Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
09-0120_M.S. CONSTRUCTION_Bid Proposal
BID PROPOSAL For the: THE LITTLE HOLLYWOOD AFFORDABLE HOUSING PROJECT PHASE II— 10 UNITS LOS RIOS HISTORIC DISTRICT �/ 1 73 Z14,4 Contractor, License No. & Classification To the Members of the Board of Directors San Juan Capistrano Community Redevelopment Agency Gentlemen: The undersigned, as bidder, declares that he has carefully examined the location of the proposed work as described, examined the Plans, Specifications, Special Provisions, and the Standard Specifications for Public Works Construction. 2006 Edition, including all supplements therefore, read the Instructions to Bidders,and is familiar with all proposal requirements,and hereby proposed and agrees, if the proposal is accepted, to complete the said construction in accordance with the Contract Documents, as defined in Section 1-2 of the Standard Specifications, in the time stated herein, for the unit price or lump sum given on the following pages of this proposal,amounting to a total of: �sirti Words Pigures Said amount to include and cover all taxes,the furnishing of all materials,the performing of all the labor requisite or proper and the providing of all necessary machinery, tools, apparatus, and other means of construction; also,the performance and completion of all the work in the manner set forth, described and shown in the Specifications or the drawings for the work. If the contract is awarded, the undersigned agrees to enter into a contract with the San Juan Capistrano Community Redevelopment Agency and to commence work within fifteen(15)calendar days from the date of execution thereof, and to diligently prosecute the work to completion before the expiration of two hundred forty(240)calendar days,and ninety(90)calendar days thereafter for the landscape maintenance. All bids are to be computed on the basis of the given Estimated Quantities of Work, as indicated in this proposal, times the unit prices as submitted by the bidders. In case of discrepancy between words and figures, the words shall prevail. In case of discrepancy between unit prices and the extension thereof,the unit price shall prevail and bids will be computed as indicated above and compared on the basis of corrected totals, given solely as a basis for 3 comparison of bids. It is understood that the San Juan Capistrano Community Redevelopment Agency does not expressly,nor by implication,agree that the actual amount of work will correspond therewith,but reserves the right to increase or decrease the amount of any item or portion of the work or to omit portions of the work as may be deemed expedient by the Engineer. It is also understood by Bidder that the San Juan Capistrano Community Redevelopment Agency has the right to reject this proposal or to award a contract to the undersigned at the prices stipulated. If the proposal is rejected, then any check or cashier's check shall be returned to the undersigned within thirty (30) days. No bid bonds will be returned. If the proposal is accepted and the undersigned fails to enter into a contract within fifteen(15)days after the agreement is delivered to him for signature,or within such further time as may be granted by the Members of the Board of Directors,then said check shall be cashed or said bond declared forfeit and an amount equal to the difference between the lowest bid and the next lowest bid who will execute a contract shall be paid into the treasury of the San Juan Capistrano Community Redevelopment Agency as liquidated damages for the failure of the undersigned to comply with the terms of this proposal. Accompanying this proposal is //�� i� /� T/ (Insert "$ cash,"cashier's check,certified check or bidder's bond on the forms from pages BB- 1 and 1313-2 of these Contract Documents, as the case may be), in an amount equal to at least ten percent(10%) of the total bid. The following is the name and place of business of the surety company which will furnish the required bonds as surety if the work is awarded to the undersigned: Licensed in accordance with an act providing for the registration of contractors -- License No. 7 3� and Classification Signature of Bidde - 4 (If an individual, so state. if a firm or co-partnership, state the firm name and give the names of all individual co-partners composing the firm: President, Secretary, Treasurer, and Manager thereof) Dated: D �q J HYD ��4r 11ri I `� S Business Address 4262`] Dated: Oi Telephone Number Further, the undersigned bidder certifies that he has thoroughly checked the figures set forth in this proposal, that they are correct to the best of his knowle41constitutehis proposal for the work called out herein. Dated: � 1 �� / Sign�aattu�rre of BidDated: d /7 7 ��� — S� Te phone Number 5 SCHEDULE OF WORK ITEMS THE LITTLE HOLLYWOOD AFFORDABLE HOUSING PROJECT PHASE 11- 10 UNITS LOS RIOS HISTORIC DISTRICT MOBILIZATION, ROUGH GRADING, & EROSION CONTROL Item Approx. Work Items With Unit Price Unit Price Total Amount uantit (Written in Words) (In Figures) C-1 1 L.S. ProjectSurveyfor the lumpsumprice of $ $ S,K.`t�,,-th&u4-pa dlW- kknd 1(Or (00. 00 (0, (00, U o dollars. C-2 1 L.S. Establish Centerline Ties and Monuments $ $ for the lump sum price of �Z�J�. �'S7J0 . OD "7-Do, pa ��/`,=," _ " l�� dollars.llars. C-3 1 L.S. Mobilization fpr the um sum price of $ $ ��`��9 Q p dollars. 3,.5w . 60 '3Sp0 . 