Loading...
1996-1105_DBX_D6_Agenda Report 0 111 f AGENDA ITEM November 5, 1996 TO: George Scarborough, City Manager FROM: William M. Huber, Director of Engineering & Building SUBJECT: Approval of Plans and Specifications and Authorization to Receive Bids - Camino Capistrano and Avenida Padre Traffic Signal Installation RECOMMENDATION By motion, approve the plans and specifications and authorize Staff to receive bids for Camino Capistrano and Avenida Padre Traffic Signal Installation. SITUATION A. Summary and Recommendation Plans and specifications have been prepared to install a traffic signal at the intersection of Camino Capistrano and Avenida Padre. The project consists of constructing traffic signal equipment(including signal poles and mast arms, controller cabinet, traffic loop detectors, etc.) street lights, sidewalk, wheelchair ramps, and curb and gutter. The plans and specifications are now ready and Staff is requesting approval and authorization to receive bids. A copy of the plans and specifications are available for review in the City Clerk's Office; a copy has also been placed in the City Council Office. B. Background The Transportation Commission requested this intersection be studied for consideration of a traffic signal here. A traffic signal warrant study was completed in accordance with Caltrans methodology as outlined in Chapter 9 of their Traffic Manual. The study results showed that warrants were satisfied for this intersection. Design of the signal was initiated once Measure "M" funding was approved for this project. COMMISSIONBOARD REVIEW N/A FINANCIAL CONSIDERATIONS The engineer's estimate for construction is $93,320. $100,000 is budgeted for FY 96-97 from Measure "M" funds and the City's Systems Development Fund. FOR CITY COUNCIL AGcN_.- . .. (D i r City Council Agenda Item -2- November 5, 1996 NOTIFICATION N/ A ALTERNATE ACTIONS 1. Approve the plans and specifications and authorize Staff to receive bids. 2. Do not approve the plans and specifications. 3. Request additional information from Staff. RECOMMENDATION By motion, approve the plans and specifications and authorize Staff to receive bids for Camino Capistrano and Avenida Padre Traffic Signal Installation. Respectfully submitted, Prepared by: 0A-"SCA-P-c-C) William M. Huber, P.E. Alan P. Oswald Director, Engineering and Building Project Manager WMH:ao (C:\ ...\PADRE-TS\AD V ERTTS.AGD)