and force specified and intended in and by the terms of the Contract, notice thereof in writing shall be served upon him, and should he neglect or refuse to provide means for satisfactory compliance with the contract, as directed by the Director of Engineering and Building, within the time specified in such notice, the City of San Juan Capistrano, in any such case, shall have the power to terminate all or any portion of the contract. Upon receiving notice of such termination, Contractor shall discontinue said work or such parts of it as the City of San Juan Capistrano may designate. Upon such termination, the Contractor's control shall terminate and thereupon the Members of the City Council, or its duly authorized representative, may take possession of all or any part of the Contractor's materials, tools, equipment, appliances, and plant, and buy such additional materials and supplies at the Contractor's expense as may be necessary for the proper conduct of the work and for completion thereof; or may employ other parties to carry the contract to completion, employ the necessary workmen, substitute other machinery or materials and purchase the SP-1 materials contracted for, in such manner as the City of San Juan Capistrano may deem proper; or the Members of the City Council may annul and cancel the contract and re-let the work or any part thereof. Any excess of cost arising therefrom over and above the contract price will be charged against the Contractor and his sureties, who will be liable therefore. In the event of such termination, all money due the Contractor retained under the terms of this contract shall be forfeited to the City of San Juan Capistrano; but such forfeiture will not release the Contractor or the sureties from liability or failure to fulfill the contract. Contractor and sureties will be credited with the amount of monies so forfeited toward any excess of cost over and above the contract price, arising from the suspension of the operation of the contract and the completion of the work by the City of San Juan Capistrano as provided above, and the Contractor will be credited with any surplus remaining after all just claims for such completion have been paid." Change 2: Section 7-13 - Laws to be Observed Add: "All contractors and subcontractors shall comply with all sections of the Municipal Code of the City of San Juan Capistrano, especially Section: 6-3.06(b), (c), (d) and (e) and shall secure the services of the City's exclusive solid waste hauler for their solid waste handling needs." Change 3: Section 8 - Facilities for City Personnel Delete this Section. Change 4: Section 2-9.3 - Survey Services The Contractor will perform and be responsible for the accuracy of survey adequate for construction. The Contractor shall preserve construction survey stakes and marks for the duration of their usefulness. If any construction survey stakes are lost or disturbed and need to be replaced, such replacement shall be by the Contractor at his expense. The Contractor shall dig all holes necessary for line and grade stakes. Unless Otherwise specified, stakes will be set and stationed by the Contractor for curbs, headers, sewers, storm drains, structures and rough grade and a corresponding cut or fill to finished grade (or flow line) indicated on a grade sheet. SECTION 2 - TERMS DEFINED Whenever in the said Standard Specifications the following terms are used, it is hereby provided that the following City departments or person shall be intended: AGENCY shall mean City of San Juan Capistrano whenever appropriate. BOARD shall mean the City Council of the City of San Juan Capistrano. ENGINEER shall mean City Engineer or other person(s) designated by same. SP-2 SECTION 3 - FLOW AND ACCEPTANCE OF WATER Surface or other waters may be encountered at various times during construction. The Contractor, by submitting a bid, acknowledges that he has investigated the risks arising from surface or other waters and has prepared his bid accordingly. It shall be the sole responsibility of the Contractor to protect his work from danger due to any waters encountered. Should any damage to the work due to surface or other water occur prior to acceptance of the work by the City, the Contractor shall repair such damage at his expense. SECTION 4 - WATER Water will be available from the Capistrano Valley Water District. Arrangements for temporary construction water services permit and water service may be made by contracting the Capistrano Valley Water District at (714) 493-1515 one week prior to need for service. All water facility construction shall conform to the "Standard Specifications," Capistrano Valley Water District, and "The Uniform Plumbing Code," 1982 Edition. SECTION 5 - INSURANCE AND OVERHEAD COSTS The Contractor shall receive no direct compensation for insurance and overhead (move-in costs, for example) costs. Accordingly, these costs should be prorated to the appropriate bid items. SECTION 6 -PROTECTION OF EXISTING UTILITIES (UNDERGROUND SERVICE ALERT) The Engineer has endeavored to show all existing utilities. The Contractor must, however, take all due precautionary measures to protect all of the existing utilities. The Contractor shall have all utilities located by contacting the responsible agency at lease 48 hours prior to commencing any construction work. The Contractor's attention is directed to the utility notification service provided by UNDERGROUND SERVICE ALERT (USA). USA member utilities will provide the Contractor with the locations of their substructures in the construction area when the Contractor gives at least 48 hours notice to the USA by calling 1-800-422-4133. Other utility phone numbers are noted on Sheet 1 of the plans. Full compensation for conforming to the requirements of this section shall be considered as included in the contract bid prices paid for the various items of work, and no additional compensation will be allowed therefore. SECTION 7 - PROTECTION OF PRIVATE PROPERTY The Contractor must remain within the construction zone to the best of his ability. The Contractor must protect all existing private property. SP-3 SECTION 8 - CONSTRUCTION ZONE Contractor shall protect property and