00 C-4 1 L.S. Clear and Gryb for the lump SUT price of $ S -P dollars. (95-Da. 0C) �oJ—Da, Da C-5 I L.S. Remove and Dispose of Existing Headwall $ $ and Trash Rack,for the lump sum of dollars. (�� Dp 1SOo • o O C-6 1 L.S. Cons ct Deesilting Basi for the lump sum $ $ dollars. r7SDO OU rf 5,,,00 C-7 1 EA. Construct Concrete Collar for the unit price $ $ of rtr--, s (5w. 0c) I SW.60 dollars per each. 6 C-8 1 L.S. Provide On-Site BMPs and Brosion Control $ S for the duration of the construction(Rough Grade&Precise Grade).per the Erosion O� 0 U 0•GO d�Dori 0 Control Plans for the lump sum of dollars. C-9 24,000 CY Rough grade the projccr site to proposed S $ rough grade plan elevations. This grading includes street undercuts;finished pads,and the over excavation and recompaction of Ya 130 0W. b Q existing soils per the geotechnical engincer's. '1 report for pa cubic yard price of do s. C-!0 788 CY Import soil for site earthwork balanceand $ S compact to proposed Trough � ) or the per -0,OC ` 66 cubic yard price.of dollars. MOBILIZATION,ROUGH GRADING,BMP SUB-TOTAL S 94/9�d,a� 7 OT'J In•rT OM] N AMI nlor_oOb_cbc•YDJ 7`1T JJfl c 1 flj IIr9 me SEWER IMPROVEMENTS Item Approx, Work Items With Unit Price Unit Price Total Amount uantit (Written in Words), (In Figures S-1 62 L.F. Furnish and Install 15"PVC SDR-35 Sewer $ $ Line with Pipe Bed ing for the unit price of 15-0.06 6? MV, dollars per linear foot. S-2 295 L.F. Furnish and Install 8"PVC SDR-35 Sewer $ $ Line with Pipe Bedding for the unit price of ISS Oo G - dollars per linear foot. S-3 165 L.F. Furnish and Install 6"PVC SDR-35 Sewer $ $ ire with Pi a Bedding for the unit price of 1 Di h2 dollars per linear foot. S-4 283 L.F. Furnish and histall 4"PVC SDR-35 Sewer $ $ Lateral for the unit price of &c� 3", 0 d�l 54 .e is dollars per linear foot. S-5 Z�A:h Construct 48" Sewer Manhole for the unit $ $ S E.A . price of jaaX ` ?36o. oo icy dollars per each. ✓I Wr2i,#2 S-6 15 EA. Construct Sewer Clean-out or the,unlit price $ $ of `/Zd') hU , Do 37J� on dollars per each. T— S-7 3 EA. Break into Existing Sewer Manhole and $ $ Connect PVC Sewer Pipe Modifying Manhole Bottom as Required for the/unit l Soo 06 54oes , a a price of dollars per eac . S-8 1 EA. Furnish and Install 4"x6"Reducer for the $ $ unit price of �, &A4 dollars per each. 8 S-9 Z7T L.F. Abandon and Remove Existing Sewer Line $ $ $cj 2 1..6 for the unit price of �� r� �0, d a �r� .2,0• 0 0 r'c AW011 dollars Sper linear foot. S-10 2 EA. Abandon and Remove Existing Sewer $ $ Manhole fo th unit rice of .�/o _ ��a, pp '�D 60 . a s puzo dolrs per each. S-11 4 EA. Adjust to Grade Existing Sewer Manhole for $ $ the unit price of SLte —M-a LA , ) o b6. o 4613Q . ao dollars per each. S-12 1 LS Supply and implement sewer by-pass $ $ pu,/�tt�p�m�g for the lu p sum of . dollars. S-13 17 L.F. Trench, Backfill, and Resurfa a Street or $ $ the unit price of gv'150,ao J O, is a dollars per linear foot. SEWER [MPROVEMENTS SUB-TOTAL $ l03 �uy, 6� 9 WATER IMPROVEMENTS Item Approx. Work Items With Unit Price Unit Price Total Amount uantit (Written in Words) (In Figures) W-1 11 EA. Fumis and stall ollar forte nit price $ $ dollars per each. �� W-2 L.F. Trench, Backfill, and esurface St eet for $ $ 131 L.F. the unit price of S, a a Gn—A�D�d� `' �2 dollars per linear foot. W-3 719 L.F. Construct 8"PVC C-900 CL-2Q0 Wat $ $ Main for the unit price of at Main • S-9 oo 4o,9g3. a dollars per linear foot. W-4 15 EA. Construct Thrust Blocky� for thpr unit price of $ $ e C< 4 G1[ n X -2-00. o a dollars per each. 300 0c) W-5 13 EA. Construct 45°, 22.5°, 11.25' Be,,��d for the $ $ unit price of �-�nl�� V�1 dGre.d� 02-d a . a o o2(O00 , 06 dollars per each. W-6 1 EA. Construct Air& Vacuum Relief Valve for $ $ the unit price of J"67-E-,9, � /OS-0 ,06 C)�}, op dollars per each. W-7 2 EA. Construct Hots Connectionrfor the unite $ $ priceof�V� `;*f�/� Min wp.e�. U.800 ,00 S- 00 , 06 dollars per each. W-8 4 EA. Furnish and Install 2.50 High Deflection $ $ Coup" g ( ) for the unit price of . L` 6 a C dollars per each. 10 I W-9 2 EA. Construct Fire Hydrant A embly for the $ $ unit price of zli6t ;1� 11P lqna , p0 ?,qO On . 06 dollars per each. i 10 AA. Construct 8"Gate Valve and Valve Box $ $ It F—•A• Assembly for the u 't price of 1106, ba d dollars per each. W-11 10 EA. Furnish and Install 1"Domestic Water $ $ Servi a line fo the per lines�'foot price of 'bpp,pp la poo, 00 Collars each. W-12 209 L.F. Furnish and Install 1" Domestic Water Meter $ $ & B x for the unit price of (� 3 dollars per linear foot. b0. as®"�° WATER IMPROVEMENTS SUB-TOTAL $ bo i i li i STREET IMPROVEMENTS Item Approx. Work Items With Unit Price Unit Price Total Amount uanti (Written in Words) (In Figures ST-1 708 S.F. Sawcut and Remove Existing A.C. Pavement $ $ for the unit price of 3 ,00 2 f2�• a a dollars per square foot. ST-2 297 S.F. Sawcut and Remove Existing Concrete $ $ Driveway for the unit price of Adz . // 66 //�7�• o0 dollars per square foot. ST-3 325 Tons. Construct 4"A.0 street paving. Actual R $ $ Value to be confirmed onsite and verified by soils en neer for the unit price ofd �`® d v 3S 1 o0 � _dollars per ton. ST-4 207 CY. Construct 5" A.B. for street paving. Actual $ $ R Value to be confirmed onsite and verified by soils engineer for the unit rice of JrS.o 1 a 6•a O T- dollars per cubic yard. ST-5 10 EA. Install Precast Concrete Wheelstop for the $ $ unit price of u, 35,. a p 3sb,Ocs dollars per each. ST-6 115 L.F. Paint 4" White Strip fqr the unit price of $ $ �O. rz,o k\ � . as dollars per linear foot. ST-7 241 S.F. Construct 5" Concrete Driveway with No. 3 $ $ Bars @ 24" O.C. for the unit price of 1 J .o0 361 6d dollars per square foot. 12 ST-8 22 L.F. Install NDS Dura Channel Drain Part No. S $ 600 with DS-221 Grate for the unit price Ib IIO[l . 