1998-0217_CAPISTRANO VALLEY BOBBY SOX_D5_Item Minutes 5. APPROVAL OF LICENSE AGREEMENT WITH CAPISTRANO VALLEY
BOBBY SOX FOR THE USE OF THE CONCESSION STAND AT COOK PARK
CORDOVA ATHLETIC FIELDS (600.30)
As set forth in the Report dated February 17,1998, from the Community Services Director,
the License Agreement with the Capistrano Valley Bobby Sox for use of the concession stand
at the Cook Park Cordova athletic fields for the period of March 1, 1998 to February 28,
1999 was approved.
APPROVAL OF LICENSE AGREEMENT WITH SAN JUAN CAPISTRANO
LITTLE LEAGUE FOR THE USE OF THE CONCESSION STAND AT THE SAN
4 AN CAPISTRANO SPORTS PARK (600.30)
As set h in the Report dated February 17, 1998 from the Community Services Director,
the License •greement with the San Juan Capistrano Little League for use of the concession
stand at the : Juan Capistrano Sports Park for the period of March 1, 1998 to July 31,
1998, was appro, -d.
7. APPROVAL OF L . NSE AGREEMENT FOR ENTRY GATE AND
LANDSCAPE AND I' ' . • TION EQUIPMENT. TRACT 14379 (SAN JUAN
ENCLAVE. LLC/PEPPERW€ ID ESTATES) (600.30)
As set forth in the Report dated Fe ary 17, 1998 from the Director of Engineering and
Building, the License Agreement with S. Juan Enclave, LLC for use of public right-of-way
along the easterly side and at the norther erminus of Alipaz Street for construction and
maintenance of an entry gate, landscaping an, related appurtenances was approved. The
Mayor was authorized to sign the Agreement an. the City Clerk was authorized to forward
the Agreement to the Orange County Recorder for ecordation.
8. APPROVAL OF AMENDMENT TO AGREEMEN TO PROVIDE DESIGN
SERVICES FOR PHASE 2 OF THE BEAR BRAND :OOSTER STATION
MODIFICATIONS (DANIEL BOYLE ENGINEE . INC.) (600,70)
(CONTINUED FROM MEETING OF FEBRUARY 3. 1998)
As set forth in the Report dated February 3, 1998 and resubmitted F:.ruary 17, 1998 from
the Public Works Director, the City Manager was authorized to execut: Amendment No. 1
to the Agreement for Engineering Services with Daniel Boyle Engineerin_. Inc. to provide
planning, design and construction engineering services for the recommended ' ase 2 intertie
with Moulton Niguel Water District for the Bear Brand Booster Station Modifi ,tions in the
additional amount of$46,622. The Report advised that while the cost to design an. build the
proposed intertie was higher, the intertie provided the greatest benefit to the Di • ict by
providing a higher fire flow rate, providing water service to the Peppertree Bend are: at a
lower cost, avoiding major construction on Sacarama Lane, and eliminating the need or
construction of additional reservoir storage and construction of a secondary power source a.
the Booster Station.
City Council Minutes -3- 2/17/98