facilities adjacent to the construction zone, and all property and facilities within the construction zone which are shown on the plans to be protected. After completion of project, the construction zone shall be clean and in a presentable condition. All public- or privately-owned improvements and facilities shall be restored to their original condition and location. In the event improvements of facilities are damaged, they shall be replaced with new materials equal to the original. Nothing herein shall be construed to entitle the Contractor to the exclusive use of any public street, way or parking area during performance of the contract work, and Contractor shall conduct his operations so as not to interfere with the authorized work of utility companies or other agencies in such streets, way or parking areas. The Contractor shall be responsible for investigating conditions of available public and private roads and of clearances, restrictions and other limitations affecting transportation and ingress and egress to the site of the work. SECTION 9 -PRE-CONSTRUCTION COORDINATION MEETING Prior to the commence of construction, arrangements will be made for a meeting between the Contractor, the Engineer, and involved utility representatives. The purpose of this meeting is to coordinate the activities of the Contractor within the limits of this contract, review scheduling, discuss construction methods and clarify inspection procedures. The Contractor will be required to submit a complete schedule in the attached form showing the number of working days required to complete each phase of the project. This schedule shall be approved by the City Engineer prior to the start of construction. SECTION 10 - NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM 1. Construction sites shall be maintained in such a condition that an anticipated storm does not carry wastes or pollutants off the site. Discharges of material other than Storm Water are allowed only when necessary for performance and completion of construction practices and where they do not: cause or contribute to a violation of any water quality standard; cause or threaten to cause pollution, contamination, or nuisance; or contain a hazardous substance in a quantity reportable under Federal Regulations 40 CFR Parts 117 and 302. Potential pollutants include but are not limited to: solid or liquid chemical spills; wastes from paints, stains, sealants, glues, limes, pesticides, herbicides, wood preservatives and solvents; asbestos fibers, paint flakes or stucco fragments, fuels, oils, lubricants, and hydraulic, radiator or batter fluids;fertilizers, vehicle/equipment wash water and concrete wash water; concrete detergent or floatable wastes;wastes from any engine/equipment steam cleaning or chemical degreasing; and superchlorinated potable water line flushings. SP-4 During construction, disposal of such materials should occur in a specified and controlled temporary area on-site, physically separated from potential storm water run-off, with ultimate disposal in accordance with local, state and federal requirements. 2. Dewatering of contaminated groundwater, or discharging, contaminated soils via surface erosion is prohibited. Dewatering of non-contaminated groundwater requires a National Pollutant Discharge Elimination System Permit from the respective State Regional Water Quality Control Board. SECTION 11 - PRESERVATION OF SURVEY MONUMENT Effective January 1, 1995, AB 1414 "Preservation of Survey Monumentation Compliance with Section 8771 of the Business and Professional Code" provides for the preservation of Survey Monuments in construction projects. This legislation mandates that prior to construction monuments are to be referenced in the field and "Corner Records" prepared for filing in the Office of the County Surveyor. It also mandates that after construction, monuments are to be reset and "Corner Records" filed with the County Surveyor. This must be done prior to certifying completion of a project. The City requires monumentation preservation on all capital improvement projects where monumentation points are present and the contractor shall be responsible for submitting proper documentation to the Office of the County Surveyor in compliance with AB 1414. Project finalization, Notice of Completion and/or release of retention shall be contingent upon obtaining documentation from the contractor's project surveyor or engineer that monuments have been set or restored and Corner Records filed with, and to, the satisfaction of the County Surveyor. All costs necessary to comply with this legislation shall be allocated to the appropriate bid item. SECTION 12 - MONUMENTATION IDENTIFICATION In accordance with the Professional Land Surveyor Act, Section 8772, any monument set by a licensed land surveyor or registered civil engineer to mark or reference a point on a property or land line shall be permanently and visibly marked or tagged with the certificate number of the surveyor or civil engineer setting it, each number to be preceded by the letters "LS." or "R.C.E.," respectively, as the case may be or, if the monument is set by a public agency, it shall be marked with the name of the agency and the political subdivision it serves. Nothing in this section shall prevent the inclusion of other information on the tag which will assist in the tracing or location of the survey records which relate to the tagged monument. Centerline ties filed with the Orange County Surveyor will be checked for compliance with this law. SP-5 SECTION 13 - ORDER OF WORK By separate contract, the City may award a slurry seal contract for various streets within the City which may include Calle Aviador and, Calle Perfecto, which are accessed via Avenida Aeropuerto and Calle San Francisco and San Luis. The slurry project would follow this project. The City also wishes to minimize the length of time that construction necessarily causes inconvenience to City residents and businesses. In order to accommodate the foregoing considerations, the following order of work shall be observed: 1. All concrete work at the intersections of Avenida Aeropuerto/Calle Aviador and Calle Perfecto. 