Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1993-0817_C.B. ELECTRIC_Bid Opening Report
Bid Opening Report Bids opened August 17 , 1993 at 2 : 00 p.m. Project Title: City Street Light Maintenance Project Engineer: Ron Sievers Pre-Bid Estimate: $20, 000 (FY 1993-94 annual estimate) Bid Bond 1. C.B. ELECTRIC Maint. w/ City-Supplied Materials (per hour) Maint. w/ Contractor-Supplied Mat' l (per hour) 95'; z Maint. w/ City-Supplied Materials (per light) '/S:D Maint. w/ Contractor-Supplied Mat' l (per light) Gs�o Emergency Work (per hour) G 4.cz Emergency Work (per light) 6e.ere 2 . CALIFORNIA RETROFIT, INC. (CRI) ,/ Maint. w/ City-Supplied Materials (per hour) 6G.0-o Maint. w/ Contractor-Supplied Mat' l (per hour) Sa,ao Maint. w/ City-Supplied Materials (per light) Sa,cv Maint. w/ Contractor-Supplied Mat ' l (per light) *.Oa Emergency Work (per hour) 6o,eV Emergency Work (per light) foo•oa 3 . Maint. w/ City-Supplied Materials (per hour) Maint. w/ Contractor-Supplied Mat ' l (per hour) Maint. w/ City-Supplied Materials (per light) Maint. w/ Contractor-Supplied Mat' l (per light) Emergency Work (per hour) Emergency Work (per light) 4 . Maint. w/ City-Supplied Materials (per hour) Maint. w/ Contractor-Supplied Mat ' l (per hour) Maint. w/ City-Supplied Materials (per light) Maint. w/ Contractor-Supplied Mat ' l (per light) Emergency Work (per hour) Emergency Work (per light) 5. 111111111 Maint. w/ City-Supplied Materials (per hour) Maint. w/ Contractor-Supplied Mat ' l (per hour) Maint. w/ City-Supplied Materials (per light) Maint. w/ Contractor-Supplied Mat ' l (per light) ,: Emergency Work (per hour) Emergency Work (per light) cc: City Clerk Staff PL&F Dept Signed: / City Manager Dated: / / 1-, The above bid amounts have not been checked. The bid totals are subject to correction after the bids have been completely reviewed. I