00 dollars per lin foo ST-9 I L.S. Remove Existing Speed Bump and Construct $ $ Speed Bump of Equal Dimensions on Ramos Street Immediately East of 4'A"Street j S0 0, h d 3 Sp 6, O a In essection f r the 1ts¢�p s pr of �doUars. ST-10 1 EA Construct Street Li for the unit price of $ oLl y 0 O S I a/ �I 00 dollars per each. STREET 1114PROVEMENTS 5UB-TOTAL 03, 6 V. 13 «T nn.nT nMv nv nnu «IOn nn«.C«C•YOJ nnTJY a VOMW IITn ' rc PRECISE GRADING Item Approx. Work Items With Unit Price Unit Price Total Amount uanti (Written in Words) (In Fi ures) PG-1 65 TON Construct 4" A.C. driveway paving. Actual $ $ R value to be Confirmed Onsite and Verified by the Soils Engineer for the unit price of P.. i ke+. dollars per on,/� i ,f . PG-2 42 CY Construct 5" A.B. for driveway paving. $. $ Actual R Value to be Confirmed Onsite and Verified by the oils Engineer for the unit Dzs a1 3� n d price of � dollars per cubic yard. PG-3 1 L.S. Construct Dry�Well for the lsuof $ $ um m dollars. 35tio. 00 3S-6 4�N. so PG-4 1 L.S. Furnish and install EcoRain Systems $ $ Raintanks for the lump sum of TftavSi)ir0s dollars. PG-5 12 L.F. Furnish and install 36"RCP for the unit $ $ price of t rD kuxg�=96j, '2 ST.0o 7j aao. oa dollars per linear foot. I �— PG-6 462 L.F. Construct 10' Wide Dirt Equestrian Trail for $ $ the unit price of dollar 35 oa \b \-10 os per linear foot. PG-7 521 L.F. Furnish and install 4"Perforated PVC Pipe $ $ Bioretention Swale Subdrain for the unit Ilk•o [�ro scl price of dollars per linear foot. 14 PG-8 1 L.S. Construct Headwall, Pipe Inlet, and Concrete $ Pad for the lump sum of i vwzn +�� �yvt Q dollars. to I(as , 00 PG-9 1 EA. Fumish and install'Tr sh Rack u for the it $ $ price of s � (0$�0 — dollars per each. PG-10 5 EA. Fumish and install 12"Atrium Grate (NDS $ d" 1 O o 1280) for the unit price of T �% �7y✓f. /✓/a/h0 dollars per each. PG-11 1 EA. Construct Junction Structure with Pressure $ $ Manhole Shaft and Pressure Plate Detail qq wrt out Reducer for the unit price of a a 5j Q 6,kk ' dollars per each. PG-12 84 L.F. Furnish and install 4" Perforated PVC $ $ Subdrain pi e for the unit price of 3a. u a dao, oa dollars per linear foot. PG-13 181 L.F. Furnish and install 4"PVC pipe for the unit $ $ price of 3 , dollars per linear fo t. PG-14 81 L.F. Fumish and install 6"PVC pipe for the unit $ $ price ofI�szz-�A-i� 3fo. ou 06 dollars per linear f6ot. PG-15 182 L.F. Furnish and in all 8"PVC pipe for the unit $ $ price of 00 dollars per linear foot. PG-16 123 L.F. Furnish and install 10,,""PVC pipe for the unit $ $ price of u :IAt/ �a, o� �l kio, 0 6 dollars per linear fbot. 15 PG-17 2 EA. Furnish and install B pard r the unit price $ $ per dollars 900 , 66 f 'o 0 , 0 0 PG-I8 4 L.F. Furnish and install 36"RGP fo th per, S $ linear foot price of 0(1 dollars. 4 0, 6-5 PG-I9 521 L.F. Construct bioretention swale per the precise $ $ grading plans and detail 70 on sheet 3. Bid item to include 8" deep gravel layer,2'deep planting mix,2"mulch layer,and general `I fine grading of the side slopes for the per linear foot price of%vg ollars. PRECISE GRADING SUB-TOTAL is 111E hC• 1T Qnr17 07 AM 731TJJn C 'AMRA LIT') ')C'C BUILDING Item Approx. Work Items With Unit Price Unit Price Total Amount uanti (Written in Words) (In Figures) B-1 7 EA Construct raised concrete foundations for 2 $ $ bedroom(NC-01) Silvercrest manufacture homesfor the unit price of "�° �U 743• ov a o dollars per each. h B-2 3 EA Construct raised concrete foundations for 1 $ $ bedroom(NC-11047) Silvercreset manufactured homes f r the price of gB 1 {. oo dollars per each. B-3 7 EA Supply and install on foundations, by an $ $ occupational licensed contractor, the 2 bedroom (NC-01) Silvercrest manufactured homes with covered o% orches&decks ,7/� o 00 for the unit price o i dollars per each as specified in the /Au;— architecture Au; - architecture Mans. B-4 3 EA Supply and install on foundations, by an $ $ occupational licensed contractor, the 1 bedroom (NC-11047) Silvercrest manufactured hod �7 ° I}1�Sm rice the um of / s/ dollars per each as specified in th�azchitecture plans. B-5 3 EA Construct covered front porches, steps, $ $ decks, railings and ramps for all bedroom (NC-11047) Silvercrest homed for the unit price ofdollars �/�l� 3 • a a per eac per a details on the architecture Mans. B-6 10 EA Construct carports with storage cabinets for $ all homes for tlW unit price of,. �[ "&" �c q k ¢ dollars per each per i p 3,o o (�$ 030 the details on the architecture plans. 17 B-7 10 EA Supply and install concrete wheel stops for $ $ all carports for the unit ri e of dollars per 35 2j�•U p each per landscape architect's details. B-8 286 SF Construct 2 concrete pads for picnic tables $ $ for the unit price of &2{ dollars per square foot per detail k/L-3 on the � ,o o -7r7 4ab landscape plans. B-9 2 EA Supply and install 8' long icnic tables for $ $ the unit price of - dollars per each per detail1 L-3 on the �v o. 0 0 landscape plans. B-10 2 EA Supply and install trash receptacles for the $ $ unit price of 4 �e � M 0� dollars per each per detai -3 on the 3 S O o 76L• o c landscape plans. B-11 1 EA Supply and install one Dog Valet Pet Waste $ $ Station with cont. footing for the unit price of _dollars per JTZ U o S� o each erthe Am ni Schedule on the landsca a plans. B-12 2 EA Construct concrete/ tone entry pil4sters for $ $ the unit price of dollars per each per detail i/L-3 on the landscape plans. 0/000,00 B-13 1 EA Fabricate and install one s reet light for the $ $ unit price of-,& -- A '4L4 liars Lt- per each per detail d/L-5 on the landscape 7 40 SDU, 6 plans B-14 16 SF Construct concrete pad and foundation for $ $ Mail Box and pedestal for the lump sum of l LLl r� dollars l/• 04 44, 676 per square foot per detail h/L-3 on the landscape plans. B-15 1 EA Supply and install one 12 Unit Type 11 $ $ Cluster Mail Box on pedestal for the unit �{ price o O dollars per a2 9D.60 _[a-�LSo1 00 each per detail h/L-3 on the Vdscape plans. 