2. Cold planing at Via California/Camino Las Ramblas; Avenida Aeropuerto/Calle Aviador and Calle Perfecto and Mission Hills. This work may be concurrent with the concrete work. 3. A.C. R&R at Via California/Camino Las Ramblas and Avenida Aeropuerto/Calle Aviador and Calle Perfecto; structural section removal and deeplift AC at Mission Hills. This work may be concurrent with the concrete work. 4. Capistrano Villas speed bumps. This work may be concurrent with the concrete work. 5. All other work, Avenida Aeropuerto/Calle Aviador and Calle Perfecto. 6. All other work, Via California/Camino Las Ramblas or Mission Hills. SECTION 14 - NOTIFICATION The Contractor shall receive no direct compensation for notifying the public of the construction work. Accordingly, these costs should be prorated to the appropriate bid items. Mission Hills and Avenida Aeropuerto Prior to two weeks before beginning any work, the Contractor shall notify all residents, businesses and agencies impacted by the work by an approved written notice detailing streets and limits of work to be done, parking and access restrictions, and the day, date and hours of work, which shall be between 8:00 a.m. and 4:00 p.m. Prior to 72 hours before beginning any work, the Contractor shall again notify all residents, businesses and agencies by an approved written notice, detailing streets and limits of work to be done, parking and access restrictions and the day, date and hours of work,which shall be between 8:00 a.m. and 4:00 p.m. The Contractor shall also post all streets 36 hours in advance of work with temporary "No Parking- Tow Away" signs at 100 foot intervals. These signs shall also state the day and week, hours of no parking, and Contractor's name. SP-6 CITY OF SAN JUAN CAPISTRANO PREVENTATIVE STREET MAINTENANCE 1996-1997 1. VIA CALIFORNIA/CAMINO LAS RAMBLAS 2. AVENIDA AEROPUERTO 3. MISSION HILLS AND 4. CAPISTRANO VILLAS SPEED BUMPS DETAIL SPECIFICATIONS AND METHOD OF PAYMENT BID ITEM 1 - PROJECT SURVEY The work for this item shall consist of project survey by a licensed engineer or surveyor and certification of construction to the required line and grade. PAYMENT The lump sum price for this item shall include all labor, materials, tools and equipment necessary to carry out the work as specified and no additional compensation shall be made therefor. BID ITEM 2 - REESTABLISH CENTERLINE TIES AND MONUMENTS The work for this item shall consist of the reestablishing of center control ties and monuments by a Registered Civil Engineer or licensed surveyor removed, disturbed or covered during the course of construction. PAYMENT The lump sum price for this item shall include all labor, materials, tools and equipment necessary to carry out the work as specified and no additional compensation shall be made therefor. BID ITEM 3 - CITY NOTIFICATION SIGNS One week prior to construction, the contractor shall provide and erect City notification signs, at locations shown on the plans or marked in the field and agreed by the engineer. The signs shall be removed within one week of completion of construction. The City will provide a black and white xerox copy of the City logo from which the contractor shall make a stencil(s) for making the signs. The stencil(s) shall become the property of the City. PAYMENT The price per each for this bid item shall include all labor, materials, tools and equipment necessary to carry out the work as specified and no additional compensation shall be made therefor. BID ITEM 4 -REMOVE EXISTING P.C.C. CURB. GUTTER. SPANDREL, VALLEY GUTTER AND SIDEWALK The work for this bid item shall include removing existing P.C.C. curb, gutter, spandrel, valley gutter and sidewalk as shown on the plans and disposal. The costs for saw cutting shall be included in this item. DS-1 PAYMENT The unit price per square foot for this bid item shall include all labor, materials, tools and equipment and no additional compensation shall be made therefor. BID ITEM 5 - P.C.C. CURB TYPE A The work for this bid item shall include constructing P.C.C. curb Type A per City of San Juan Capistrano Standard Plan No. 300. PAYMENT The unit price per lineal foot for this bid item shall include all labor, materials, tools and equipment and no additional compensation shall be made therefor. BID ITEM 6 - P.C.C. SPANDREL AND CURB The work for this bid item shall include constructing P.C.C. spandrel and curb per OCEMA Standard Plan No. 207 and details on the project plans. PAYMENT The unit price per square foot for this bid item shall include all labor, materials, tools and equipment and no additional compensation shall be made therefor. BID ITEM 7 - P.C.C. HANDICAP ACCESS RAMP The work for this bid item shall include constructing P.C.C. handicap access ramp and retaining curb per APWA Standard Plan No. 111 - 1 and details on the project plans. PAYMENT The unit price per square foot for this bid item shall include all labor, materials, tools and equipment and no additional compensation shall be made therefor. BID ITEM 8 - P.C.C. VALLEY GUTTER The work for this bid item shall include constructing P.C.C. valley gutter per details on the project plans. PAYMENT The unit price per square foot for this bid item shall include all labor, materials, tools and equipment and no additional compensation shall be made therefor. DS-2 BID ITEM 9 - P.C.C. 4" THICK SIDEWALK The work for this item shall include constructing 4" thick P.C.C. sidewalk per City Standard Plan No. 330 and details on the project plans. PAYMENT The unit price per square foot for this bid item shall include all labor, materials, tools and equipment and no additional compensation shall be made therefor. BID ITEM 10 - COLD PLANE EXISTING ASPHALT CONCRETE 0.12' DEEP TO ZERO The work for this item will consist of cold planing the pavement 0.12' deep to zero where shown on the plans or marked in the field and as directed by the Engineer. The workmanship, materials and equipment necessary to complete the work as required shall conform to Section 302-5.2 of the Standard Specifications. PAYMENT Payment for cold planing 0.12' deep to zero shall be at the contract unit price bid per square foot, which shall be full compensation for furnishing all labor, materials, equipment, cleaning