1997-0912_ALL AMERICAN ASPHALT_Staff Memo MEMORANDUM September 12, 1997 TO: William M. Huber, Director FROM: Brian Perry, Senior Civil Engineer Department of Engineering&Building SUBJECT: Preventative Street Maintenance 1997-1998 1. Peppertree Bend 2. Mission Hills Ranch 3. Silver Creek Drive 4. Calle Arroyo Bike Trail 5. Rancho Viejo Road Bids were opened September 9, 1997 for the above subject construction project. The low bidder, Excel Paving,called me later that afternoon to say there was an error in his bid of$318,258. A letter of bid withdrawal has been received September 12, 1997 and is attached. The bid error is greater, covering more items that I had understood when I told you this withdrawal was likely to happen. In order to move the project along, I will begin processing to award the contract to the second low bidder, All American Asphalt, at$325,984.30. Please review the situation with the City Attorney. The Agenda Item for award of contract will need to deal with the issue of calling or not calling the bonds. If you need any other information, please let me know. BP/st p „V„,,, cc: Cheryl Johnson, City Clerk ;-. EXCEL CO. A GENERAL ENGINEERING CONT'RACT'OR P.O BOX 16405 LONG BEAM,CA. 908065195 STATE LICENSE NO. 688659 A (562)599-5841 FAX(562)591-7485 DATE: -/). -9 7 TO: ATIN: /el( -1 "e77 FROM . 1// c SENDING / PAGES,INCLUDING COVER sub:E'1' MESSAGE: If/,/ '�a�-p - ���- _ • .._. PLEASE CALL IF YOU DO NOT R. ;CF.IVE ALL PAGES rot/Trn• 4 1.111, T !OT T c,m ,c. ,T c<701TS'F,hhTl. W(lH-{ EXCEL PAVING COMPANY • P.O. BOX 16405 A GENERAL ENGINEERING CONTRACTOR LONG BEACH, CA 90806-6196 STATE LICENSE NO. 454186 A (213) 599 5841 SEPTEMBER 11, 1997 CITY OF SAN JUAN CAPISTRANO 32400 PASEO ADELANTO SAN JUAN CAPISTRANO, CA 92675 ATTN: BRIAN PERRY RE: RPEVENTATIVE STREET MAINTENANCE 1997-1998 SUBJECT: REQUEST FOR BID WITIIDRAWL DUE TO CLERICAL ERROR GENTLEMEN: THIS LETTER IS TO NOTIFY YOU THAT EXCEL PAVING COMPANY (EXCEL) MADE AN INADVERTENT CLERICAL ERROR IN OUR BID PROPOSAL WHICH RESULTED IN OUR BID BEING MATERIALLY LOWER THAN INTENDED. THE TOTAL BASE BID AMOUNT SHOULD HAVE BEEN $333,559.50 RATHER THAN THE AMOUNT OF $313,735.50, WHICH WAS SUBMITTED IN ERROR. THIS ERROR RESULTED IN A $19,824.00 OR 6.3 PERCENT LOWER BASE BID THAN EXCEL INTENDED. INCLUDING THE ALTERNATE, EXCEL'S BID WAS $26,941 .50 OR 8.5% LOWER THAN INTENDED. THE MISTAKE THAT OCCURRED AFFECTED BID ITEMS #11 - DEEP LIFT ASPHALT, AND ITEMS e15 & 122 - SUBDRAIN. WHILE TRANSPOSING THE WORK SHEETS TO THE FINAL BID SUMMARY, THE ESTIMATOR TRAINEE ASSISTING ME INADVERTENTLY LEFT OUT THE ASPHALT MATERIAL AND MADE A TRANSPOSITION ERROR ON THE SURDRAIN ITEMS. THE ESTIMATOR TRANIRE SHOULD HAVE FACTORED THE COST OF $22.37 FOR ASPHALT MATERIAL IN ITEM 11. ALSO. THE ACTUAL COST OF $24.00 FOR ITEM 15 AND 22, SUBDRAIN, WAS ERRONEOUSLY ENTERED