1998-0303_ALL AMERICAN ASPHALT_D4_Agenda Report AGENDA ITEM March 3, 1998 TO: George Scarborough, City Manager FROM: William M. Huber, Director of Engineering & Building SUBJECT: Resolution, Notice of Completion and Final Report-Preventative Street Maintenance 1997-1998 - 1. Peppertree Bend, 2. Mission Hills Ranch , 3. Silver Creek Drive, 4. Calle Arroyo Bike Trail, and 5. Rancho Viejo Road (CIP No's.111, 119 and 134) (All American Asphalt) RECOMMENDATION By Resolution, determine that the work for the Capital Improvement Project, Preventative Street Maintenance 1997-1998; (CIP No's. 111, 119 and 134) has been completed and declare the work to be accepted; direct the City Clerk to forward a Notice of Completion to the Orange County Recorder for recording and authorize Staff to release the 10% retention in the amount of$34,606.63, 35 days after the recordation of the Notice of Completion. SITUATION A. Summary and Recommendation The construction of the Preventative Street Maintenance 1997-1998 has been completed to the satisfaction of the City Engineer and is ready for acceptance and recordation of a Notice of Completion with the County Recorder. B. Background In October 1997, the City Council awarded a contract to perform preventative street maintenance work to All American Asphalt in a number of locations as follows: 1. Peppertree Bend Peppertree Bend was constructed as Tract 10593 in 1980 prior to annexation to the City in 1981. The street had shown signs of deterioration for some time, and in the mid-year Capital Improvement Project Review 1995-1996, City Staff were directed to prepare rehabilitation plans. These plans to overlay the street were prepared in 1996 and construction budgeted for 1997-1998. The work consisted of an asphalt concrete overlay. FOR CITY COUNCIL AGE! , i � AGENDA ITEM -2- March 3, 1998 2. Mission Hills Ranch Silver Spur Road, Branding Iron Road, Canyon Crest Road, Outpost Road and Mission Hills Drive, comprising the Mission Hills Ranch, were constructed in 1968 as Tract 6427. The streets were slurried in 1987 but now required some removal and replacement of deteriorated pavement together with an asphalt concrete overlay to preserve the long-term structural integrity of these streets. 3. Silver Creek Drive Ground water was coming to the street surface in Silver Creek Drive in the Stoneridge area of the City. If left unaddressed, this would cause costly deterioration of the street requiring reconstruction. A system of 4" diameter perforated pipes has been installed under the street to intercept the ground water and convey it to an existing catch basin and drainage system near the intersection with Hillside Terrace. It has been noted that additional areas of ground water seepage are occurring. It is proposed to extend the subdrain system constructed in this contract in the 1998-1999 program to address these additional areas and to provide a similar subdrain system for Hillside Terrace near its intersection with Saddleridge Drive. This work is a necessary prerequisite for future street preventative maintenance such as slurry seal. 4. Calle Arroyo Bike Trail The bike trail on the south side of Calle Arroyo between La Novia Avenue and Paseo Tirador had deteriorated due to root intrusion from adjacent trees, such that remedial work required its removal and reconstruction. As part of the reconstruction, the project included the use of"Biobarrier" Root Control System. "Biobarrier" is a multi- year chemical barrier system which controls roots by preventing root development. 5. Rancho Viejo Road South of Golf Club Drive Ground water was coming to the street surface along the east side gutter in Rancho Viejo Road south of Golf Club Drive. This was causing deterioration of the street and traffic signal inductive loop detectors. This project installed a 4" diameter perforated pipe under the street adjacent to the gutter to intercept the ground water and convey it to an existing catch basin. The traffic signal loop detectors were also reinstalled. COMMISSIONBOARD REVIEW, RECOMMENDATIONS N/A AGENDA ITEM -3- March 3, 1998 FINANCIAL CONSIDERATIONS Funds are budgeted in the 1997-1998 Capital Improvement Program as follows: Peppertree Bend, Account No. 12-65300-4703-134 $76,000.00 Calle Arroyo Bike Trail, Account No. 12-65300-4703-111 50,000.00 Preventative Street Maintenance., Account No. 12-65300-4734-119 216,000.00 Water District, Account No. 12-65300-4753-119 6,000.00 City Sewer Fund, Account No. 12-65300-4717-119 $4.500.00 Construction Total $352,500.00 Funds were allocated to each project from the 1997-1998 Capital Improvement Program as follows: Peppertree Bend, Account No. 12-65300-4703-134 $76,000.00 Calle Arroyo Bike Trail, Account No. 12-65300-4703-111 $50,000.00 Preventative Street Maintenance., Account No. 12-65300-4734-119 $189,484.30 Water District Concrete & Pavement Services Fund, Account No. 12-65300-4753-119 $6,000.00 City Sewer Fund, Account No. 12-65300-4717-119 $4,500.00 Construction Total $325,984.00 Construction was completed for$346,066.26 due to minor quantity changes with funding allocation as follows: Peppertree Bend, Account No. 12-65300-4703-134 $72,506.91 Calle Arroyo Bike Trail, Account No. 12-65300-4703-111 $49,984.75 Preventative Street Maintenance., Account No. 12-65300-4734-119 $206,151.60 Water District Concrete & Pavement Services Fund, Account No. 12-65300-4753-119. $9,100.00 City Sewer Fund, Account No. 12-65300-4717-119 $8,323.00 Construction Total $346,066.26 NOTIFICATION All American Asphalt Edward C. Raymund, Peppertree Bend Glen Fouret, Peppertree Bend John Grant, Outpost Road Margaret Cogdell, Ortega Properties ALTERNATE ACTIONS 1. Accept the improvements. 2. Do not accept the improvements. 3. Refer to Staff for additional information. AGENDA ITEM -4- March 3, 1998 RECOMMENDATION By Resolution, determine that the work for the Capital Improvement Project, Preventative Street Maintenance 1997-1998; (CIP No's. 111, 119 and 134) has been completed and declare the work to be accepted; direct the City Clerk to forward a Notice of Completion to the Orange County Recorder for recording and authorize Staff to release the 10% retention in the amount of$34,606.63, 35 days after the recordation of the Notice of Completion. Respectfully submitted, Pre ared by, William M. Huber, P.E. Brian Perry, P.E. Director, Engineering and Building Project Manager. WMH/BP:ssg Attachments: 1. Resolution 2. Notice of Completion a:\agendas\2-3prev.bp