and incidentals necessary to cold plane the areas shown on the plan and as directed by the Engineer and no additional payment shall be made therefor. BID ITEM 11 - REMOVE AND REPLACE ASPHALT CONCRETE The work for this bid item shall include the removing of existing asphalt, furnishing and placing of III C2 AR 4000 asphalt concrete marked in the field prior to street slurry. The workmanship and materials shall conform to Section 302-5 and 400-4 of the Standard Specifications and Orange County Standard No. 1805. PAYMENT The unit price bid per ton for asphalt concrete shall include all labor, materials, tools and equipment necessary to construct the work and no additional compensation shall be made therefor. BID ITEM 12 - REMOVE EXISTING STRUCTURAL SECTION The work for this item shall consist of removing and disposing of the existing asphalt concrete section as shown on the plans, or marked in the field and as directed by the Engineer. Sawcutting is not required where the area is to have an asphalt concrete overlay. The workmanship and materials necessary to complete the work as required shall conform to Section 300-2 of the Standard Specifications. DS-3 PAYMENT The unit price per square foot for this item shall include all labor, materials, tools, equipment and incidentals to remove and dispose of existing asphalt concrete as shown on the plans or marked in the field and no additional compensation shall be made therefor. BID ITEM 13 - PAVEMENT REINFORCING FABRIC Pavement reinforcement fabric shall conform to Section 213-1 of the Standard Specifications and these Special Provisions. Pavement reinforcing fabric shall be placed on existing pavement to be surfaced or between layers of asphalt concrete when such work is shown on the plans, or specified in the Special Provisions or ordered by the Engineer. Before placing the pavement reinforcing fabric, a binder of paving asphalt shall be applied to the surface to receive the pavement reinforcing fabric at an approximate rate of 0.25 gallon per square yard of surface covered. The exact rate will be determined by the Engineer. The binder shall be applied to a width equal to the width of the fabric mat plus 3 inches on each side. Before applying binder, large cracks, spills and chuckholes in existing pavement shall be repaired as directed by the Engineer, and such repair work will be paid for as extra work as provided in Section 4-1.03D. The fabric shall be stretched, aligned and placed with no wrinkles that lap. The test for lapping shall be made by gathering together the fabric or more, the fabric shall be cut to remove the wrinkle, then lapped in the direction of paving. Lap in excess of 2 inches shall be removed. Pavement reinforcing fabric shall not be placed in areas of conform tapers where the thickness of overlaying asphalt concrete is 0.08 foot or less. If manual laydown methods are used, the fabric shall be unrolled, stretched, aligned and placed in increments of approximately 30 feet. Adjacent borders of the fabric shall be lapped 2 to 4 inches. The preceding roll shall lap 2 to 4 inches over the following roll in the direction of paving at ends of roll or at any break. At fabric overlays, both the tack coat and the fabric shall overlap the previously placed fabric by the same amount. Seating of the fabric with rolling equipment after placing will be permitted. Turning of the paving machine and other vehicles shall be gradual and kept to a minimum to avoid damage. A small quantity of asphalt concrete, to be determined by the Engineer, may be spread over the fabric immediately in advance of placing asphalt concrete surfacing in order to prevent fabric from being picked up by construction equipment. DS-4 Public traffic shall not be allowed on the bare reinforcing fabric, except that public cross traffic shall be allowed to cross the fabric under traffic control, after the Contractor has placed a small quantity of asphalt concrete over the fabric. Care shall be taken to avoid tracking binder material onto the pavement reinforcing fabric or distorting the fabric during seating of the fabric with rolling equipment. If necessary, exposed binder material shall be covered lightly with sand. Engineering fabrics shall be placed in accordance with the various sections of these specifications requiring the use of an engineering fabric or as specified in the Special Provisions. A Certificate of Compliance for each kind of engineering fabric used on the project shall be furnished to the Engineer. Engineering fabrics shall be furnished to the Engineer in protective covers capable of protecting the fabric from ultraviolet rays, abrasion and water. Pavement reinforcing fabric shall be manufactured from polyester, polypropylene, or polopropylene- nylon material. The fabric shall be non-woven and shall conform to the following: Weight, 3.0 to 8.0 ounces per square yard ASTM Designation: D 1910 Grab tensile strength (1-inch grip), 90 pounds min. ASTM Designation: D 1117 Elongation at break, 40 percent, min. ASTM Designation: D 1117 Fabric thickness, 12 to 100 mils ASTM Designation: D 461. PAYMENT Pavement reinforcing fabric will be measured by the square foot by dimensional limits shown on the plans or staked in the field. There shall be no allowance for overlaps in the measurement. Unless otherwise specified, payment shall be made by unit price per square yard, which shall include full compensation for testing, furnishing, delivering and placing pavement reinforcing fabric complete in place. The cost shall include all labor, equipment and tools required to complete the work and no additional compensation shall be made therefor. BID ITEM 14 - PROVIDE AND PLACE ASPHALT CONCRETE DEEPLIFT SECTION The work for this item shall include the furnishing and placing of asphalt concrete as indicated on the plans and in the specifications. The workmanship and materials necessary to complete the work required shall conform to Section 302-5 of the Standard Specifications and Orange County Standard Plan 1805. DS-5 PAYMENT The unit price per ton of this item shall include all labor, materials, tools and equipment necessary to place the asphalt concrete deeplift section, and no