AS $4.00. BY ADJUSTING EACH BID ITEM TO INCLUDE THE INTENDED COST PLUS MARKUP, EXCEL'S TOTAL AMOUNT SHOULD HAVE BEEN $333,559.50 WITH AN ALTERNATE OF $11,640.00 (SEE ENCLOSURES) . UNFORTUNATELY, WITH THE TIME PRESSURES OF CLOSING OUT THE BID, LAST MINUTE CUTS AND OTHER PROJECTS ALSO BIDDING, I WAS UNABLE TO DETECT THE MISTAKE AT THE TIME OF BID. IN LIGHT OF THE ABOVE. PURSUANT TO THE PROVISION OF CALIFORNIA PUBLIC CODE SECTION 5100, EXCEL HEREBY REQUESTS THAT IT BE RELIEVED OF ITS BID AND THAT OUR BID BOND BE RETURNED. SINCERELY. EXCEL PAVING COMPANY WILLIAM F. CRAUTEN ESTIMATOR WB/CG IIHI.T -QlT :'T r '/.f-4,T 5-i0TY 7t7Tl, 01 YFi1c: SANJUANI 1 Agncye C1;! S:NP:UAN OF CAP • Final Bid No. . Description Unit : Quantity : Unit cost : Total coat Units Total Bid 1 : SURVEY is 1 : 2,590.00 : 2,590 2,000.00 2,000.00 2 : TIE9 : LS 1 : 6,000.00 : 6,000 5,000.00 5,000.00 3 : SIGNS : EA 5 : 600.00 : 3,000 600.00 3,000.00 4 : TC : LS 1 : 2,500.00 : 2,500 _ 2,500.00 2,500.00 5 : MILL : SF 76,770 : 0.12 : 9,289 0.15 11,515.50 6 : AC OVERLAY : fN 3,216 : 30.13 : 96,910 34.00 109,344.00 7 : AOJ MN : EA 26 . 150.00 : 3,900 1/0.00 4,420,00 8 : AOJ uv : EA 31 : 165.00 : 5,115 185.00 5,735.00 9 : R/R AC : TN 1,362 : 41.58 : 56,636 47.00 64,014.00 1' ' RMV ' 1 - 14 22.00 16 /64.00 (11 : DEEP LIFT AC : TN 348 . 8.07 : 2 810 8.00 2,784.00 R/R PCc C+Q42.12 4,002 4 ,rr 13 : BIKE TRAIL AC : TN 400 : 42.60 ; 17,030 48.00 19,200.00 1 BIKE ;. L AB got : 25.28 • 20 226 29.00 so so ' 15 : SUBORAIN : LF 00 : 4.00 : 2,000 4.50 2,450.00 1 N IN : EA 1 r 500.00 -'1'W.OU 76U.U0~ 17 : D10 BARRIER : LF 80 r 20.00 : 1,600 22.00 1,760.00 18 : 810 BARRIER : LF 1,385 : 20.00 : 27,700 22.40 31,024,00 19 : PROJECT SICNS : LS 1 : 3,8/0.00 : 3,810 3,000.00 3,000.00 20 : STORAGE COST : LS 1 : 1,200.00 : 1,200 1,200.00 1,200.00 * SUBIOIAL BASE BID 281,43/ BASE DID 313,735.50 21 : TRAF.CONTROL VIEJO RD : LS 1 : 1,500.00 1 500.00 • 500.00 500.00 22 SUB DRAIN 325 : 4.00 : 1,300.00 4. 0 162.50 23 : ECT SUBDRAIN : EA 1 : 500.00 : 500.00 560.00 560.00 24 : LOOPS : EA 10 : 178.00 : 1,780.00 200.00 2,000.00 • SUBTOTAL ALTERNATE OID 5,080 ALFERNATE 810 4,522.50 TOTAL COST ABOVE ITEMS 286,517 FINAL BIO 318,258.00 IndIrects super 1,200 taffic 0 stripe 0 permits 1,000 0 0 cleanup 700 TOTAL COST 289,417 OH/Profit/Bond 1.100 TARGET BID 318,359 , rr:-. ,-. • ,1rf inis,1 ,(A 1 .'I r,['t`If,1,1 U ';Al','I,t,t,[l. r I I : NIN1 • File; SANJUAN2 Agncy: CITY OF SAN JUAN CAP. Y\- --1-43r- b lb Job: VARIOUS Date: 9/9/9/ a 1 PM _ _ = Final Did No. . Description Unit : Quantity : Unit cost : Total cost Units Total Bid 1 : SURVEY : LS 1 : 2,590.00 : 2,590 2,000.00 2,000.00 2 TIES LS 1 : 6,000.00 : 6,000 5,000.00 5,000.00 i : SIGNS : EA 5 : 600.00 : 3,000 600.00 3,000.00 4 : TC : LS 1 : 2,500.00 : 2,500 2,500.00 2,500.00 5 : MILL : SF 76,770 : 0.12 : 9,289 0.15 11,515.50 6 : AC OVERLAY : TN 3,216 : 30.13 : 96,910 34.00 109,344.00 7 : ADJ MM - EA 26 - 150.00 : 3,900 _ 170.00 4,420.00 8 ADJ WV EA 31 : 165.00 : 5,115 185.00 5,135.00 9 : R/R AC : TN 1,362 = 41.58 = 56,636 47.00 66,014.00 10 : RMVL : CY ' 0, 55 T___L____.,_ • $. 