Loading...
06-0711_D.M. KISLLING CONSTRUCTION_Transmittal from DM KislingJul 11 06 09:19a D Kisling Construction 1961 493-4251 6 t • ►1 0,10 .40 :4) S'r •'• " •J F•'' '+c July 11, 2006 City of San Juan Capistrano 32400 Paseo Adelanto San Juan Capistrano, CA 92675 Attention: Mr. Peter Salgado, Senior Civil Engineer Re: SC04 Pipeline Anode Installation Dear Peter. We are pleased to submit a proposal for the installation of four (4) pre-packaged anodes along the SC - 04 Transmission on La Pate Avenue in the city of San Juan Capistrano. We propose to furnish all labor, materials, and equipment required to complete the installation of four (4) sixty pound (60 Lb.) pre-packaged Zinc Anodes in accordance with the plans as prepared by RBF Consulting; entitled "SC -04 Transmission Main Anode Installation", Plan 0575 A, Sheets 1 & 2, dated May 22, 2006; for the lump sum cost of Eight Thousand Two Hundred Fifty Dollars ($ 8,250.00) Exclusions to this proposal are as follows; 1) Any Design, Engineering, or Surveying. 2) Permits or Fees. 3) Bonds. Sincerely, John J. Tolmasov, P.E. EXHIBIT A P.2