18 13-17 2,304 SF Construct 4"thick sidewalks with stoops at. $ $ all houses for the unit price of -0—" dollars per square foot f per detail b/L-5 on the landscape plans. B-18 373 LF Construct 4'high wood fence enclosure at all S $ hof the unit price of dollars.per linear foot per detadd/L-A on the landscape plans. B-19 680 LF Construct equestrian fence for the unit price $ S Of dollars der linear oot per detail a/L-5 on the ��• v o 2'7 $gp landscape plan$. B-20 36 EA. Furnish and Install d2"-18"boulders as part $ $ of the stone stacking for the unit price of &AY" dollars (7$ • o o per detail 6/L-4 onific landscape plans. B-21 57 EA. Furnish and Install 9"-12" cobble as part of $ $ the stong stacking for the unit price of dollars 33 ��• Oc, per d ail /L-4 on landscape.plaas. B-22 123 EA. Furnish and Install 6'-9"cobble as part of $ S the,stqne stgcking for the unit price of dollars `t S• o % .a a per detail b/L 4 of the landscape plans. B-23 1980 SF Construct 6" thick concrete paving for the 10 S S carpo or the per square foot price of j dollars. L® o l3, �(�D• oa . 8U DING SUB-TOTAL S I, Iz�7/g7�j,ob 19 r.n• cc• it OM7 07 Arai nloc_tWn-reF-XBJ 7-1T44n c NCM AIr"1 ioz Domestic Water Irrigation Equipment DI-1 1 LS Supply and install connection to 1-1/2"water $ /Ord,OB $ meter for the irrigation point of connection the unit price of OAA— It r C6\ .Lje 6)t) dollars. DI-2 5 EA. Supply and install 2"Brass gate va z for $ fs0 $ the unit price of Pj's( Awl�-<� ��17 dollars per each. a 6 DI-3 I EA Supply and install 1-1/2"Reduced pressure $. cil do, 00 $ backflow preventer with wye strainer for the unit price of6Ae -(FtoiLS&ftigurdollars per each. hwnAC�C� DI-4 1 EA Supply and install backflow stainless steel $ 135-b- 00 $ vandal resistant enclosure for the unit price of A r eeri 7d dollars per each. I35a,00 DI-5 1 EA Supply and install booster pump with $ /,qlen oo $ electrical connection for the unit price of Op dollars per each. 9,too, 0 DI-6 1 EA Supply and install 2" Plastic pressure $ v2 q oto $ reducing master valve for the unit price of - dollars per each. c C DI-7 1 EA Supply, install and connect to controller a 1- $ 73. co $ 1/4"plastic flow sensor for the unit price of ollars per each. 7 or DI-8 5 EA. Supply and install 3/4" brass quick coupler $ j 31 , oo $ valves for the unit price of Ofiw /71cz��oP s,�rdollars per each. �'� ` 20 Dl-9 4EA. Supply and install 1"plastic automatic $ 4y. $ control valves for he unit price of �f1- I177U��,tj�t- , dollars per each. br7(p,b0 _ OO ul l `N n� DI-10 4 EA. Supply and install 1-1/2" plastic automatic $ �(US Op $ control valves for the unit price of One kutidollars per each. Dl-I1 1 EA. Supply and install 120/240 VAC power $ (o6J $ meter for the irrigation control timer for the unit price of dollars per each. — DI-12 1 EA. Supply and install automatic irrigation $ 7800. 00 $ control timer in a §tainless steel encl9sure for the unit price ofU0 dollars per each. DI-13 I LS Supply and install connection from electrical $ $ meter to irrigation control timer for the unit �/ 1 price of.22�f{�/�✓/air lollars. DI-14 650 L.F. Supply and install 2" Schedule 40 PVC mainline and fittings for the unit price of RbJo rQol( u-,oe 4oHars per lineal foot. DI-15 3,800 L.F. Supply and install Schedule 40 PVC non $ j, -7c $ pressure lateral piping and fittings f the / unit price ofOC for�'a� &qL O. 00 per lineal foot. C DI-16 4,250 L.F. Supply and install #14 AWG irrigation $ control wire including lead wire, common (080, OU wire and extra wires for the unit price of .,fs dollars per lineal foot. 21 DI-17 201 EA. Supply and install Rainbird 1812 SAM PRS $ p $ 12"pop up spray heads with MPR nozzles per plan for th u it price of --1' ,12 0.c t6�� dollars per each. C_;?; DI-18 54 EA. Supply and install Rainbird PARS PRS spray $ 3 $ heads on riser with check valve and MPR nozzles per plan f r the unit price of f in c�P�/roo llars per each. DI-19 62 EA. Supply and install Rainbird 1804 SAM PRS $ 1 D_SD $ 4"pop up strip bubblers with PCS screens per plan for the unit price of -7 T"i' - LI Je, 11-r dollars per each. F r= Z�;,rl-r . DI-20 18 EA. Supply and install Rainbird 1812 SAM PRS $ _�j $ 12"pop up spray heads with rotary nozzles per plan for the unit price of #off Do Ao b dollars per each. DI-21 54 EA. Supply and install Rainbird 1806 SAM PRS $ 1 e , p p $ 6"pop up 5H-13 bubblers with PCS screens per plan for the unit price of ,o0 dollars per each. DI-22 300 L.F. Supply and install 2" Schedule 40 PVC $ L , b p $ sling per plan for the unit price of 11 Vie-_ ,4o ((er- Q� dollars per lineal foot. 4 3�C•DO l L Lr�4 DI-23 50 L.F. Supply and install 3" Schedule 40 PVC $ 5, 40 $ sl ving per plan for the unit price of „27D.00 X /a.-,s dollars per lineal foot. DI-24 500 L.F. Supply and install 4" Schedule 40 PVC $ $ sleeving pc plan for the unit price of 3lo d D.v U per/T 114--ar\ dollars per lineal foot. oy.t? 'TlJaL6 . DOMESTIC IRRIGATION SUB-TOTAL $07 6 22 0 Future Recycled Water Irrigation Enuinment RI-1 1 LS Supply and install connection to 1-1/2" water $ $ meter for the irrigation point of connection 100- 60 /00,00 the unit price of � ht e dollars. RI-2 8 EA. Supply and install 2" Bass gate valves f r $ $ the unit price of15-6. 00 /Z OJ. OO dollars per each. RI-3 1 EA Supply and install 1-1/2" Reduced pressure $ $ backflow preventer with wye strainer for the Noo,0 O NOL), 00 unit price of OW Tko"e d 1� dollars per each. 4-cu, Kw «Q RI-4 1 EA Supply and install backflow stainless steel $ $ vandal resistant enclosure for the unit price /3 5-D, 00 /35-b, op of jttt�es Ajj dollars per each. a,A ` 1 RI-5 1 EA Supply and install 1-1/2" Schedule 80 PVC $ $ Basket Strainer with 80 mesh stainless steel j too, OD //00, 0C) screen for the unit price of u"o-,-i 60 dollars per each. RI-6 1 EA Supply and install booster pump with $ $ electrical connection fpr the unit price of 1�t 3 O o• o o /C/, Soo,6o 1(w&R-n :Qlw 6e 'dollars per each. RI-7 1 EA Supply and install 2"Plastic pressure $ $ reducing master valve with purple knobs for 0-0 00 the unit price of 7ZO 0 h uAdp4e d dollars per each. RI-8 1 EA Supply, install and connect to controller a 1- $ $ 1/4" plastic flown nso for the unit price of 70,Ca ��0, 7JU v c hwal ollars per each. 23 RI-9 7 EA. Supply and install 3/4" brass recycled water $ $ quick cou ier�al es for the unit price of 0/1,2llvl'd =dollars per each. /W.00 Od JUv"v RI-10 15 EA. Supply and install 1"plastic automatic $ $ control valves with urple l bs for the unit price of 6m h4 t dollars per /5—b, 00 Z ZSR' v,-' each. RI-1 I 1 EA. Supply and install ]-1/2"plastic automatic $ $ control valves/wit p ple knobs for the unit 00- 00 00, 00 price of dollars per each. RI-12 1 EA. Supply and install 120/240 VAC power $ $ meter for the irrigqtion control timer for the ,{ r unit price of AWb"Adollars per each IfAAF RI-13 1 EA. Supply and install automatic irrigation $ $ control timer in a stainless steel enc sure for the unit price o �19! 