Loading...
1997-0127_HOLLAND-LOWE CONSTRUCTION, INC._Addendum No. 2 cif t `' „� �1 i 9 MEMBERS OF THE CITY COUNCIL �j COLLENE CAMPBELL !!� 1 JOHN GREINER -rd. IMAPoRetto WYATT HART • atenisxto 1961 GIL JONES 1776 DAVID M.SWERDLIN • ll • CITY MANAGER GEORGE SCARBOROUGH January 27, 1997 ADDENDUM NO. 2 PREVENTATIVE STREET MAINTENANCE, 1996-1997 1. Via California/Camino Las Ramblas 2. Avenida Aeropuerto 3. Mission Hills; and, 4. Capistrano Villas Speed Bumps. The following changes to the plans and specifications are promulgated through this addendum. Schedule of Work Items Delete Page 6 Add Page 6R, attached. Detail Specifications and Method of Payment Delete Page DS-2 Add Page DS-2R, attached. A signed copy of this addendum shall accompany the bid. ig.,___, 12 Contractor Brian Perry Senior Civil Engineer brian\addendum.2 32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 • (714) 493-1171 . , '1""' SCHEDULE OF WORK ITEMS PREVENTATIVE STREET MAINTENANCE 1996-1997 1, VIA CALIFORNIA/CAMINO LAS RAMBLAS 2. AVENIDA AEROPUERTO 3. MISSION HILLS AND 4, CAPISTRANO VILLAS SPEED BUMPS Item Approximate Work Items With Unit Price Unit Price Total Amount Quantity (Written in Words) (In Figures) 1 L.S. Project survey for the lump sum price of dollars. $ 2 L.S. Reestablish centerline ties and monuments for the lump sum price of dollars. $ 3 6 Ea. Provide City notification signs for the unit price of dollars per each. $ $ 4 62 CY. Remove existing P.C.C. curb, gutter, spandrel, valley gutter and sidewalk for the unit price of dollars per cubic yard. $ $ 5 32 L.F. Construct P.C.C. curb Type "A" for the unit price of dollars per lineal foot. $ $ 6 1384 S.F. Construct P.C.C. spandrel and curb for the unit price of dollars per square foot. $ $ 7 936 S.F. Construct P.C.C. handicap access ramp and retaining curb for the unit price of dollars per square foot. $ $ 8 64 S.F. Construct 6" thick P.C.C. valley gutter for the unit price of dollars per square foot. $ $ 9 230 S.F. Construct 4" thick P.C.C. sidewalk for the unit price of dollars per square foot. $ $ 10 49,715 S.F. Cold plane 0.12' to zero for the unit price of_ dollars per square foot. $ $ 11 328 Ton Remove and replace existing asphalt for the unit price of dollars per ton. $ $ 6R r� PAYMENT (BID ITEM 4) The unit price per cubic yard for this bid item shall include all labor, materials, tools and equipment and no additional compensation shall be made therefor. BID ITEM 5 - P.C.C. CURB TYPE A The work for this bid item shall include constructing P.C.C. curb Type A per City of San Juan Capistrano Standard Plan No. 300. PAYMENT The unit price per lineal foot for this bid item shall include all labor, materials, tools and equipment and no additional compensation shall be made therefor. BID ITEM 6 - P.C.C, SPANDREL AND CURB The work for this bid item shall include constructing P.C.C. spandrel and curb per OCEMA Standard Plan No. 207 and details on the project plans. PAYMENT The unit price per square foot for this bid item shall include all labor, materials, tools and equipment and no additional compensation shall be made therefor. BID ITEM 7 - P.C.C. HANDICAP ACCESS RAMP The work for this bid item shall include constructing P.C.C. handicap access ramp and retaining curb per APWA Standard Plan No. 111 - 1 and details on the project plans. PAYMENT The unit price per square foot for this bid item shall include all labor, materials, tools and equipment and no additional compensation shall be made therefor. BID ITEM 8 - P.C,C. VALLEY GUTTER The work for this bid item shall include constructing P.C.C. valley gutter per details on the project plans. PAYMENT The unit price per square foot for this bid item shall include all labor, materials, tools and equipment and no additional compensation shall be made therefor. DS-2R