Loading...
05-0405_BELAIRE - WEST LANDSCAPE INC._D3_Agenda Report4/5/2005 D3 AGENDA REPORT TO: Dave Adams, City Manager e111 - FROM: Nasser Abbaszadeh, Engineering & Building Director SUBJECT: Consideration of Approval of Plans and Specifications and Authorization to Receive Bids — Capistrano Regional Library Site Repairs (CIP No. 454) RECOMMENDATION By motion: 1. Approve the plans and specifications for the San Juan Capistrano Regional Library Site Repairs; and, 2. Authorize Staff to receive bids. SITUATION A. Summary and Recommendation Plans and specifications have been prepared for the San Juan Capistrano Regional Library Site Repairs. Staff is requesting approval and authorization to receive bids. A copy of the plans and specifications is available for review in the City Clerk's office. A copy has also been placed in the City Council office. B. Background The San Juan Capistrano Regional Library, designed by Architect Michael Graves, was opened in December 1983. In June 1982, the City entered into a maintenance agreement with the County of Orange for the library complex. The County is responsible for maintenance of the library proper, interior, and exterior, except for painting the exterior, which is 70% reimbursable to the City. Maintenance of the rest of the complex is the City's responsibility. At its February 1, 2005 meeting, City Council adopted a budget and repair strategy for the City's areas of responsibility. 0 Agenda Report Paae 2 Work was divided into four phases as follows: Phase Cost 1. Site Work Repairs $156,000 2. Building Repairs $375,000 3. Roof $145,000 4. Missing Features $ 87,000 0 April 5, 2005 Plans and specifications for the site work repairs are now ready and consist of the following: The library complex relies on a sub drain system, which eventually outlets to a storm drain in Acjachema Street. The sub drains have been inspected by closed circuit television camera, cleaned and root intrusion, bottles and cans removed. There are exterior surface drainage and grading issues grade does not slope away from the building nor towards solution to these problems is to scarify the areas in front the grades to allow for overflow and slope to the piped drains and French drains; repair the irrigation system, rei the building and landscape the old gazebo area. to be addressed where finish surface drains. The proposed and behind the library, adjust drainage system; install area nove some heads adjacent to Preparation of full plans for this kind of work would not be economical. The proposed strategy is to prepare a design/build specification for corrective work. This work is estimated to cost $142,000, and a 10% contingency is recommended for a total of $156,000. This work is being performed first. COMMISSIONS/BOARD REVIEW, RECOMMENDATIONS The City's Environmental Administrator has reviewed this project in accordance with the California Environmental Quality Act (CEQA) and has determined that the project is exempt from environmental review pursuant to Section 15201 of CEQA (Class 1: repairs and maintenance of existing facilities). FINANCIAL CONSIDERATIONS In February 2004, City Council allocated $275,000 from General Fund Reserves. The amount of $250,000 has been carried over to FY 04-05. 0 0 Agenda Report Paae 3 The following parties received notification of this Council agenda item: John C. Loomis, Thirtieth Street Architects* Mary Eidsvold, Friends of the Library* Teri Garza, Librarian* Jose Marquez, Orange County Public Library* * Agenda report included RECOMMENDATION By motion: April 5, 2005 1. Approve the plans and specifications for the San Juan Capistrano Regional Library Site Repairs Project; and, 2. Authorize Staff to receive bids. Respectfully submitted: Nasser Abbaszadeh, P.E. Engineering & Building Director NA/BP:jcr Attachment 1. Location Map Prepared by: Brian Perry, P.E. Project Manager 0 THE CITY OF SAN JUAN CAPISTRANO "y 0 3000 8000 9000 Feet ATTACHMENT I SAN JUAN CAPISTRANO REGIONAL LIBRARY REPAIRS k k Y 4" C, .......... LOCATION 2 '4 —T 0 3000 8000 9000 Feet ATTACHMENT I