0U ,U p goo , 00 dollars per each. hu-11"d , RI-14 1 LS Supply and install connection from electrical $ $ meter to irrigation control timer for the unit 3/g 3 price of�4 y^rev,!�gllars. RI-15 700 L.F. Supply and install Purple 2" Schedule 40 $ $ PVC mainline and fittings for the unit price of 7141044( - EJl�n dollars per lineal a SID o2O 3U ,00 foot. Ca4b R1-16 4,550 L.F. Supply and install Purple Schedule 40 PVC $ $ non pressure lateral piping and fitt gs fo _ the unit price of U(dor 1��� ' a`� dollars per lineal foot. C 24 RI-17 5751-.F. Supply and install Purple Schedule 40 $ $ Ultraviolet resistant(UVR)PVC non $� 0 3• S pressure lateral piping and fittings on rade for the unit price of �31Q ((°� dollars per lineal foot. Yre- RI-18 6,200 L.F. Supply and install 414 AWG irrigation $ $ control wire including lead wire, common wire and extra wires for the unit price of 0 5�kay\ dayk-) dollars per lineal foot. RI-19 131 EA. Supply and install Rainbird 1812 SAM PRS $ $ NP 12"pop up spray heads with MPR nozzles per pl for_ the unit price of dollars per each. R1-20 22 EA. Supply and install Rainbird PASS PRS spray $ $ heads on riser with check valve and MPR nozzles per plan for the unit price of 3 '75D ollars per each. R1-21 2 EA. Supply and install Rainbird 1804 SAM PRS $ $ NP 4"pop up strip bubblers with PCS screens per plan for the unit price of aA•o o �� • d 61A. dollars per each. RI-22 29 EA. Supply and install Rainbird 1812 SAM PRS $ $ NP 12"pop up spray heads with rotary nozzles per plan for the unit price of Q- o (ola, •O 4 -134 dollars per each. RI-23 23 EA. Supply and install Rainbird 5012 PL-R-SAM $ $ NP 12"pop up rotor heads with MPR nozzles per plan for the unit price of YI. , dollars per each. RI-24 19 EA. Supply and install Rainbird PARS PRS spray $ $ heads on riser with check valve and rotary l� • ve nozzles per plan for the unit price of 3�-'° • � 4--,-� dollars per each. 25 RI-25 7 EA. Supply and install Rainbird 500OS-PL-R $ $ rotor heads on riser with check valve and -M�7P'�R` .n�o--zzles per plan for the unit price of t• Oo Z0-6 . e o w, LR41.2, dollars per each. R1-26 111 EA. Supply and install Rainbird 1806 SAM PRS $ $ NP 6" pop up 5H-13 bubblers with PCS screens per plan for the unit price of a Q\c, • a o M116?k,07� eie dollars per each. RI-27 100 L.F. Supply and install 2" Schedule 40 PVC $ $ sleeving per plan for the unit price of dp//e-s dollars per lineal foot. � of R1-28 175 L.F. Supply and install 4" Schedule 40 PVC $ $ sleeving per plan fob the unit price of � dollars per lineal foot. Rs \SbG, zS RI-29 2 EA. Supply and install recycled Water signs for $ $ the unit price of dollars per each. 6 ,6z8,So FUTURE RECYCLED WATER IRRIGATION EQUIPMENT SUB-TOTAL $ 26 LANDSCAPE Item Approx. Work Items With Unit Price Unit Price Total Amount uantit (Written in Words) (In Figures) L-1 1 LS Remove existing Willow & Eucalyptus trees $ � SZSD $ 3/ 50C) and roots for the lump sum of �yyuy 2V�- Zjjl� dollars. L-2 1 LS Clean and trim by a certified arborist and $ $ protect in place the existing cluster of Pepper trees in the center of thg site, for the lump Soo, O° gc5c, ' ob sum ofe!� jY�1 o ars. L-3 34,997 SF Soil prep and fine grade all landscape areas $ $ for the unit price of - cow dollars per square foot. O,\O 0 L-4 34,997 SF Weed abatement in all landscape areas for $ $ the unit price of TPin Cin f$ dollars per square foot. O. C7 34'1 ,-1 } L-5 10 EA Supply and install 15 gal. trees as shown on $ $ the landscape plans for the unit price of ( - dollars per each. �� •o o ftp .o A L-6 45 EA Supply and install 24" box trees stakes and $ $ ties as shown on the landscape plans for the unit price ol` WO KSLk",�dollars 00 �a t 2-'99. Oo per each. �_� L-7 8,154 SF Hydroseed Bioswale seed mix as specified in $ $ the Ground Cover Schedule of the landscape plans for the unit price of f n LQ,v . 1 d IS-. 4 v dollars per square foot. 27 L-8 5,045 SF Hydroseed Meadow seed mix as specified in $ $ the Ground Cover Schedule of the Ian dsea_qp-e plans for the unit price of —fl-deAke G°�Wi) �' 1� IROS . 4 b dollars per square foot. L-9 13,567 SF Hydroseed Low Growing Native seed mix as $ $ specified in the Ground Cover Schedule of the landscape plans for the unit price of i D Q CJ`c • 3L dollars per square foot. L-10 216 CY Supply and install a 2" deep layer of Bark $ $ Mulch in all landscape areas for the unit price of ?jp . o o Ie LA c dollars per cubic yard. L-11 418 EA Supply and install 1 gal. shrubs (mostly CA $ $ natives) as shown on the landscape plans for the unit price of —vim. 0,00 dollars per each. L-12 762 EA Supply and install 5 gal. shrubs (mostly CA $ $ natives) as shown on the landscape p ans for the unit price of �Z 3 . 3�5, 0. dollars per each. L-13 90 DAYS 90 Day Lands�eca/p`p'e Maintenance for the unit $ $ price of 2Vn . C(-'1.j-j dollars per day. 1 414oa L-14 36 EA Supply and install 12"-18"Boulders as $ $ shown on the landscape plans for the unit price of —fiZt1,;,�, a5, Oo dollars per each per s he ule on detail b/L-4 �db' o0 on the landscape plans. L-15 1 LS Supply and install 57-9"-12" Cobbles as $ $ directed by the landscape architect for the lump sum of a610,00 dollars per schedule on detail b/L-4 on the landscape plans. 