Loading...
1997-0902_ALL AMERICAN ASPHALT_Addendum No. 1 �` DRUG USE riaN,a • MEMBERS OF THE CITY COUNCIL IS COLLENE CAMPBELL T-11JOHN GREINER r I - n!oroario WYATT HART r,uu,+o 1961 GILJONES 1776 DAVID M.SWERDLIN • CITY MANAGER GEORGE SCARBOROUGH September 2, 1997 ADDENDUM NO. 1 PREVENTATIVE STREET MAINTENANCE, 1997-1998 1. PEPPERTREE BEND 2. MISSION HILLS RANCH 3. SILVER CREEK DRIVE 4. CALLE ARROYO BIKE TRAIL AND 5. (ADDITIVE ALTERNATE) RANCHO VIEJO ROAD The following changes to the plans and specifications are promulgated through this addendum. Table of Contents Delete Page 1 Add Page 1, Revised. Section 13 - Utility Relocations Delete Page SP-6 Add Pages SP-6R. A signed copy of this addendum shall accompany the bid. Contractor Brian Perry Senior Civil Engineer brian\adn97-98.a 32400 PASEO ADELANTO, SAN JUAN CAPISTRANO, CALIFORNIA 92675 • (714) 493-1171 • TABLE OF CONTENTS (REVISED) PREVENTATIVE STREET MAINTENANCE 1997-1998 1. PEPPERTREE BEND, 2. MISSION HILLS RANCH, 3. SILVER CREEK DRIVE, 4. CALLE ARROYO BIKE TRAIL, AND 5. (ADDITIVE ALTERNATE) RANCHO VIEJO ROAD TITLE PAGE CONTRACT DOCUMENTS Notice Inviting Bids 1 Bid Proposal 3 Schedule of Work Items 6 Non-Collusion Affidavit 9 Designation of Sub-Contractors 10 Instructions to Bidders 11 Bid Bond BB-1 Performance Bond PB-1 Labor& Material Bond LM-1 CONTRACT Contract 1-4 SPECIAL PROVISIONS Work to be Done SP-1 Section 1 Standard Specifications SP-3 Section 2 Terms Defined SP-3 Section 3 Flow and Acceptance of Water SP-3 Section 4 Water SP-3 Section 5 Insurance and Overhead Costs SP-3 Section 6 Protection of Existing Utilities SP-3 Section 7 Protection of Private Property SP-4 Section 8 Construction Zone SP-4 Section 9 Pre-Construction Coordination Meeting SP-4 Section 10 National Pollutant Discharge Elimination System SP-4 • Section 11 Preservation of Survey Monuments SP-5 Section 12 Monumentation Identification SP-5 Section 13 Utility Relocation SP-6R Project Schedule Form DETAIL SPECIFICATIONS AND METHOD OF PAYMENT Bid Item 1 Project Survey DS-1 Bid Item 2 Reestablish Centerline Ties and Monuments DS-1 Bid Item 3 City Notification Signs DS-1 Bid Item 4 & 21 Traffic Control DS-1 Bid Item 5 Cold Plane Existing Concrete 0.12' Deep to Zero DS-2 Bid Item 6 Asphalt Concrete Overlay III C2 AR4000 DS-2 Bid Item 7 Adjustment of City Manhole Frames and Cover Sets to Grade DS-3 Bid Item 8 Adjustment of CVWD Valve Boxes to Grade DS-3 • SECTION 13 - UTILITY RELOCATIONS In accordance with Section 5-1 of the Specifications, the Contractor shall determine the location and depth of all utilities, including service connections, which have been marked by the respective owners and which may affect or be affected by its operations. The Contractor shall receive no direct compensation for this work. Accordingly, full compensation for such work should be prorated to the appropriate bid items. Utility relocations may be necessary during this construction contract. The various utilities have indicated that the following notifications and work schedules are necessary: 1. Silver Creek Drive Utility Facility Advance Notification Time for Utility Work Cox Cable TV House Service 5 Working Days 1 Working Day So. Calif. Gas House Service The Gas Co. will pothole existing house services and, if necessary, will lower them to 1-foot bellow bottom of trench prior to this construc- tion contract. 2 Calle Arroyo Bike Trail Utility Facility Water Main Line These utilities have indicated & the close proximity of their So. Calif. Gas House Service facilities to the construction area. It is not anticipated that relo- cation will be necessary for these facilities. The contract, however, requires excavation by hand for the installation of the street-side Biobarrier. 3. Mission Hills Drive Utility Facility Pacific Bell New Line Pacific Bell has indicated that it will construct new underground facilities within the area of Rancho Viejo Road and Mission Hills Drive. The contractor shall allow for this utility work to precede the street work. The Contractor shall allow in his bid for all costs to accommodate this work into his construction schedule. The Contractor shall receive no direct payment for accommodating this work. Accordingly, these costs should be prorated to the appropriate bid items. The Contractor shall notify the utility in writing of the work required with copy of the letter to the City Project Manager. SP-6R