6 /64.00 11 : DEEP LIFT AC TN 348 : 30.44 : 10 595 33.50 11 658.00 R/R P G LF 42.12 : 4,002 47.00 4,465.00 13 BIKE FRAIL AC IN 400 : 42.60 : 17,038 : 48.00 19,200.00 14 BIKE T L4X_� TN _____;_______Q12_;__, X 28 _ 20,226 : 29.00 3 200.00 15 : SUBORAII : LF 500 : 24.00 : 12,000 26 40 13,200.00 h •NNECT SUBDRAIN EA 1 . 500.00 . 50$ 560.00 560.0$ 17 : BIO BARRIER LF 80 ; 20.00 : 1,600 22.00 1,760.00 18 : 810 BARRIER : LF 7 1,385 : 20.00 : 21,/00 22.40 51,024.00 19 : PROJECT SIGNS LS 1 : 3,870.00 : 3,870 3,000.00 3,000.00 20 : STORAGE COST l5 1 : 1,200.00 : 1,200 1.200.00 1,200.00 • SUBTOTAL BASE BIO 299,222 BASE BID 333,559.50 21 : TR1lF•GON`TJ( O RO s 1 1 500.00 1 500.00 500.00 500. 0 --t--- 22 -Ir22 : SUBDRAIN : LF 325 : 24.00 : 1,800.00 - 26.40 8,580.00 COSUIJORAIN FA 500.00 . 500.0, 560.00 .0.00 24 LOOPS EA 10 : 178.00 : 1, .0.00 200.00 2,000.00 • SUBTOTAL ALTERNATE BID 11,580 ALTERNATE BID 11,640.00 TOTAL COST ABOVE ITEMS 310,802 FINAL BID 45,199.50 Indirecte super 1,200 taffic 0 S b stripe 0 �� Go 5. s.. --7 perm 1,000 3 r- t 3 � ''79' S� 0 00 J cleanup 100 Vx 1cJ S , 14'1,-)Si TOTAL COST 313,702 .94, 7'-ii 4' 7� / - 0H/Profit/Bond 1.100 D E b TARGET BIO 345,072 & Q. C r,VI/4.T 4 4 14, T 0 I It 1s?T 7 VI T ,T L JA' ,!,{,T S'i(11 T`0'1,4T r' 11 I 1 II>>r 4 • 1 : AC OVERLAY : TN 3216 Motto: AC .SZ16 X 42.33 S\u 71,813.28 OIL 228000 SF 11 x 155 f\u 1,705.00 ' Notes: tabor\Equipment Qty $\hr roller 5-12 1 65.00 AC Machine Crew(no sk 1 617.00 011 Truck 1 155.00 • broom 1 96.00 933.00 X 24 Hre 22,392.00 Miscellaneous Charges: Moves is 1,000.00 Total Unit Coet 30.13 I Total 96,910.28 eea5a333.5 s»vaMa 2 : R/R AC : TN • 1362 Molls: AC 1:562 x 22.33 SW 30,413.46 Notes: RMVL • 768 CY 2 3" AC tabor\Equipment: city $\hr Foreman 1 56.00 laborer 1 34.50 ldr 950b 1 103.00 Truck & Pup 7 60.88 stomper 1 95.00 saw pcc 4"cut 1 9/.00 811.66 x 16 Mrs 12,986.56 Notes: F/GR0 83000 SF labor\Equlpmcnt Qty $\hr Foreman 1 56.00 laborer 2 34.50 skip 50 1 83-00 blade 12G 1 95.00 wtr tk 4,000g1 1 65.00 roller 5-12 1 65.00 431.00 X 16 Mrs 6,928.00 bte9- PAVE tabor\Equipment Qty 11\hr AC Machine Cr•ew(no 3k 1 617.00 AC Skip Crew 3 320.00 1,57/.00 x 4 Mrs 6,108.00 ,IA i' bttt l•lta,T '(nT T ,o`l.t���T. 5X1(1 TSS,tibl r1I 7 N11?1 3 : RPM CY • 762 Notes: DEEP LIFT AREAS - 160 CY Labor\Equipmcnt: Qty i\hr Foreman 1 56.00 laborer 1 34.50 1dr 950b 1 103.00 Truck & Pup 7 60.88 stomper 1 95.00 maw pcc 1."cut 1 97.00 811.66 X 4 Hrs 3,246.64 Notes: BIKE BATH = 600 CY Labor\Equipment Qty i\hr Foreman 1 56.00 laborer 1 34.50 skip 50 1 83.00 ldr 950b 1 103.00 Truck 8 Pup 5 60.88 stomper 0. 