28 L-16 1 LS Supply and install 123-6"-9" Cobbles as $ $ directed by the 1 dsca e ar hitec for the lump sum of �UO,O o dollars per sche ule on detail b/L-4 on he landscape plans. L-17 48 LF Construct concrete steps in sidewalks per $ ab• $ grading plans for the unit price of �fn dollars per linear foot. L-18 496 LF Construct 6"concrete mow curbs on both $ $ side of DG path for the unit price of Q 7 t dollars per linear foot 18 - 00 per Mail c/L-5 on landscape plans. L-19 744 SF Construct and install 3" thick colored, $ $ stabilized, decomposed granite path for the unit price of I o lars per square foot per pavi notes on s -2 of the landscape plans. L-20 3 EA Fabricate and install wood path lights for the $ ,{ �v unit price of pYe� /fa / dollars `-1 i per each per detail /L-4 on the landscape plans. LANDSCAPE SUB-TOTAL $ _U,,y 76,9 Total Bid Price(Enter here and on Page 5) �f/dysr���i1G� $ � 083, 53 , 33 Words � / � ��Z�� ,33 Figures �d J ALTERNATIVE BID ITEMS The Contractor shall also provide costs for the following bid alternate items for possible inclusion or substitution(as applicable) of base bid items shown above. 29 Item Approx. Work Items With Unit Price Unit Price Total Amount Quantity (Written in Words) (In Figures) A-1 1 L.S. Cut into Existing 26"Dia. 0.250" Min. $ 19 �� $ Thick Steel Casing& 15"PVC SDR-26 c1i C(67S PVC Sewer Line for the lump sum of dollars. A-2 3 EA Additional Plant Material-24" box trees $ 4 bb $ 20 U stakes and ties for the unit price of Avg- 4&�A(iwZ4g�'7 dollars per each. A-3 10 EA Additional Plant Material - 5 gal. shrubs for $ 3o $ 3 O d the unit price of dollars per each.—� A-4 30 EA Additional Plant Material - 1 gal. shrubs for $ ) $ 360 the unit price of dollars per each. ALTERNATE BID ITEMS TOTAL $gf, 760 30 SCHEDULE OF WORK ITEMS THE LITTLE HOLLYWOOD AFFORDABLE HOUSING PROJECT PHASE II— 10 UNITS LOS RIOS HISTORIC DISTRICT DRY UTILITIES Item Avvrox. Work Items With Unit Price Unit Price Total Amount uantit (Written in Words) (In Fi ug res) DU-I 760 L.F. Trench main-4 party joint trench(E, G, $ $ T, C) for the per h ear foot price of N a .0 o 10, vo o-fK _ -1 y dollars. DU-2 50 L.F. Trench main- 3 party joint trench(E,T, $ $ C) for the per linear foot price of `C 00 !75W.00 71-� dollars. DU-3 50 L.F. Trench main -2 party joint trench (T, C) $ $ for the per linear foot price of rrr� k© ,00 ADO, 00 dollars. DU-4 60 L.F. Trench main- I party joint trench(G) $ $ for the per linear foot price of ( 0, 00 boo 00 dollars. DU-5 920L.F. Apply 3" sand cushion for the per linear $ $ foot price of - ew_ —Pun do I L , Cdollars. �2- C)o 0 6 �o 30-a DU-6 760 L.F. Apply 12" sand shade over electric for $ $ the per line�i foot price of r AVO dollars. DU-7 860 L.F. Apply 6" sand shade over CATV & $ $ Telephone for the linear foot price of ,OJ S-'3 0. op dollars. DU-8 820 L.F. Apply 12" sand shade over gas for the $ $ per linear foot price of ry 00 ���0 00 S�✓ dollars. DU-9 1270 Furnish and install 2" conduit, electric $ $ L.F. (sch 40) including pullrope,sweeps, and mandrel all conduit as required for the q-00 per linear foot price of dollars. DU-10 530 L.F. Furnish and install 4" conduit, $ $ telephone (sch 40) including pullrope, sweeps, and mandrel all conduit as 1�•0� 3�p, 00 required for the per linear foot price of dollars. DU-11 390 L.F. Furnish and install 2" conduit, $ $ telephone (sch 40) including pullrope, sweeps, and mandrel all conduit as q,o0 3 �� o required for the per linear foot price of dollars. 30-b DU-12 4 EA. provide excavation,material and labor (including ground rods&rock base &/or slurry)as required for SDG&E �SjjD t 0 O 3312 for the per unit 1"01 )D Cori i 00 a dollars. DU-13 2 EA. Provide excavation,material and labor (including ground rods&rock base &/or slurry)as requited for SDG&E � 0 t7 0 0 o0 3421 transformer pad for�h per unit price of fc IF e dollars. DU-14 4 EA. Provide excavation,material and labor (including ground rods&rock base &/or slurry)as required for AT&T' �(), 00 pf}O 0 a 1 T'x30" plice bqx for the per unit price . of �F,�-x- V�w��v,-eQQ dollars. DU-15 4 EA. Provide trench notch for Cox Communication structures(to be installed by others). Item includes excavation,material and labor g00, 0 D Z0b o0 (including ground rods&rock base &/or sl )as required for the per unit price of � . -a dollars. DU-16 10 EA. Provide service extensions for the per unit priceorg[ j c5tix 00,00 2-f,,OOd , oa h � dollars. DU-17 6 EA. Furnish and Install Bollards for Transformers for the per unit price of '900. 0 0 dollars. "IY DRY UTILITIES SUB-TOTAL FY UT� / . 30-C SO'd 90:£i 8002 9Z nary GL8£-88b-W:xej 33I3d0 S.210rb^I AID JCS DESIGNATION OF SUB-CONTRACTORS Submit with Proposal. In compliance with the Provisions of Section 4100-4107 of the Government Code of the State of California as amended, the undersigned certifies that he has used the sub-bids of the following listed sub-contractors in making up his bid,and that the sub-contractors listed will be used for the work for which they bid, subject to the approval of the Engineer, and in accordance with the applicable provisions of the Specifications. It is understood and agreed that all those portions of the work called for in the contract documents for which a sub-contractor is not listed will be performed by the undersigned through his forces. If no sub-contractors are listed, all bonds and insurance will be written in the name of the general contractor only. Item of Work Sub-contractor License No. Address Phone & Classification 1. �5��✓� �iw / //l�a/suR✓� ,� (�yo-v3 sL> 2. 