additional compensation shall be made therefor. BID ITEM 15, 22 AND 26 - ASPHALT CONCRETE OVERLAY The work for this bid item shall include the furnishing and placing of III C2 AR4000 asphalt concrete as indicated on the plans and in the specifications. The workmanship and materials necessary to complete the work as required shall conform to Section 302-5 of the Standard Specifications and Orange County Standard Plan 1805. PAYMENT The unit price bid per ton for asphalt concrete overlay shall include all labor, material, tools and equipment necessary to construct the asphalt concrete paving and no additional compensation shall be made therefor. BID ITEM 16&19 - ADJUSTMENT OF CITY MANHOLE FRAMES AND COVER SETS TO GRADE The work for this bid item shall include setting all existing sewer and storm drain, manhole frames and cover sets to grade within the area to be surfaced. It shall be the responsibility of the Contractor to locate all manholes prior to doing any work and have them dimensioned from two known points. PAYMENT The unit price bid per each for adjusting manhole frames and cover sets to grade shall include all labor, materials, tools and equipment, as well as traffic control and no additional compensation will be made therefor. BID ITEM 17, 20 AND 24 - ADJUSTMENT OF CVWD VALVE BOXES TO GRADE The work for this bid item shall include setting all existing CVWD water, valve boxes to grade within the area to be surfaced, per Capistrano Valley Water District Standard Plan W13. It shall be the responsibility of the Contractor to locate all valve boxes prior to doing any work and have them dimensioned from two known points. The District should be notified at least forty-eight hours before any work begins (714/493-1515). At the sole option of the District, this work may be deleted from the contract. Bid prices should reflect this eventuality and no adjustment to other bid prices will be made. PAYMENT The unit price bid per each for adjusting CVWD valve boxes to grade shall include all labor, materials, tools and equipment, as well as traffic control and no additional compensation will be made therefor. DS-6 BID ITEM 18, 23 AND 27 - PROJECT STRIPING Within 24 hours following the street construction, the Contractor shall provide the traffic striping shown on the plans complete with reflective pavement markings in accordance with the Standard Specifications for Public Works Construction and the requirements stated on the plans. The street shall not be left unstriped over any weekend period. PAYMENT The lump sum bid for pavement marking shall include all work specified and shall include labor, materials, tools and equipment and no additional compensation shall be made therefor. BID ITEM 21, 25, 28 AND 29 - TRAFFIC CONTROL The Contractor shall have traffic control plans prepared by a Registered Traffic Engineer and shall provide and maintain traffic control devices during the construction of the project and until striped. In addition to those provisions of Section 7-10 of the Standard Specifications for Public Works Construction(Green Book) dealing with Public Convenience and Safety, the following requirements are included as contract specifications: All warning and regulatory signs, lights and devices used for the protection of the public on the project shall conform to those described in the current issue of the State of California Manual of Warning Signs, Lights and Devices for the use in Performing Work Upon Highways as required by Section 21400 of the California Vehicle Code. Guidelines for the use and placement of these traffic control devices shall conform to the applicable layouts described in the State Manual and in the latest edition of the Work Area Traffic Control Handbook (WATCH) published by Building News, Inc. All traffic control patterns shall be subject to approval of the Engineer. One-way traffic with the use of flagmen shall be permitted during work hours. All ingress and egress shall be maintained as one-way at a minimum with the use of flagmen during work hours. Outside of work hours traffic shall be returned to two-way. Capistrano Villas Speed Bumps The work for this item shall consist of providing traffic control plans to the approval of the City Engineer and implementation to the requirements of the plans, specifications and WATCH Manual. 1. Street closures will be permitted for up to two hours at a single location. 2. Street closures must be planned to ensure that access to all residential and business properties is possible with minimum inconvenience. 3. The contractor shall provide written notification to impacted residents 48 hours in advance of any closure. DS-7 4. The contractor shall provide signs (4' x 4') at the two adjacent intersections (three adjacent intersections for a closure at an intersection) 48 hours in advance of any closure. The signs shall indicate the date and time of the closure. 5. The contractor shall conduct his work in such a manner that the closed road can readily be opened for emergency vehicles if necessary. 6. Street closures of less than 5 minutes need not be notified, but shall not be more frequent than one per morning and one per afternoon on any one day. PAYMENT The lump sum price bid for traffic control shall include all labor, materials, tools and equipment necessary to complete the work as specified, and no additional payment shall be made therefor. BID ITEM 30 - ASPHALT BUMP The installation of asphalt Bumps No. 13 and 14 on Avenida De La Vista and one each on Calle San Francisco and Calle San Luis will be as shown on location map with precise locations as specified by the City Engineer and in conformance with attached standard plan, and Bumps will be twelve feet in width and three inches in height at the mid point. A+/- 1/4 inch tolerance will be maintained. The bump will be installed across the entire roadway to the lip of the gutter with the final three foot area tapered flush with the pavement or gutter. Asphalt will be hand laid in two lifts and hot rolled over a tack coat. Pavement surface will be clean and raised pavement markers and other non-asphaltic material will be removed. Painted centerline stripes may remain. The shape of the asphalt bump will