95.00 628.40 X 16 Mrs 10,054.40 Notes: Labor‘Equlpsont Qty i\hr 0.00 X 0 Mrs 0.00 Miscellaneous Charges: Moves LS 750.00 Dump Fees LS 500.00 Total Unit Cost 19.10 I Total 14,551.04 3 3 4 : DEEP LIFT AC : TN 348 Notes: Labor\Equipment Qty t\hr AC Skip Crew 1 320.00 320.00 X 8 Mrs 2,560.00 Miscellaneous Charges: MOM LB 250.00 Total Unit Coat 8.07 I Total 2,810.00 2.bT,t 141-11,1 ,0T 't F,VI'LFSF t 5."i0IFF,bbt1. (ii : WOH { 5 : R/R PCC CsG : Lf 95 : Math: C+G 95 X 20.95 '!\U 1,990.25 Notes: RMVL 8 CY Labor\Equipment: Oty t\hr Truck & Pup 1 60.88 stomper 1 95.00 saw pcc 4"cut 1 91.00 252.88 x 4 Mrs 1,011.52 Notes: B/F Labor\Equipment Oty i\hr 250.00 X 4 firs 1,000.00 Notes: Labor\Equipment Oty i\hr 0.00 X 0 Mrs 0.00 Total Unit Cost 42.12 I Total 4,001.77 6 : BIKE TRAIL AC : TN 400 Mutts- AC 23.43 X 400 $\U 9,372.00 Notia: Labor\Equipment Oty f\hr AC Skip Crew 1 320.00 320.00 X 8 Mrs 2,560.00 Notes: F/GRD Labor\Equipment Oty S\hr Foreman 1 56.00 laborer 1 34.50 skip 50 1 83.00 wtr tk 4,000g1 1 65.00 roller 5-12 1 65.00 303.50 X 16 Firs 4,856.00 Miscellaneous Charges: Moves L9 250.00 Total Unit Cost 42..60 ` Total 1/,U38.00 i,c ,?rI'.{ l.t•T.h WNI-,T ,PIT �'1 f�Pf'l.E,F,T S�;OITSf,bbT/. - [ll l-J1)N 1 r 7 : BIKE TRAIL AB : TN 800 Marts: AB 800 X 8.13 SW 6,504.00 Motes: labor\Equipment City SW Foreman 1 56.00 laborer 2 34.50 skip 50 2 83.00 wtr tk 4,000x1 1 65.00 roller 5-12 1 65.00 421.00 X 32 Hrs 13,472.00 Notes: lobor\Equipment sty S\hr 0.00 X 0 firs 0.00 Miscellaneous Charges: Moves LS 250.00 Total Unit Cost 25.28 I Total 20,226.00 1,1/RO'd 1.t'tq Wt1c,t :Ot ?t F�1`/.F,F,t SSOtTEA7t7 /. 01 : W(l?1 1 RETT 71. 31 7i40 Peet 8ARflETf CONSTRUCTION COMPANY BID PROPOSAL P.O. Box Ire'. General Engineering Contractors & Newport Bomb, CA 92659-42). Califotnia J.i'i r+*e A-191075 543-1901 Phone: 71,11DXYXV CONTRACT 543-1470 Fax. 7144150ii 7144150m- Page _L.__4f__.. Bio TO: DACE: September 9 , 1997 EXCOL Paving Company 2230 Lemon Avenue Long tela:h, California LOCATION: Provontative Street Maintenance Project- 97-9e San :Wan Capistrano, California We propose to furnish you labor and material as noted below at the Unit Price shown for the construction of ITEM NO. 1 -- DESWIIPTION I QUANTITY I UNIT' MICE I 15. 4" SC`t1Adn16A 40 Sub-Drain System 500 LP 24 .00 $1200:. 22 . A1tArnah.e Bid : 4" Schedule 40 vub-Drain 325 I,F 24 .00 $.'786(' Noteel I . Engineering, inspection fool or permit fees are not included. 2. Removal or replacement of permanent Coneroto or Asphalt is not included. When accepted by the buyer this bid constitutes a firm contract between both parties hereto for the labor and mate, herein referred to according to the terms and conditions on both sides hereof. Dwyer: .` _ _ _ BAitRETT CONSTItUCTVON COMPANY Approved: rr h rrt 1 T rnt �i � �n. ,rrt �;(21iS't,} t,1! nl