3. �lJ�ni -JIlewiS6ns _�/T rj /�6Yfiori; C�h- C �/x)s�y-a29aL 4. ei/a/ ia l�z.d%i✓fj �./!I G/{ ffls�z CA (c/ �Ei S21( 5. 6. 9W 6_1311 7. o s. BIDDER'S NAME a r V ,0 t t' ip L9 'Y,a �"IDJ AUTHORIZED SIGNATURE 32 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT STATE OF CALIFORNIA }SS COUNTY OF ORANGE_ _ _ _ On 11/17/08 before me, HEDIEH SABET personally appeared MIKE SAGHAFI NAME(S)OF SIGNER(S) personally known to me -OR-proved to me on the basis of satisfactory evidence to be the person(s)whose name(s)is/am subscribed to the within instrument and acknowledged to me that he/she/they executed the same in histher/their authorized capacity(ies),and that by his/her/their N.MET signature(s)on the instrument the person(s),or the entity upon behalf of COMM. 01617668 which the person(s)acted,executed the instrument. Notary PubW•Califorrpa I ^ ., Orange CWally WITNESS my hand and official seal. Conor Ego No. 11009 t C` r SIGNATUREJ OF NOTARY OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT INDIVIDUAL CORPORATE OFFICER NON-COLLUSION AFFIDAVIT TITLE(S) TITLE OR TYPE OF DOCUMENT PARTNER(S) LIMITED or GENERAL 1 ATTORNEY-IN-FACT TRUSTEE(S) NUMBER OF PAGES GUARDIAN/CONSE RVATO R OTHER: 11/17/08 DATE OF DOCUMENT SIGNER IS REPRESENTING: NAME OF PERSON(S(OR ENTITY(IES) SIGNER(S)OTHER THAN NAMED ABOVE 4' i:ny)bia. �..:G.�'� «aJtl Bond No. T-100 BID BOND KNOW ALL MEN BY THESE PRESENTS, that we, M.s. construction Management Group , as PRINCIPAL, and Travelers Casualty and Surety company of America as SURETY, hereinafter called Surety, are held and firmly bound unto the San Juan Capistrano Community Redevelopment Agency,Obligee,hereinafter called { Agency, in the sum of S 1o% of Amount Bid for payment whereof Principal and Surety bind themselves,theirbeirs,executors,administrators,successors and assigns,jointly and severally,fairly by these presents. �I THE CONDITION OF THIS OBLIGATION is such that,. whereas the Principal has submitted the accompanying bid dated November 17th 2008, for the construction of f The Little Hollywood Affordable Housing Project Phase II - 10 Units for the San Juan I Capistrano Community Redevelopment Agency,Orange County, California. i NOW,THEREFORE, if the Principal shall not withdraw said bid within thirty (30) days i after the opening of same,and shall,within fifteen(15)days after the agreement has been presented to him for execution, enter into a written contract with the Agency in accordance with the bid as accepted. and if the Principal shall give the required bond with good and sufficient sureties, or sureties for the faithful performance and proper fulfillment of such contract and for theprotection of laborers and material men,or in the event of the withdrawal of said bid within the periods specified, C or the failure to enter into said contract and give said bond within the time specified,if the Principal shall,within sixty(60)days after request by the Agency,pay the Agency the difference between the , amount specified in said bid and the amount for which the Agency may procure the required work and/or supplies if the latter amount be in excess of the former, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue. Further, as a part of the obligation secured hereby, and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by Agency in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered. I 38 i IN WITNESS WHEREOF,the above-bounden parties have executed this instrument under their several seals this 13th day of November ,200 e,the name and corporate seal of each corporate party being affixed hereto and these presents duly signed by its undersigned representative pursuant to authority of its governing body. Two Witnesses (If Individual) M.S. Construction Mana e nt crou PRINCIPAL By: i Title: ATTEST(If Corporation) Corporate Seal Trers Casualty d Surety Company of America 7RETY ATTEST By: Daniel Huckabay Title: Attorne i -Fact = Title: G�_. APPROVED AS TO FORM: Omar Sandoval,Agency Attorney 39 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT STATE OF CALIFORNIA Countyof Orange On 11/13/08 before me, Arturo Ayala Notary Public Date Here Insert Name and Title of the Officer personally appeared Daniel Huckabay Name(s)of Signer(s) who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) ^• n r,��< ., -� acted, executed the instrument. r' ' "I"t✓ I certify under PENALTY OF PERJURY under the laws of / 0'p,' the State of California that the foregoing paragraph is true l r r CC:: and correct. Witness my hanti#a Signature Place Notary Seal Above Signature of Notary Public OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Bid Bond Document Date: 11/13/08 Number of Pages: Two Signer(s) Other Than Named Above: Capacity(les)Claimed by Signer(s) Signer's Name: Daniel Huckabay Signer's Name: ❑ Individual ❑ Individual ❑ Corporate Officer—Title(s): ❑ Corporate Officer—Title(s): ❑ Partner—❑ Limited❑General ❑ Partner—❑Limited❑General 56 Attorney in Fact ❑ Attorney in Fact ❑ Trustee ❑ Trustee ❑ Guardian or Conservator Top of thumb here ❑ Guardian or Conservator Top of thumb here ❑ Other: ❑ Other: Signer Is Representing: Signer Is Representing: 02007 National Notary Association•9350 De Soto Ave.,P.O.Box 2402•Chatsmuln,CA 9131&2402•w mNat onalNotary,org Item#590] Reorder Cell Toll-Free 1.333-376-682] Bond No. T-100 WARNIN*IS POWER OF ATTORNEY IS INVALID WITHOUT THE RWRDER FCOTIRAVELERS POWER OF ATTORNEY Farmington Casualty Company St.Paul Guardian Insurance Company Fidelity and Guaranty Insurance Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company Seaboard Surety Company Travelers Casualty and Surely Company of America St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company Attorney-In Fact No. 217860 Certificate No.001242188 KNOW ALL MEN BY THESE PRESENTS:That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York,that St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company and St.Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota,that Farmington Casualty Company,Travelers Casualty and Surety Company,and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut,that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland,that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa,and that Fidelity and Guaranty Insurance Underwriters,Inc. is a corporation duly organized under the laws of the State of Wisconsin(herein collectively called the"Companies"),and that the Companies do hereby make,constitute and appoint Ralph Eidem Jr., Daniel Huckabay,and Arturo Ayala of the City of Change ,State of California ,their true and lawful Attomey(s)-in-Fact, each in their separate capacity if more than one is named above,to sign,execute,seal and acknowledge any and all bonds,reeognizances,conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF,the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed,this_ I Oth day of October 2006 Farmington Casualty Company St.Paul Guardian Insurance Company Fidelity and Guaranty Insurance Company SL Paul Mercury Insurance Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company Seaboard Surety Company Mravelers Casualty and Surely Company of America St.Paul Fire and Marine Insurance Company United Stales Fidelity and Guaranty Company GnBV�r SIL°FIY 6 rI.Y INS l"�rly`yy'y� tr+Ne You. ....�.8 JP,. 9.t.i iNy ®R, '4( v $ ipPrrF� ')) }]7192] '^: z! NRnnORa,Cors. n � �" ^ 81CLAr/AIIN State of Connecticut By: V City of Hartford ss. Georg Thompson, mor ice Presidem On this the lOdt day of October 2006 before me personally appeared George W. Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company. Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters, Inc.,Seaboard Surety Company,St.Paul Fire and Marine Insurance Company,St.Paul Guardian insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America, and United States Fidelity and Guaranty Company, and that he,as such, being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporaatiotnss by himself as a duly authorized officer, In Witness Whereof,I hereunto set my hand and official seal. O• My Commission expires the 30th day of June,2011. P '%I/l\G * Marie C.Tetreeult.Notary Public �s 58440-6-06 Printed in U.S.A. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUTTHE RED BORDER WARNIDI'THIS POWER OF ATTORNEY IS INVALID WITHOUT THE D`'0 BORDER This Power of Attorney is granted under and by tho.-thority of the following resolutions adopted by the Boards Directors of Farrington Casualty Compafpv,FidelitL and Guaranty Insurance Company, Fidelity and Guaranty Insurance Underwriters, Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,which resolutions are now in full force and effect,reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Atlomeys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of a bond,recognizance,or conditional undertaking,and any of%aid officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her;and it is FURTHER RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED,that any bond,recognizance,contract of indemnity,or writing obligatory in the nature of a bond,recognizance,or conditional undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President,any Second Vice President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal,if required)by one or more Attorneys-in-Pact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED,that the signature of each of the following officers: President,any Executive Vice President,any Senior Vice President,any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Resident Vice Presidents,Resident Assistant Secretaries or Attomeys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such power of attomey or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I,Kori M.Johanson,the undersigned,Assistant Secretary,of Farmington Casualty Company,Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters. Inc., Seaboard Surety Company, St. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney exeeuied by said'Companies,which is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this 13th day of November _2008 Kon M.Johanse Assistant Secretary; � 511SS�+A vqy't�.9xc8+i'�;fo1 8o1a99q5'ltt1t® s 1XEI 'U � ��PIiO t;OSNEIOA.nlLlGf%9�offf/ P!i�ppg-lONq gl�q: (ri `J x.ucrtorxaN.m•,f"o= 18T9456 7na�*:927 _ :,,197 q•_S8AL;+z To verify the authenticity of this Power of Attorney,call I-gW-4213880 or contact us at www,,tpaultmveters'bond.com.Please refer to the Attorney-In-Fact number, the above-named individuals and the details of the bond to which the power is attached. WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER • CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT STATE OF CALIFORNIA }SS COUNTY OF ORANGE On 11/17/08 befdre me, HEDIEH SABET personally appeared MIKE SAGHAFI NAME(S)OF SIGNERS) personally known to me -OR-proved to me on the basis of satisfactory evidence to be the person(s)whose name(s)istare subscribed to the within instrument and acknowledged to me that he/shetthey executed the same in histherttheir authorized capacity(ies),and that by histher/their H. SABET signature(s)on the instrument the person(s),or the entity upon behalf of CGMM. *1617668 z which the person(s)acted,executed the instrument. aNotdry Public.California a zSIMY Orange County WITNESS my hand and official seal. Comm.Ex ka Nov.l 2009 Lv SIGNATURE,OF NOTARY OPTIONAL Though the data below is not required by law,it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT INDIVIDUAL CORPORATE OFFICER BID BOND TITLE(S) TITLE OR TYPE OF DOCUMENT PARTNER(S) LIMITED or GENERAL ATTORNEY-IN-FACT TRUSTEE(S) NUMBER OF PAGES GUAR DIAN/CONSERVATOR OTHER: 11/17/08 DATE OF DOCUMENT SIGNER IS REPRESENTING: NAME OF PERSON(S(OR ENTITY(IES) SIGNER(S)OTHER THAN NAMED ABOVE