be ensured by use of two templates, one of which will control the twelve foot cross section and the other the taper to the lip of the gutter or edge of pavement. Asphalt concrete shall conform to Section 302-5 of the Standard Specifications and Orange County Standard Plan 1805. PAYMENT The unit price bid for asphalt concrete speed bump, in place, shall include all labor, materials, tools and equipment necessary to complete the work as specified, and no additional payment shall be made therefor. BID ITEM 31 - SPEED BUMP SIGN The installation of SPEED BUMP advance warning signs shall be in accordance with the attached location map with precise locations as specified by the City Engineer. The speed bump sign will be a 30-inch W37 (modified) advance warning sign. As shown on the attached plan, letters will be 5-inch series E. The signs will be mounted on a 1 1/2-inch unistrut post with 1 3/4-inch base erected in accordance with Orange County EMA Standard Plan No. 1417. DS-8 PAYMENT The unit price bid for the advance warning sign unit will include the specified SPEED BUMP sign, the unistrut post and all labor, materials, tools and equipment necessary to complete the work as specified, and no additional payment shall be made therefor. BID ITEM 32 - INSTALL THERMOPLASTIC LEGENDS The installation of 'BUMP" thermoplastic stencils/legends will be in conformance with attached Standard Plan and location map with precise locations as specified by the City Engineer for Avenida De La Vista. The BUMP legend will consist of eight foot high letters consisting of thermoplastic white pavement stencil. PAYMENT The unit price bid for the BUMP legend will include all labor, materials, tools and equipment necessary to complete the work as specified, and no additional payment shall be made therefor. BID ITEM 33 - INSTALL TWELVE-INCH WIDE THERMOPLASTIC WHITE STRIPES The installation of twelve-inch wide thermoplastic white stripes will be in conformance with the attached Standard Plan and location map with precise locations as specified by the City Engineer. The twelve-inch wide longitudinal ladder markings will be placed on each BUMP at six feet on center. PAYMENT The unit price bid per lineal foot for the thermoplastic white stripes shall include all labor, materials, tools and equipment necessary to complete the work as specified, and no additional payment shall be made therefor. BID ITEM 34 - STRIPE LEGENDS Striping of"BUMP" stencils/legends will be in conformance with attached Standard Plan and location map with precise locations as specified by the City Engineer for Calle San Francisco and Calle San Luis. The BUMP legend will consist of eight-foot high letters, two coats of paint, 7-days apart. PAYMENT The unit price bid for striping the BUMP legend will include all labor, materials, tools and equipment necessary to complete the work as specified and no additional payment shall be made therefor. DS-9 BID ITEM 35 - STRIPE TWELVE-INCH WIDE WHITE STRIPES Striping of twelve-inch wide lines will be in conformance with the attached Standard Plan and location map with precise locations as specified by the City Engineer. The twelve-inch wide longitudinal ladder markings will be placed on each BUMP at six-feet on center, two coats, 7-days apart. PAYMENT The unit price bid per lineal foot for striping the white stripes shall include all labor, materials, tools and equipment necessary to complete the work as specified and no additional payment shall be made therefor. spcpkgl a.bp DS-10 CITY NOTIFICATION SIGN ,,e4%. Your City Dollars 184N at Work Rehabilitation of Via California / Camino Las Ramblas Proposed Completion - (date) 1997 1. Black letters on beige background 2. 5'-0" x 3'-0" 3. Single post mounted Al CITY NOTIFICATION SIGN Your City Dollars qV4 at Work Avenida Aeropuerto Rehabilitation Proposed Completion - (date) 1997 1. Black letters on beige background 2. 5'-0" x 3'-0" 3. Single post mounted A2 CITY NOTIFICATION SIGN a, Your City Dollars '� at Work Mission Hills Rehabilitation Don Juan Avenue, Guadalupe Street Ysidora Street and Andres Pico Road Proposed Completion - (date) 1997 1. Black letters on beige background 2. 5'-0" x 3'-0" 3. Single post mounted A3 PAVEMENT VaDTH DIMENSION PER PLAN 1.5' 6' R= 1/2" 1/4" : 1' R= 1/2" PAVEMENT WIDTH '-- DIMENSION PER PLAN 1.5" 6" C.F. SEE . . 3" NOTE3 �. R= +.2" 1: R= 1/2„ FINISHED ,i ► `" cn #4 LONGI- SURFACE FLOW ► TUDINAL BA7► zp� x zFINISHED wSURFACE F1 �' II j #4 x 9" LG.DOWEL • - AT4' -0" O.C. I TYPE "A" TYPE "B" NOTES: 1. 1/4" EXPANSION JOINTS SHALL BE PLACED AT 40' INTERVALS AND AT ALL MEDIAN NOSES. 1/8" x 2" WEAKENED PLANE OR PLASTIC CONTROL JOINTS SHALL BE PLACED AT 10' INTERVALS. FOR DETAILS,SEE STD.PLAN NO. 320. 2. DOWELS AND REINFORCING BAR FOR TYPE"B"CURB MAY BE DF.T.FTED WHEN EXTRUDED CONCRETE IS BONDED TO PAVEMENT SURFACE WITH APPROVED ADHESIVE,EXCEPTING THE ISLAND NOSES WHICH SHALL BE DOWELED. 3. WHERE MEDIANS ARE LANDSCAPED, CURB SHALL EXTEND 6" BELOW SUB -GRADE AND BE BACKED WITH A 20 MIL PLASTIC MOISTURE BARRIER THAT EXTENDS 6" BELOW CURB C.F.AND H SHALL BE PER PLAN. 4. THESE CURBS ARE NON-WATER CARRYING. TRANSITION TO TYPE "C" CURB AND GUTTER PER PLAN. 5. CONCRETE SHALL BE 520-C-2500 PER CURRENT EDITION OF STANDARD jaa„ SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SEC. 201-1.1.2 (se \-.1.- ) 177G lb ,, City of San Juan Capistrano ��. REVISIONS STANDARD TYPE "A" AND "B" CURBS PLAN NO. 300 2/,� _, ,_,. j�!� ,‘,/e.� 7/20/95 APPROVED BY CITY ENGINEER,WILLIAM M.HUBER R.C.E.31785 DATE SHT 1 OF 1 /� A4 il.-� Variab e Begin gutter transition 1 15' 15' t Conc. 8" thick + Control joint, S../'-.7 D 1/4 premolded,filler, A/ A 3 >\. A� min. depth 2 \ - Q _ R/W 3 C /' C ! . \- 3 R/W \'i I 1 + \ R_ . __ i Maintain straight_flow line 4' -.- \ 4 N. 15.� N • 15 \\ 4-#4-4'0"6 24" O.C. Control joints 2" deep Control joint (typical) A— PLAN Normal 8" guutterter . width AMI p'-6" min. "'' VOLUME CONCRETE SECTION C-C Cross Gutter=0.198 C.Y./L.F. ---Variable gutter Normal Spandrel (Excluding 2' gutter) 3/4 8 Var. width 25 Radius=6.23 C.Y. 35 Radius=10.12 C.Y. .. •• • 8" 6" min. SECTION B-B NOTES: 1. Smooth trowel 8" wide flowline in X-Gutter and Aprons where grades are less than 0.5%. 