1990-1211_BARWICK DATSUN AGENCY_E4_Item Minutes The motion carried by the following vote:
AYES: Councilmen Buchheim, Jones,
Vasquez, and Mayor Friess
NOES: None
ABSENT: Councilman Hausdorfer
The Mayor was directed to execute the Amendment on behalf of
the City, and the City Clerk was authorized to forward the
document to the Orange County Recorder's Office.
�—� RESOLUTION. NOTICE OF COMPLETION. AND FINAL REPORT -
STREET IMPROVEMENTS, 33375 CAMINO CAPISTRANO - ARCHITECTURAL
CONTROL 85-8 (BARWICK IMPORTS/WHITING-TURNER) (600. 30)
In response to Councilman Jones, Mr. Wellington advised that
the concerns regarding compliance with details in the
construction documents were being discussed with the
applicant and are expected to be resolved shortly.
It was moved by Councilman Jones and seconded by Councilman
Buchheim that the following Resolution be adopted declaring
the construction of improvements south of San Juan Dodge (AC
83-8) , including Barwick Imports' portion (AC 85-8) , to be
complete as set forth in the Report dated December 11, 1990,
from the Interim Director of Engineering and Building:
RESOLUTION NO, 90-12-11-2 . COMPLETION OF STREET
IMPROVEMENTS - CAMINO CAPISTRANO FROM 1100 FEET
SOUTH TO 1540 FEET SOUTH OF AVENIDA AEROPUERTO -
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN
JUAN CAPISTRANO, CALIFORNIA, DECLARING WORK TO BE
COMPLETED AS TO PLANS AND SPECIFICATIONS FOR THE
CONSTRUCTION OF STREET IMPROVEMENTS - CAMINO
CAPISTRANO FROM 1100 FEET SOUTH TO 1540 FEET SOUTH
OF AVENIDA AEROPUERTO
The motion carried by the following vote:
AYES: Councilmen Buchheim, Jones, Vasquez
and Mayor Friess
NOES: None
ABSENT: Councilman Hausdorfer
The Resolution accepted the work as complete in the amount
of $109,306 and directed the City Clerk to forward a Notice
of Completion to the County Recorder. The Faithful
-3-
12/11/90
Performance Bond in the amount of $41,400 was exonerated, and
staff was authorized to release the 10% retention in the
amount of $10,931 thirty-five (35) days after recording the
Notice of Completion.
PUBLIC BEARINGS
1. HEARING TO RECEIVE PUBLIC COMMENT ON ENVIRONMENTAL
IMPACT REPORT SAN JOAQUIN HILLS TRANSPORTATION
CORRIDOR (800.501
Proposal•
The purpose of this hearing was to receive comments relative
to the adequacy of the draft EIR prepared on the San Joaquin
Hills Transportation Corridor. Pertinent comments will be
presented at the Agency's public hearing on the draft EIR in
February 1991 by Mayor Friess, who is the City's voting
representative to the San Joaquin Hills Transportation
Corridor Agency. That hearing was tentatively scheduled for
February 14, 1991, in the City Council Chamber at Santa Ana
City Hall at 9:30 a.m.
Written Communication:
Report dated December 11, 1990, from the Director of Plan-
ning, summarizing the background of the corridor and the two
alignment options. The Report included a letter dated
November 19, 1990, from Thomas Tomlinson, Planning Manager,
to Steven Letterly, Environmental Manager of the Transporta-
tion Corridor Agencies, forwarding the City's comments on the
draft EIR.
Exhibits were on display, including large aerial photographs
of the area impacted by the proposed corridor and drawings
showing the proposed Option #1 and Option #2 alignments.
Mayor Friess summarized the background of the corridor and
its proposed alignment. The City's main concerns are whether
the impacts of building the corridor can be satisfactorily
mitigated.
Gene Foster, Transportation Corridor Agency (TCA) Engineer,
reviewed the history of early traffic studies and projec-
tions, the various EIRs submitted, and the differences
between Option #1 and alternative Option #2. The Agency is
proposing that "mitigation monitoring" be utilized to help
residents determine the type and severity of each impact so
that each can be addressed and mitigated separately. It was
noted that sound walls were required as a part of the
Interstate 5 construction.
-4-
12/11/90