1997-0127_HOLLAND-LOWE CONSTRUCTION, INC._Addendum No. 2 cif
t `'
„� �1 i 9 MEMBERS OF THE CITY COUNCIL
�j COLLENE CAMPBELL
!!� 1 JOHN GREINER
-rd.
IMAPoRetto WYATT HART
• atenisxto 1961 GIL JONES
1776 DAVID M.SWERDLIN
• ll •
CITY MANAGER
GEORGE SCARBOROUGH
January 27, 1997
ADDENDUM NO. 2
PREVENTATIVE STREET MAINTENANCE, 1996-1997
1. Via California/Camino Las Ramblas
2. Avenida Aeropuerto
3. Mission Hills; and,
4. Capistrano Villas Speed Bumps.
The following changes to the plans and specifications are promulgated through this addendum.
Schedule of Work Items
Delete Page 6
Add Page 6R, attached.
Detail Specifications and Method of Payment
Delete Page DS-2
Add Page DS-2R, attached.
A signed copy of this addendum shall accompany the bid.
ig.,___, 12
Contractor Brian Perry
Senior Civil Engineer
brian\addendum.2
32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 • (714) 493-1171
. , '1""'
SCHEDULE OF WORK ITEMS
PREVENTATIVE STREET MAINTENANCE 1996-1997
1, VIA CALIFORNIA/CAMINO LAS RAMBLAS
2. AVENIDA AEROPUERTO
3. MISSION HILLS AND
4, CAPISTRANO VILLAS SPEED BUMPS
Item Approximate Work Items With Unit Price Unit Price Total Amount
Quantity (Written in Words) (In Figures)
1 L.S. Project survey for the lump sum price of
dollars. $
2 L.S. Reestablish centerline ties and monuments for
the lump sum price of
dollars. $
3 6 Ea. Provide City notification signs for the unit
price of dollars per each. $ $
4 62 CY. Remove existing P.C.C. curb, gutter,
spandrel, valley gutter and sidewalk for the
unit price of dollars
per cubic yard. $ $
5 32 L.F. Construct P.C.C. curb Type "A" for the unit
price of dollars per lineal
foot. $ $
6 1384 S.F. Construct P.C.C. spandrel and curb for the
unit price of dollars per
square foot. $ $
7 936 S.F. Construct P.C.C. handicap access ramp and
retaining curb for the unit price of
dollars per square foot. $ $
8 64 S.F. Construct 6" thick P.C.C. valley gutter for the
unit price of dollars per
square foot. $ $
9 230 S.F. Construct 4" thick P.C.C. sidewalk for the
unit price of dollars per
square foot. $ $
10 49,715 S.F. Cold plane 0.12' to zero for the unit price of_
dollars per square foot. $ $
11 328 Ton Remove and replace existing asphalt for the
unit price of dollars per ton. $ $
6R
r�
PAYMENT (BID ITEM 4)
The unit price per cubic yard for this bid item shall include all labor, materials, tools and equipment
and no additional compensation shall be made therefor.
BID ITEM 5 - P.C.C. CURB TYPE A
The work for this bid item shall include constructing P.C.C. curb Type A per City of San Juan
Capistrano Standard Plan No. 300.
PAYMENT
The unit price per lineal foot for this bid item shall include all labor, materials, tools and equipment
and no additional compensation shall be made therefor.
BID ITEM 6 - P.C.C, SPANDREL AND CURB
The work for this bid item shall include constructing P.C.C. spandrel and curb per OCEMA Standard
Plan No. 207 and details on the project plans.
PAYMENT
The unit price per square foot for this bid item shall include all labor, materials, tools and equipment
and no additional compensation shall be made therefor.
BID ITEM 7 - P.C.C. HANDICAP ACCESS RAMP
The work for this bid item shall include constructing P.C.C. handicap access ramp and retaining curb
per APWA Standard Plan No. 111 - 1 and details on the project plans.
PAYMENT
The unit price per square foot for this bid item shall include all labor, materials, tools and equipment
and no additional compensation shall be made therefor.
BID ITEM 8 - P.C,C. VALLEY GUTTER
The work for this bid item shall include constructing P.C.C. valley gutter per details on the project
plans.
PAYMENT
The unit price per square foot for this bid item shall include all labor, materials, tools and equipment
and no additional compensation shall be made therefor.
DS-2R