2. See Std. Plan 213 for control joint details. 3. When full depth A.0 is used, A.B. as shown in Section A-A shall not be placed. i 15' - 15' 4' - 4' 3/e, Normal Structural Level 8 l line Structural section , , , , _ ` _ _ : .r— S PK $' ALTERNATE'A' — S' 2" FOR SIDEWALK 1 CURB& ADJACENT TO CURB GUTTER _1/4,,_ PER FT. 'fir v gr.`4" P.C.C.SIDEWALK I • • 3'PUBLIC UTILITY EASEMENT i COLD JOINT REQUIRED FOR 5'PARKWAY CLASS 2 AGGREGATE BASE 6' OR CMB (3/4" MAX.AGGREGATE) SECTION A- A A 3' UTILITY EASEMENT REQUIRED FOR 5' PARKWAY - - - - - - -- 4' P.C.C.SIDEWALKr�. — : NI 1/4" EXPANSION JOINT1/8„x 2„WEAKENED a 1/4" EXPANSION JOINT JOINT'OR PLASTIC CONTROLED pPLANE INT OR PLASTIC OCONTROL CURB&GUTTER 10' 1. 10' I 10' 1` 10' 10' _ 10' 40' A..011--1 PLAN Jwsn SEE SHEET 2 FOR DIMENSIONS AND NOTES 4,0 �, • 77G� Ilcl • City of San Juan Capistrano REVISIONS STANDARD STANDARD SIDEWALK DETAILS PLAN NO. 330 (/, do;„,, ,/��� ,./e.?4e4 7/20/95 \\ APPROVED BY CITY ENGINEER,WILLIAM M.HUBER R.C.E.31785 DATE SHT 1 OF 2 J A6 ":5 DIMENSIONS 1 PK=PARKWAY WIDTH S =SIDEWALK WIDTH 50' R/W--PK=5' S =4' -4" 60' R/W--PK= 10' S =4' -4" 84' R/W-- PK=7' S =4' -4" RESIDENTIAL,6' -4" COMMERCIAL&INDUSTRIAL 106' R/W--PK=7' S =4' -4" RESIDENTIAL,6' -4" COMMERCIAL&INDUSTRIAL 120' R/W--PK=8' S =4' -4" RESIDENTIAL,7' -4" COMMERCIAL&INDUSTRIAL S' =4' -0" NOTES: 1. 1/4" EXPANSION JOINTS SHALL BE PLACED AT 40' INTERVALS AND AT THE END OF ALL CURB RETURNS. 2. 1/8" x 2" PLASTIC CONTROL OR WEAKENED PLANE JOINTS SHALL BE PLACED AT 10' INTERVALS. 3. EXPANSION JOINTS AND WEAKENED PLANE JOINTS FOR SIDEWALK SHALL BE PLACED TO COINCIDE WITH JOINTS OF THE CURB. 4. FOR EXPANSION JOINT AND WEAKENED PLANE JOINT DETAILS,SEE STD.PLAN NO.320. 5. SIDEWALK THICKNESS IS 4" EXCEPT AT DRIVEWAYS WHERE IT SHALL BE 6"THICK 6. CONCRETE SHALL BE 520-C-2500 PER CURRENT EDITION OF STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SEC.201-1.1.2. 7. 10' INTERVAL BETWEEN TRANSVERSE JOINTS MAY BE VARIED IF JOINING EXISTING IMPROVEMENTS AND APPROVED BY CITY ENGINEER. 8. WIDEN SIDEWALK TO PROVIDE MIN.CLEAR DISTANCE PER STD.PLAN NO.340. 9. ALL EXPOSED CORNERS ON SIDEWALK SHALL BE ROUNDED OFF WITH 1/2"RADIUS, EXCEPT AS OTHERWISE SHOWN ON STD.PLAN NO.300 OR 301. Jew • ilk • via�� • City of San Juan Capistrano REVISIONS STANDARD STANDARD SIDEWALK DETAILS PLAN NO. 330 G-�.a,�� /""' ,��A4 7/20/95 APPROVED BY CITY ENGINEER,WILLIAM M.HUBER R.C.E.31785 DATE SHT 2 OF 2 J A7 NC,N-POTABLE WATER DOMESTIC WATER l BROOKS 4TT BROOKS 3RT / H&C #1 H&C 10" 41111111L .•••••••• • •••••••••• N.P.W. •• • IIII •. i• ••. • ••• ••••• • • ••••••••• •; •••4•x•0.•,.• 24" DIA. FOR 3RT 6" 26" DIA. FOR 4TT TOP N A.C. PAVEMENT / FINISHED GROUND L I 1 _I" SURFACE 2"R. � U L ' > r: CLASS "B" \`// co 1-.. a) '\\` / CONCRETE COLLAR oM (TYP.) t.x \\\y/ ' i VALVE BOX \\\// Lu CONC. Z COLLAR _J TRACER WIRE. 14 GA BARE �r o FOR COPPER WIRE, TAPED TO PIPE .1 '-'4 \ PAVEMENT EVERY 10' AND FIXED TO TOP F-- Z / CONDITION / OF VALVE CAN. o Z Cl) 1-1-:CO w o '-- o ao. ..r- 8" CL100 ACP OR 8" PVC SDR35 SEWER Z 0 Q PIPE FOR VALVE WELL MATERIAL •o Pi BACKFILL AROUND VALVE (" 117 2 WITH SAND PER SECTION 15100 is j L 1 WATER MAIN /%\\` 11/././....... 7 a t____4AL-_,., CLASS "B" - 4 . #4 STEEL REINFORCING BARS CONCRETE / COATED WITH 3M EC-244, KOPPERS ANCHOR ` • Y CO. BITUMASTIC NO. 505 OR BLOCK APPROVED EQUAL ONLY TO EXPOSED PART OF REINFORCING A it BARS VALVE & VALVE 3OX I \ STALLATI O \ REVISIONS CAPISTRANO VALLEY STD. NO. NO. DATE APPROVED 1 03/11/92 Rwc 0if/bN WATERDISTRICT 2 08/11/92 RWC — 1 3 c„,„ ...... ØOTENLa D E SHEET 10F 2 F:\CVVVOSPD\W-13A A8 TYPICAL BUTTERFLY VALVE OPERATOR POSITION STREET q. -N 1 VALVE (TYP.) . - - 4. . : ----------/ PIPE (TYP.) 6 . . .. OPERATOR (TYP.) — SEE NOTE 4 4W CONSTRUCTION NOTES: VALVE 1. PROVIDE VALVE STEM EXTENSION IF DEPTH WELL TO VALVE NUT EXCEEDS 3 FEET. SEE DWG. W-9. JIL 2. IN NEW TRACT DEVELOPMENTS, PRIOR TO -LI PAVING EXTEND VALVE PIPE WELL 2' ABOVE GROUND ON "KEY VALVES" FOR EMERGENCY SHUTOFFS. VALVE 4'- 1.-1 3. BUTTERFLY VALVE OPERATORS SHALL BE , \ LOCATED ON THE LEFT-HAND SIDE OF THE / \ VALVE (AT THE TEE OR CROSS) AND i \ LOOKING THROUGH THE VALVE TOWARD THE ---- - w-lis IIIMIIIIMMINIIIMINIIMIIIIi PIPE END. 0"1"11 4. WHERE CONCRETE CROSS GUTTERS WILL EXIST AT STREET INTERSECTIONS WHICH WILL / INTERFERE WITH VALVE BOXES, THE PIPELINE SHALL BE MOVED TO A POSITION OF 7 FEET OFF THE CURB FACE TO CLEAR CROSS GUTTER. a 5. VALVES TO BE LOCATED ADJACENT TO d . a • FITTINGS WHEREVER POSSIBLE USING .1 e FLG X RT VALVES. 6. VALVES BOLTED TO FITTINGS WILL NOT < REQUIRE ANCHOR BLOCKS. A 1 a VALVE SIZE DIMENSION A B 6" OR SMALLER 12" 12' C 8" 13" 14" 10" 14" 15" 12" 14" 18" DIMENSION "Of' = TRENCH WIDTH PLUS 2X PIPE DIAMETER VALVE AND VALVE BOX ASTALLATIO \ REVISIONS STD. NO. NO. DATE APPROVED 4CAPISTRANO VALLEY 1 01/24/90 RwC elk ..w. WATER DISTRICT 'SY 13 2 08/11/92 RwC _ - CI, .111. 01 APP-evE 9 A!Or — 111. RICT-ENGINEER - - SHEET 2 OF 2 F\CVwDSTD\W-138 A9 Center of speed bump to be located at the following locations: AVENIDA DE LA VISTA 1 Through 12 constructed previously 13) 16 feet north of the alley located just south of 26532 Calle Santa Barbara 14) 37 feet south of the alley that is south of Calle La Purisma. CALLE SAN FRANCISCO 15) 135 feet east of the alley located just west of 26491 Calle San Francisco. CALLE SAN LUIS 16) 165 feet east of the alley located just west of 26972 Calle San Luis. spcpkgl a.bp Al 0 Q 11111111110111111111.c.,„... .. ,..... .... 00 ISM 'r• if HT1.....„-----61 _____, ,, ra c ••"0 ..anoW .rr .:f.T r. ',tom _ Al _ 1 18 ....JR 3. i AA taa : a.., iiii a VI- it C� .,'�- � "e3 a!V �'rt C=' i: 1-1 i r+ ���tt's' :;; r wit '�,i : ' ail �:;�1►� ;� �I � �`�H(���;;� ti w ...• :v • �J� J 7 • _ ") �f'-� �.3 'ate • v? .........:.... •n.. lira ,gi v1u.As n vr. . :�J c -' —.�--- f�...-'" mac„ CAPtS�ANO ,a, .... , , 6 0 v,.11.1%o isoinas Mrr,r, ! wa.n .r+ --""Il (a.,Ai '.a� •��i{ � I ,.►� ' „........ --:1 is...-------.::-.-7,,is i---m 'ofgl2 . ;---',.. ...., : . t JIII . .,g,.. :,..., A i Joi.1111 Re:.3 i J .■.SO t)M 0 I �i ,` ' 3 I >♦ 1f49 fi y!. j. J� ! a J4 E J -�• , PLIC S 1� 11�111 .p Et 'moi& 3 t M 03 2'ii , 1 ,•�` 9 �orw. ...co.LA " c.i � Iiiii00000111______,..iiTRANOt c VILLA'�4 �''� �M "I tat V ��Lam"- i. � f,11"A O..!