06-0711_D.M. KISLLING CONSTRUCTION_Transmittal from DM KislingJul 11 06 09:19a D
Kisling Construction 1961 493-4251
6 t • ►1 0,10
.40 :4)
S'r •'• " •J F•'' '+c
July 11, 2006
City of San Juan Capistrano
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
Attention: Mr. Peter Salgado, Senior Civil Engineer
Re: SC04 Pipeline Anode Installation
Dear Peter.
We are pleased to submit a proposal for the installation of four (4) pre-packaged anodes along the SC -
04 Transmission on La Pate Avenue in the city of San Juan Capistrano.
We propose to furnish all labor, materials, and equipment required to complete the installation of four
(4) sixty pound (60 Lb.) pre-packaged Zinc Anodes in accordance with the plans as prepared by RBF
Consulting; entitled "SC -04 Transmission Main Anode Installation", Plan 0575 A, Sheets 1 & 2, dated
May 22, 2006; for the lump sum cost of Eight Thousand Two Hundred Fifty Dollars ($ 8,250.00)
Exclusions to this proposal are as follows;
1) Any Design, Engineering, or Surveying.
2) Permits or Fees.
3) Bonds.
Sincerely,
John J. Tolmasov, P.E.