/V GY'M.K'/si. lk-. litii., ra, :I .,� ii '7%iit , c,lb �•n.,w. , t� � i�U. .vim �� 44 i ill.41) \ C7>X 7; IT 0 '�, I� -----111 1— _ — CApiSTRANO V ,o ,..,, 0 :M..zii 1-+ I rA i V t immimmaimmi 1a a { 7 ^L ; )_, •...) 4 C' E.• -y,- es-(o Pt/J-S /L i✓NiT�; (< sr"X.c,c '4 .;:-- H ' K C7)2 ii., 8 . v so• - 4 - } LA II I in il PIANJ0-•J0 _ADVANCE y�EH/ SPEED WARNING BUMP SIGN (S M P F{ ".nrrgJ si/fas E 'Z" P------ffdig"1"1 1 5' . j(C7/ON A-A p ADVANCE I a oma- M N N OWARNI it — — —: N N N N N Ni r) SIGNNC NP}`.4 TI i i i f f f t I i f i i i FT—i i i 12 c. tcriow 6.6 Al2 Rivet Iocotions .750 1 see No to 6) ��__-�I =,n Cbi 11 1 1 1 � 1 � • Ii NOTES 1. Square perro.ated steel tube posts with break-away base, "Telespar", shall be used for all traffic control and in::ormational signs within • rozci right-of-way, with the exception of street name signs per Standard PlanI407. 2. The number of posts required for sign inscallotion shai' b, determ'n2d by the area of the sign or combination of signs to be ins_alled. A single post shall be used where ,,oth the length and width are less than 48", with the exception of a 48" x 48" stop sign. Douh'e posts shall be used where either the length or the width exceeds 48''. 3. The anchor assembly shall consist of a 2" square by 2' -6" Anchor Post and a 24" square by l ' -6" Ancor Sleeve. .4. The Anchor Assembly, consisting of the Anchor Post anc Anchor Sleeve, shall be driven simultaneously until only I." to 2 ' rema'.ns above ground level . The tops of both pieces shai_ r ' flush 5. All dirt shall be removed from the inside top 8" of the Anchor Assembly to allow for installation of thy. sign post. 6. Install the 1 3/4" square Sign Post E" to 8" into the Anchor Assembly and secure in place with two 5/16" Universal Head Drive Rivets as shown. The rivets shall be installed on the side opposite t:s`fic flow and the side away from traffic as shown in order to achieve .h- maximum break-away effect. 7. Installation according to these requirements is essential to mairLain the b-eak-away characteristic& of the post system Under NO circums,ances shall the Anchor Assembly be secured in concrete footings. ORANGE COUNTY ENVIRONMENTAL MANAGEMENT AGENCY STD. PLAN Approved 14 1 7 C.R. IWlsow, Diriclor of Public *forks Adopted: Res.85-339 Revised: • SIGN POST INSTALLATION - - SHEET 2 u 22.,- A14 _ IP, 1 M.•he.head boll..Ih flat washers,nbl,r 'API{q,,./� . I I /rather,Ml end lam n.l - p .l i.l�ll tl rel•••I,... .ir. M' " . \ c I.1•Ys Om. Rt.".HO unbalanced -, upns errata 11100 36'0dth •. .Out WWI.WS.r•t-se'.O'-6•le.ter.36- mem.ens I.• m 1 slew. \ _-__i'4• JI�ri.i.0'-6'I>p3.•.!4 eras seen,' 1,O.Dae 1.OAh 1,1992 rnorm o.it.. ._ r3ssx • ! 2'4. 3'41 '/ Bend bee rack too YbckN.ryrr•e w•411.4e.Wm IB" • s'T'tl iYr Mac•pelage 4 dWal 6te 141•ea �� • t\ I sena .._,a� . ... •M Nal.z uA,:• SECTION B•8 SECTION C-G SEC TION D-D POST SPACING TABLE SIGN PANEL • SIGN PANEL POST k•s.•slot LENGTH OVERHANG SPACING I 2 9 c/0 c .n ane7t 01113 140s..doh, ec th unp for srQn•54 •A• •9• •C• 1 1 orae dear,. 4'_B y5'-0_"9 S'6' 7',9'f►12' 3'6' )•. _,. _ 1 tYlyy 1 6'-d 8 6'6. 12-a Is. 4'-0•' e i e Attach•rel b pas, '' Y.elWIlon pot -- >�•ln.Ys ...-.... f wan Dolls 01 lop -' 7'-o'a 7-6' IV a Kr r-6• 1r% 4.hes trap bdt mitt not t .-.� cen,er and bottom ie- .. .OMer•,nwr ter, (�. 1 IrxY sooty and nut :••, -% � .::::-...,,,,E __B•_0• 19• s•-0• .. ._. r i ------....-77Th., 9•O' ---f 22 S_4 Nell DIOCY to pas/al _ •' .1 9'•6' 24' S'-8 7_____ r C mrd-depth of.teh r W �. Sign panel Ill LI-.r 10'-0' 24' 6.-0" 111 "E"Peel Embedment r- id-6• 24' 6'6• UNBALANCED BALANCED END VIEW BALANCED II^0',11'_6"91Y-O' 24•,27_830• Y-0 Post Embedment -_12'-6' 30 T_6- Post •E• _ 13•-0. 30' --8.0•.. _Sete _ I3'-6'Et N'-6' _ 30'8 36• B••6' �/1 SINGLE POST INSTALLATIQN_ = -- i.i 75' --- - -`" i.4'Pote i-IPL' /Jljl i 1vt zn' _ I4'_Cr_._Is'o' 30'8 s6 1 9'-0' -1 .-L IS..Noels r.godY9 Peek•.ey 1.r1•r.to 4-e6-Rost i,-0 t e i-D h--T(.7' 4...6. 4 5' 15'-6.8 16'-0' 36.6 39' 9'"6' '0 0) .Ingle peel e.eta.eliau, I g '' '6's 6' S0 , _Ifi 6 39• 10'-O' ,---t t X 6 6'.a 60I7-O'8 l7'-6• 39"e 42• 10.6' '7 L11 - PLAN 18'-0'8 NY-6' 42'8 451 II 0' r' • 3 rb ha.oar br' M. M bad -. -_ m bat.•Mrs•Noe. looser 19' 0' 45• II" D •r t ..A• LMeth d sl en pone,• Strap is 6111 nod God pen w, 19'6.8 20'0' 45.8 aB' 17_0' _ Z -11 K6• l lb'.1Ye S4. la 20'6"B 21'-0• 49-8 Si 12.6' •8'.'C'Po.l .pOLing . B' _��- Yt'In, M bon.,m _21-•6^ St. 13.'0. 33 0. hOq o•erMrla ELEVATION Iblleash«.,ober.oc.rt, --- - -- -' --- I Detail'4' bek •a.M.and nue 22.0.8 27_6" 5i B 54: 13'-6_ y I(n BACK BRACE DETAILS 23`0' _ - 64" 4'o_ N o (S.• Plater2) NOTES +2`16"B 24'-0• sea 57- N'.6• 11111. i 1111 I. Place bre doenswn of posl cross sect,nmol to s.yl od1 See Sec non C C 6 2. Boto.ced urple posl installations of unnamed Sala. Neel 01.0lurn panel • He.Moa Doll Siena Stroll hove block apocer. it 1B'or mor N drp,h 000 o come.nnon o1 Sd.ce line block spacers and Dock bro.,11 19 or more 1n depth and 34'b more Post•E P'or1e1 Da,s -LInridlhSignpanrN lessten IB•in depth and 34•os more In.�dlh. o -CL PostC--------"AM-11-'' •boll Mve bock baces o&7. -fut Fbl was Mr 3. For post ate see soon 107.1, formal of quantity sheets r' Fleash.rut 4. Bolonced sine.pent mstolblrons 01 Lomtnoted Panel and Promra singe Orlsed haSmokes.? 4�6 '1 FIDer.esMr end tom nal sneel pante urns remake bock braces when 34•a more m.Idle. ' teure,Se• ,: 5 Breakoro) tfotwe to ample Doll Ins10110 IIon shall be Int some os the SW Yhle --� 1J BREAKAWAY FEATURE be01,0.0y feature semen for tM two poll Instal..., Hole Boll nolo toy,n pep 1 on 17. oral 7•raw i.Veer ----Same as abort boll 6. tolerance for Moe/tete.01 denims notes In Dr league.IS t•I/8" of panel Droll holes In post la match pet,en..le 6••6"ewlr ELE vATION 00neifoe msned SIDE VIEW O..rvt•0.09r4•.6 e,.e. alga nae ai.pweuN to.I5 .I..o 5•d Na.6 1.1.1...s.. •1 DETAIL A ebbed Saw. TWO POST INSTALLATION i STATE OF CAL191..0 - -- s4.' Dlomrlt,lar seglf sheet ol..m.num gm,sr, OEPARIIENI Of TRANSPORTATION kD• homed op U.emletnonoted panel•Ian.. ROADSIDE SIGNS - WOOD POST homed smote.teres Num�mwn pool u N TYPICAL INSTALLATION DETAILS NO. 2 NO SCALE - - - � S2 R